H1. Res. 6118, Ord. 1902, Res. 6119, Timberwolf RidgeKALisPEii, Development Services Department 201 V Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalisi)ell.com/planning REPORT TO: Doug Russell, City Manager FROM: PJ Sorensen, Senior Planner SUBJECT: KA-22-09/KPUD-22-05/KPP-22-08 — Timberwolf Ridge Annexation, Initial Zoning, Planned Unit Development, and Preliminary Plat MEETING DATE: March 6, 2023 BACKGROUND: Timberwolf Ridge, LLC, has submitted a request for annexation, initial zoning of RA-1 (Residential Apartment) with a Residential Planned Unit Development ("PUD") overlay, and major preliminary plat on approximately 20.1 acres of land. The development, called Timberwolf Ridge, would contain up to 400 multi -family dwelling units in six (6) buildings on six (6) lots along with parking, recreational amenities, and open space. The property is located at 605 Stillwater Road at the intersection of Stillwater Road and Timberwolf Parkway and can be described as Parcel A of Certificate of Survey Number 16743, situated, lying and being in the Southwest Quarter of the Southwest Quarter of the Northwest Quarter and the Northwest Quarter of the Northwest Quarter of the Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. The Kalispell Planning Board held a duly noticed public hearing on February 14, 2023, to consider the request. Staff presented staff report KA-22-09/KPUD-22-05/KPP-22-08 providing details of the proposal and evaluation. Staff recommended that the Planning Board adopt the staff report as findings of fact and recommend to the Council that the request be granted subject to 34 listed conditions. No public comments were received at the public hearing other than from the applicant. The public hearing was closed and motions were presented to adopt staff report KA-22-09/KPUD-22-05/KPP- 22-08 as findings of fact and recommend to the Kalispell City Council that the annexation be approved with an initial zoning designation of RA-1 (Residential Apartment), the Planned Unit Development be approved subject to the 34 conditions, and the preliminary plat be approved subject to the 34 conditions. Board discussion concluded that the request was appropriate, and the motions were approved on a unanimous vote. RECOMMENDATIONS: ANNEXATION: It is recommended that the Kalispell City Council approve Resolution 6118, a Resolution to provide for the alteration of boundaries of the City of Kalispell by including therein as an annexation property which can be described as Parcel A of Certificate of Survey Number 16743, situated, lying and being in the Southwest Quarter of the Southwest Quarter of the Northwest Quarter and the Northwest Quarter of the Northwest Quarter of the Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. INITIAL ZONING AND PLANNED UNIT DEVELOPMENT: It is recommended that the Kalispell City Council approve the first reading of Ordinance 1902, an Ordinance to amend Section 27.02.010, official zoning map, City of Kalispell Zoning Ordinance 1677, by zoning certain real property described as Parcel A of Certificate of Survey Number 16743, situated, lying and being in the Southwest Quarter of the Southwest Quarter of the Northwest Quarter and the Northwest Quarter of the Northwest Quarter of the Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana, as RA-1 (Residential Apartment), and applying a Residential Planned Unit Development Zoning Overlay subject to 34 conditions in accordance with the Kalispell Growth Policy Plan- It 2035, and provide an effective date. PRELIMINARY PLAT: It is recommended that the Kalispell City Council approve Resolution 6119, a resolution approving a request from Timberwolf Ridge, LLC, for approval of the preliminary plat for Timberwolf Ridge, a major subdivision preliminary plat consisting of approximately 20.1 acres with 34 conditions of approval, which can be described as Parcel A of Certificate of Survey Number 16743, situated, lying and being in the Southwest Quarter of the Southwest Quarter of the Northwest Quarter and the Northwest Quarter of the Northwest Quarter of the Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. FISCAL EFFECTS: There are no anticipated fiscal impacts at this time. ALTERNATIVES: Deny the request. ATTACHMENTS: Resolution 6118 Ordinance 1902 Resolution 6119 February 14, 2023, Kalispell Planning Board Minutes Staff Report Maps Application Materials Linked Here c: Aimee Brunckhorst, Kalispell City Clerk Return to: Kalispell City Clerk PO Box 1997 Kalispell, MT 59903 RESOLUTION NO. 6118 A RESOLUTION TO PROVIDE FOR THE ALTERATION OF THE BOUNDARIES OF THE CITY OF KALISPELL BY INCLUDING THEREIN AS AN ANNEXATION CERTAIN REAL PROPERTY DESCRIBED AS PARCEL A OF CERTIFICATE OF SURVEY NUMBER 16743, SITUATED, LYING AND BEING IN THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER AND THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 36, TOWNSHIP 29 NORTH, RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA, TO BE KNOWN AS TIMBERWOLF RIDGE ADDITION NO. 462, TO ZONE SAID PROPERTY IN ACCORDANCE WITH THE KALISPELL ZONING ORDINANCE, AND TO DECLARE AN EFFECTIVE DATE. WHEREAS, the City of Kalispell received a petition from Timberwolf Ridge, LLC, representing the owners of the above -referenced property, requesting the City of Kalispell annex the territory into the City; and WHEREAS, the Kalispell Planning Department has made a report on the petitioner's Annexation Request, #KA-22-09, dated February 8, 2023; and WHEREAS, the Kalispell City Planning Board and Zoning Commission recommended the territory be zoned City RA-1, Residential Apartment, with a Planned Unit Development overlay, upon annexation into the City of Kalispell; and WHEREAS, pursuant to §7-2-4211(2), MCA, the City shall include the full width of any public streets or roads, including the rights -of -way, that are adjacent to the property being annexed; and WHEREAS, the City of Kalispell desires to annex said property in accordance with Title 7, Chapter 2, Part 46, Montana Code Annotated. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL AS FOLLOWS: SECTION 1. That all the real property described as Parcel A of Certificate of Survey Number 16743, situated, lying and being in the Southwest Quarter of the Southwest Quarter of the Northwest Quarter and the Northwest Quarter of the Northwest Quarter of the Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana, be annexed to the City of Kalispell and the boundary of the City is altered to so provide. SECTION 2. Upon the effective date of this Resolution, the City Clerk is directed to make and certify under the seal of the City, a copy of the record of these proceedings as are entered on the minutes of the City Council and file said documents with the Flathead County Clerk and Recorder. From and after the date of filing of said documents as prepared by the City Clerk, or on the effective date hereof, whichever shall occur later, said annexed territory is part of the City of Kalispell and its citizens and property shall be subject to all debts, laws and ordinances and regulations in force in the City of Kalispell and shall be entitled to the same privileges and benefits as are other parts of the City. SECTION 3. The territory annexed by this Resolution shall be zoned in accordance with the Kalispell Zoning Ordinance. SECTION 4. This Resolution shall be effective immediately upon passage by the City Council. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, THIS 6TH DAY OF MARCH, 2023. Mark Johnson Mayor ATTEST: Aimee Brunckhorst, CMC City Clerk Return to: Kalispell City Clerk PO Box 1997 Kalispell, MT 59903 ORDINANCE NO. 1902 AN ORDINANCE TO AMEND SECTION 27.02.010, OFFICIAL ZONING MAP, CITY OF KALISPELL ZONING ORDINANCE, (ORDINANCE NO. 1677), BY CREATING A RESIDENTIAL PLANNED UNIT DEVELOPMENT TO BE KNOWN AS TIMBERWOLF RIDGE PUD OVER CERTAIN REAL PROPERTY MORE PARTICULARLY DESCRIBED AS PARCEL A OF CERTIFICATE OF SURVEY NUMBER 16743, SITUATED, LYING AND BEING IN THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER AND THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 36, TOWNSHIP 29 NORTH, RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA, IN ACCORDANCE WITH THE KALISPELL GROWTH POLICY - PLAN IT 2035, AND TO PROVIDE AN EFFECTIVE DATE. WHEREAS, Timberwolf Ridge, LLC, representing the owners of the property described above, petitioned the City of Kalispell that the zoning classification attached to the above described tract of land be zoned RA-1, Residential Apartment, with a Planned Unit Development overlay to be known as Timberwolf Ridge PUD, on approximately 20.1 acres of land; and WHEREAS, the property is currently zoned County AG-80 and is located at 605 Stillwater Road; and WHEREAS, the petition of Timberwolf Ridge, LLC was the subject of a report compiled by the Kalispell Planning Department, Staff Report #KPUD-22-05, in which the Kalispell Planning Department evaluated the petition and recommended that a Planned Unit Development overlay be attached to the above described tract of land pursuant to Kalispell City Code 72.21.030(2)(b); and WHEREAS, the Kalispell City Planning Board held a Public Hearing on the matter on February 14, 2023, and recommended that a Planned Unit Development overlay be attached to approximately 20.1 acres of land, pursuant to Kalispell City Code 72.21.030(2)(b); and WHEREAS, after considering all the evidence submitted on the proposal to attach a Planned Unit Development overlay to the property, the City Council finds such zoning to be consistent with the Kalispell Growth Policy — Plan It 2035 and adopts, based upon the criterion set forth in Section 76-3-608, M.C.A., and State, Etc. v. Board of County Commissioners, Etc. 590 P2d 602, the findings of fact of KPD as set forth in Staff Report No. #KPUD-22-05. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, AS FOLLOWS: SECTION 1. Section 27.02.010, of the Official Zoning Map of the Kalispell Zoning Ordinance, (Ordinance No. 1677) is hereby amended by attaching the property described above with a Planned Unit Development overlay. SECTION 2. The Planned Unit Development overlay proposed by Timberwolf Ridge, LLC upon the real property described above is hereby approved subject to the following conditions: 1. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the future preliminary plat as approved by the city council. 2. The Planned Unit Development for Timberwolf Ridge allows the following deviations from the Zoning Regulations: (1) Section 27.09.040 - Height: The maximum height by right in the RA-1 is 45 feet. The deviation would allow 60 feet. (2) Section 27.20.140 — Structures to Have Access: The zoning regulation do not allow a building permit to be issued for a property that does not have access to a public street or an approved private street. This deviation would allow two lots to be created with access through common parking facilities. 3. The Planned Unit Development for Timberwolf Ridge allows the following deviation from the Subdivision Regulations: (1) Sections 28.3.12 and 28.3.13(C) — Blocks and Subdivision Access: The subdivision regulations require block lengths of at least 250 feet and not more than 600 feet. They also provide for right-of-way extensions to provide interconnectivity to adjacent properties. Subject to providing pedestrian accesses to adjoining parcels, this deviation would allow the block/access provided in the submitted plans. 4. Upon approval of the preliminary PUD by the City Council, the property owner shall proceed with the preparation of the final PUD plan as provided in Section 27.19.020(7) of the Kalispell Zoning Ordinance. 5. The abandonment or expiration of the PUD is governed by Section 27.19.020(10) of the Kalispell Zoning Ordinance. 6. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. 7. Any storm water ponds shall be designed in a way that they become a visual interest to the development. Chain link fencing surrounding ponds as the dominant fixture shall not be allowed without mitigation. The developer shall work closely with the Parks Department and Public Works to develop a design that is both visually appealing and meets the required safety guidelines. It is intended that when the project is developed the ponds will act as features, particularly along the roadways, rather than a private maintenance utility facility. 8. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. 9. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction. 10. New infrastructure required to serve the property shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. 11. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and in compliance with the city's facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved. 12. Any water rights associated with the property shall be transferred to the City of Kalispell. The water rights shall be allocated proportionally for each phase of the development prior to final plat. 13. If any fencing is to be constructed as part of the development, it shall comply with height and location zoning standards and should be a consistent design throughout the development. Any fencing will be required to be reviewed and approved by the city Architectural Review Committee, which shall ensure a consistency of colors and materials to be used to present an aesthetically pleasing design. 14. The developer shall submit the street designs to the Kalispell Public Works Department for review and approval prior to construction. Street designs shall meet the city standards for design and construction. 15. Stillwater Road is designated as a minor arterial and Timberwolf Parkway as a minor collector in the Transportation Plan. Both roads shall be upgraded to that standard along the property's frontage including, but not necessarily limited to curb/gutter, landscape boulevard, sidewalk, and streetlights. The right-of-way currently owned by the developer shall be dedicated to the city. A dedication of additional road right-of-way may be required to accommodate the road classification and improvements. 16. Prior to final plat, all mitigation recommended as part of the approved traffic impact study shall be completed. All improvements shall be reviewed and approved by the Public Works Department. Per the city Standards for Design and Construction, the development shall maintain or improve the existing level of service for the affected roadways rather than simply maintaining an acceptable level of service. Improvements necessary to maintain the existing level of service will be required. 17. Required mitigation related to the Traffic Impact Study would include (a) making the Four Mile Drive/Stillwater Road intersection a four-way stop; and (b) adding a westbound right turn lane in Timberwolf Parkway is also required at the intersection with Stillwater Road. 18. Cross easements for parking and access shall be included on the plat to serve all of the lots. 19. Prior to commencing any development of the property, a full geotechnical report shall be submitted. Any recommendations shall be implemented. 20. The preliminary plat approval shall be valid for a period of three years from the date of approval. 21. Prior to final plat, a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell, any private infrastructure has been constructed per city standards, and a proper bond has been accepted for unfinished work. 22. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 23. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature 24. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 25. A property owners' association shall be formed and established to provide for the maintenance of the common areas, including, but not necessarily limited to, parks and open space. 26. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 27. A letter shall be obtained from the Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision, common area, and adjoining rights -of -way. The approved landscape plan shall be implemented or a cash -in -lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. 28. A park plan shall be created and approved by the Parks and Recreation Director prior to issuance of any building permit. As a multi -family development, 500 square feet of land per unit or the equivalent in improvements shall be provided as recreational amenities. 29. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners' association defaults on their park and open space amenity conditions. The assessments levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 30. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a stormwater maintenance district. This district shall only be activated in the event that the property owner(s) default on the maintenance of the approved stormwater facilities. The assessments levied within the maintenance district shall be determined by the Public Works Department with approvals by the Kalispell City Council. 31. Pursuant to Sec 28.3.25 of the subdivision regulations, the final plat shall include a note stating that "The owners hereby waive the right to protest the creation of an SID for the purpose of financing improvements to area roads which specifically benefit this subdivision." This note shall be expanded to also specifically list the roundabout as one of the projects that the waiver would apply to. 32. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal. 33. All utilities shall be installed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. 34. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. SECTION 3. The balance of Section 27.02.010, Official Zoning Map, City of Kalispell Zoning Ordinance not amended hereby shall remain in full force and effect. SECTION 4. This Ordinance shall take effect from and after 30 days of its passage by the City Council. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, MONTANA, THIS 20TH DAY OF MARCH, 2023. Mark Johnson Mayor ATTEST: Aimee Brunckhorst, CMC City Clerk RESOLUTION NO. 6119 A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF TIMBERWOLF RIDGE, DESCRIBED AS PARCEL A OF CERTIFICATE OF SURVEY NUMBER 16743, SITUATED, LYING AND BEING IN THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER AND THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 36, TOWNSHIP 29 NORTH, RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA. WHEREAS, Timberwolf Ridge, LLC, representing the owners of the certain real property described above, has petitioned for approval of the Subdivision Plat of said property; and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on February 14, 2023 on the proposal and reviewed Subdivision Report #KPP-22-08 issued by the Kalispell Planning Department; and WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval of the Preliminary Plat of Timberwolf Ridge, subject to certain conditions and recommendations; and WHEREAS, the city council of the City of Kalispell at its regular council meeting of March 6, 2023, reviewed the Kalispell Planning Department Report #KPP-22-08, reviewed the recommendations of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-22-08 are hereby adopted as the Findings of Fact of the city council. SECTION 2. That the application of Timberwolf Ridge, LLC for approval of the Preliminary Plat of Timberwolf Ridge, Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the future preliminary plat as approved by the city council. 2. The Planned Unit Development for Timberwolf Ridge allows the following deviations from the Zoning Regulations: (1) Section 27.09.040 - Height: The maximum height by right in the RA-1 is 45 feet. The deviation would allow 60 feet. (2) Section 27.20.140 — Structures to Have Access: The zoning regulation do not allow a building permit to be issued for a property that does not have access to a public street or an approved private street. This deviation would allow two lots to be created with access through common parking facilities. The Planned Unit Development for Timberwolf Ridge allows the following deviation from the Subdivision Regulations: (1) Sections 28.3.12 and 28.3.13(C) — Blocks and Subdivision Access: The subdivision regulations require block lengths of at least 250 feet and not more than 600 feet. They also provide for right-of-way extensions to provide interconnectivity to adjacent properties. Subject to providing pedestrian accesses to adjoining parcels, this deviation would allow the block/access provided in the submitted plans. 4. Upon approval of the preliminary PUD by the City Council, the property owner shall proceed with the preparation of the final PUD plan as provided in Section 27.19.020(7) of the Kalispell Zoning Ordinance. 5. The abandonment or expiration of the PUD is governed by Section 27.19.020(10) of the Kalispell Zoning Ordinance. 6. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. 7. Any storm water ponds shall be designed in a way that they become a visual interest to the development. Chain link fencing surrounding ponds as the dominant fixture shall not be allowed without mitigation. The developer shall work closely with the Parks Department and Public Works to develop a design that is both visually appealing and meets the required safety guidelines. It is intended that when the project is developed the ponds will act as features, particularly along the roadways, rather than a private maintenance utility facility. 8. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. 9. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction. 10. New infrastructure required to serve the property shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. 11. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and in compliance with the city's facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved. 12. Any water rights associated with the property shall be transferred to the City of Kalispell. The water rights shall be allocated proportionally for each phase of the development prior to final plat. 13. If any fencing is to be constructed as part of the development, it shall comply with height and location zoning standards and should be a consistent design throughout the development. Any fencing will be required to be reviewed and approved by the city Architectural Review Committee, which shall ensure a consistency of colors and materials to be used to present an aesthetically pleasing design. 14. The developer shall submit the street designs to the Kalispell Public Works Department for review and approval prior to construction. Street designs shall meet the city standards for design and construction. 15. Stillwater Road is designated as a minor arterial and Timberwolf Parkway as a minor collector in the Transportation Plan. Both roads shall be upgraded to that standard along the property's frontage including, but not necessarily limited to curb/gutter, landscape boulevard, sidewalk, and streetlights. The right-of-way currently owned by the developer shall be dedicated to the city. A dedication of additional road right-of-way may be required to accommodate the road classification and improvements. 