Burns McDonnell Statement of Qualifications Solid Waste Master Plano u i), i,) i,,, 8 3 4 3 47 7
,JAINUARY 6, 2023
5:00 P.M. HT
January 6.2823
Ms. Susie Turner, Public Works Director
City of Kalispell
Kalispell, MT 59901
Re. Burms& McDonnell Response bmCity of Kalispell Solid Waste Master Plan RFQ
Dear Ms. Turner:
To prepare a Solid Waste Master Plan, the City of Kalispell (CK) is seeking a partner that possesses
financia|, operational and planning solid waste experience and who has a track record of evaluating
cost of service and benchmarks to successfully implement rate adjustments. Having extensive
experience in all these areas, Burns& McDonnell is that partner. When other cities in the U.S. have
faced similar financial and operational issues with their solid waste systems, many have turned to us
for sound, independent advice. Our reputation is based on our ability to provide an objective
evaluation of ci1y'sso|id waste system, with a focus on sound technical and business solutions.
Prior Regional Experience Accelerates Understanding of Key Issues: The leaders of our project
team have completed solid waste financial, operational and planning studies for many communities
in Montana and nearby states. Further, teaming with Great West Engineering enhances our
understanding of key regional solid waste issues. Relevant Montana examples include:
w City of Helena: Ongoing solid waste master plan and forth -coming cost ofservice study.
w City of Bozeman- Multiple master planning, financial and collection operational studies.
City of Billings: Completed a solid waste cost of service study. Prior to joining Burns & McDonnell,
Matt Evans was a lead author for the City's 2014 solid waste master plan.
Seasoned Project Team Focused on Solid Waste Planning Provides a Proven Methodology. Our
team has focused their careers providing financial, operational and business consulting to our solid
waste clients. Working together since the 2000s we have led solid waste planning, operational anc
financial studies for many communities across the western U.S.
Financial Focused Methodology Provides Accurate and Timely Results. Our proposed approach is
consistent with similar cost of service study projects our team members have completed for
municipal clients. Due to our experience and capacity of our Solid Waste and Resource Recovery
Team, we can meet the CK's schedule requirement.
We understand how difficult it can be to make decisions based solely on the information provided in
procurement documents. As such, we strongly encourage you to contact the references we have
included as part of our submittal for a deeper understanding of how we, as employee owners,
approach our relationships. VVmlook forward tocontinuing our work inthe region hycollaborating
with the City of Kalispell. Please contact Scott Pasternak or Matt Evans should you have any
questions regarding our submittal and visit our vvehsite .
Sincerely,
Scott Pasternak
Department Manager
512-872-71/1
952-222-7249
N,
tt7�v E
Associate Civil Engineer
8201 Norman Center [}rive Suite 500\ BUoormington, MIN 55437
Table of Contents
2. General Information
3. Relevant Company Experience
4. Consultant Qualifications
5. Contract Understanding & Approach
6. Approach to Contract Management
7. Other Factors
8. Examples
2
3
6
8
10
17
18
2 General
Information
Burns & McDonnell was founded inl898byClinton S.Burns and Robert E.
McDonnell.nlg8G Burns McDonnellbecame percent This
� ' �
103000
was e defining milestone infusing e sense mfentrepreneuria|isrn into the firm that
has truly defined our culture.
100%
VVeare a fully integrated engineering, architecture, construction, environmental
EMPLOYEE -OWNED
and consulting firm with amultidisciplinary staff ofmore than l0QOOprofessimn�|s
'
—'------''
FOUNDEDKN
worldwide. With annual revenues of$4.3 biUion, we have large -firm resources but
small -firm responsiveness. Burns& McDonnell ranks inthe upper 5 percent of
18�98
Engineering News-Record's Top 500 Design Firms being among the leaders in
---''--'--'
MORE
many service categories. Because we are relationship -focused and dedicated to
THAN 60
creating amazing success for our clients, we have a 90 percent repeat -business
OFFICES
rate and client partnerships that span multiple decades. Clients appreciate our
entrepreneurial ambition.
