03-02-23 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY
Thursday, March 2, 2023
First Floor Conference Room
201 First Avenue East
ATTENDING:
Kari Barnhart, Planner II Keith Haskins, Deputy Public Works Director
Patrick Jentz, Engineer III Alexander Smith, Engineer I
Ryan Votapka, Engineer Rebecca Franke, MDT
GUESTS: 0
HEAR THE PUBLIC: None
PERFORMANCE BOND REMINDERS: None
OLD BUSINESS:
The Harper/Jiffy Lube- 1280/1290 Highway 2 W; new 40-unit multifamily development/Lube Center – Nothing new.
This will be on the agenda next week.
Parkland Meadows (Lots 5&7 - Bldgs A thru E) – Airport Rd; new multifamily apartment buildings – Nothing new.
This will be on the agenda next week.
NW MT Head Start – 79 7th Ave EN; addition – Del Phipps is currently working with engineer regarding existing
building deficiencies. This will be on the agenda next week.
Creekside Commons – Glenwood Dr; new apartment building – Public Works needs to verify grease/oil separator. This
will be on the agenda next week.
Laird Noller Truck & RV – 3178 Hwy 93 S; new truck & RV service center – Updated site plan received, they are not
planning on doing a connection to Highway 93 now and are making changes to the water and sewer. This will be on the
agenda next week.
Gateway Mall Parking Lot – 1203 Hwy 2 W – parking lot remodel – Public Works is waiting on verification of
backflow. This will be on the agenda next week.
Logan ED Parking Lot – 310 Sunnyview Lane – parking lot remodel – Nothing new. This will be on the agenda next
week.
Office remodel – 417 E Idaho – MDT has the application to remove access off Idaho. This will be on the agenda next
week.
LC Staffing – 620 Treeline Rd – new office building – Public Works sent comments out 3/1/23, pretreatment comments
went out 1/3/23. This will be on the agenda next week.
Six40 Lofts – 640 E Idaho St – hotel renovation to apartments – Public Works sent comments 2/7/23, they will be
requiring a downstream analysis. This will be on the agenda next week.
Kalispell Tank & Well Project – 1110 N Main St/3221 Hwy 93 N/850 Four Mile Dr – Plan Review and Fire Department
have comments out. This will be on the agenda next week.
Parkline Towers – 820 E Idaho – 2 new multi-family apartment buildings – Public Works sent comments out 3/2/23.
This will be on the agenda next week.
Tooth Booth – 455 Cascade Loop - new dental office –Public Works is waiting for the record drawing deposit. This
will be on the agenda next week.
All Creatures – 325 Jefferson Blvd – new veterinary clinic – Public Works has comments from them in their review
queue. This will be on the agenda next week.
North Annex (Old Fairbridge) – 1701 Hwy 93 S – remodel hotel to apartments – Public Works is still waiting on
civils. This will be on the agenda next week.
Meadows Edge Lift Station – NHN Morning Eagle Dr – new lift station – Public Works requested lot lines be added
to their plans. This will be on the agenda next week.
Glacier Bank Downtown – 146/202 N Main St – bank remodel – Public Works doesn’t really have anything on this,
project shows piping in the storm. This will be on the agenda next week.
Take 5 Oil Change – 52 N Main St – oil change service center – Public Works sent comments 3/1/23, all asphalt will
need to be replaced. This will be on the agenda next week.
406 Spa – 1315 US Hwy 2 W – addition – Planning advised that a lot of the sitework was done in Phase 1. This will be
on the agenda next week.
NEW BUSINESS:
OTHER COMMENTS:
The meeting was adjourned at 10:20 AM.