16. Prior to final plat, all mitigation recommended as part of the approved traffic impact study shall be completed. All improvements shall be reviewed and approved by the Public Works Department. Per the city Standards for Design and Construction, the development shall maintain or improve the existing level of service for the affected roadways rather than simply maintaining an acceptable level of service. Improvements necessary to maintain the existing level of service will be required. 17. Required mitigation related to the Traffic Impact Study would include (a) making the Four Mile Drive/Stillwater Road intersection a four-way stop; and (b) adding a westbound right turn lane in Timberwolf Parkway is also required at the intersection with Stillwater Road. 18. Cross easements for parking and access shall be included on the plat to serve all of the lots. 19. Prior to commencing any development of the property, a full geotechnical report shall be submitted. Any recommendations shall be implemented. 20. The preliminary plat approval shall be valid for a period of three years from the date of approval. 21. Prior to final plat, a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell, any private infrastructure has been constructed per city standards, and a proper bond has been accepted for unfinished work. 22. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 23. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature 24. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 25. A property owners' association shall be formed and established to provide for the maintenance of the common areas, including, but not necessarily limited to, parks and open space. 26. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 27. A letter shall be obtained from the Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision, common area, and adjoining rights -of -way. The approved landscape plan shall be implemented or a cash -in -lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. 28. A park plan shall be created and approved by the Parks and Recreation Director prior to issuance of any building permit. As a multi -family development, 500 square feet of land per unit or the equivalent in improvements shall be provided as recreational amenities. 29. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners' association defaults on their park and open space amenity conditions. The assessments levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 30. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a stormwater maintenance district. This district shall only be activated in the event that the property owner(s) default on the maintenance of the approved stormwater facilities. The assessments levied within the maintenance district shall be determined by the Public Works Department with approvals by the Kalispell City Council. 31. Pursuant to Sec 28.3.25 of the subdivision regulations, the final plat shall include a note stating that "The owners hereby waive the right to protest the creation of an SID for the purpose of financing improvements to area roads which specifically benefit this subdivision." This note shall be expanded to also specifically list the roundabout as one of the projects that the waiver would apply to. 32. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal. 33. All utilities shall be installed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. 34. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. SECTION 3. Upon proper review and filing of the Final Plat of said subdivision in the office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL THIS 6TH DAY OF MARCH, 2023. ATTEST: Aimee Brunckhorst, CMC City Clerk Mark Johnson Mayor KALISPELL CITY PLANNING BOARD & ZONING COMMISSION MINUTES OF REGULAR MEETING February 14, 2023 CALL TO ORDER AND ROLL The regular meeting of the Kalispell City Planning Board and Zoning CALL Commission was called to order at 6:00 p.m. Board members present were Chad Graham (chair), Pip Burke, Kevin Aurich, Doug Kauffinan, Rory Young, Kurt Vomfell, and Joshua Borgardt. PJ Sorensen and Jarod Nygren represented the Kalispell Planning Department. Keith Haskins representing the Kalispell Public Works Department. APPROVAL OF MINUTES Vomfell moved and Borgardt seconded a motion to approve the minutes of the January 10, 2023, meeting of the Kalispell City Planning Board and Zoning Commission. VOTE BY ACCLAMATION The motion passed unanimously on a vote of acclamation. HEAR THE PUBLIC None. KA-22-09, KPUD-22-05, KPP-22-08 A request from Timberwolf Ridge, LLC, for annexation, initial zoning of TIMBERWOLF RIDGE RA-1 (Residential Apartment) with a Residential Planned Unit Development ("PUD") overlay, and major preliminary plat on approximately 20.1 acres of land. The development, called Timberwolf Ridge, would contain up to 400 multi -family dwelling units in six (6) buildings on six (6) lots along with parking, recreational amenities, and open space. The property is located at 605 Stillwater Road at the intersection of Stillwater Road and Timberwolf Parkway and can be described as Parcel A of Certificate of Survey Number 16743, situated, lying and being in the Southwest Quarter of the Southwest Quarter of the Northwest Quarter and the Northwest Quarter of the Northwest Quarter of the Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. STAFF REPORT PJ Sorensen representing the Kalispell Planning Department reviewed Staff Report 4KA-22-09, KPUD-22-05, & KPP-22-08. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Staff Report 4KA-22-09, KPUD-22-05, & KPP-22-08 as findings of fact and recommend to the Kalispell City Council that the property be annexed and the zoning for the property be RA-1 (Residential Apartment), with a PUD overlay, the preliminary plat be approved, and that the preliminary plat be approved. BOARD DISCUSSION Graham requested to see the presentation from the applicant that shows how they arrived with their design. David Koel from Cushing Terrell gave the presentation. PUBLIC COMMENT None. MOTION — KA-22-09 Vomfell moved and Kauffman seconded that the Kalispell Planning Board adopt staff report 4KA-22-09 as findings of fact and recommend to the Kalispell City Council that the property be annexed and the zoning for the property be RA-1 (Residential Apartment), with a PUD overlay. BOARD DISCUSSION None. Kalispell City Planning Board Minutes of the meeting of February 14, 2023 Page I 1 ROLL CALL Motion passed unanimously on a roll call vote. MOTION — KPUD-22-05 Kauffman moved and Vomfell seconded that the Kalispell City Planning Board and Zoning Commission adopt Staff Report 4KPUD-22-05 as findings of fact and recommend to the Kalispell City Council that the Timberwolf Ridge PUD be approved subject to the conditions listed in the staff report. BOARD DISCUSSION Young felt that the condition for the stormwater ponds being a visual interest is very subjective. Sorensen advised that detailed plans are typically not provided at this stage and that this verbiage has been used for PUDs in previous years. Nygren stated that it is difficult to design them without a full engineered design due to many variables. They do have some good templates that guide developers but there are plans to do some updates. ROLL CALL Motion passed unanimously on a roll call vote. MOTION — KPP-22-08 Vomfell moved and Young seconded that the Kalispell City Planning Board and Zoning Commission adopt staff report 4KPP-22-08 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for Timberwolf Ridge be approved subject to the conditions listed in the staff report. BOARD DISCUSSION None. ROLL CALL Motion passed unanimously on a roll call vote. KPP-23-01— SPRING CREEK A request from GKM Associates, LLC, for preliminary plat approval for PARK PHASES 2 & 3 Spring Creek Park Phases 2 and 3, a major subdivision on approximately 49.6 acres located to the southeast of the intersection of Three Mile Drive and West Springcreek Road. The subdivision would contain 22 lots (18 attached single-family lots, three multi -family lots, and one commercial lot) as well as streets, parks and open space. It is anticipated that the multi- family lots would contain up to 464 dwelling units. The development proposal is consistent with a Planned Unit Development overlay approved by the Kalispell City Council on March 21, 2022 (Ordinance 1873). The property can be described as Tract 1 of Certificate of Survey No. 20588, a tract of land, situated, lying and being in the Northwest Quarter of Section 11, Township 28 North, Range 22 West, P.M.M., Flathead County, Montana, excepting therefrom the subdivision plat of Spring Creek Park Phase IA, on file and of record in Flathead County, Montana, located in the northwest one quarter of Section 11, Township 28 North, Range 22 West, Principal Meridian, Montana, City of Kalispell, County of Flathead, Montana. STAFF REPORT PJ Sorensen representing the Kalispell Planning Department reviewed Staff Report 4KPP-23-01. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff report 4KPP-23-01 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for Spring Creek Park Phases 2 and 3 be approved subject to the conditions in the staff report. Kalispell City Planning Board Minutes of the meeting of February 14, 2023 Page12 BOARD DISCUSSION Young asked staff if Phase 3 could be platted before Phase 1. Sorensen and Nygren advised that it could be but the improvements would be done based on the associated PUD. Graham asked staff if there is something to trigger improvements. Sorensen advised that MDT bases warranted improvements on actual traffic volumes and the uniform traffic manual. MDT requires studies done before and would likely require the developer to put some funds into escrow or bond for it to cover the cost of the required improvements. Once warrants are in, they would install them. Graham confirmed with staff that part of the Phase 2 & 3 improvements would be going in as part of the PUD. Graham also stated that this project was previously approved and is not a new project. Sorensen added that all 5 traffic mitigation conditions were part of the 2022 PUD approval; there is no additional density and there is the same number of lots. PUBLIC COMMENT Mike Brodie, representing the developer, advised the Board that they conducted a warrant study for Phase 1 and a traffic signal is not currently warranted, but after they conducted a sensitivity analysis, a signal would be warranted after Phase 2. They are working with MDT on roundabout. MOTION — KPP-23-01 Vomfell motioned and Burke seconded that the Kalispell City Planning Board and Zoning Commission adopt staff report 4KPP-23-01 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for Spring Creek Park Phases 2 and 3 be approved subject to the conditions listed in the staff report. BOARD DISCUSSION None. ROLL CALL Motion passed unanimously on a roll call vote. KA-23-01— FOUR MILE WELL A request from the City of Kalispell for annexation and initial zoning of SITE R-2 (Residential) of a property located at 850 Four Mile Drive. The property is intended to be used as a well site which would be part of the city water system infrastructure. The property can be described as a tract of land located in the Northwest Quarter of the Northeast Quarter of Section 2, Township 28 North, Range 22 West, P.M.M., Flathead County, Montana, and further described as Tract 1 of Certificate of Survey No. 12112, containing 1.52 acres, more or less, as filed in the office of the Clerk and Recorder of Flathead County, Montana, on February 24t'', 1995, as Document No. 9505515180. STAFF REPORT PJ Sorensen representing the Kalispell Planning Department reviewed Staff Report 4KA-23-01. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Staff Report 4KA-23-01 as findings of fact and recommend to the Kalispell City Council that the property be annexed and the zoning for the property be city R-2 (Residential). BOARD DISCUSSION Young asked if there is additional R-2 zoning outside of the subject property. Sorensen advised that the suburban residential designation generally supports R-1, R-2, R-3, and R-4. The property immediately adjacent to the east is currently city zoned for R-2. Vomfell asked how the city determines if there is adequate water supply. Sorensen advised that the facilities, transportation, water, and stormwater plans are all incorporated in the growth policy. Haskins advised that prior to approving Kalispell City Planning Board Minutes of the meeting of February 14, 2023 Page 13 a new development, Public Works reviews firm capacity and storage tank capacity and the demand that a new development would require and that they are adding new development into the models for facility plans. Young confirmed with staff that the city must follow DEQ and the State of Montana requirements. Nygren advised that they allocate density to certain areas within the urban growth boundaries and that they are planning out to 75 to 100 years of growth. Developers pay the impact fees that are used for the construction of the well sites and water storage. PUBLIC COMMENT None. MOTION — KA-23-01 Kauffman motioned and Vomfell seconded that the Kalispell City Planning Board and Zoning Commission adopt Staff Report 4KA-23-01 as findings of fact and recommend to the Kalispell City Council that the property be annexed and the zoning for the property be city R-2 (Residential). BOARD DISCUSSION None. ROLL CALL Motion passed unanimously on a roll call vote. OLD BUSINESS Nygren advised that the city was awarded a planning grant to make Main Street more pedestrian friendly. The planning process will take 2-3 years and will require working with the County, MDT, and USDOT, . NEW BUSINESS Sorensen updated the board on the upcoming March 14, 2023 Planning Board Meeting. ADJOURNMENT The meeting adjourned at approximately 6:58 pm. Chad Graham President APPROVED as submitted/amended: Kirstin Robinson Recording Secretary Kalispell City Planning Board Minutes of the meeting of February 14, 2023 Page 14 TIMBERWOLF RIDGE ANNEXATION/INTIAL ZONING - STAFF REPORT #KA-22-09 PLANNED UNIT DEVELOPMENT - STAFF REPORT #KPUD-22-05 MAJOR PRELIMINAY PLAT — STAFF REPORT #KPP-22-08 KALISPELL PLANNING DEPARTMENT FEBRUARY 8, 2023 A report to the Kalispell City Planning Board and the Kalispell City Council regarding a request from Timberwolf Ridge, LLC, for annexation, initial zoning, a Planned Unit Development (PUD) overlay, and major preliminary plat approval on approximately 20.1 acres. A public hearing has been scheduled before the Planning Board for February 14, 2023, beginning at 6:00 PM in the Kalispell City Council Chambers. The Planning Board will forward a recommendation to the Kalispell City Council for final action. BACKGROUND INFORMATION This report regards a request from Timberwolf Ridge, LLC, for annexation, initial zoning of RA- T (Residential Apartment) with a Residential Planned Unit Development ("PUD") overlay, and major preliminary plat on approximately 20.1 acres of land. The development, called Timberwolf Ridge, would contain up to 400 multi -family dwelling units in six (6) buildings on six (6) lots along with parking, recreational amenities, and open space. A: Applicant: Timberwolf Ridge, LLC c/o WGM Group 431 First Avenue West Kalispell, MT 59901 B: Location: The property is located at 605 Stillwater Road at the intersection of Stillwater Road and Timberwolf Parkway and can be described as Parcel A of Certificate of Survey Number 16743, situated, lying and being in the Southwest Quarter of the Southwest Quarter of the Northwest Quarter and the Northwest Quarter of the Northwest Quarter of the Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. C: Existing Land Use and Zoning: The subject property is generally undeveloped with a small unused agricultural building in the center of the property. The current zoning for property is county AG-80 (Agricultural), which is "a district to protect and preserve agricultural land for the performance of a wide range of agricultural functions. It is intended to control the scattered intrusion of uses not compatible with an agricultural environment, including, but not limited to, residential development." The property is in Section 36. The majority of that section became the Spring Prairie PUD, which includes a mix of commercial, single-family, and high -density housing. This property was not included at the time because it was in private ownership. It does, however, function in many ways as a part of that PUD. Kalispell Zoning KALISPELL - Timberwolf Ridge rti rr .nuo � ws a�aena�c�� omm.eP�o � naa am�na n�e.vwo R-5)PUD Residentiali Pmressiond Office with Pud R>�uruo Resitlentlal RPart n [ � Suh�ect Intlustrial-BusElus men wirn'rud I Panel R-3. PJC Residential With Pud RAIPua Residential W h Pud i1?t1o.�dmW;; Aparhnent-WAh�Pud a,t� r o,d-t,a, ty 0 160 32C 640 960 aan �d a —ty a& i Feet ❑ty r.� Kdispa 0-3. 6asema pi w. P"--ikl- WISJ= Esri Community Maps, ArcCLS.Com D. Size: The subject property is approximately 20.1 acres. E: Adjacent Zoning: North: R-5/PUD East: R-4/PUD; R-5/PUD South: R-4/PUD; R-3/PUD; RA- 1/PUD West: RA-1/PUD; R-3/PUD F: Adjacent Land Uses: North: Government office; High School East: Undeveloped land; Highway bypass; Single-family residential; Multi -family residential South: Undeveloped single-family residential; Multi -family residential West: Undeveloped single-family and Multi -family residential G. Proposed Zoning: The proposed zoning of the property to be annexed is RA-1 (Residential Apartment) with a PUD overlay. The RA-1 zone is "a residential district intended to provide for urban areas for multi -family use and compatible non-residential uses of medium land use intensity. It should be served with all public utilities and be in 2 close proximity to municipal services, parks, or shopping districts. This zoning district would typically be found in areas designated as urban residential or high density residential on the Kalispell Growth Policy Future Land Use Map." The PUD, outlined further below, will serve as an overlay zoning district. The district shall function in concert with one or more of the underlying zones to provide a comprehensive, integrated development plan which will serve to modify the underlying RA-1 zone. H: General Land Use Character: The subject property is located on the east side of Stillwater Road between Old Reserve Drive and Four Mile Drive. It is historically an agricultural area, but has seen significant development over the last 20 years. The Highway 93 Bypass lies just to the east of the property and it is surrounded by development including Glacier High School, DNRC, and multiple multi -family projects to the east and south. Immediately to the west is Starling, which is a high -density residential subdivision with a mix of single-family, townhouse, and multi -family dwellings. A substantial amount of additional residential and office development is expected to continue in the area surrounding the property. KALISPELL Kalispell Growth Policy - Timberwolf Ridge tM sum P-4 u nay Mixed u- High a.—ty Residential I1 Commercial Subjec# - -- Parcel y �I I 0 160 320 640 960 wo�ne�w [dd.,mel, F[,dyad ca my Gss. Feet crty of Red Pell GIs. Basemap: Audi e�h.rsb - IV15s 2022 Esn Comm unity Maps, AFCGIS.COm L• Relation to the Growth Policy: The Kalispell Growth Policy Future Land Use Map designates the subject property as Urban Mixed Use and High -Density Residential. The proposed RA-1 zone is supported by those designations. The City of Kalispell Growth Policy Plan -It 2035, Chapter 4A on Housing, encourages a variety of residential development that provides housing for all sectors and income levels within the community. City services including sewer, water and streets are in the vicinity and available to the subject property. J: Availability of Public Services and Extension of Services: Water and sewer services are available within the Stillwater Road right-of-way. Access to the property will be from Stillwater Road and Timberwolf Parkway 3 Sewer: City of Kalispell upon annexation Water: City of Kalispell upon annexation Refuse: City of Kalispell upon annexation Electricity: Flathead Electric Cooperative Gas: NorthWestern Energy Telephone: CenturyTel Schools: School District 91 (West Valley)/Glacier High School Fire: West Valley Rural Fire/City of Kalispell upon annexation Police: Flathead County Sheriff/City of Kalispell upon annexation I. ANNEXATION EVALUATION Compliance with the growth polices Two primary means for managing growth in the City of Kalispell are redevelopment/infill within the current city limits or annexation of outlying areas. A goal of the growth policy is to provide a comprehensive, effective growth management plan that provides for all the needs of the community, is adaptable to changing trends and is attuned to the overall public welfare. Chapter 9, Public Infrastructure and Services, includes a goal to "make public water and sewer available to areas that are in close proximity to services," and annexation allows for such extensions to happen. In addition, the city council adopted an annexation policy in 2011, with a corresponding map, as an addendum to the city's growth policy document. The purpose of the annexation policy is to give the Planning Board, the Council, and the development community direction when property owners outside of the city limits are requesting annexation. The property proposed for annexation falls inside the city's direct annexation boundary. 2. Municipal Services: The City of Kalispell has an extension of services plan that details how services would be extended to the annexed property. Both sanitary sewer and water services are available to the property and each main would be extended by the developer through the property. The site is currently protected by the West Valley Rural Fire District and the Flathead County Sheriff s office. The applicant has submitted a Notice of Withdrawal from Rural Fire District. At the time of annexation, the property will be served by the Kalispell Police and Fire Departments. The site lies approximately 0.6 miles from fire station 62 and is readily serviceable by the city fire, police, and ambulance services. Given the level of existing services available to the property, annexation will not overburden the municipal services in place. 3. Distance from current citv limits: The subject property is immediately adjacent to the existing city limits line, and is surrounded on all sides by the city limits. It is currently an island of county jurisdiction surrounded by the city. In those situations, annexation is preferrable for continuity of both development and provision of services, including emergency response. 