B. Primary and Secondary Contact Information
Scott Pasternak and Matt Evans will lead this project for the CK based on their extensive solid waste
planning, operational and financial cost of service experience in Montana and the nearby region.
Scott Pasternak
512-872-7141
C. Legal Company Organization with Org Chart
management is headed by a
board of directors and a
president osshown the right.
The firm is divided in1oll
functional groups (global
practices) that offer
professional services, each nf
these practices is headed by
mre�ident/viceoresident.
� �
These officers are available to Burns & McDonnell's clients at any time to provide executive attention.
Matt Evans, RE
952-222-7249
Burns & McDonnell's state of Montana Business Standards Division Board of Professional Engineers &
Land Surveyors License number is: PEL-EF-LIC-600. Further, we have an Active -Good Standing
Business License with the Montana Secretary of State (F009189). Copies of these documents can be
provided as requested.
BURNS *�M'DONNELL 0
3. Relevant Company Experience
Burns & McDonnell provides comprehensive solid
numerous clients throughout the United States. ecitiescounties Great
Plains,
demographics,„ goals,_ size, and challengesKalispell.
Billings, MT
Cheyenne, Y
Vermillion, SD
Denver, CO
Bozeman, T
Campbell County, WY
Beatrice, NE
Larimer County, CO
Helena, MT
Sheridan, WY
NNSWC, NE
Crow Wing County, MN
McKenzie County, ND
Fremont County, WY
Butler County, KS
Lyon County, MN
Grand Forks, ND
Rapid City, SD
Johnson County, KS
Morrison County, M
West Fargo, ND
Sioux Falls, SD
Kansas City, KS
St. Joseph, MO
Williston, ND
Brookings, SD
Adams County, CO
Columbia, MO
The following matrix summarizes the challenges we have successfully consulted on for the projects
included in this section. Brief project descriptions
follow.
(Need foir Date Increases
✓
✓
✓
✓
✓
IfZate Inequity with IResiideirntii«all
✓
✓
✓
✓
✓
and Coirrnimeirciall
Financial and Ieseirve IFund
✓
✓
✓
Pollicie
Challenging ng ervi e Aire«as
✓
✓
✓
✓
✓
(e.g., Alleys, IDowntown)
Service Capacity
✓
✓
✓
✓
✓
Cost Increases Outpace
✓
✓
✓
Inflation
IPersoininel and Equipment
✓
✓
✓
Constraints
Il-�outiiirng
✓
✓
✓
Open Collection System
✓
✓
✓
Illiigh Cost of Recycling
✓
✓
✓
✓
✓
Commission Communications
✓
✓
✓
✓
BURNSMMONNELL. 0
Client Contact:
Ryan Leland, Public Works Director
(406) 447-8433
Rlelancl�helenamt.gov
111MIAT TRA
Project Team. Matt Evans (Project Manager), Scott
Pasternak (Advisor), Gretchen Mathiason
(Collections Analvst)
Contract Cornpleflon: April 2024
Actual Completion: Project on -going, on schedule
Brief Descirlptlon: In collaboration with Great West Engineering, Burns & McDonnell is developing a
solid waste management plan. Our efforts include evaluating the residential and commercial collection
operations. We are also providing stakeholder engagement services, developing CIPs and an
implementation plan.
11::: indlings and Recommendations: To be determined, as the project is on -going.
