Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Smiths facade improvements
FINISH FLOOR 100'-0" T.O. MASONRY 128'-0" 5 6 07-01 06-10T 04-73 09-05 07-01 09-03 B.O. NEW ENTRY FASCIA 109'-4" 09-0805-02 05-01 +/- V.I.F. +/- V.I.F. FINISH FLOOR 100'-0" 5 6 T.O. EXIST. CORNICE 126'-0" 09-07 09-04 06-10T 07-01 04-73 09-03 07-62 B.O. DRIVE THRU FASCIA 110'-0" T.O. DRIVE THRU PARAPET 116'-1" +/- V.I.F. +/- V.I.F. +/- V.I.F. 09-08 09-08 05-01 05-02 FINISH FLOOR 100'-0" T.O. MASONRY 128'-0" A B C D F G H T.O. EXIST. CORNICE 126'-0" 02-03 02-0402-04 02-04 02-0902-0102-02 09-07 02-02 09-0809-0509-0507-01 09-07 09-07 15 A5.3 04-73 07-6206-10T 09-03 09-03 07-62 B.O. DRIVE THRU FASCIA 110'-0" T.O. DRIVE THRU PARAPET 116'-1" B.O. NEW ENTRY FASCIA 109'-4" 09-03 09-04 09-0504-73 +/- V.I.F. +/- V.I.F. +/- V.I.F. +/- V.I.F. +/- V.I.F. 05-01 05-02 02-04 A5.3 5 A5.3 13 7 A5.4 5 A5.4 6 A5.4 7 A3.1 6 A3.1 5 A3.1 FINISH FLOOR 100'-0" T.O. MASONRY 128'-0" 56 05-02 07-01 04-73 07-01 07-01 09-04 09-03 B.O. NEW ENTRY FASCIA 109'-4"+/- V.I.F. +/- V.I.F. 09-05 09-05 09-08 06-10T 05-01 TE L : 8 0 1 . 5 2 1 . 9 1 1 1 F A X : 8 0 1 . 5 2 1 . 9 1 5 8 SA L T L A K E C I T Y , U T A H 8 4 1 0 1 17 1 W E S T P I E R P O N T A V E . SH E E T N O . DA T E : DR A W N B Y : PR O J E C T N O . : TH E S E D O C U M E N T S A R E I N - ST R U M E N T S O F S E R V I C E AN D S H A L L R E M A I N T H E PR O P E R T Y O F T H E AR C H I T E C T . N O U S E O R R E - US E O F T H E S E D O C U M E N T S SH A L L B E P E R M I T T E D UN L E S S A U T H O R I Z E D I N WR I T I N G B Y P R E S C O T T MU I R A R C H I T E C T W I T H AP P R O P R I A T E C O M P E N SA T I O N . C O P Y R I G H T © 2 0 2 3 PR E S C O T T M U I R A R C H I T E C T EX T E R I O R E L E V A T I O N A2 . 1 Au t h o r 05 . 0 5 . 2 3 22 . 1 1 0 SM I T H ' S F O O D A N D D R U G 18 5 3 R D A V E N U E E A S T N O R T H KA L I S P E L L , M T 5 9 9 0 1 ST O R E # 1 7 2 R E M O D E L ME C H A N I C A L E N G I N E E R S PV E I N C . 8 0 1 . 3 5 9 . 3 1 5 8 EL E C T R I C A L E N G I N E E R S TH O M A S A N D K O L K M A N E N G . C O . I N C . 8 0 1 . 4 8 4 . 8 1 6 1 ST R U C T U R A L E N G I N E E R S AR W E N G I N E E R S 8 0 1 . 7 8 2 . 6 0 0 8 1. NORTH, EAST, AND WEST FACADE TO BE REPAINTED, THIS INCLUDES ALL EXISTING PAINTED SURFACES ON OR NEAR THE BUILDING, WHETHER SPECIFICALLY NOTED ON THE ELEVATIONS OR NOT (COPINGS, RAILS, DOORS, FRAMES, CMU, EIFS/ STUCCO, ETC.) MASK OFF AND DO NOT PAINT EXISTING UNPAINTED SURFACES (STONE, CONCRETE, ROOFING TILE, ALUMINUM, ETC, U.N.O.). VERIFY EXTENT W/ PROJECT MANAGER. 2. CONTRACTOR TO PAINT 2'-0" X 2'-0" SAMPLE ON EXIST. SURFACE OF EACH COLOR FOR APPROVAL BY OWNER PRIOR TO EXECUTION. EXTERIOR ELEVATION NOTES: EXTERIOR ELEVATION PAINT LEGEND AND KEYED NOTES: 09-08 SW 6096 JUTE BROWN 09-07 SW 6095 TOASTY 09-05 SW 602 LIGHTWEIGHT BEIGE 09-04 SW 6094 SENSATIONAL SAND 09-03 SW 7101 FUTON 07-01 NEW FIBER CEMENT SIDING, RE: SPECIFICATION 07 4600 07-62 NEW COPING 02-01 EXIST. PICK-UP DOOR 02-02 EXIST. WINDOW 02-03 EXIST. STOREFRONT SYSTEM/SLIDING DOORS 02-04 EXISTING SIGN 02-09 EXIST. UNPAINTED CONCRETE CURB. 04-73 NEW STONE VENEER, RE: DIV 01 SPECIFICATION SECTION 047300 FOR MANUFACTURER AND COLOR 05-01 ANGLE PLATE W/ BOLTS 05-02 EPOXY COUNTERSUNK ANCHOR BOLTS 06-10T NEW WOOD FASCIA 3/32" = 1'-0"3 ENTRY EAST EXTERIOR 3/32" = 1'-0"2 PHARMACY DRIVE - THRU EXTERIOR EAST 3/32" = 1'-0"1 EXTERIOR ELEVATION NORTH 3/32" = 1'-0"4 EXTERIOR ELEVATION WEST 05.10.23