4. Cost of services: The property is located within the annexation boundary, which was established based in part on the ability to efficiently serve the property. That is particularly true for land that is effectively wholly surrounded. Once annexed to the city, full city services will be made available to the property owner. Any necessary infrastructure associated with this development will be required to be constructed in accordance with the City of Kalispell's Design and Construction Standards and any other development policies, regulations or ordinances that may apply. As undeveloped land, any cost of servicing the property would be minimal, but there would be assessments and tax revenue that would be collected. Once developed, it is anticipated that the revenue generated would exceed the cost of servicing the property. 5 II. Initial Zoning and Zone Change Evaluation Based on Statutory Criteria The statutory basis for reviewing a change in zoning is set forth by 76-2-303, M.C.A. Findings of fact for the zone change request are discussed relative to the itemized criteria described by 76-2- 304, M.C.A. and Section 27.29.020, Kalispell Zoning Ordinance. The property proposed to be annexed is currently zoned county AG-80 (Agriculture). The proposed zoning of the entire property is city RA-1 (Residential Apartment) with a PUD overlay. The RA-1 zone is ""a residential district intended to provide for urban areas for multi -family use and compatible non-residential uses of medium land use intensity. It should be served with all public utilities and be in close proximity to municipal services, parks, or shopping districts. This zoning district would typically be found in areas designated as urban residential or high density residential on the Kalispell Growth Policy Future Land Use Map." 1. Does the requested zone comply with the growth polio The Kalispell Growth Policy Future Land Use Map designates the subject property as Urban Mixed Use and High -Density Residential. The proposed RA-1 zone is supported by those designations. The City of Kalispell Growth Policy Plan -It 2035, Chapter 4A on Housing, encourages a variety of residential development that provides housing for all sectors and income levels within the community. City services including sewer, water and streets are in the vicinity and available to the subject property. 2. Will the requested zone have an effect on motorized and non -motorized transportation systems? The requested zone itself would not have an effect on the transportation systems, although the proposed development under the zoning would have an impact. The property's primary access is off of Stillwater Road, which is classified as a minor arterial in the Kalispell Area Transportation Plan — Move 2040. It is also in close proximity to an interchange providing access to the Highway 93 Bypass. Impacts to the transportation system would be addressed as part of the development based on a Traffic Impact Study ("TIS"). Levels of service would need to be maintained or improved and recommendations of the TIS would be implemented. 3. Will the requested zone secure safety from fire, panic, and other dangers? Adequate access and public facilities are available to the site in the case of an emergency. There are no features related to the property which would compromise the safety of the public. All municipal services including police, fire protection, water and sewer service are currently available to the area. 4. Will the requested zone promote the public health, safety and general welfare? As with safety from fire and other dangers, the general health, safety, and welfare of the public will be promoted through general city regulations designed to regulate allowable 6 uses when the property is developed. In this case, the requested zoning classification of RA-1, particularly in conjunction with the PUD overlay, will promote the health and general welfare by restricting land uses to those that would be compatible with the adjoining properties and those in the vicinity. 5. Will the requested zone provide for adequate light and air? Setback, height, and lot coverage standards for development occurring on this site are established in the Kalispell Zoning Ordinance and PUD to ensure adequate light and air is provided. 6. Will the requested zone facilitate the adequate provision of transportation, water, sewerage, schools, parks, and other public requirements? All public services and facilities are available to the property. Specific details for provision of services are addressed as part of the PUD. 7. Will the requested zone promote compatible urban growth? The requested zone would allow a continuation of the type of growth occurring in the area, which includes several multi -family developments. It is expected that additional development will occur in the vicinity that would continue that trend. 8. Does the requested zone give consideration to the character of the district and its particular suitability for particular uses? The proposed RA-1 zoning district is consistent with the development trends of the area. It also gives due consideration of the suitability of this property for the allowed uses in the zoning district, such as proximity of city services. 9. Will the proposed zone conserve the value of buildings? Value of the buildings in the area will be conserved because the RA-1 zone will promote compatible and like uses on this property as are likely to develop on other properties in the area. Future development in the area will be reviewed for compliance with the dimensional standards and design review criteria to ensure its appropriateness for the area and compatibility with the surrounding neighborhoods as they develop. 10. Will the requested zone encourage the most appropriate use of the land throughout the municipality? Urban scale development should be encouraged in areas where services and facilities are available. In this case, sanitary sewer and water are adjacent to the property. The proposed zoning is consistent with the proposed growth policy future land use designation and is compatible with current zoning in the immediate area. 7 III. EVALUATION OF THE PLANNED UNIT DEVELOPMENT PROPOSAL The intent of a PUD district is to serve as an overlay zoning district. The district shall function in concert with one or more of the underlying zones to provide a comprehensive, integrated development plan which will serve to modify the underlying zone and, where appropriate, subdivision standards with the intent of providing flexibility of architectural design and density as well as providing the option to mix land uses and densities while preserving and enhancing the integrity and environmental values of an area. The Timberwolf Ridge PUD would provide 400 multi -family dwelling units in six buildings, along with garages, parking, recreational areas, and open space over a 20.1-acre site. The PUD will be a Residential PUD and function in concert with the proposed RA-1 underlying zone. plan sketch of a development LEGEND a Head—b- 6 Maadaw-Lawn c Terraced trar�srtiorre (r]'p-1 d-�ridge'elemen[s e canyon sedan F Sieida 9 15il"I ka - lawn at.. h Garages I ruck-m,d., paAdng -typ. F,.nlrylprop oP' k Parking - Eyp. I 6ernr Trans - screening m oetenlinn areas Parkggr 400r Ts _Z5% W 12 s(aRs QW) 2br(2 sr uper} -Pb96 ibr 11 sf�Nprr� $Ialg needed = 700 450 stdo" 2:5 tuck_d radar -725 slalt� sho G. regas not mduded Section 27.19.020(4) of the zoning regulations provides that the planning board shall review the PUD application and plan based on the following criteria: A. The compliance of the proposed PUD with the city growth policy and, in particular, density and use policies of the plan. The Kalispell Growth Policy Future Land Use Map designates the subject property as Urban Mixed Use and High -Density Residential. The proposed RA-1 zone is supported by those designations. The City of Kalispell Growth Policy Plan -It 2035, Chapter 4A on Housing, encourages a variety of residential development that provides housing for all sectors and income levels within the community. For high -density residential neighborhoods, densities from 20-40 units per acre are contemplated. The proposed development has a density of about 19.9 units per acre. The requested PUD can be found to comply with the land use designation, as well as policies found within the Kalispell Growth Policy Plan -It 2035. 8 B. The extent to which the PUD departs from the underlying zoning and the reasons why such departures are or are not deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations. (1) Section 27.09.040 - Height: The maximum height by right in the RA-1 is 45 feet. The applicant is requesting a deviation to allow 60 feet. The buildings are designed to have an actual height of 54 feet plus appurtenances. The additional height is based on the specific building design, which includes parking under , the building and a stepped design for architectural interest. The additional height allows for a reduction in surface parking with the parking under the building, and more open green space on the site. Keeping the buildings towards the center of the site with landscape buffering at the site boundaries helps mitigate the additional height as well. Based on the improved building and site design, the requested deviation is appropriate. SURFACE l PICAL GREEN PA"KPNG BUQD[NG 1 TYPICAL BUILDING SECTICN SCALE IN FEET J -0- 1'-0' SCALE 106- V-O' (2) Section 27.20.140 — Structures to Have Access: The zoning regulation do not allow a building permit to be issued for a property that does not have access to a public street or an approved private street. Two of the lots being created do not have direct access. However, the overall layout of the PUD functions with a common parking area and utility layout. This 9 type of orientation is fairly common in many commercial and multi -family projects throughout the city and is appropriate in this context, provided that cross -easements for parking and access are included on the plat. C. The extent to which the PUD departs from the subdivision regulations (if subdivision is anticipated) and the public works standards for design and construction applicable to the subject property, the reasons why such departures are deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations; (1) Sections 28.3.12 and 28.3.13(C) — Blocks and Subdivision Access: The subdivision regulations require block lengths of at least 250 feet and not more than 600 feet. They also provide for right-of-way extensions to provide interconnectivity to adjacent properties. At this location, there are a number of factors which make road extensions unnecessary, including the location of the bypass and BPA power easement as well as the future extensions of Timberwolf Parkway and Wolfpack Way. It would be appropriate to include pedestrian connections to the east and south in lieu of road connections through the parking lot of this project. Subject to adding the pedestrian connections, this deviation would be appropriate. D. The overall internal integrity of the PUD including the appropriate use of internal design elements, the use of buffers between different land uses, the use of transitions between uses of greater and lesser intensity, the use of enhanced design features to provide connectedness for both vehicle and pedestrian traffic throughout the PUD and the use of innovative and traditional design to foster more livable neighborhoods; The PUD is designed as one comprehensive use. The six lots and buildings are tied together functionally in terms of use, parking, recreational amenities, and maintenance. Design elements such as the under building parking and common recreational space helps bring the project together in a clear, intentional manner. Externally, the project is near office space and other recently approved city residential projects of similar intensity. There isn't a need for buffering per se, but the projects interface with the surrounding area in terms of road and pedestrian improvements creates a consistent environment for both this project and adjoining properties. E. The nature and extent of the common open space in the planned development project, the reliability of the proposals for maintenance and conservation of the common open space and the adequacy or inadequacy of the amount and function of the open space in terms of the land use, densities and dwelling types proposed in the plan; The PUD includes several park/open space areas totaling 5.4 acres (over 25% of the site), highlighted by the 1.94-acre central park between the buildings. The parks and common areas will be landscaped, irrigated and maintained, and will include amenities that will be determined during the site review/building permit process. As a multi -family development, 500 square feet of land per unit of the equivalent in improvements need to be provided as recreational amenities. 10 The valuation can include common amenities within the buildings as well. Specific landscape plans, depending upon the specific area, will be reviewed as part of the subdivision process or as part of the building permit/site review process, which would include review by the Architectural Design Review Committee. F. The manner in which said plan does or does not make adequate provision for public services, provide adequate control over vehicular traffic and further the amenities of light or air, recreation and visual enjoyment; Public service facilities and infrastructure are adequate for the development of this site. Any new improvements to the property such as roads, storm water facilities and water/sewer mains would be installed in accordance with city policies and standards at the developers' expense. Water: Water to the subdivision will be provided by the City of Kalispell. There is an existing water main within the Stillwater Road right-of-wav that will be extended into and throughout the development. The main will need to be extended per the Standards for Design and Construction. There is adequate capacity within the city's water system to accommodate this project. Under the subdivision regulations, any water rights will need to be transferred to the city prior to final plat and will be addressed during the platting process. Sewer: Sewer to the subdivision will be provided by the City of Kalispell. There is an existing sewer main within the Stillwater Road right-of-way that will be extended into and throughout the development. Per the sanitary sewer facility plan, due to topography at this location, a main will not need to be extended in Timberwolf Parkway. The main will need to be extended to the south property line per the Standards for Design and Construction. There is adequate capacity within the city's sewer system to accommodate this project. 11 Solid Waste: Solid waste collection can be provided by the City of Kalispell. Specific designs of the garbage enclosures and collection areas will be reviewed in conjunction with the building permit and site review process. Access and Roads: The property fronts on Stillwater Road and Timberwolf Parkway, with two accesses onto Stillwater and one onto Timberwolf. Stillwater Road is designated as a minor arterial and Timberwolf Parkway as a minor collector in the Transportation Plan. Both roads will need to be upgraded to that standard along the property's frontage including, but not necessarily limited to curb/gutter, landscape boulevard, sidewalk, and streetlights. Currently, the eastern portion of Stillwater Road (a 60 foot declared county road) and the southern portion of Timberwolf Parkway are owned by the developer. The right-of-way will need to be dedicated to the city. Also, a dedication of additional road right-of-way may be required to accommodate the road classification and improvements. Control over vehicular traffic: A Traffic Impact Study ("TIS") was prepared by WGM in December 2022 and was submitted with the application. The TIS noted potential issues with the Four Mile Drive/Stillwater Road intersection. As the city standard is to maintain or improve the level of service at affected intersections, the TIS has been under review by the City and KLJ, who provides third -party review for the City, for additional clarity. The result of the analysis was a need to make the Four Mile Drive/Stillwater Road intersection a four-way stop. It appears that, with recent improvements to the intersection, the addition of two stop signs will likely address the issue. A westbound right turn lane on Timberwolf Parkway is also required at the intersection with Stillwater Road. The third -party analysis also noted that: 3-lane sections on Four Mile Drive and Stillwater Road were referenced in the Kalispell Long-range transportation plan. While the corridor improvements will be necessary to mitigate future growth, as developments are added an opportunity to add these left -turn lanes should be considered by the City. While 430 Stillwater (ed. a/k/a Stillwater Crossing) has these left -turn lanes added, Timberwolf Ridge and additional phases at Starling should consider adding the (north -bound and south -bound left) turn lanes at Stillwater Road and Timberwolf Parkway. With this being justified by both developments, the cost share between the addition of the left turn lanes should be split 50/50 between both developments as each TIS is approved. Based on the TIS review, Stillwater Road should eventually have a south -bound left turn lane at the intersection with Timberwolf Parkway, but it is not necessary at this point in time to address a drop in the level of service and should not be a condition of approval. Also, it should be noted that prior approvals for developments in the immediate vicinity (i.e. DNRC and Starling) have been based in part on a requirement for an eventual roundabout at that intersection. Since a roundabout is not needed at this time, the approvals have been centered on a participation in the future construction of a roundabout, likely as part of a Special Improvement District once Timberwolf Parkway is extended to the east in conjunction with current dedication 12 of the necessary right-of-way for the roundabout. A condition of approval should include similar provisions. However, it may be an opportunity for all of the parties to come together to construct the roundabout now rather than install improvements which will need to be removed later. Installation of the roundabout, subject to review and approval by the Kalispell Public Works Department, would be an option that would likely satisfy any mitigation requirements. Any necessary improvements to accomplish any mitigation will be required. Storm Water: Storm water runoff from the site shall be managed and constructed per the City of Kalispell Standards for Design and Construction and storm water management program. Any open storm water facilities should have an elevated aesthetic design to be reviewed and approved by the Parks and Public Works Departments. Final design will be approved by the Kalispell Public Works Department prior to development. Additionally, prior to receiving any building permits, the developer will need to submit a construction storm water management plan to the Public Works Department. This plan will need to show how storm water will be treated and where it will be directed during construction activities. Schools: The property is within the boundaries of School District #1 (West Valley/Glacier High School). On average, it would be anticipated that there would be about 200 students (K-12) from the neighborhood at full build -out. Section 76-3-608(l) of the Montana Code Annotated states that the governing body may not deny approval of a proposed subdivision based solely on the subdivision's impacts on educational services. Police: Police services will be provided by the Kalispell Police Department. The department can adequately provide service to this property. Fire Protection: Fire protection services will be provided by the Kalispell Fire Department. The department can adequately provide service to this development. As part of the building permit and site review process, fire protection, including fire flow and hydrant location, will be reviewed. Fire station 62 is located approximately 0.6 miles away providing good response time. Parks: The PUD includes several park/open space areas totaling 5.4 acres (over 25% of the site), highlighted by the 1.94-acre central park between the buildings. The parks and common areas will be landscaped, irrigated and maintained, and will include amenities that will be determined during the site review/building permit process. As a multi -family development, 500 square feet of land per unit of the equivalent in improvements need to be provided as recreational amenities. The valuation can include common amenities within the buildings as well. Specific landscape plans, depending upon the specific area, will be reviewed as part of the subdivision process or as part of the building permit/site review process, which would include review by the Architectural Design Review Committee. G. The relationship, beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established; The subject property is located on the east side of Stillwater Road between Old Reserve Drive and Four Mile Drive. It is historically an agricultural area, but has seen significant development over the last 20 years. The Highway 93 Bypass lies just to the east of the property, and it is 13 surrounded by development including Glacier High School, DNRC, and multiple multi -family projects to the east and south. Immediately to the west is Starling, which is a high -density residential subdivision with a mix of single-family, townhouse, and multi -family dwellings. A substantial amount of additional residential and office development is expected to continue in the area surrounding the property. This development is consistent with the existing and anticipated growth in the neighborhood. H. In the case of a plan which proposes development over a period of years, the sufficiency of the terms and conditions proposed to protect and maintain the integrity of the plan which finding shall be made only after consultation with the city attorney; The plan includes two phases of development. As with any phased project, each phase will need to stand on its own in terms of access, infrastructure and services. Section 27.19.020(10) of the zoning ordinance outlines procedures for abandonment/expiration to be followed when the PUD fails to comply with a completion schedule. L Conformity with all applicable provisions of this chapter. Section 27.19.030(2) of the zoning ordinance allows for Residential PUDs in RA-1 zones with a minimum of two developable acres. The development contains 20.1 acres, well over the minimum threshold. The zoning ordinance allows up to 20 units per acre in an RA-1 zone with the PUD overlay. No specific deviations from the Kalispell Zoning Ordinance or Subdivision Regulations can be identified based upon the information submitted with the application other than those addressed in this report. 