City of Bozeman, MT I Solid Waste Cost of Service and Recycling and
Composting Feasibility Studies
Project Budget. Cost of Service: $60,000; Project Team. Scott Pasternak (Project Manager),
Feasibility Study: $35,000 Jonathan Ghysels (Planner), Eric Weiss (Planner)
Client Contact: Contract Cornple'don: Cost of Service: June 2019;
Kevin Handelin, Solid Waste Superintendent Feasibility Study: August 2022
(406) 582-3238 Actual Completion. Cost of Service: June 2019;
khandelin(&)bozeman.net Feasibility Study: August 2022
Brief Description: In 2019, we completed a cost of service and rate design study. From 2021-2022 we
have completed multiple composting and recycling collection studies. The combined projects have
provided the City with a master plan for its costs/rates and collection operations.
Findings and Recommendations: Provided the City with an understanding of how costs would
change over the next five years, which allowed the City Commission to adjust rates. Collection studies
detailed the costs, environmental benefits and implementation steps for composting and recycling
211511�
li F � I' I I ir III I
Client Contact:
Jennifer Duray, Finance Director
(406) 657-8239
duravi(c-bci. bill incis.mt.us
Project Team: Scott Pasternak (Project Manager),
Matt Evans (Senior Planner), Jonathan Ghysels
(Planner)
F'2510MIROM 01 WAIMINER4111 "I
Brief Descirlptlon: Burns & McDonnell conducted a solid waste cost of service study for residential,
commercial, composting and landfill services. Evaluated key cost centers associated with each
program and the cost recovery methodology to provide a five-year financial projection. Identified the
potential for revenue enhancements for the disposal and collection operations and provided key
benchmarking comparisons. We also developed CIP for collection vehicles and capital improvements.
...... ...
BURNS &MqDON NELL.
�UindUings and Reco0mii-neindatUons: Having had very low collection and landfill rates in place for
multiple years, the City Commission increased rates in an equitable manner based on our
Client Contact:
Jeff Barber, Solid Waste Superintendent
(605)355-3406
Project Team: Scott Pasternak (Financial Lead),
Bob Craggs (Recycling & Composting Lead), Matt
Evans (Collection Lead), Jonathan Ghysels
(Financial Analyst), Eric Weiss (Collection Analyst)
Actual Completion: August 2021
Contract Completion: Ju|y2Q2l
1131rlef 113escription: Burns & McDonnell completed a solid waste master plan that addressed collection,
financial and facility aspects of the City's solid waste system. For collection services, we completed an
evaluation of collection routes, planning for expansion, and developing recommendations for
efficiently managing the collections. Our cost -of -service analysis identified that current solid waste
rates were not adequate. Our team worked with the City and a group of stakeholders to develop rate
recommendations supporting successful operations while limiting the financial impact to residents.
11::: lindlings aii �d 1::ZecoimrT-ieindatloiI We provided financial and operational recommendations that are
simple for City staff to implement and allow for quick access to operating data to track success. CIP
based implementation plans and financial recommendations informed City Council to make proactive
decisions. Since public input was critical for the plan's success, focus was also placed on stakeholder
management services. The City Commission adopted the plan and recommended rate increases.
Client Contact:
Vicky Nernecek, Public Works Director
(307)637-6259
Project Team. Matt Evans (Project Manager),
Scott Pasternak (Financial and Collection Lead),
Actual Completion- December 2019
Brief Description: Burns & McDonnell completed an integrated solid waste management plan for the
City. Key efforts evaluated the Ci1y'scollection system for residential refuse' residential recycling,
commercial refuse` and yard waste. Additionally, we developed a cost ofservice and rate design study
that provided an understanding of baseline costs, as well as proposed changes based on the findings
ofthe integrated solid waste management plan. VVeevaluated recycling diversion alternatives and
options 10improve routing efficiencies.
11::: !!1 �dlings and Recomimenclations: Based on our analysis and input via stakeholder engagement
workshops, we helped the City optimize its collection routes. Our rate adjustments focused on
aligning the cost of service to provide equitable rates.