14 IV. REVIEW AND FINDINGS OF FACT FOR THE MAJOR PRELIMINARY PLAT MMRERWOIF RI, EINEORMRTON me�iw-°acw w. a\ r=- s , } A. Effects on Health and Safety: rAT WGM GRO UP � PUS 2.0 J Fire: The property would be considered to be at low risk of fire because any building constructed within the subdivision would be built in accordance with the International Fire Code and have access which meets city standards. The area to be built upon does not have steep slopes or woody fuels. Hydrants will be required to be placed in compliance with the requirements of the fire code and approved by the Fire Chief. Access: The property fronts on Stillwater Road and Timberwolf Parkway, with two accesses onto Stillwater and one onto Timberwolf. Stillwater Road is designated as a minor arterial and Timberwolf Parkway as a minor collector in the Transportation Plan. Access and roads are discussed in more detail in part D below relative to effects on local services. With the two lots not having direct access to the public street, cross easements for parking and access should be included on the plat to serve all of the lots. Geotech: A Geotech report was not submitted as part of the application, but will need to be prepared prior to any site development or issuance of a building permit. Preliminary indications, as well as surrounding development, do not raise any specific concerns related to the development of the site. While there are some slight to moderate slopes on the property, there are no major topographical conditions impacting the site, and the environmental assessment indicates that groundwater does not appear to be an issue based on static well water levels of 120 feet below the surface. 15 BPA Easement: The southeast corner of the property is encumbered with an easement for the BPA powerlines that run from the southwest to the northeast. The site design takes the easement into account by incorporating the area as open space. B. Effects on Wildlife and Wildlife Habitat: There is no surface water or associated wetlands which would provide any aquatic or riparian habitat. There also does not appear to be any significant wildlife impacts. The Resources and Analysis Section of the Kalispell Growth Policy includes information from the Montana Department of Fish, Wildlife and Parks relating to deer, elk and moose habitat. As with the majority of the Kalispell area outside of the core downtown, the maps show a whitetail deer density of 5 to 30 per square mile, but no significant elk or moose habitat. C. Effects on the Natural Environment: Surface and groundwater: The subdivision will be served by public water and sewer thereby minimizing any potential impacts to groundwater. Per the Environmental Assessment, the static groundwater based on well levels is about 120 feet below the surface. There is no floodplain associated with the property (DFIRM 30029C1805J, effective date November 4, 2015) Drainage: Roadways will be paved and curb/gutter will channel runoff to designed low points, where storm water will be collected and routed to storm water ponds. Any open storm water facilities should have an elevated aesthetic design to be reviewed and approved by the Parks and Public Works Departments. Storm water runoff from the site shall be managed and constructed per the City of Kalispell Standards for Design and Construction and storm water management program. Final design will be approved by the Kalispell Public Works Department prior to development. A condition of approval requires that a property owners' association be created for the maintenance of the common area which would include the common area drainage easements. As part of the storm easement areas, the association will be required to mow the area to reduce fire hazard and reduce spread of noxious weeds. In order to help ensure the continued maintenance of the storm water facilities, a note shall be placed on the final plat indicating a waiver of the right to protest creation of a stormwater maintenance district. This district shall only be activated in the event that the property owner(s) default on the maintenance of the approved stormwater facilities. The assessments levied within the maintenance district shall be determined by the Public Works Department with approvals by the Kalispell City Council. Lastly, the developer is required to submit to the Kalispell Public Works Department an erosion/sediment control plan for review and approval. These plans provide for managing storm water on the site and include stabilizing the construction site through an approved revegetation plan after site grading is completed. 16 D. Effects on Local Services: Water: Water to the subdivision will be provided by the City of Kalispell. There is an existing water main within the Stillwater Road right-of-way that will be extended into and throughout the development. The main will need to be extended per the Standards for Design and Construction subject to review and approval by the Kalispell Public Works Department. There is adequate capacity within the city's water system to accommodate this project. Proportionate water rights shall be dedicated to the City of Kalispell per Section 28.3.08 of the subdivision regulations. Sewer: Sewer to the subdivision will be provided by the City of Kalispell. There is an existing sewer main within the Stillwater Road right-of-way that will be extended into and throughout the development. Per the sanitary sewer facility plan, due to topography at this location, a main will not need to be extended in Timberwolf Parkway. The main will need to be extended to the south property line per the Standards for Design and Construction. There is adequate capacity within the city's sewer system to accommodate this project. Access and Roads: The property fronts on Stillwater Road and Timberwolf Parkway, with two accesses onto Stillwater and one onto Timberwolf. Stillwater Road is designated as a minor arterial and Timberwolf Parkway as a minor collector in the Transportation Plan. Both roads will need to be upgraded to that standard along the property's frontage including, but not necessarily limited to curb/gutter, landscape boulevard, sidewalk, and streetlights. Currently, the eastern portion of Stillwater Road (a 60 foot declared county road) and the southern portion of Timberwolf Parkway are owned by the developer. The right-of-way will need to be dedicated to the city. Also, a dedication of additional road right-of-way may be required to accommodate the road classification and improvements. A Traffic Impact Study ("TIS") was prepared by WGM in December 2022 and was submitted with the application. The TIS noted potential issues with the Four Mile Drive/Stillwater Road intersection. As the city standard is to maintain or improve the level of service at affected intersections, the TIS has been under review by the City and KLJ, who provides third -party review for the City, for additional clarity. The result of the analysis was a need to make the Four Mile Drive/Stillwater Road intersection a four- way stop. It appears that, with recent improvements to the intersection, the addition of two stop signs will likely address the issue. A westbound right turn lane in Timberwolf Parkway is also required at the intersection with Stillwater Road. The third -party analysis also noted that: 3-lane sections on Four Mile Drive and Stillwater Road were referenced in the Kalispell Long-range transportation plan. While the corridor improvements will be necessary to mitigate future growth, as developments are added an opportunity to add these left -turn lanes should be considered by the City. While 430 Stillwater (ed. a/k/a Stillwater 17 Crossing) has these left -turn lanes added, Timberwolf Ridge and additional phases at Starling should consider adding the (north -bound and south -bound left) turn lanes at Stillwater Road and Timberwolf Parkway. With this being justified by both developments, the cost share between the addition of the left turn lanes should be split 50/50 between both developments as each TIS is approved. Based on the TIS review, Stillwater Road should eventually have a south -bound left turn lane at the intersection with Timberwolf Parkway, but it is not necessary at this point in time to address a drop in the level of service and should not be a condition of approval. Also, it should be noted that prior approvals for developments in the immediate vicinity (i.e. DNRC and Starling) have been based in part on a requirement for an eventual roundabout at that intersection. Since a roundabout is not needed at this time, the approvals have been centered on a participation in the future construction of a roundabout, likely as part of a Special Improvement District once Timberwolf Parkway is extended to the east in conjunction with current dedication of the necessary right-of-way for the roundabout. A condition of approval should include similar provisions. However, it may be an opportunity for all of the parties to come together to construct the roundabout now rather than install improvements which will need to be removed later. Installation of the roundabout, subject to review and approval by the Kalispell Public Works Department, would be an option that would likely satisfy any mitigation requirements. Any necessary improvements to accomplish any mitigation will be required. Also, the subdivision regulations (Sec 28.3.25) require that the final plat include a note stating that "The owners hereby waive the right to protest the creation of an SID for the purpose of financing improvements to area roads which specifically benefit this subdivision." This note should be expanded to also specifically list the roundabout as one of the projects that the waiver would apply to. Schools: The property is within the boundaries of School District #1 (West Valley) and Glacier High School. On average, it would be anticipated that there would be about 200 students (K-12) from the development at full build -out. Section 76-3-608(l) of the Montana Code Annotated states that the governing body may not deny approval of a proposed subdivision based solely on the subdivision's impacts on educational services. Police: Police services will be provided by the Kalispell Police Department. The department can adequately provide service to this subdivision. Fire Protection: Fire protection services will be provided by the Kalispell Fire Department. The department can adequately provide service to this development. Additionally, the road network to the subdivision provides adequate access for fire protection. As part of the building permit and site review process for the multi -family use, fire protection, including fire flow and hydrant location, will be reviewed. Fire station 62 is located approximately 0.6 miles away providing good response time. 18 Parks and Recreation: The PUD includes several park/open space areas totaling 5.4 acres (over 25% of the site), highlighted by the 1.94-acre central park between the buildings. The parks and common areas will be landscaped, irrigated and maintained, and will include amenities that will be determined during the site review/building permit process. As a multi -family development, 500 square feet of land per unit or the equivalent in improvements need to be provided as recreational amenities. The valuation can include common amenities within the buildings as well. Specific landscape plans, depending upon the specific area, will be reviewed as part of the subdivision process or as part of the building permit/site review process, which would include review by the Architectural Design Review Committee. The proposal includes covenants and a management plan providing for maintenance of the shared facilities. It is imperative that these areas be well maintained for the visual aspects of the project and the functionality of the parks, open space, and storm drainage areas. Therefore, staff recommends that a note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners' association defaults on their park and open space amenity conditions. The taxes levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. Solid Waste: Solid waste collection can be provided throughout the subdivision by the City of Kalispell. Specific designs of the garbage enclosures and collection areas for the multi -family use will be reviewed in conjunction with the building permit and site review process for the buildings. There is sufficient capacity within the landfill to accommodate this additional solid waste generated from this subdivision. Medical Services: Ambulance service is available from the fire department and ALERT helicopter service. Kalispell Regional Medical Center is approximately 1.6 miles from the site. E. Effects on Agriculture and agricultural water user facilities: The site has been traditionally used for agricultural uses, although it has not been in production for some time and is currently vacant. According to the Kalispell Growth Policy Resources and Analysis Section, "Important Farmlands" map, the property includes some areas designated as farmlands of statewide importance and some areas as prime farmland if irrigated. It does not appear that development of the site would remove farmland from production or have any impact on any nearby agricultural operations given that the property is surrounded by development. Current policies in the Kalispell Growth Policy Plan -It 2035, Chapter 5, Land Use: Natural Environment, state the following: Policy Encourage urban growth only on agriculture lands entirely within the city's annexation policy boundary. 19 The subject property is entirely within the annexation policy boundary and was previously annexed as part of the prior proposed development. By allowing higher density development within the city's growth policy area, it can reasonably be expected that more farmland could be conserved because the availability of residential and commercial lots within the Kalispell Growth Policy boundary, limiting sprawl/leapfrog development. F. Relation to the Kalispell Growth Policy: The Kalispell Growth Policy Future Land Use Map designates the subject property as Urban Mixed Use and High -Density Residential. The proposed RA-1 zone is supported by those designations. The City of Kalispell Growth Policy Plan -It 2035, Chapter 4A on Housing, encourages a variety of residential development that provides housing for all sectors and income levels within the community. City services including sewer, water and streets are in the vicinity and available to the subject property. The proposed development is consistent with the Growth Policy and supports its goals and objectives. G. Compliance with Zoning: The request is in compliance with the RA-1 zoning regulations with the PUD overlay applicable to the development. H. Compliance with the Kalispell Subdivision Regulations: This request complies with provisions of the Kalispell Subdivision Regulations and PUD overlay applicable to the development. RECOMMENDATIONS 1. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Staff Report #KA-22-09 as findings of fact and recommend to the Kalispell City Council that the property be annexed and the zoning for the property be RA-1 (Residential Apartment), with a PUD overlay. 2. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Staff Report #KPUD-22-05 as findings of fact and recommend to the Kalispell City Council that the Timberwolf Ridge PUD be approved subject to the conditions listed below: 3. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff report #KPP-22-08 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for Timberwolf Ridge be approved subject to the conditions listed below: 20 CONDITIONS OF APPROVAL 1. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the future preliminary plat as approved by the city council. 2. The Planned Unit Development for Timberwolf Ridge allows the following deviations from the Zoning Regulations: (1) Section 27.09.040 - Height: The maximum height by right in the RA-1 is 45 feet. The deviation would allow 60 feet. (2) Section 27.20.140 — Structures to Have Access: The zoning regulation do not allow a building permit to be issued for a property that does not have access to a public street or an approved private street. This deviation would allow two lots to be created with access through common parking facilities. 3. The Planned Unit Development for Timberwolf Ridge allows the following deviation from the Subdivision Regulations: (1) Sections 28.3.12 and 28.3.13(C) — Blocks and Subdivision Access: The subdivision regulations require block lengths of at least 250 feet and not more than 600 feet. They also provide for right-of-way extensions to provide interconnectivity to adjacent properties. Subject to providing pedestrian accesses to adjoining parcels, this deviation would allow the block/access provided in the submitted plans. 4. Upon approval of the preliminary PUD by the City Council, the property owner shall proceed with the preparation of the final PUD plan as provided in Section 27.19.020(7) of the Kalispell Zoning Ordinance. 5. The abandonment or expiration of the PUD is governed by Section 27.19.020(10) of the Kalispell Zoning Ordinance. 6. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. 7. Any storm water ponds shall be designed in a way that they become a visual interest to the development. Chain link fencing surrounding ponds as the dominant fixture shall not be allowed without mitigation. The developer shall work closely with the Parks Department and Public Works to develop a design that is both visually appealing and meets the required safety guidelines. It is intended that when the project is developed the ponds will act as features, particularly along the roadways, rather than a private maintenance utility facility. 21 8. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. 9. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction. 10. New infrastructure required to serve the property shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. 11. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and in compliance with the city's facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved. 12. Any water rights associated with the property shall be transferred to the City of Kalispell. The water rights shall be allocated proportionally for each phase of the development prior to final plat. 13. If any fencing is to be constructed as part of the development, it shall comply with height and location zoning standards and should be a consistent design throughout the development. Any fencing will be required to be reviewed and approved by the city Architectural Review Committee, which shall ensure a consistency of colors and materials to be used to present an aesthetically pleasing design. 14. The developer shall submit the street designs to the Kalispell Public Works Department for review and approval prior to construction. Street designs shall meet the city standards for design and construction. 15. Stillwater Road is designated as a minor arterial and Timberwolf Parkway as a minor collector in the Transportation Plan. Both roads shall be upgraded to that standard along the property's frontage including, but not necessarily limited to curb/gutter, landscape boulevard, sidewalk, and streetlights. The right-of-way currently owned by the developer shall be dedicated to the city. A dedication of additional road right-of-way may be required to accommodate the road classification and improvements. 16. Prior to final plat, all mitigation recommended as part of the approved traffic impact study shall be completed. All improvements shall be reviewed and approved by the 22 Public Works Department. Per the city Standards for Design and Construction, the development shall maintain or improve the existing level of service for the affected roadways rather than simply maintaining an acceptable level of service. Improvements necessary to maintain the existing level of service will be required. 17. Required mitigation related to the Traffic Impact Study would include (a) making the Four Mile Drive/Stillwater Road intersection a four-way stop; and (b) adding a westbound right turn lane in Timberwolf Parkway is also required at the intersection with Stillwater Road. 18. Cross easements for parking and access shall be included on the plat to serve all of the lots. 19. Prior to commencing any development of the property, a full geotechnical report shall be submitted. Any recommendations shall be implemented. 20. The preliminary plat approval shall be valid for a period of three years from the date of approval. 21. Prior to final plat, a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell, any private infrastructure has been constructed per city standards, and a proper bond has been accepted for unfinished work. 22. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 23. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature 24. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 23 25. A property owners' association shall be formed and established to provide for the maintenance of the common areas, including, but not necessarily limited to, parks and open space. 26. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 27. A letter shall be obtained from the Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision, common area, and adjoining rights -of -way. The approved landscape plan shall be implemented or a cash -in -lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. 28. A park plan shall be created and approved by the Parks and Recreation Director prior to issuance of any building permit. As a multi -family development, 500 square feet of land per unit or the equivalent in improvements shall be provided as recreational amenities. 29. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners' association defaults on their park and open space amenity conditions. The assessments levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 30. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a stormwater maintenance district. This district shall only be activated in the event that the property owner(s) default on the maintenance of the approved stormwater facilities. The assessments levied within the maintenance district shall be determined by the Public Works Department with approvals by the Kalispell City Council. 31. Pursuant to Sec 28.3.25 of the subdivision regulations, the final plat shall include a note stating that "The owners hereby waive the right to protest the creation of an SID for the purpose of financing improvements to area roads which specifically benefit this subdivision." This note shall be expanded to also specifically list the roundabout as one of the projects that the waiver would apply to. 32. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal. 33. All utilities shall be installed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. 34. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 24 < KLI Memorandum Date: 1/20/2023 To: Keith Haskins, PE — Kalispell City Engineer From: Joe DeVore, PE, PTOE, RSP21; Emma Myers-Verhage RE: Stillwater Road TIS Review and Recommendations Methodology and Volumes Review: ➢ Three Traffic Impact Studies for three new developments in Kalispell, MT were studied to analyze each of their respective traffic impacts on the surrounding network. The three developments will be located along Stillwater Road, between W Reserve Drive and Four Mile Drive. Stillwater Road is classified as a local road and is located west of Interstate 93 and downtown Kalispell. The developments are described below: 0 430 Stillwater is a mixed -use development comprised of 97 single-family homes, 192 apartment units, and 20,386 square feet of retail space. This development is located northwest of the intersection of Stillwater Road and Four Mile Drive and is expected to be completed in 2023. The proposed development includes two accesses off Four Mile Drive, and one access off Stillwater Road. o The Starling Subdivision includes 75 single-family homes and 35 apartment units and is expected to be complete in 2027. This development is located west of Stillwater Road, across from the Montana Department of Natural Resources and Conservation. One access to this development includes an extension of the existing Timberwolf Parkway, to become a four -legged intersection. The second access will be a new four -legged intersection, located 600 feet south of Timberwolf Parkway. The east leg of this new intersection will serve as access to Timberwolf Ridge, another new development in the area. o Timberwolf Ridge includes 400 apartment units, expected to be complete in 2027. This proposed development is located east of Stillwater Road and south of Timberwolf Parkway. This development will have three accesses. One access is a four -legged intersection on Stillwater Road, with the west leg serving the Starling Subdivision (described above). A second access on Stillwater Road is located 600 feet south of the first access. This will be a three-legged intersection with Stillwater Road. A third access to the development site will be located off Timberwolf Parkway, approximately 700 feet east of the intersection of Stillwater Road and Timberwolf Parkway. ➢ Traffic count data was collected and presented as a part of the each TIS for new developments within the study area. These volumes were collected between 2020 and 2022. For the purposes of this memo, the maximum volume of each turning movement was used. The turning movements used for this analysis is detailed in Appendix A. ➢ Site -Generated Vehicle Trips were presented in each TIS and were quantified using ITE Trip Generation (10th Edition) and ITE Trip Generation (11t" Edition). o A total of 4,410 incoming trips and 4,408 outgoing trips are expected to be generated daily by all three proposed developments. o The additional trips used for this analysis is detailed in Appendix B. 1 < KLI ➢ Traffic Distribution o Trip distribution was presented as a part of each TIS for the new development. The additional trips added to each turning movement were taken directly from each TIS. Figure 1 shows the range of percentage of additional traffic volumes the intersections of Stillwater Road and Reserve Drive, and Stillwater Road and Four Mile Drive. The percentages were taken directly from each TIS. Figure 1 — Trip Distribution Percentage Ranges ➢ The following volume scenarios were used to analyze traffic impacts on the network: o Future No -Build (2027): Future volumes were determined by applying a 1.5% annual growth rate to the volumes determined by each TIS. This scenario includes no additional trips generated by the proposed developments. o Phase A Build (2027): This scenario includes 2027 projected volumes, as well as additional trips generated by the 430 Stillwater development, as this development is expected to complete before the other two. o Phase B Build (2027): This scenario includes 2027 projected volumes, and additional trips generated by both the 430 Stillwater development, as well as expected trips generated by the Starling Subdivision. o Phase C Build (2027): This scenario includes 2027 projected volumes, and additional trips generated by all three developments: 430 Stillwater, Starling Subdivision, and Timberwolf Ridge. 2 < KLI ➢ All scenarios listed above were modeled and a traffic operations analysis was performed using VISTRO. The following intersections are expected to experience decreased level of service due to increased traffic: Stillwater Road and Four Mile Drive (Table 1), Stillwater Road and Timberwolf Parkway (Table 2), and Stillwater Road and a new access to the 430 Stillwater development (Table 3). The tables below show the LOS results and the additional delay (in seconds per vehicle) caused by each development. The intersections not displayed in tables are not expected to experience decreased level of service. A full summary of the LOS results of all intersections can be found in Appendix C. Table 1— Stillwater Road and Four Mile Drive LOS Results Note: LOS and delay in brackets [J represent the worst approach, as the intersection is side -street stop -controlled. Table 2 — Stillwater Road and Timberwolf Parkwav LOS Results Future No -Build None A [B] 1 [11] A [A] 3 [9] Phase A Build 430 Stillwater A [B] +0 [+0] A [A] +0 [+0] Phase B Build Starling Subdivision A [B] +2 [+3] A [B] +2 [+4] Phase C Build Timberwolf Ridge A [C] +0.4 [+1] A [C] +0.2 [+2] Note: LOS and delay in brackets [J represent the worst approach, as the intersection is side -street stop -controlled. Table 3 — Stillwater Road and Stillwater Crossina LOS Results Future No -Build None Intersection does not exist, all traffic is due to trips generated by the developments. Phase A Build 430 Stillwater A [A] 1 [9] A [A] 2 [9] Phase B Build Starling Subdivision A [A] +0 [+0] A [A] +0 [+0] Phase C Build Timberwolf Ridge A [B] +0 [+1] A [B] +0 [+1] Note: LOS and delay in brackets [J represent the worst approach, as the intersection is side -street stop -controlled. Intersection Recommendations: Two improvements are recommended to mitigate the LOS deficiencies explained above. ➢ An all -way stop is recommended at Stillwater Road and Four Mile Drive. This will address increased LOS for both the eastbound and westbound approaches and will best fit the increased volumes the minor approaches. 3 KLI ➢ A westbound right (WBR) turn lane is recommended at Stillwater Road and Timberwolf Parkway. This will address the increase in LOS for that approach in the near -term conditions. The delay and LOS for these intersections with the implementation of these improvements are shown in Table 4. Table 4 — Phase C Mitiaation LOS Results Stillwater Rd and Phase C Build B [E] 13 [43] B [D] 15 [33] Four Mile Dr Phase C Mitigation B 14 B 13 Stillwater Rd and Phase C Build A [C] 4 [15] A [C] 5 [15] Timberwolf Pkwy Phase C Mitigation A [B] 4 [14] A [B] 5 [14] Note: LOS and delay in brackets [J represent the worst approach, as the intersection is side -street stop -controlled. The recommended improvements are expected to mitigate the LOS deficiencies resulting from the additional site -generated traffic from all studied developments. All intersections within the study area are expected to operate with LOS A or B under the Phase C Mitigation scenario. Staff Recommendations: 3-Lane sections on Four -Mile Drive and Stillwater Road were referenced in the Kalispell Long-range transportation plan. While the corridor improvements will be necessary to mitigate future growth, as developments are added an opportunity to add these left -turn lanes should be considered by the City. While 430 Stillwater has these left -turn lanes added, Timberwolf Ridge and additional phases at Starling Road should consider adding the NBL and SBL turn lanes at Stillwater Road and Timberwolf Parkway. With this being justified by both developments, the cost share between the addition of the left -turn lanes should be split 50/50 between both developments as each TIS is approved. Furthermore, the City should look at identifying additional funding for the corridor to upgrade the segment of Stillwater Road between Four -Mile Drive and Old Reserve Drive in 2026-2027 with the addition of these development contributions. This will limit the increased risk of run-off road crashes due to the 2-lane to 3-lane transitions on the corridor with the development left -turn lanes. 4 KLI AppendixA—Turning Movement Counts Stillwater Road TIS Review Volumes 1/16/2023 No -Build (Existing) AM Peak *Using maximum turning movement from TIS's 2022 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 36 23 56 28 52 4 7 221 120 88 108 28 Stillwater Rd and Timberwolf Pkwy 0 256 32 24 101 0 0 0 0 12 0 8 Stillwater Rd and 4 Mile Dr 8 132 63 72 24 4 10 20 4 40 23 152 No -Build (Future) 1.5% annual growth rate 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 39 25 60 30 56 4 8 238 129 95 116 30 Stillwater Rd and Timberwolf Pkwy 0 276 34 26 109 0 0 0 0 13 0 9 Stillwater Rd and 4 Mile Dr 9 142 68 78 26 4 11 22 4 43 25 164 Phase A Build 430 Stillwater 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 39 25 66 30 56 4 8 238 129 97 116 30 Stillwater Rd and Timberwolf Pkwy 0 282 34 26 111 0 0 0 0 13 0 9 Stillwater Rd and Stillwater Crossing 12 245 0 0 93 1 3 0 26 0 0 0 Stillwater Rd and 4 Mile Dr 1 12 1 1431 68 1 99 1 29 1 11 1 22 1 77 1 11 1 43 1 49 173 4 Mile Dr and Stillwater Access E 1 0 0 0 56 0 7 3 40 0 0 24 24 4 Mile Dr and Stillwater Access W 0 0 0 15 0 2 1 28 0 0 24 7 Phase B Build 430 Stillwater and Starling Subd. 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 48 31 113 30 58 4 8 238 132 113 116 30 Stillwater Rd and Timberwolf Pkwy 25 307 34 26 119 13 38 13 76 13 4 9 Stillwater Rd and Development Access 20 335 0 0 187 8 25 0 59 0 0 0 Stillwater Rd and Stillwater Crossing 12 289 0 0 1227, 1 3 1 0 1 26 0 1 0 1 0 Stillwater Rd and 4 Mile Dr 12 152 68 193 56 24 26 77 11 43 49 204 4 Mile Dr and Stillwater Access E 0 0 0 56 0 7 3 44 0 0 37 24 4 Mile Dr and Stillwater Access W 0 0 0 15 0 1 2 1 32 1 0 0 37 1 7 Phase C Build 430 Stillwater, Starling Subd., and Timberwolf Ridge 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 48 31 139 30 58 4 8 238 132 121 116 30 Stillwater Rd and Timberwolf Pkwy 25 332 40 29 127 13 38 13 76 32 4 18 Stillwater Rd and Development Access 20 354 8 4 210 8 25 0 59 26 0 11 Stillwater Rd and Timberwolf Access S 0 274 11 4 156 0 0 1 0 1 0 34 0 13 Stillwater Rd and Stillwater Crossing 12 313 0 0 305 1 3 0 26 0 0 0 Stillwater Rd and 4 Mile Dr 12 154 68 260 64 27 27 77 11 43 49 225 4 Mile Dr and Stillwater Access E 0 0 0 56 0 7 3 45 0 0 40 24 4 Mile Dr and Stillwater Access W 1 0 0 0 15 0 2 1 33 0 0 40 7 Timberwolf Pkwy and Timberwolf Access N 1 28 1 0 1 0 1 0 0 1 2 20 1 5 1 9 1 0 1 0 Stillwater Road TIS Review Volumes 1/16/2023 No -Build (Existing) PM Peak *Using maximum turning movement from TIS's 2022 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 52 24 52 52 41 9 4 114 28 33 251 29 Stillwater Rd and Timberwolf Pkwy 0 61 16 8 95 0 0 0 0 48 0 32 Stillwater Rd and 4 Mile Dr 4 16 64 70 36 4 2 24 0 96 22 60 No -Build (Future) 1.5% annual growth rate 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 56 26 56 56 44 10 4 123 30 36 270 31 Stillwater Rd and Timberwolf Pkwy 0 66 17 9 102 0 0 0 0 52 0 34 Stillwater Rd and 4 Mile Dr 4 17 69 75 39 4 2 26 0 103 24 65 Phase A Build 430 Stillwater 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 56 26 67 56 44 10 4 123 30 51 270 31 Stillwater Rd and Timberwolf Pkwy 0 77 17 9 117 0 0 0 0 52 0 34 Stillwater Rd and Stillwater Crossing 36 81 0 0 95 5 3 0 26 0 0 0 Stillwater Rd and 4 Mile Dr 1 13 22 69 1 96 1 42 1 20 15 81 7 1 103 99 94 4 Mile Dr and Stillwater Access E 0 0 0 56 0 7 9 24 0 0 47 77 4 Mile Dr and Stillwater Access W 0 0 0 15 0 2 3 18 0 0 33 21 Phase B Build 430 Stillwater and Starling Subd. 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 62 30 98 56 51 10 4 123 41 104 270 31 Stillwater Rd and Timberwolf Pkwy 84 94 17 9 145 42 25 8 50 52 14 34 Stillwater Rd and Development Access 66 166 0 0 167 28 17 0 39 0 0 0 Stillwater Rd and Stillwater Crossing 36 231 0 0 1 184 5 3 1 0 1 26 0 1 0 1 0 Stillwater Rd and 4 Mile Dr 13 52 69 158 60 29 30 81 7 103 99 199 4 Mile Dr and Stillwater Access E 0 0 0 56 0 7 9 39 0 0 56 77 4 Mile Dr and Stillwater Access W 0 0 0 15 0 1 2 3 33 1 0 0 42 1 21 Phase C Build 430 Stillwater, Starling Subd., and Timberwolf Ridge 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 62 30 118 56 51 10 4 123 41 138 270 31 Stillwater Rd and Timberwolf Pkwy 84 110 38 19 172 42 25 8 50 64 14 40 Stillwater Rd and Development Access 66 195 28 12 194 28 17 0 39 17 0 7 Stillwater Rd and Timberwolf Access S 0 117 36 15 146 0 0 1 0 1 0 22 0 9 Stillwater Rd and Stillwater Crossing 36 316 0 0 234 5 3 0 26 0 0 0 Stillwater Rd and 4 Mile Dr 13 60 69 201 65 31 34 81 7 103 99 272 4 Mile Dr and Stillwater Access E 0 0 0 56 0 7 9 43 0 0 58 77 4 Mile Dr and Stillwater Access W 1 0 0 0 15 0 2 3 37 0 0 44 21 Timberwolf Pkwy and Timberwolf Access N 1 18 1 0 1 0 1 0 0 1 22 1 3 1 1 1 30 0 5 0 KLI Appendix B —Additional Trips Summary Stillwater Road TIS Review Additional Trips 1/16/2023 AM Peak NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBTV. Phase A (additional trips) 430 Stillwater 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 0 0 6 0 0 0 0 0 0 2 0 0 Stillwater Rd and Timberwolf Pkwy 0 6 0 0 2 0 0 0 0 0 0 0 Stillwater Rd and Development Access 0 0 0 0 0 0 0 0 0 0 0 0 Stillwater Rd and Timberwolf Access S 0 0 0 0 0 0 0 0 0 0 0 0 Stillwater Rd and Stillwater Crossing 12 10 0 0 4 1 3 0 26 0 0 0 Stillwater Rd and 4 Mile Dr 3 1 0 21 3 7 11 55 7 0 24 9 4 Mile Dr and Stillwater Access E 0 0 0 56 0 7 3 16 0 0 9 24 4 Mile Dr and Stillwater Access W 0 0 0 15 0 2 1 4 0 0 9 7 Timberwolf Pkwy and Timberwolf Access N 0 1 0 1 0 0 0 0 0 0 0 0 0 0 Phase B (additional trips) Starling Subd. 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 9 6 47 0 2 0 0 0 3 16 0 0 Stillwater Rd and Timberwolf Pkwy 25 25 0 0 8 13 38 13 76 0 4 0 Stillwater Rd and Development Access 20 25 0 0 76 8 25 0 59 0 0 0 Stillwater Rd and Timberwolf Access S 0 0 0 0 0 0 0 0 0 0 0 1 0 Stillwater Rd and Stillwater Crossing 0 44 0 0 134 0 0 0 0 0 0 0 Stillwater Rd and 4 Mile Dr 0 9 0 94 27 13 4 0 0 0 0 31 4 Mile Dr and Stillwater Access E 0 0 0 0 0 0 0 4 0 0 13 0 4 Mile Dr and Stillwater Access W 0 0 0 0 0 0 0 4 0 0 13 0 Timberwolf Pkwy and Timberwolf Access N 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 Phase C (additional trips) Timberwolf Ridge 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 0 0 26 0 0 0 0 0 0 8 0 0 Stillwater Rd and Timberwolf Pkwy 0 25 6 3 8 0 0 0 0 19 0 9 Stillwater Rd and Development Access 0 19 8 4 23 0 0 0 0 26 0 11 Stillwater Rd and Timberwolf Access S 0 14 11 4 1 45 0 0 0 0 34 0 13 Stillwater Rd and Stillwater Crossing 0 24 0 0 78 0 0 0 0 0 0 0 Stillwater Rd and 4 Mile Dr 0 2 0 67 8 3 1 0 0 0 0 21 4 Mile Dr and Stillwater Access E 0 0 0 0 0 0 0 1 0 0 3 0 4 Mile Dr and Stillwater Access W 0 1 0 0 0 0 0 0 1 0 0 3 0 Timberwolf Pkwy and Timberwolf Access N 28 1 0 1 0 1 0 0 0 0 0 9 0 0 0 Stillwater Road TIS Review Additional Trips 1/16/2023 PM Peak NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBTV. Phase A (additional trips) 430 Stillwater 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 0 0 11 0 0 0 0 0 0 15 0 0 Stillwater Rd and Timberwolf Pkwy 0 11 0 0 15 0 0 0 0 0 0 0 Stillwater Rd and Development Access 0 0 0 0 0 0 0 0 0 0 0 0 Stillwater Rd and Timberwolf Access S 0 0 0 0 0 0 0 0 0 0 0 0 Stillwater Rd and Stillwater Crossing 36 10 0 0 14 5 3 0 26 0 0 0 Stillwater Rd and 4 Mile Dr 9 5 0 21 3 16 13 55 7 0 75 29 4 Mile Dr and Stillwater Access E 0 0 0 56 0 7 9 18 0 0 Mile Dr and Stillwater Access W 0 0 0 15 0 2 3 12 0 0Timberwolf t23M774 Pkwy and Timberwolf Access N 0 0 0 0 0 0 0 0 0 0 Phase B (additional trips) Starling Subd. 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 6 4 31 0 7 0 0 0 11 53 0 0 Stillwater Rd and Timberwolf Pkwy 84 17 0 0 28 42 25 8 50 0 14 0 Stillwater Rd and Development Access 66 84 0 0 50 28 17 0 39 0 0 0 Stillwater Rd and Timberwolf Access S 0 0 0 0 0 0 0 0 0 0 0 1 0 Stillwater Rd and Stillwater Crossing 0 150 0 0 89 0 0 0 0 0 0 0 Stillwater Rd and 4 Mile Dr 0 30 0 62 18 9 15 0 0 0 0 105 4 Mile Dr and Stillwater Access E 0 0 0 0 0 0 0 15 0 0 9 0 4 Mile Dr and Stillwater Access W 0 0 0 0 0 0 0 15 0 0 9 0 Timberwolf Pkwy and Timberwolf Access N 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 Phase C (additional trips) Timberwolf Ridge 2027 NB SB EB WB Intersection L T R L T R L T R L T R Stillwater Rd and Reserve Dr 0 0 20 0 0 0 0 0 0 34 0 0 Stillwater Rd and Timberwolf Pkwy 0 16 21 10 27 0 0 0 0 12 0 6 Stillwater Rd and Development Access 0 29 28 12 27 0 0 0 0 17 0 7 Stillwater Rd and Timberwolf Access S 0 48 36 15 1 29 0 0 0 0 22 0 9 Stillwater Rd and Stillwater Crossing 0 85 0 0 50 0 0 0 0 0 0 0 Stillwater Rd and 4 Mile Dr 0 8 0 43 5 2 4 0 0 0 0 73 4 Mile Dr and Stillwater Access E 0 0 0 0 0 0 0 4 0 0 2 0 4 Mile Dr and Stillwater Access W 0 1 0 0 0 0 0 0 4 0 0 2 0 Timberwolf Pkwy and Timberwolf Access N 18 1 0 1 0 1 0 0 0 0 0 30 0 0 0 KLI Appendix C— LOS Results Summary Stillwater Road TIS Review Level of Service 1/18/2023 AM Peak *Highlight shows worsening LOS, as compared to No -Build No -Build (Existing) Delay (sec/veh) Level of Service No development (2022) Approach Approach Intersection LOS Intersection NB SB EB W13 Int. NB SB EB WB Int. Delay Worst Approach Stillwater Rd and Reserve Dr 4 4 6 4 5 A A A A A Stillwater Rd and Timberwolf Pkwy 0 2 - 11 1 A A - B A B Stillwater Rd and 4 Mile Dr 0 6 13 11 6 A I A I B I B A B No -Build (Future) Delay (sec/veh) Level of Service No development (2027) Approach Approach Intersection LOS Intersection NB SB EB W13 Int. NB SB EB WB Int. Delay Worst Approach Stillwater Rd and Reserve Dr 5 4 6 5 5 A A A A A Stillwater Rd and Timberwolf Pkwy 0 2 - 11 1 A A - B A B Stillwater Rd and 4 Mile Dr 0 6 13 11 6 A I A I B I B A B Phase A Build Delay (sec/veh) Level of Service 430 Stillwater (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB WB NB SB EB WB Int. Delay Worst Approach Stillwater Rd and Reserve Dr 5 4 7 5 5 A A A A A Stillwater Rd and Timberwolf Pkwy 0 2 - 11 1 A A - B A B Stillwater Rd and Stillwater Crossing 0 0 9 - 1 A A A - A A Stillwater Rd and 4 Mile Dr 0 6 16 13 8 A A C B A C 4 Mile Dr and Stillwater Access E - 9 1 0 4 A A A A A 4 Mile Dr and Stillwater Access W - 9 0 0 1 2 A A A A A Phase B Build Delay (sec/veh) Level of Service 430 Stillwater and Starling Subd. (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB Ng NB SB EB W13 Int. Delay Worst Approach Stillwater Rd and Reserve Dr 5 4 7 5 6 A A A A A Stillwater Rd and Timberwolf Pkwy 1 1 12 14 3 A A B B A B Stillwater Rd and Development Access 0 0 11 - 2 A A B A B Stillwater Rd and Stillwater Crossing 0 0 10 - 1 A A A A A Stillwater Rd and 4 Mile Dr 0 6 1 27 16 10 A A D C B D 4 Mile Dr and Stillwater Access E - 9 0 0 4 A A A A A 4 Mile Dr and Stillwater Access W 9 1 0 0 2 A A I A A A Phase C Build Delay (sec/veh) Level of Service 430 Stillwater, Starling Subd., and Timberwolf Ridge (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB W13 NB SB EB W13Int. Delay Worst Approach Stillwater Rd and Reserve Dr 6 4 7 5 6 A A A A A Stillwater Rd and Timberwolf Pkwy 0 1 13 15 4 A A B C A C Stillwater Rd and Development Access 0 0 12 15 2 A A B B A B Stillwater Rd and Timberwolf Access S 0 0 - 11 1 A A - B A B Stillwater Rd and Stillwater Crossing 0 0 10 - 1 A A B A B Stillwater Rd and 4 Mile Dr 0 6 43 19 13 A A C B E 4 Mile Dr and Stillwater Access E - 9 0 0 3 A A A A A 4 Mile Dr and Stillwater Access W - 9 0 0 2 A A A A A Timberwolf Pkwy and Timberwolf Access N 9 8 4 0 6 A A A A A A Phase C Mitigation Delay (sec/veh) Level of Service 430 Stillwater, Starling Subd., and Timberwolf Ridge (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB W13NB SB EB W13Int. Delay Worst Approach Stillwater Rd and Reserve Dr 6 4 7 5 6 A A A A A Stillwater Rd and Timberwolf Pkwy 0 1 13 15 4 A A B B A B Stillwater Rd and Development Access 0 0 12 151 2 A A B B A B Stillwater Rd and Timberwolf Access S 0 0 - 11 1 A A - B A B Stillwater Rd and Stillwater Crossing 0 0 10 - 1 A A I B - A B Stillwater Rd and 4 Mile Dr 14 14 12 13 14 B B B B B 4 Mile Dr and Stillwater Access E - 9 0 0 3 A A A A A 4 Mile Dr and Stillwater Access W - 9 0 0 2 A A A A A Timberwolf Pkwy and Timberwolf Access N 9 8 4 0 6 A A A A A A Stillwater Road TIS Review Level of Service 1/18/2023 PM Peak *Highlight shows worsening LOS, as compared to No -Build No -Build (Existing) Delay (sec/veh) Level of Service No development (2022) Approach Approach Intersection LOS Intersection NB SB EB W13 Int. NB SB EB WB Int. Delay Worst Approach Stillwater Rd and Reserve Dr 4 5 4 5 5 A A A A A Stillwater Rd and Timberwolf Pkwy 0 1 - 10 3 A A - A A A Stillwater Rd and 4 Mile Dr 0 5 11 11 7 A I A I B I B A B No -Build (Future) Delay (sec/veh) Level of Service No development (2027) Approach Approach Intersection LOS Intersection NB SB EB W13 Int. NB SB EB WB Int. Delay Worst Approach Stillwater Rd and Reserve Dr 4 5 4 5 5 A A A A A Stillwater Rd and Timberwolf Pkwy 0 1 - 10 3 A A - A A A Stillwater Rd and 4 Mile Dr 0 5 11 11 7 A I A I B I B A B Phase A Build Delay (sec/veh) Level of Service 430 Stillwater (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB WB NB SB EB WB Int. Delay Worst Approach Stillwater Rd and Reserve Dr 4 5 4 5 5 A A A A A Stillwater Rd and Timberwolf Pkwy 0 1 - 10 3 A A - A A A Stillwater Rd and Stillwater Crossing 2 0 9 - 2 A A A - A A Stillwater Rd and 4 Mile Dr 1 5 14 13 9 A A B B A B 4 Mile Dr and Stillwater Access E - 9 2 0 3 A A A A A 4 Mile Dr and Stillwater Access W - 9 1 0 1 2 A A A A A Phase B Build Delay (sec/veh) Level of Service 430 Stillwater and Starling Subd. (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB Ng NB SB EB W13 Int. Delay Worst Approach Stillwater Rd and Reserve Dr 5 6 5 6 5 A A A A A Stillwater Rd and Timberwolf Pkwy 3 0 12 13 5 A A B B A B Stillwater Rd and Development Access 2 0 10 - 2 A A B A B Stillwater Rd and Stillwater Crossing 1 0 10 - 1 A A A A A Stillwater Rd and 4 Mile Dr 1 5 22 16 12 A A C C B C 4 Mile Dr and Stillwater Access E - 10 1 0 3 A A A A A 4 Mile Dr and Stillwater Access W 9 1 0 2 A A A A A Phase C Build Delay (sec/veh) Level of Service 430 Stillwater, Starling Subd., and Timberwolf Ridge (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB W13 NB SB EB W13Int. Delay Worst Approach Stillwater Rd and Reserve Dr 5 6 5 6 6 A A A A A Stillwater Rd and Timberwolf Pkwy 3 1 12 15 5 A A B C A C Stillwater Rd and Development Access 2 0 11 14 3 A A B B A B Stillwater Rd and Timberwolf Access S 0 1 - 10 1 A A - B A B Stillwater Rd and Stillwater Crossing 1 0 10 - 1 A A B A B Stillwater Rd and 4 Mile Dr 1 5 33 20 15 A A D C B D 4 Mile Dr and Stillwater Access E - 10 1 0 3 A A A A A 4 Mile Dr and Stillwater Access W - 9 1 0 1 A A A A A Timberwolf Pkwy and Timberwolf Access N 9 8 1 0 5 A A A A A A Phase C Mitigation Delay (sec/veh) Level of Service 430 Stillwater, Starling Subd., and Timberwolf Ridge (2027) Approach Int. Approach Intersection LOS Intersection NB SB EB W13NB SB EB W13Int. Delay Worst Approach Stillwater Rd and Reserve Dr 5 6 5 6 6 A A A A A Stillwater Rd and Timberwolf Pkwy 3 1 12 14 5 A A B B A B Stillwater Rd and Development Access 2 0 11 141 3 A A B B A B Stillwater Rd and Timberwolf Access S 0 1 - 10 1 A A - B A B Stillwater Rd and Stillwater Crossing 1 0 10 - 1 A A I B - A B Stillwater Rd and 4 Mile Dr 12 13 12 15 13 B B B B B B 4 Mile Dr and Stillwater Access E - 10 1 0 3 A A A A A 4 Mile Dr and Stillwater Access W - 9 1 0 1 A A A A A Timberwolf Pkwy and Timberwolf Access N 9 8 1 0 5 A A A A A A Generated with UM19910M Scenario 1: 1 Existing AM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.1 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 36 23 56 28 52 4 7 221 120 88 108 28 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 36 23 56 28 52 4 7 1 221 1 120 88 108 1 28 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 9 6 14 7 13 1 2 55 30 22 27 7 Total Analysis Volume [veh/h] 36 23 56 28 52 4 7 221 120 88 108 28 Pedestrian Volume [ped/h] 0 0 0 0 D1 Generated with Version 2022 (SP 0- Intersection Settings Scenario 1: 1 Existing AM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 261 237 171 67 Exiting Flow Rate [veh/h] 265 59 151 311 Demand Flow Rate [veh/h] 36 23 56 28 52 4 7 221 120 88 108 28 Adjusted Demand Flow Rate [veh/h] 36 23 56 28 52 4 7 221 120 88 108 28 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 118 86 355 229 Capacity of Entry and Bypass Lanes [veh/h] 1058 1085 1159 1289 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1037 1063 1136 1264 X, volume / capacity 0.11 0.08 0.31 0.18 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.37 0.26 1.31 0.64 95th-Percentile Queue Length [ft] 9.33 6.42 32.69 16.09 Approach Delay [s/veh] 4.46 4.07 6.09 4.35 Approach LOS A A A A Intersection Delay [s/veh] 5.12 Intersection LOS A LPL Generated with UM19910M Scenario 1: 1 Existing AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 11.4 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.021 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Base Volume Input [veh/h] 256 32 24 101 12 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 256 32 24 101 12 8 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 64 8 6 25 3 2 Total Analysis Volume [veh/h] 256 32 24 101 12 8 Pedestrian Volume [ped/h] D3 Generated with Version 2022 (SP 0- Intersection Settings Scenario 1: 1 Existing AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.02 0.01 d_M, Delay for Movement [s/veh] 7.85 11.42 9.88 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.04 0.04 0.10 0.10 95th-Percentile Queue Length [ft/In] 0.00 0.00 1.01 1.01 2.41 2.41 d_A, Approach Delay [s/veh] 0.00 1.51 10.80 Approach LOS A A B d_I, Intersection Delay [s/veh] 0.93 Intersection LOS B all Generated with UM19910M Scenario 1: 1 Existing AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 14.6 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.025 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 8 132 1 63 72 1 24 4 10 20 1 4 40 1 23 1 152 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 8 132 63 72 24 4 10 20 4 40 23 152 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 2 33 16 18 6 1 3 5 1 10 6 38 Total Analysis Volume [veh/h] 8 132 63 72 24 4 10 20 4 40 23 152 Pedestrian Volume [ped/h] D5 Generated with Version 2022 (SP 0- Intersection Settings Scenario 1: 1 Existing AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 j.00 O.Ou 0.05 0.03 1 0.04 1 0.00 0.07 1 0.04 0.17 d_M, Delay for Movement [s/veh] 7.28 ) 7.76 1 14.60 1 12.44 1 8.95 12.23 12.87 10.29 Movement LOS A A A A A A B B A B B B 95th-Percentile Queue Length [veh/In] 0.01 0.01 0.01 0.17 0.00 0.00 0.22 0.22 0.22 0.24 0.81 0.81 95th-Percentile Queue Length [ft/In] 0.36 0.36 0.36 4.13 0.00 0.00 5.41 5.41 5.41 6.01 T0.34 20.34 d_A, Approach Delay [s/veh] 0.29 5.58 12.66 10.93 Approach LOS A A B B d_I, Intersection Delay [s/veh] 6.15 Intersection LOS B 0 Generated with UM Scenario 1: 1 Existing AM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and 4 Mile Dr r -.)l� � 7 28 221 - as 10 0)CQT / g 10 152 12 2023 CP W a / � N D7 Generated with UM19910M Scenario 2: 2 Existing PM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 4.7 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 52 24 52 52 41 9 4 114 28 33 251 29 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 52 24 52 52 41 9 4 114 28 33 251 29 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 13 6 13 13 10 2 1 29 7 8 63 7 Total Analysis Volume [veh/h] 52 24 52 52 41 9 4 114 28 33 251 29 Pedestrian Volume [ped/h] 0 0 0 0 Generated with Version 2022 (SP 0- Intersection Settings Scenario 2: 2 Existing PM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 173 343 129 82 Exiting Flow Rate [veh/h] 104 58 318 222 Demand Flow Rate [veh/h] 52 24 52 52 41 9 4 114 28 33 251 29 Adjusted Demand Flow Rate [veh/h] 52 24 52 52 41 9 4 114 28 33 251 29 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 131 105 149 320 Capacity of Entry and Bypass Lanes [veh/h] 1157 973 1211 1270 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1134 954 1187 1245 X, volume / capacity 0.11 0.11 0.12 0.25 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.38 0.36 0.42 1.00 95th-Percentile Queue Length [ft] 9.52 8.95 10.49 24.98 Approach Delay [s/veh] 4.14 4.76 4.07 5.12 Approach LOS A A A A Intersection Delay [s/veh] 4.66 Intersection LOS A ce Generated with UM19910M Scenario 2: 2 Existing PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 9.9 HCM 7th Edition Level Of Service: A 15 minutes Volume to Capacity (v/c): 0.060 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Base Volume Input [veh/h] 61 16 8 95 48 32 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 61 16 8 95 48 32 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 15 4 2 24 12 8 Total Analysis Volume [veh/h] 61 16 8 95 48 32 Pedestrian Volume [ped/h] D10 Generated with Version 2022 (SP 0- Intersection Settings Scenario 2: 2 Existing PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.06 0.03 d_M, Delay for Movement [s/veh] 7.37 9.89 9.04 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.01 0.01 0.30 0.30 95th-Percentile Queue Length [ft/In] 0.00 0.00 0.33 0.33 7.56 7.56 d_A, Approach Delay [s/veh] 0.00 0.57 9.55 Approach LOS A A A d_I, Intersection Delay [s/veh] 3.17 Intersection LOS A D11 Generated with UM19910M Scenario 2: 2 Existing PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 11.5 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.148 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 4 16 64 70 36 4 2 24 0 96 22 60 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 4 16 64 70 36 4 2 24 0 96 22 60 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 1 4 16 18 9 1 1 6 0 24 6 15 Total Analysis Volume [veh/h] 4 16 64 70 36 4 2 24 0 96 22 60 Pedestrian Volume [ped/h] D12 Generated with Version 2022 (SP 0- Intersection Settings Scenario 2: 2 Existing PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 j.00 O.Ou 0.05 0.00 1 0.04 0.00 0.15 1 0.03 0.06 d_M, Delay for Movement [s/veh] 7.30 ) 7.49T11.40 11.18 11.52 11.12 8.95 Movement LOS A A A A A A B B B B A 95th-Percentile Queue Length [veh/In] 0.01 0.01 0.01 0.14 0.00 0.00 0.13 0.13 0.13 0.52 0.31 0.31 95th-Percentile Queue Length [ft/In] 0.19 0.19 0.19 3.62 0.00 0.00 3.35 1 3.35 - -- 12.95 7.72 7.72 d_A, Approach Delay [s/veh] 0.35 4.76 11.20 10.60 Approach LOS A A B B d_I, Intersection Delay [s/veh] 6.86 Intersection LOS B D13 Generated with UM Scenario 2: 2 Existing PM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and 4 Mile Dr �vun'i Y_ N gc a t 4 29 2$ — 61 t } 32 4 J 6022 D14 Generated with 92MM NUM Scenario 3: 3 Future No -Build AM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.4 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 39 25 60 30 56 4 8 238 129 95 116 30 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 39 25 60 30 56 4 8 1 238 1 129 95 116 1 30 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 10 6 15 8 14 1 2 60 32 24 29 8 Total Analysis Volume [veh/h] 39 25 60 30 56 4 8 238 129 95 116 30 Pedestrian Volume [ped/h] 0 0 0 0 D15 Generated with Version 2022 (SP 0- Intersection Settings Scenario 3: 3 Future No -Build AM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 282 255 185 73 Exiting Flow Rate [veh/h] 286 64 162 335 Demand Flow Rate [veh/h] 39 25 60 30 56 4 8 238 129 95 116 30 Adjusted Demand Flow Rate [veh/h] 39 25 60 30 56 4 8 238 129 95 116 30 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 127 92 383 246 Capacity of Entry and Bypass Lanes [veh/h] 1036 1064 1144 1281 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1016 1044 1121 1256 X, volume / capacity 0.12 0.09 0.33 0.19 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.42 0.28 1.48 0.71 95th-Percentile Queue Length [ft] 10.40 7.07 37.12 17.72 Approach Delay [s/veh] 4.65 4.21 6.49 4.51 Approach LOS A A A A Intersection Delay [s/veh] 5.39 Intersection LOS A D16 Generated with 92MM NUM Scenario 3: 3 Future No -Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 11.7 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.024 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Base Volume Input [veh/h] 276 34 26 109 13 9 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 276 34 26 109 13 9 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 69 9 7 27 3 2 Total Analysis Volume [veh/h] 276 34 26 109 13 9 Pedestrian Volume [ped/h] D17 Generated with Version 2022 (SP 0- Intersection Settings Scenario 3: 3 Future No -Build AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.02 0.01 d_M, Delay for Movement [s/veh] 7.91 11.74 10.04 Movement LOS A A A A B B 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.04 0.04 0.11 0.11 95th-Percentile Queue Length [ft/In] 0.00 0.00 1.10 1.10 2.77 2.77 d_A, Approach Delay [s/veh] 0.00 1.52 11.05 Approach LOS A A B d_I, Intersection Delay [s/veh] 0.96 Intersection LOS B i Generated with 92MM NUM Scenario 3: 3 Future No -Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 15.5 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.030 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 9 142 68 78 26 4 11 22 4 43 25 164 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 9 142 68 78 26 4 11 22 4 43 25 164 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 2 36 17 20 7 1 3 6 1 11 6 41 Total Analysis Volume [veh/h] 9 142 68 78 26 4 11 22 4 43 25 164 Pedestrian Volume [ped/h] D19 Generated with Version 2022 (SP 0- Intersection Settings Scenario 3: 3 Future No -Build AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 j.00 O.Ou 0.06 0.03 1 0.04 1 0.00 0.08 1 0.05 0.19 d_M, Delay for Movement [s/veh] 7.29 ) 7.81 1 15.54 1 12.90 1 9.09 12.74 13.36 10.55 Movement LOS A A A A A A C B A B B B 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.02 0.18 0.00 0.00 0.25 0.25 0.25 0.28 1 0.92 0.92 95th-Percentile Queue Length [ft/In] 0.40 0.40 0.40 4.56 0.00 0.00 6.35 6.35 6.35 6.90T3.07 23.07 d_A, Approach Delay [s/veh] 0.30 5.64 13.27 11.26 Approach LOS A A B B d_I, Intersection Delay [s/veh] 6.34 Intersection LOS C D20 Generated with F2MKTI i7Ti7 Scenario 3: 3 Future No -Build AM 1 /17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and 4 Mile Dr 9 11 164 13 22 26 f d � � 43 rn� D21 Generated with 92MM NUM Scenario 4: 4 Future No -Build PM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 4.9 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 56 26 56 56 44 10 4 123 30 36 270 31 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 26 56 56 44 10 4 123 30 36 270 31 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 7 14 14 11 3 1 31 8 9 68 8 Total Analysis Volume [veh/h] 56 26 56 56 44 10 4 123 30 36 270 31 Pedestrian Volume [ped/h] 0 0 0 0 D22 Generated with Version 2022 (SP 0- Intersection Settings Scenario 4: 4 Future No -Build PM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 187 369 139 88 Exiting Flow Rate [veh/h] 112 62 343 240 Demand Flow Rate [veh/h] 56 26 56 56 44 10 4 123 30 36 270 31 Adjusted Demand Flow Rate [veh/h] 56 26 56 56 44 10 4 123 30 36 270 31 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 141 113 161 344 Capacity of Entry and Bypass Lanes [veh/h] 1141 947 1198 1262 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1119 929 1175 1238 X, volume / capacity 0.12 0.12 0.13 0.27 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.42 0.40 0.46 1.11 95th-Percentile Queue Length [ft] 10.52 10.04 11.53 27.80 Approach Delay [s/veh] 4.29 4.99 4.21 5.36 Approach LOS A A A A Intersection Delay [s/veh] 4.86 Intersection LOS A D23 Generated with 92MM NUM Scenario 4: 4 Future No -Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 10.0 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.066 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Base Volume Input [veh/h] 66 17 9 102 52 34 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 66 17 9 102 52 34 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 17 4 2 26 13 9 Total Analysis Volume [veh/h] 66 17 9 102 52 34 Pedestrian Volume [ped/h] D24 Generated with Version 2022 (SP 0- Intersection Settings Scenario 4: 4 Future No -Build PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.07 0.03 d_M, Delay for Movement [s/veh] 7.39 10.03 9.11 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.02 0.02 0.33 0.33 95th-Percentile Queue Length [ft/In] 0.00 0.00 0.38 0.38 8.33 8.33 d_A, Approach Delay [s/veh] 0.00 0.60 9.67 Approach LOS A A A d_I, Intersection Delay [s/veh] 3.21 Intersection LOS B D25 Generated with 92MM NUM Scenario 4: 4 Future No -Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 11.9 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.165 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 4 17 69 75 39 4 2 26 0 103 24 65 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 4 17 69 75 39 4 2 1 26 1 0 103T 24 1 65 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 1 4 17 19 10 1 1 7 0 26 6 16 Total Analysis Volume [veh/h] 4 17 69 75 39 4 2 26 0 103 24 65 Pedestrian Volume [ped/h] D26 Generated with Version 2022 (SP 0- Intersection Settings Scenario 4: 4 Future No -Build PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 j.00 O.Ou 0.05 0.00 1 0.04 0.00 0.16 1 0.04 0.06 d_M, Delay for Movement [s/veh] 7.31 ) 7.51 11.72 11.39 11.88 11.31 9.02 Movement LOS A A A A A A B B B B A 95th-Percentile Queue Length [veh/In] 0.01 0.01 0.01 0.16 0.00 0.00 0.15 0.15 0.15 0.59 0.34 0.34 95th-Percentile Queue Length [ft/In] 0.19 0.19 0.19 3.92 0.00 0.00 3.73 1 3.73 ? -- 14.64 8.57 8.57 d_A, Approach Delay [s/veh] 0.32 4.77 11.41 10.84 Approach LOS A A B B d_I, Intersection Delay [s/veh] 6.99 Intersection LOS B D27 Generated with F2MKTI i7Ti7 Scenario 4: 4 Future No -Build PM 1 /17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and 4 Mile Dr 4 31 123 270 30 36 0)0)CD / 34 6 24 52 0 103 i Generated with 92MMUNUIi7 Scenario 5: 5 Phase A Build AM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.4 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 39 25 66 30 56 4 8 238 129 97 116 30 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 39 25 66 30 56 4 8 1 238 1 129 97 116 1 30 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 10 6 17 8 14 1 2 60 32 24 29 8 Total Analysis Volume [veh/h] 39 25 66 30 56 4 8 238 129 97 116 30 Pedestrian Volume [ped/h] 0 0 0 0 D29 Generated with Version 2022 (SP 0- Intersection Settings Scenario 5: 5 Phase A Build AM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 282 257 187 73 Exiting Flow Rate [veh/h] 288 64 162 341 Demand Flow Rate [veh/h] 39 25 66 30 56 4 8 238 129 97 116 30 Adjusted Demand Flow Rate [veh/h] 39 25 66 30 56 4 8 238 129 97 116 30 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 133 92 383 248 Capacity of Entry and Bypass Lanes [veh/h] 1036 1062 1141 1281 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1016 1041 1119 1256 X, volume / capacity 0.13 0.09 0.34 0.19 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.44 0.28 1.49 0.72 95th-Percentile Queue Length [ft] 10.97 7.08 37.24 17.90 Approach Delay [s/veh] 4.71 4.22 6.51 4.52 Approach LOS A A A A Intersection Delay [s/veh] 5.41 Intersection LOS A D30 Generated with 92MMUNUIi7 Scenario 5: 5 Phase A Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 11.8 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.024 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Base Volume Input [veh/h] 282 34 26 111 13 9 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 282 34 26 111 13 9 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 71 9 7 28 3 2 Total Analysis Volume [veh/h] 282 34 26 111 13 9 Pedestrian Volume [ped/h] D31 Generated with Version 2022 (SP 0- Intersection Settings Scenario 5: 5 Phase A Build AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.02 0.01 d_M, Delay for Movement [s/veh] 7.92 11.82 10.08 Movement LOS A A A A B B 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.04 0.04 0.11 0.11 95th-Percentile Queue Length [ft/In] 0.00 0.00 1.10 1.10 2.80 2.80 d_A, Approach Delay [s/veh] 0.00 1.50 11.11 Approach LOS A A B d_I, Intersection Delay [s/veh] 0.95 Intersection LOS B D32 Generated with 92MMUNUIi7 Scenario 5: 5 Phase A Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 5: Stillwater Rd and Stillwater Crossing Two-way stop Delay (sec / veh): 10.8 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.005 Name Stillwater Rd Stillwater Rd Stillwater Crossing N Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Stillwater Crossing N Base Volume Input [veh/h] 12 245 93 1 3 26 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 12 245 93 1 3 26 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 61 23 0 1 7 Total Analysis Volume [veh/h] 12 245 93 1 3 26 Pedestrian Volume [ped/h] D33 Generated with Version 2022 (SP 0- Intersection Settings Scenario 5: 5 Phase A Build AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.03 d_M, Delay for Movement [s/veh] 7.41 10.84 8.87 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.00 0.00 0.10 0.10 95th-Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.00 2.46 2.46 d_A, Approach Delay [s/veh] 0.35 0.00 9.07 Approach LOS A A A d_I, Intersection Delay [s/veh] 0.93 Intersection LOS B D34 Generated with 92MMUNUIi7 Scenario 5: 5 Phase A Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 19.9 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.074 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 12 143 68 99 29 11 22 77 11 43 49 173 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 12 143 68 99 29 11 22 77 11 43 49 173 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 36 17 25 7 3 6 19 3 11 12 43 Total Analysis Volume [veh/h] 12 143 68 99 29 11 22 77 11 43 49 173 Pedestrian Volume [ped/h] D35 Generated with Version 2022 (SP 0- Intersection Settings Scenario 5: 5 Phase A Build AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 j.00 O.Ou 0.07 0.07 1 0.17 0.01 0.11 1 0.10 1 0.20 d_M, Delay for Movement [s/veh] 7.31 ) 7.86T 19.86 1 15.75 11.28 15.64 T4.79 1 11.29 Movement LOS A A A A A A C C B C B B 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.02 0.24 0.00 0.00 1.00 1.00 1.00 0.38 1 1.28 1.28 95th-Percentile Queue Length [ft/In] 0.54 0.54 0.54 5.88 0.00 0.00 24.94 24.94 24.94 9.45T2.10 32.10 d_A, Approach Delay [s/veh] 0.39 5.60 16.13 12.65 Approach LOS A A C B d_I, Intersection Delay [s/veh] 8.13 Intersection LOS C D36 Generated with 92MMUNUIi7 Scenario 5: 5 Phase A Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 7: 4 Mile Dr and Stillwater Access E Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.2 A 0.061 Name Stillwater Access E 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access E 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 56 7 3 40 24 24 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 7 3 40 24 24 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 2 1 10 6 6 Total Analysis Volume [veh/h] 56 7 3 40 24 24 Pedestrian Volume [ped/h] D37 Generated with Version 2022 (SP 0- Intersection Settings Scenario 5: 5 Phase A Build AM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.06 0.01 0.00 d_M, Delay for Movement [s/veh] 9.20 8.75 7.31 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.22 0.22 0.01 0.01 0.00 0.00 95th-Percentile Queue Length [ft/In] 5.44 5.44 0.13 0.13 0.00 0.00 d_A, Approach Delay [s/veh] 9.15 0.51 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 3.89 Intersection LOS A i Generated with 92MMUNUIi7 Scenario 5: 5 Phase A Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 8: 4 Mile Dr and Stillwater Access W Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 8.9 A 0.016 Name Stillwater Access W 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access W 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 15 2 1 28 24 7 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 15 2 1 28 24 7 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 4 1 0 7 6 2 Total Analysis Volume [veh/h] 15 2 1 28 24 7 Pedestrian Volume [ped/h] D39 Generated with Version 2022 (SP 0- Intersection Settings Scenario 5: 5 Phase A Build AM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.00 d_M, Delay for Movement [s/veh] 8.86 8.50 7.28 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.05 0.05 0.00 0.00 0.00 0.00 95th-Percentile Queue Length [ft/In] 1.35 1.35 0.04 0.04 0.00 0.00 d_A, Approach Delay [s/veh] 8.82 0.25 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.04 Intersection LOS A am Generated with LWZSM Scenario 5: 5 Phase A Build AM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and Stillwater C Stillwater Rd and 4 Mile Dr n2 9 3 22 J 173 77 ~ 49f 13 26 11 43Whim CO m N i7 4 Mile Dr and Stillwater Acce �4 Mile Dr and Stillwater Acce 3 24 )( 1 —' ' 7 40 24 28 — 24 D41 Generated with 92MM NUM Scenario 6: 6 Phase A Build PM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.0 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 56 26 67 56 44 10 4 123 30 51 270 31 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 26 67 56 44 10 4 123 30 51 270 31 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 7 17 14 11 3 1 31 8 13 68 8 Total Analysis Volume [veh/h] 56 26 67 56 44 10 4 123 30 51 270 31 Pedestrian Volume [ped/h] 0 0 0 0 D42 Generated with Version 2022 (SP 0- Intersection Settings Scenario 6: 6 Phase A Build PM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 187 385 154 88 Exiting Flow Rate [veh/h] 128 62 343 251 Demand Flow Rate [veh/h] 56 26 67 56 44 10 4 123 30 51 270 31 Adjusted Demand Flow Rate [veh/h] 56 26 67 56 44 10 4 123 30 51 270 31 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 152 113 161 360 Capacity of Entry and Bypass Lanes [veh/h] 1141 933 1180 1262 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1119 914 1157 1238 X, volume / capacity 0.13 0.12 0.14 0.28 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.46 0.41 0.47 1.18 95th-Percentile Queue Length [ft] 11.48 10.22 11.74 29.51 Approach Delay [s/veh] 4.38 5.08 4.28 5.49 Approach LOS A A A A Intersection Delay [s/veh] 4.97 Intersection LOS A D43 Generated with 92MM NUM Scenario 6: 6 Phase A Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 10.2 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.068 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Base Volume Input [veh/h] 77 17 9 117 52 34 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 77 17 9 117 52 34 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 19 4 2 29 13 9 Total Analysis Volume [veh/h] 77 17 9 117 52 34 Pedestrian Volume [ped/h] am Generated with Version 2022 (SP 0- Intersection Settings Scenario 6: 6 Phase A Build PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.07 0.03 d_M, Delay for Movement [s/veh] 7.41 10.22 9.19 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.02 0.02 0.34 0.34 95th-Percentile Queue Length [ft/In] 0.00 0.00 0.38 0.38 8.59 8.59 d_A, Approach Delay [s/veh] 0.00 0.53 9.81 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.98 Intersection LOS B D45 Generated with 92MM NUM Scenario 6: 6 Phase A Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 5: Stillwater Rd and Stillwater Crossing Two-way stop Delay (sec / veh): 10.1 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.004 Name Stillwater Rd Stillwater Rd Stillwater Crossing N Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Stillwater Crossing N Base Volume Input [veh/h] 36 81 95 5 3 26 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 36 81 95 5 3 26 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 9 20 24 1 1 7 Total Analysis Volume [veh/h] 36 81 95 5 3 26 Pedestrian Volume [ped/h] a• Generated with Version 2022 (SP 0- Intersection Settings Scenario 6: 6 Phase A Build PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.03 d_M, Delay for Movement [s/veh] 7.45 10.13 8.88 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.06 0.06 0.00 0.00 0.10 0.10 95th-Percentile Queue Length [ft/In] 1.53 1.53 0.00 0.00 2.42 2.42 d_A, Approach Delay [s/veh] 2.29 0.00 9.01 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.15 Intersection LOS B D47 Generated with 92MM NUM Scenario 6: 6 Phase A Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 16.3 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.040 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 13 22 1 69 96 1 42 20 15 81 1 7 103 1 99 1 94 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 13 22 69 96 42 20 15 1 81 1 7 103 99 1 94 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 6 17 24 11 5 4 20 2 26 25 24 Total Analysis Volume [veh/h] 13 22 69 96 42 20 15 81 7 103 99 94 Pedestrian Volume [ped/h] am Generated with Version 2022 (SP 0- Intersection Settings Scenario 6: 6 Phase A Build PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 j.00 O.Ou 0.06 0.04 1 0.15 1 0.01 0.22 1 0.18 0.09 d_M, Delay for Movement [s/veh] 7.36 ) 7.56 1 16.30 1 13.61 1 10.30 15.02 13.59 10.51 Movement LOS A A A A A A C B B C B B 95th-Percentile Queue Length [veh/In] 0.03 0.03 0.03 0.20 0.00 0.00 0.74 0.74 1 0.74 0.84 1 1.12 1.12 95th-Percentile Queue Length [ft/In] 0.63 0.63 0.63 5.11 0.00 0.00 18.58 18.58 18.58 21.12 28.05 28.05 d_A, Approach Delay [s/veh] 0.92 4.59 13.78 13.11 Approach LOS A A B B d_I, Intersection Delay [s/veh] 9.26 Intersection LOS C a• Generated with 92MM NUM Scenario 6: 6 Phase A Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 7: 4 Mile Dr and Stillwater Access E Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.5 A 0.065 Name Stillwater Access E 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access E 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 56 7 9 24 47 77 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 7 9 24 47 77 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 2 2 6 12 19 Total Analysis Volume [veh/h] 56 7 9 24 47 77 Pedestrian Volume [ped/h] D50 Generated with Version 2022 (SP 0- Intersection Settings Scenario 6: 6 Phase A Build PM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.06 0.01 0.01 d_M, Delay for Movement [s/veh] 9.50 9.02 7.47 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.23 0.23 0.02 0.02 0.00 0.00 95th-Percentile Queue Length [ft/In] 5.82 5.82 0.38 0.38 0.00 0.00 d_A, Approach Delay [s/veh] 9.45 2.04 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 3.01 Intersection LOS A D51 Generated with 92MM NUM Scenario 6: 6 Phase A Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 8: 4 Mile Dr and Stillwater Access W Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 8.9 A 0.016 Name Stillwater Access W 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access W 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 15 2 3 18 33 21 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 15 2 3 18 33 21 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 4 1 1 5 8 5 Total Analysis Volume [veh/h] 15 2 3 18 33 21 Pedestrian Volume [ped/h] D52 Generated with Version 2022 (SP 0- Intersection Settings Scenario 6: 6 Phase A Build PM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.00 d_M, Delay for Movement [s/veh] 8.92 8.58 7.32 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.05 0.05 0.01 0.01 0.00 0.00 95th-Percentile Queue Length [ft/In] 1.37 1.37 0.13 0.13 0.00 0.00 d_A, Approach Delay [s/veh] 8.88 1.05 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.88 Intersection LOS A D53 Generated with F2MKTI i7Ti7 Scenario 6: 6 Phase A Build PM 1 /17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and Stillwater C 4 _ _ 31 34 3 30 5 f 52 26 i 4 Mile Dr and Stillwater Acce �4 Mile Dr and Stillwater Acce g J 77 )( 3 —1 �,— 21 24 47 18 — 33 Stillwater Rd and 4 Mile Dr 6� ar' 81 94 99 7 � � 103 D54 Generated with 92MM NUM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.6 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 48 31 113 30 58 4 8 238 132 113 116 30 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 48 31 113 30 58 4 8 1 238 1 132 113 116 1 30 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 12 8 28 8 15 1 2 60 33 28 29 8 Total Analysis Volume [veh/h] 48 31 113 30 58 4 8 238 132 113 116 30 Pedestrian Volume [ped/h] 0 0 0 0 D55 Generated with Version 2022 (SP 0- Intersection Settings Scenario 7: 7 Phase B Build AM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 282 283 205 89 Exiting Flow Rate [veh/h] 309 70 171 389 Demand Flow Rate [veh/h] 48 31 113 30 58 4 8 238 132 113 116 30 Adjusted Demand Flow Rate [veh/h] 48 31 113 30 58 4 8 238 132 113 116 30 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 196 94 386 265 Capacity of Entry and Bypass Lanes [veh/h] 1036 1035 1120 1261 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1016 1015 1098 1236 X, volume / capacity 0.19 0.09 0.34 0.21 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.69 0.30 1.55 0.79 95th-Percentile Queue Length [ft] 17.37 7.46 38.73 19.76 Approach Delay [s/veh] 5.32 4.36 6.71 4.73 Approach LOS A A A A Intersection Delay [s/veh] 5.63 Intersection LOS A D56 Generated with 92MM NUM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 15.7 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.037 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Base Volume Input [veh/h] 25 307 1 34 26 1 119 13 38 13 1 76 13 1 4 1 9 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 25 307 34 26 119 13 38 13 76 13 4 9 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 6 77 9 7 30 3 10 3 19 3 1 2 Total Analysis Volume [veh/h] 25 307 34 26 119 13 38 13 76 13 4 9 Pedestrian Volume [ped/h] D57 Generated with Version 2022 (SP 0- Intersection Settings Scenario 7: 7 Phase B Build AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 j.00 O.Ou 0.02 0.09 1 0.03 0.08 0.04 1 0.01 1 0.01 d_M, Delay for Movement [s/veh] 7.51 ) 7.99T 15.25 1 15.22 10.40 15.69 T4.10 1 10.53 Movement LOS A A A A A A C C B C B B 95th-Percentile Queue Length [veh/In] 0.04 0.04 0.04 0.04 0.04 0.04 0.77 0.77 0.77 0.19 1 0.19 0.19 95th-Percentile Queue Length [ft/In] 1.08 1 1.08 1.08 1.12 1.12 1.12 19.20 1 19.20 1 19.20 4.67 4.67 4.67 d_A, Approach Delay [s/veh] 0.51 1.31 12.34 13.66 Approach LOS A A B B d_I, Intersection Delay [s/veh] 3.42 Intersection LOS C i Generated with 92MM NUM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: Stillwater Rd and Development Access Two-way stop Delay (sec / veh): 13.3 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.052 Name Stillwater Rd Stillwater Rd Development Access Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Development Access Base Volume Input [veh/h] 20 335 187 8 25 59 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 20 335 187 8 25 59 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 5 84 47 2 6 15 Total Analysis Volume [veh/h] 20 335 187 8 25 59 Pedestrian Volume [ped/h] D59 Generated with Version 2022 (SP 0- Intersection Settings Scenario 7: 7 Phase B Build AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.05 0.07 d_M, Delay for Movement [s/veh] 7.63 13.27 9.95 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.03 0.03 0.00 0.00 0.41 0.41 95th-Percentile Queue Length [ft/In] 0.84 0.84 0.00 0.00 10.34 10.34 d_A, Approach Delay [s/veh] 0.43 0.00 10.94 Approach LOS A A B d_I, Intersection Delay [s/veh] 1.69 Intersection LOS B ME Generated with 92MM NUM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 5: Stillwater Rd and Stillwater Crossing Two-way stop Delay (sec / veh): 12.4 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.006 Name Stillwater Rd Stillwater Rd Stillwater Crossing N Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Stillwater Crossing N Base Volume Input [veh/h] 12 289 227 1 3 26 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 12 289 227 1 3 26 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 72 57 0 1 7 Total Analysis Volume [veh/h] 12 289 227 1 3 26 Pedestrian Volume [ped/h] D61 Generated with Version 2022 (SP 0- Intersection Settings Scenario 7: 7 Phase B Build AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.01 0.03 d_M, Delay for Movement [s/veh] 7.70 12.43 9.62 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.00 0.00 0.12 0.12 95th-Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.00 2.96 2.96 d_A, Approach Delay [s/veh] 0.31 0.00 9.91 Approach LOS A A A d_I, Intersection Delay [s/veh] 0.68 Intersection LOS B D62 Generated with 92MM NUM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 34.6 HCM 7th Edition Level Of Service: D 15 minutes Volume to Capacity (v/c): 0.151 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 12 152 68 193 56 24 26 77 11 43 49 204 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 12 152 68 193 56 24 26 1 77 1 11 43 49 1 204 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 38 17 48 14 6 7 19 3 11 12 51 Total Analysis Volume [veh/h] 12 152 68 193 56 24 26 77 11 43 49 204 Pedestrian Volume [ped/h] D63 Generated with Version 2022 (SP 0- Intersection Settings Scenario 7: 7 Phase B Build AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 j.00 O.Ou 0.14 0.15 1 0.25 1 0.01 0.19 1 0.15 0.24 d_M, Delay for Movement [s/veh] 7.39 ) 8.11 1 34.64 1 25.39 1 17.37 24.31 19.85 12.76 Movement LOS A A A A A A D D C C C B 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.02 0.50 0.00 0.00 1.91 1.91 1.91 0.67 1 1.86 1.86 95th-Percentile Queue Length [ft/In] 0.53 0.53 0.53 12.48 0.00 0.00 47.81 47.81 47.81 16.84 46.60 46.60 d_A, Approach Delay [s/veh] 0.38 5.74 26.72 15.61 Approach LOS A A D C d_I, Intersection Delay [s/veh] 10.19 Intersection LOS D M Generated with 92MM NUM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 7: 4 Mile Dr and Stillwater Access E Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.3 A 0.062 Name Stillwater Access E 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access E 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 56 7 3 44 37 24 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 7 3 44 37 24 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 2 1 11 9 6 Total Analysis Volume [veh/h] 56 7 3 44 37 24 Pedestrian Volume [ped/h] D65 Generated with Version 2022 (SP 0- Intersection Settings Scenario 7: 7 Phase B Build AM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.06 0.01 0.00 d_M, Delay for Movement [s/veh] 9.30 8.82 7.34 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.22 0.22 0.01 0.01 0.00 0.00 95th-Percentile Queue Length [ft/In] 5.57 5.57 0.13 0.13 0.00 0.00 d_A, Approach Delay [s/veh] 9.25 0.47 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 3.54 Intersection LOS A M• Generated with 92MM NUM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 8: 4 Mile Dr and Stillwater Access W Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 8.9 A 0.016 Name Stillwater Access W 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access W 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 15 2 1 32 37 7 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 15 2 1 32 37 7 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 4 1 0 8 9 2 Total Analysis Volume [veh/h] 15 2 1 32 37 7 Pedestrian Volume [ped/h] D67 Generated with Version 2022 (SP 0- Intersection Settings Scenario 7: 7 Phase B Build AM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.00 d_M, Delay for Movement [s/veh] 8.95 8.56 7.30 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.06 0.06 0.00 0.00 0.00 0.00 95th-Percentile Queue Length [ft/In] 1.38 1.38 0.04 0.04 0.00 0.00 d_A, Approach Delay [s/veh] 8.90 0.22 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.69 Intersection LOS A go Generated with LWZSM Scenario 7: 7 Phase B Build AM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and Developme Stillwater Rd and Stillwater C r � cao �fV f` N � W�4} 3 Stillwater Rd and 4 Mile Dr (44 Mile Dr and Stillwater Acce 4 Mile Dr and Stillwater Acce NCn� l ' 1 ti � N ST 26 J � 204 3 24 1 1 7 77 44 � 37 32 37 1 "� 43 r �rn rvSP q] N � 238 3 g 13 q 25 3 132 113 78 13 59 � 26 9 Generated with 92MM NUM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.4 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 62 30 98 56 51 10 4 123 41 104 270 31 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 62 30 98 56 51 10 4 1 123 1 41 104 270 1 31 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 16 8 25 14 13 3 1 31 10 26 68 8 Total Analysis Volume [veh/h] 62 30 98 56 51 10 4 123 41 104 270 31 Pedestrian Volume [ped/h] 0 0 0 0 D70 Generated with Version 2022 (SP 0- Intersection Settings Scenario 8: 8 Phase B Build PM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 187 445 215 98 Exiting Flow Rate [veh/h] 200 66 349 283 Demand Flow Rate [veh/h] 62 30 98 56 51 10 4 123 41 104 270 31 Adjusted Demand Flow Rate [veh/h] 62 30 98 56 51 10 4 123 41 104 270 31 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 194 120 172 414 Capacity of Entry and Bypass Lanes [veh/h] 1141 877 1109 1249 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1119 860 1087 1225 X, volume / capacity 0.17 0.14 0.15 0.33 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.61 0.47 0.55 1.46 95th-Percentile Queue Length [ft] 15.27 11.76 13.66 36.55 Approach Delay [s/veh] 4.73 5.53 4.69 6.04 Approach LOS A A A A Intersection Delay [s/veh] 5.43 Intersection LOS A D71 Generated with 92MM NUM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 15.0 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.122 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Base Volume Input [veh/h] 84 94 17 9 145 42 25 8 50 52 14 34 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 84 94 17 9 145 42 25 1 8 1 50 527 14 1 34 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 21 24 4 2 36 11 6 2 13 13 4 9 Total Analysis Volume [veh/h] 84 94 17 9 145 42 25 8 50 52 14 34 Pedestrian Volume [ped/h] D72 Generated with Version 2022 (SP 0- Intersection Settings Scenario 8: 8 Phase B Build PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.06 j.00 O.Ou 0.01 0.06 1 0.02 0.06 0.12 1 0.03 1 0.04 d_M, Delay for Movement [s/veh] 7.70 ) 7.45T 14.19 1 13.68 9.97 15.04 T4.52 1 10.36 Movement LOS A A A A A A B B A C B B 95th-Percentile Queue Length [veh/In] 0.15 0.15 0.15 0.02 0.02 0.02 0.45 0.45 0.45 0.69 1 0.69 0.69 95th-Percentile Queue Length [ft/In] 3.79 3.79 3.79 0.39 0.39 0.39 11.34 11.34 11.34 17.24 17.24 17.24 d_A, Approach Delay [s/veh] 3.32 0.34 11.60 13.37 Approach LOS A A B B d_I, Intersection Delay [s/veh] 5.25 Intersection LOS C D73 Generated with 92MM NUM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: Stillwater Rd and Development Access Two-way stop Delay (sec / veh): 12.4 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.033 Name Stillwater Rd Stillwater Rd Development Access Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Development Access Base Volume Input [veh/h] 66 166 167 28 17 39 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 66 166 167 28 17 39 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 17 42 42 7 4 10 Total Analysis Volume [veh/h] 66 166 167 28 17 39 Pedestrian Volume [ped/h] D74 Generated with Version 2022 (SP 0- Intersection Settings Scenario 8: 8 Phase B Build PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.05 0.03 0.05 d_M, Delay for Movement [s/veh] 7.69 12.39 9.60 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.11 0.11 0.00 0.00 0.25 0.25 95th-Percentile Queue Length [ft/In] 2.85 2.85 0.00 0.00 6.34 6.34 d_A, Approach Delay [s/veh] 2.19 0.00 10.45 Approach LOS A A B d_I, Intersection Delay [s/veh] 2.26 Intersection LOS B D75 Generated with 92MM NUM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 5: Stillwater Rd and Stillwater Crossing Two-way stop Delay (sec / veh): 12.1 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.006 Name Stillwater Rd Stillwater Rd Stillwater Crossing N Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Stillwater Crossing N Base Volume Input [veh/h] 36 231 184 5 3 26 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 36 231 184 5 3 26 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 9 58 46 1 1 7 Total Analysis Volume [veh/h] 36 231 184 5 3 26 Pedestrian Volume [ped/h] D76 Generated with Version 2022 (SP 0- Intersection Settings Scenario 8: 8 Phase B Build PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.03 0.01 0.03 d_M, Delay for Movement [s/veh] 7.64 12.07 9.38 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.06 0.06 0.00 0.00 0.11 0.11 95th-Percentile Queue Length [ft/In] 1.53 1.53 0.00 0.00 2.81 2.81 d_A, Approach Delay [s/veh] 1.03 0.00 9.65 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.14 Intersection LOS B D77 Generated with 92MM NUM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 28.1 HCM 7th Edition Level Of Service: D 15 minutes Volume to Capacity (v/c): 0.144 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 13 52 69 158 60 29 30 81 7 103 99 199 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 13 52 69 158 60 29 30 1 81 1 7 103 99 1 199 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 13 17 40 15 7 8 20 2 26 25 50 Total Analysis Volume [veh/h] 13 52 69 158 60 29 30 81 7 103 99 199 Pedestrian Volume [ped/h] i Generated with Version 2022 (SP 0- Intersection Settings Scenario 8: 8 Phase B Build PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 J.00 0.0u 0.11 0.14 1 0.20 1 0.01 0.32 1 0.24 0.20 d_M, Delay for Movement [s/veh] 7.41 ) 7.75 1 28.06 1 19.87 1 14.46 21.46 18.11 13.00 Movement LOS A A A A A A D C B C C B 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.02 0.36 0.00 0.00 1.56 1.56 1 1.56 1.35 1 2.31 2.31 95th-Percentile Queue Length [ft/In] 0.61 0.61 0.61 9.04 0.00 0.00 38.91 38.91 38.91 33.82 5 7.76 57.76 d_A, Approach Delay [s/veh] 0.72 4.96 21.63 16.43 Approach LOS A A C C d_I, Intersection Delay [s/veh] 11.62 Intersection LOS D D79 Generated with 92MM NUM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 7: 4 Mile Dr and Stillwater Access E Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.7 A 0.067 Name Stillwater Access E 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access E 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 56 7 9 39 56 77 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 7 9 39 56 77 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 2 2 10 14 19 Total Analysis Volume [veh/h] 56 7 9 39 56 77 Pedestrian Volume [ped/h] M Generated with Version 2022 (SP 0- Intersection Settings Scenario 8: 8 Phase B Build PM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.07 0.01 0.01 d_M, Delay for Movement [s/veh] 9.65 9.08 7.49 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.24 0.24 0.02 0.02 0.00 0.00 95th-Percentile Queue Length [ft/In] 6.01 6.01 0.38 0.38 0.00 0.00 d_A, Approach Delay [s/veh] 9.59 1.40 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.75 Intersection LOS A 01 Generated with 92MM NUM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 8: 4 Mile Dr and Stillwater Access W Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.0 A 0.017 Name Stillwater Access W 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access W 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 15 2 3 33 42 21 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 15 2 3 33 42 21 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 4 1 1 8 11 5 Total Analysis Volume [veh/h] 15 2 3 33 42 21 Pedestrian Volume [ped/h] i Generated with Version 2022 (SP 0- Intersection Settings Scenario 8: 8 Phase B Build PM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.00 d_M, Delay for Movement [s/veh] 9.04 8.62 7.34 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.06 0.06 0.01 0.01 0.00 0.00 95th-Percentile Queue Length [ft/In] 1.41 1.41 0.13 0.13 0.00 0.00 d_A, Approach Delay [s/veh] 8.99 0.61 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.51 Intersection LOS A i Generated with LWZSM Scenario 8: 8 Phase B Build PM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and Developme Stillwater Rd and Stillwater C �[74U Y NAB C7A 31 25 3 3 270 8 14 17 d � � 104 50 � � 52 39 � 26 Stillwater Rd and 4 Mile Dr 4 Mile Dr and Stillwater Acce 4 Mile Dr and Stillwater Acce L:J mom 7 � � 34 J � 199 9 77 3 21 81 39 56 33 42 � � 0 7 3 wN� M Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.7 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 48 31 139 30 58 4 8 238 132 121 116 30 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 48 31 139 30 58 4 8 1 238 1 132 121 116 1 30 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 12 8 35 8 15 1 2 60 33 30 29 8 Total Analysis Volume [veh/h] 48 31 139 30 58 4 8 238 132 121 116 30 Pedestrian Volume [ped/h] 0 0 0 0 i Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 282 291 213 89 Exiting Flow Rate [veh/h] 317 70 171 415 Demand Flow Rate [veh/h] 48 31 139 30 58 4 8 238 132 121 116 30 Adjusted Demand Flow Rate [veh/h] 48 31 139 30 58 4 8 238 132 121 116 30 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 223 94 386 273 Capacity of Entry and Bypass Lanes [veh/h] 1036 1026 1111 1261 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1016 1006 1089 1236 X, volume / capacity 0.21 0.09 0.35 0.22 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.81 0.30 1.57 0.82 95th-Percentile Queue Length [ft] 20.34 7.53 39.21 20.53 Approach Delay [s/veh] 5.59 4.40 6.79 4.79 Approach LOS A A A A Intersection Delay [s/veh] 5.73 Intersection LOS A M Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 17.3 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.097 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Base Volume Input [veh/h] 25 332 1 40 29 1 127 13 38 13 1 76 32 1 4 1 18 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 25 332 40 29 127 13 38 13 76 32 4 18 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 6 83 10 7 32 3 10 3 19 8 1 5 Total Analysis Volume [veh/h] 25 332 40 29 127 13 38 13 76 32 4 18 Pedestrian Volume [ped/h] i Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 j.00 O.Ou 0.02 0.10 1 0.03 1 0.08 0.10 1 0.01 0.03 d_M, Delay for Movement [s/veh] 7.52 ) 8.07 1 16.27 1 15.99 1 10.64 17.30 15.48 11.57 Movement LOS A A A A A A C C B C C B 95th-Percentile Queue Length [veh/In] 0.04 0.04 0.04 0.05 0.05 0.05 0.82 0.82 1 0.82 0.46 1 0.46 0.46 95th-Percentile Queue Length [ft/In] 1.08 1.08 1.08 1.25 1.25 1.25 20.55 20.55 20.55 11.43 11.43 11.43 d_A, Approach Delay [s/veh] 0.47 1.38 12.87 15.26 Approach LOS A A B C d_I, Intersection Delay [s/veh] 3.86 Intersection LOS C am Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: Stillwater Rd and Development Access Two-way stop Delay (sec / veh): 16.2 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.075 Name Stillwater Rd Stillwater Rd Development Access Development Access Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(' -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd Development Access Development Access Base Volume Input [veh/h] 20 354 8 4 210 8 25 0 59 26 0 11 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 20 354 8 4 210 8 25 0 59 26 0 11 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 5 89 2 1 53 2 6 0 15 7 0 3 Total Analysis Volume [veh/h] 20 354 8 4 210 8 25 0 59 26 0 11 Pedestrian Volume [ped/h] M Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 J.00 0.0u 0.00 0.07 1 0.00 0.07 0.07 1 0.00 1 0.02 d_M, Delay for Movement [s/veh] 7.69 ) 8.01 15.36 10.29 16.25 11.13 Movement LOS A A A A A A C _ B C C B 95th-Percentile Queue Length [veh/In] 0.03 0.03 0.03 0.01 0.01 0.01 0.47 0.47 0.30 0.30 0.30 95th-Percentile Queue Length [ft/In] 0.85 0.85 0.85 0.17 0.17 0.17 11.81 11.81 7.45 7.45 7.45 d_A, Approach Delay [s/veh] 0.40 0.14 11.80 14.73 Approach LOS A A B B d_I, Intersection Delay [s/veh] 2.37 Intersection LOS C M Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 4: Stillwater Rd and Timberwolf Access S Two-way stop Delay (sec / veh): 11.8 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.060 Name Stillwater Rd Stillwater Rd Timberwolf Access S Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Access S Base Volume Input [veh/h] 274 11 4 156 34 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 274 11 4 156 34 13 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 69 3 1 39 9 3 Total Analysis Volume [veh/h] 274 11 4 156 34 13 Pedestrian Volume [ped/h] D91 Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.06 0.02 d_M, Delay for Movement [s/veh] 7.82 11.81 10.23 Movement LOS A A A A B B 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.01 0.01 0.25 0.25 95th-Percentile Queue Length [ft/In] 0.00 0.00 0.17 0.17 6.22 6.22 d_A, Approach Delay [s/veh] 0.00 0.20 11.37 Approach LOS A A B d_I, Intersection Delay [s/veh] 1.15 Intersection LOS B D92 Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 5: Stillwater Rd and Stillwater Crossing Two-way stop Delay (sec / veh): 13.5 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.007 Name Stillwater Rd Stillwater Rd Stillwater Crossing N Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Stillwater Crossing N Base Volume Input [veh/h] 12 313 305 1 3 26 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 12 313 305 1 3 26 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 78 76 0 1 7 Total Analysis Volume [veh/h] 12 313 305 1 3 26 Pedestrian Volume [ped/h] D93 Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.01 0.04 d_M, Delay for Movement [s/veh] 7.88 13.54 10.13 Movement LOS A A A A B B 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.00 0.00 0.13 0.13 95th-Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.00 3.31 3.31 d_A, Approach Delay [s/veh] 0.29 0.00 10.49 Approach LOS A A B d_I, Intersection Delay [s/veh] 0.60 Intersection LOS B am Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 55.6 HCM 7th Edition Level Of Service: F 15 minutes Volume to Capacity (v/c): 0.228 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 12 154 68 260 64 27 27 77 11 43 49 225 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 12 154 68 260 64 27 27 1 77 1 11 43 49 1 225 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 39 17 65 16 7 7 19 3 11 12 56 Total Analysis Volume [veh/h] 12 154 68 260 64 27 27 77 11 43 49 225 Pedestrian Volume [ped/h] D95 Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 J.00 0.0u 0.19 0.23 1 0.32 1 0.01 0.27 1 0.20 0.26 d_M, Delay for Movement [s/veh] 7.41 ) 8.31 1 55.57 1 40.21 1 28.87 35.55 24.70 14.32 Movement LOS A A A A A A F E D E C B 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.02 0.71 0.00 0.00 3.01 3.01 1 3.01 1.03 1 2.43 2.43 95th-Percentile Queue Length [ft/In] 0.53 0.53 0.53 17.85 0.00 0.00 75.29 75.29 75.29 25.74 60.74 60.74 d_A, Approach Delay [s/veh] 0.38 6.16 42.74 18.81 Approach LOS A A E C d_I, Intersection Delay [s/veh] 12.91 Intersection LOS F M Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 7: 4 Mile Dr and Stillwater Access E Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.3 A 0.063 Name Stillwater Access E 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access E 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 56 7 3 45 40 24 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 7 3 45 40 24 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 2 1 11 10 6 Total Analysis Volume [veh/h] 56 7 3 45 40 24 Pedestrian Volume [ped/h] D97 Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.06 0.01 0.00 d_M, Delay for Movement [s/veh] 9.33 8.84 7.34 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.22 0.22 0.01 0.01 0.00 0.00 95th-Percentile Queue Length [ft/In] 5.60 5.60 0.13 0.13 0.00 0.00 d_A, Approach Delay [s/veh] 9.27 0.46 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 3.46 Intersection LOS A M Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 8: 4 Mile Dr and Stillwater Access W Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) Name Stillwater Access W 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access W 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 15 2 1 33 40 7 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 15 2 1 33 40 7 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 4 1 0 8 10 2 Total Analysis Volume [veh/h] 15 2 1 33 40 7 Pedestrian Volume [ped/h] M Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.00 d_M, Delay for Movement [s/veh] 8.97 8.58 7.31 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.06 0.06 0.00 0.00 0.00 0.00 95th-Percentile Queue Length [ft/In] 1.39 1.39 0.04 0.04 0.00 0.00 d_A, Approach Delay [s/veh] 8.92 0.21 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.62 Intersection LOS A D100 Generated with 92MM NUM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 9: Timberwolf Pkwy and Timberwolf Access N Two-way stop Delay (sec / veh): 9.0 HCM 7th Edition Level Of Service: A 15 minutes Volume to Capacity (v/c): 0.030 Name Timberwolf Access N Timberwolf Pkwy Timberwolf Pkwy Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 25.00 30.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Timberwolf Access N Timberwolf Pkwy Timberwolf Pkwy Base Volume Input [veh/h] 28 0 0 0 0 2 20 5 9 0 1 1-7 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 28 0 0 0 0 2 20 5 9 0 1 0 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 7 0 0 0 0 1 5 1 2 0 0 0 Total Analysis Volume [veh/h] 28 0 0 0 0 2 20 5 9 0 1 0 Pedestrian Volume [ped/h] D101 Generated with Version 2022 (SP 0- Intersection Settings Scenario 9: 9 Phase C Build AM 1 /17/2023 Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] u 0 Two -Stage Gap Acceptance No No Number of Storage Spaces in Median 0 0 Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.03 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 1 0.00 O.Ou d_M, Delay for Movement [s/veh] 8.97 8.33 7.25 i 7.24 0.00 0.00 Movement LOS A A A A I A A I A 95th-Percentile Queue Length [veh/In] 0.09 9 0.09 0.( 0.01 0.04 0.04 0.04 0.00 0.00 J 95th-Percentile Queue Length [ft/In] 2.32 2 2.32 0.' 0.14 0.95 0.95 0.95 0 0.00 d_A, Approach Delay [s/veh] 8.97 8.33 4.26 0.00 Approach LOS A A A A d_I, Intersection Delay [s/veh] 6.35 Intersection LOS A D1O2 Generated with LWZSM Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and Developme Stillwater Rd and Timberwolf CDaC>i 2 to 1 $ � _ _ 76 _ 132 121 32 59 26 34 cb 04o� m ocC'nOD h ." j A Stillwater Rd and Stillwater C Stillwater Rd and 4 Mile Dr 4 Mile Dr and Stillwater Acce Mile Dr and Stillwater Acce [77 /4 3 r7J 225 324 1 � 7 26 D r 43 45 40 33 _ 40 r� w N �� D103 Generated with iiEiRTINI'Ti7 Scenario 9: 9 Phase C Build AM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Timberwolf Pkwy and Timber N OO } 20 J _ p s � � a Irk �fla D104 Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Intersection Level Of Service Report Intersection 1: Stillwater Rd and Reserve Dr Control Type: Roundabout Delay (sec / veh): 5.7 Analysis Method: HCM 7th Edition Level Of Service: A Analysis Period: 15 minutes Intersection Setup Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 55.00 55.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name Stillwater Rd Stillwater Rd Reserve Dr Reserve Dr Base Volume Input [veh/h] 62 30 118 56 51 10 4 123 41 138 270 31 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 Proportion of CAVs [%] 0.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 62 30 118 56 51 10 4 1 123 1 41 138 270 1 31 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 16 8 30 14 13 3 1 31 10 35 68 8 Total Analysis Volume [veh/h] 62 30 118 56 51 10 4 123 41 138 270 31 Pedestrian Volume [ped/h] 0 0 0 0 D105 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Number of Conflicting Circulating Lanes 1 1 1 1 Circulating Flow Rate [veh/h] 187 479 250 98 Exiting Flow Rate [veh/h] 235 66 349 303 Demand Flow Rate [veh/h] 62 30 118 56 51 10 4 123 41 138 270 31 Adjusted Demand Flow Rate [veh/h] 62 30 118 56 51 10 4 123 41 138 270 31 Lanes Overwrite Calculated Critical Headway No No No No User -Defined Critical Headway [s] I..... ­ W ­ W ­ W Overwrite Calculated Follow -Up Time No No No No User -Defined Follow -Up Time [s] 3._ 3.0 3.00 3.00 A (intercept) 1380.00 1380.00 1380.00 1380.00 B (coefficient) 0.00102 0.00102 0.00102 0.00102 HV Adjustment Factor 0.98 0.98 0.98 0.98 Entry Flow Rate [veh/h] 215 120 172 448 Capacity of Entry and Bypass Lanes [veh/h] 1141 847 1070 1249 Pedestrian Impedance 1.00 1.00 1.00 1.00 Capacity per Entry Lane [veh/h] 1119 830 1049 1225 X, volume / capacity 0.19 0.14 0.16 0.36 Movement, Approach, & Intersection Results Lane LOS A A A A 95th-Percentile Queue Length [veh] 0.69 0.49 0.57 1.65 95th-Percentile Queue Length [ft] 17.23 12.25 14.24 41.23 Approach Delay [s/veh] 4.90 5.76 4.89 6.37 Approach LOS A A A A Intersection Delay [s/veh] 5.69 Intersection LOS A A Ii Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 2: Stillwater Rd and Timberwolf Pkwy Two-way stop Delay (sec / veh): 17.1 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.171 Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Pkwy Timberwolf Pkwy Base Volume Input [veh/h] 84 110 38 19 172 42 25 8 50 64 14 40 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 84 110 38 19 172 42 25 1 8 1 50 647 14 1 40 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 21 28 10 5 43 11 6 2 13 16 4 10 Total Analysis Volume [veh/h] 84 110 38 19 172 42 25 8 50 64 14 40 Pedestrian Volume [ped/h] D107 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.06 j.00 O.Ou 0.01 0.07 1 0.02 1 0.06 0.17 1 0.03 0.04 d_M, Delay for Movement [s/veh] 7.76 ) 7.53 1 15.63 1 14.88 1 10.31 17.12 16.34 11.41 Movement LOS A A A A A A C B B C C B 95th-Percentile Queue Length [veh/In] 0.15 0.15 0.15 0.03 0.03 0.03 0.50 0.50 1 0.50 0.97 1 0.97 0.97 95th-Percentile Queue Length [ft/In] 3.87 3.87 3.87 0.83 0.83 0.83 12.61 12.61 12.61 24.32 24.32 24.32 d_A, Approach Delay [s/veh] 2.81 0.61 12.35 15.09 Approach LOS A A B C d_I, Intersection Delay [s/veh] 5.41 Intersection LOS C Wi Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 3: Stillwater Rd and Development Access Two-way stop Delay (sec / veh): 15.1 HCM 7th Edition Level Of Service: C 15 minutes Volume to Capacity (v/c): 0.046 Name Stillwater Rd Stillwater Rd Development Access Development Access Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(' -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd Development Access Development Access Base Volume Input [veh/h] 66 195 28 12 194 28 17 0 39 17 0 7 1-7 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 1 2.00 2.00 F.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 66 195 28 12 194 28 17 0 39 17 0 7 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 17 49 7 3 49 7 4 0 10 4 0 2 Total Analysis Volume [veh/h] 66 195 28 12 194 28 17 0 39 17 0 7 Pedestrian Volume [ped/h] D109 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.05 j.00 O.Ou 0.01 0.04 1 0.00 0.05 0.05 1 0.00 1 0.01 d_M, Delay for Movement [s/veh] 7.75 ) 7.69T14.65 9.89 15.15 .� 9.79 Movement LOS A A A A A A B _ A C B A 95th-Percentile Queue Length [veh/In] 0.12 0.12 0.12 0.02 0.02 0.02 0.29 0.29 0.17 0.17 0.17 95th-Percentile Queue Length [ft/In] 2.93 2.93 2.93 0.52 0.52 0.52 7.36 7.36 4.28 4.28 4.28 d_A, Approach Delay [s/veh] 1.77 0.39 11.34 13.58 Approach LOS A A B B d_I, Intersection Delay [s/veh] 2.60 Intersection LOS C D110 Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 4: Stillwater Rd and Timberwolf Access S Two-way stop Delay (sec / veh): 10.6 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.033 Name Stillwater Rd Stillwater Rd Timberwolf Access S Approach Northbound Southbound Westbound Lane Configuration �"► �"� Turning Movement Thru Right Left Thru Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 25.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Timberwolf Access S Base Volume Input [veh/h] 117 36 15 146 22 9 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 117 36 15 146 22 9 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 29 9 4 37 6 2 Total Analysis Volume [veh/h] 117 36 15 146 22 9 Pedestrian Volume [ped/h] D111 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.03 0.01 d_M, Delay for Movement [s/veh] 7.54 10.56 9.16 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.00 0.00 0.03 0.03 0.13 0.13 95th-Percentile Queue Length [ft/In] 0.00 0.00 0.63 0.63 3.32 3.32 d_A, Approach Delay [s/veh] 0.00 0.70 10.15 Approach LOS A A B d_I, Intersection Delay [s/veh] 1.24 Intersection LOS B D112 Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 5: Stillwater Rd and Stillwater Crossing Two-way stop Delay (sec / veh): 13.5 HCM 7th Edition Level Of Service: B 15 minutes Volume to Capacity (v/c): 0.007 Name Stillwater Rd Stillwater Rd Stillwater Crossing N Approach Northbound Southbound Eastbound Lane Configuration �"I F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Rd Stillwater Rd Stillwater Crossing N Base Volume Input [veh/h] 36 316 234 5 3 26 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 36 316 234 5 3 26 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 9 79 59 1 1 7 Total Analysis Volume [veh/h] 36 316 234 5 3 26 Pedestrian Volume [ped/h] D113 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.03 0.01 0.03 d_M, Delay for Movement [s/veh] 7.75 13.49 9.69 Movement LOS A A A A B A 95th-Percentile Queue Length [veh/In] 0.06 0.06 0.00 0.00 0.12 0.12 95th-Percentile Queue Length [ft/In] 1.53 1.53 0.00 0.00 3.06 3.06 d_A, Approach Delay [s/veh] 0.79 0.00 10.08 Approach LOS A A B d_I, Intersection Delay [s/veh] 0.92 Intersection LOS B D114 Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 6: Stillwater Rd and 4 Mile Dr Two-way stop Delay (sec / veh): 43.6 HCM 7th Edition Level Of Service: E 15 minutes Volume to Capacity (v/c): 0.242 Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Approach Northbound Southbound Eastbound Westbound Lane Configuration ,iF + i F Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 0 0 0 1 0 Entry Pocket Length [ft] 60.00 160.00 Floc, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 35.00 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Stillwater Rd Stillwater Rd 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 13 60 69 201 65 31 34 81 7 103 99 272 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 13 60 69 201 65 31 34 1 81 1 7 103 99 1 272 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 3 15 17 50 16 8 9 20 2 26 25 68 Total Analysis Volume [veh/h] 13 60 69 201 65 31 34 81 7 103 99 272 Pedestrian Volume [ped/h] D115 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 j.00 O.Ou 0.14 0.24 1 0.24 1 0.01 0.40 1 0.29 0.28 d_M, Delay for Movement [s/veh] 7.42 ) 7.87 1 43.65 1 28.75 1 21.74 28.17 22.46 15.78 Movement LOS A A A A A A E D C D C C 95th-Percentile Queue Length [veh/In] 0.02 0.02 0.02 0.48 0.00 0.00 2.48 2.48 1 2.48 1.84 1 3.60 3.60 95th-Percentile Queue Length [ft/In] 0.60 0.60 0.60 11.97 0.00 0.00 62.10 62.10 62.10 45.97 89.88 89.88 d_A, Approach Delay [s/veh] 0.68 5.32 32.50 1987. Approach LOS A A D C d_I, Intersection Delay [s/veh] 14.55 Intersection LOS E D116 Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 7: 4 Mile Dr and Stillwater Access E Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.7 A 0.068 Name Stillwater Access E 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access E 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 56 7 9 43 58 77 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 56 7 9 43 58 77 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 14 2 2 11 15 19 Total Analysis Volume [veh/h] 56 7 9 43 58 77 Pedestrian Volume [ped/h] D117 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.07 0.01 0.01 d_M, Delay for Movement [s/veh] 9.69 9.10 7.49 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.24 0.24 0.02 0.02 0.00 0.00 95th-Percentile Queue Length [ft/In] 6.06 6.06 0.38 0.38 0.00 0.00 d_A, Approach Delay [s/veh] 9.63 1.30 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.70 Intersection LOS A D118 Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 8: 4 Mile Dr and Stillwater Access W Two-way stop Delay (sec / veh): HCM 7th Edition Level Of Service: 15 minutes Volume to Capacity (v/c) 9.1 A 0.017 Name Stillwater Access W 4 Mile Dr 4 Mile Dr Approach Southbound Eastbound Westbound Lane Configuration �"� �"► Turning Movement Left Right Left Thru Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 35.00 35.00 35.00 Grade [%] 0.00 0.00 0.00 Crosswalk No No No Volumes Name Stillwater Access W 4 Mile Dr 4 Mile Dr Base Volume Input [veh/h] 15 2 3 37 44 21 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 15 2 3 37 44 21 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 4 1 1 9 11 5 Total Analysis Volume [veh/h] 15 2 3 37 44 21 Pedestrian Volume [ped/h] D119 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.00 d_M, Delay for Movement [s/veh] 9.08 8.63 7.35 Movement LOS A A A A A A 95th-Percentile Queue Length [veh/In] 0.06 0.06 0.01 0.01 0.00 0.00 95th-Percentile Queue Length [ft/In] 1.42 1.42 0.13 0.13 0.00 0.00 d_A, Approach Delay [s/veh] 9.02 0.55 0.00 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.44 Intersection LOS A D120 Generated with 92MM NUM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0- Control Type: Analysis Method Analysis Period: Intersection Setup Intersection Level Of Service Report Intersection 9: Timberwolf Pkwy and Timberwolf Access N Two-way stop Delay (sec / veh): 8.9 HCM 7th Edition Level Of Service: A 15 minutes Volume to Capacity (v/c): 0.019 Name Timberwolf Access N Timberwolf Pkwy Timberwolf Pkwy Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left I Thru Right Left Thru Right Lane Width [ft] 1200. 1200. 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] 10(, -- No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] 0 (^^ Speed [mph] 25.00 30.00 25.00 25.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk No No No No Volumes Name Timberwolf Access N Timberwolf Pkwy Timberwolf Pkwy Base Volume Input [veh/h] 18 0 0 0 0 22 3 1 1 30 0 1 5 1 0 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1 2.00 1 2.00 2.00 2.00 2.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 TO 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 TT 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 18 0 0 0 0 22 3 1 30 0 5 0 Peak Hour Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15-Minute Volume [veh/h] 5 0 0 0 0 6 1 0 8 0 1 0 Total Analysis Volume [veh/h] 18 0 0 0 0 22 3 1 30 0 5 0 Pedestrian Volume [ped/h] D121 Generated with Version 2022 (SP 0- Intersection Settings Scenario 10: 10 Phase C Build PM 1 /17/2023 Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] u 0 Two -Stage Gap Acceptance No No Number of Storage Spaces in Median 0 0 Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.00 0.00 0.00 0.00 0.02 0.00 0.00 0.00 0.00 1 0.00 O.Ou d_M, Delay for Movement [s/veh] 8.88 8.41 7.23 i 7.28 0.00 0.00 Movement LOS A A A A I A A I A 95th-Percentile Queue Length [veh/In] 0.06 -S 0.06 0.06 1 0.( 0.06 0.01 0.01 0.01 0.00 0.00 J 95th-Percentile Queue Length [ft/In] 1.45 5 1.45 1.56 1. 1.56 0.15 0.15 0.15 0 0.00 d_A, Approach Delay [s/veh] 8.88 8.41 0.64 0.00 Approach LOS A A A A d_I, Intersection Delay [s/veh] 4.64 Intersection LOS A D122 Generated with LWZSM Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Stillwater Rd and Reserve Dr Stillwater Rd and Timberwolf Stillwater Rd and Developme Stillwater Rd and Timberwolf + i 123 � 270 2s 8 - L 14 0 - 0 9 41 � � 138 50 � � 64 39 � � 17 � 22 d7Ws NOS ��9p rCh OT�N rn�� f � f.s V Q1 Stillwater Rd and Stillwater C Stillwater Rd and 4 Mile Dr 4 Mile Dr and Stillwater Acce 4 Mile Dr and Stillwater Acce L�J `" g J 272 r--, g J 77321 26 03 43 66837 44 D123 Generated with iiEiRTINI'Ti7 Scenario 10: 10 Phase C Build PM 1/17/2023 Version 2022 (SP 0-7) Traffic Volume - Base Volume Tiimmberwolf Pkwy and Timber 9 3 q 34 p 1�f °Ooa D124 MY OF KALISPELL-, lis,ell Growth Policy - Timberwolf Ridge ® Subject Parcel 0 V Commercial Urban Mixed Use ° High Density Residential Ad a Urban Mixed ° Use Commercial Subject Parcel 93 �e High Density 93 Residential Data Sources: Montana Cadastral, N 0 160 320 640 960 Flathead County GIs. Feet City of Kalispell GIs, Basemap: Austin Bachurski - 12/15/2022 Esri Community Maps, ArCGIS.com CITY OF Kalispell Mailing List ®Subject Parcel � Mailing List Parcels KALISPELL Timberwolf Ridge 0 Other Parcels Data Sources: Montana Cadastral, Flathead County GIs. City of Kalispell GIs, Austin Bachurski - 12/15/2022 0 345 690 1380 2070 Feet Basemap: Esri Community Maps, ArcGIS.com