BURNS *�M'D0NNELL 0
4 Consultant
Ntt Qualifications
Since 1970, the Burns & McDonnell Solid Waste and Resource Recovery Practice has successfully
completed hundreds of financial, operational and engineering solid waste projects. Distinguished fro
financial only focused consulting firms, Burns & McDonnell combines technical and financial skills wit
innovative problem solving in everything we do — from cost of service analysis to operational revie
and solid waste master plans — to help the you find the best solution for your community. I
00� 11% has teamed with Great West Engineering. Fo nde on solid waste engineering
,000 GreatWest in 1984, Great West specializes in full -service solid waste engineering and
11 N G I N R I N G planning expertise. Based out of Helena with three Montana offices, their
personnel have assisted the region with solid waste services for almost 30 years. Their team of
engineers, technicians and hydrogeologists have provided solid waste consulting services to over 100
solid waste facilities in the western United States.
Brief summaries for our proposed Project Team are below. Full resumes can be found in the Appendix.
Scott Pasternak I Burns & McDonnell
Scott leads Burns & McDonnell's Financial and Planning Solid Waste and Resource
Recovery Practice. Since the 1990s, he has worked with local governments to solve
challenging technical and financial solid waste management and recycling issues. Over this
time, he completed hundreds of projects for clients across the United States, including multiple
projects for local governments in Montana and nearby states. Scott was the project manager for
Burns & McDonnell's Montana projects for the Cities of Billings and Bozeman. Additional Recent
Experience Relevant to Kalispell: Cities of Helena, Amarillo, Billings, Bozeman, Dallas, Denver, Fort
Worth, Goodyear, Kansas City, Rapid City and Siloam Springs.
Matt Evans I Burns & McDonnell
Matt is a project manager and civil engineer providing solutions in solid waste
management. With more than 20 years of experience, Matt has provided consulting
services to municipalities including the preparation of solid waste master plans, collection
studies, and financial analyses. In Montana, Matt is the Burns & McDonnell project manager for the
solid waste master plan for the City of Helena and previously contributed to a solid waste master
plan and cost of service study for the City of Billings. Additional Recent Experience Relevant to
Kalispell: Cities of Cheyenne, Rapid City, Williston, Big Spring and Amarillo.
Bob Craggs, UD|Burns &YNrDonnuU
Bob serves as the Solid Waste and Resource Recovery Technical Services Leader and a
Senior Project Manager. He has more than 3Uyears mfindustry experience specializing in
--- solid waste management planning integrating the technical, economic, and environmental
policy, including recycling, composting, stakeholder engagement, and cost of service studies.
Additional Experience Relevant to Kalispell: Cities of Cheyenne, Rapid City, Sheridan and Sioux Falls.
BURNS *�M'DONNELL 0
Eric Weiss I Burns & McDonnell
Planning and financial studies are one of Eric's focus areas. He has developed multiple
collection, planning and cost -of -service studies. As part of these studies, Eric provides
long-term financial plans that address costs and benefits associated with various solid
waste management programs including collection, processing and materials management for
residential and commercial customers. Eric has contributed to recent solid waste projects i
Montana fort e cities of Billings, Bozeman and Helena. Additional Recent Experience Relevant to
Kalispell: Cities of Rapid City, West Fargo, Corpus Christi, Garland, Goodyear, Lawrence, Little Rock
and the Town of Queen Creek.
Jonathan Ghysels I Burns & McDonnell
Jonathan Ghysels has served municipal clients by working on solid waste cost of service
and strategic planning studies. He is experienced in supporting the financial optimization
of solid waste management systems and all integrated components. He specializes in solid
waste rate design, cost of service, service benchmarking, financial analysis and planning. Jonathan has
contributed to recent solid waste projects in Montanafort e cities of Billings, Bozeman and
Helena. Additional Recent Experience Relevant to Kalispell: Cities of Kansas City, Dallas, Denver,
Fort Worth, Kansas City, Rapid City and Siloam Springs.
Gretchen Mathiason I Burns & McDonnell
Gretchen Mathiason is a civil engineer -in -training specializing in solid waste management
planning and engineering. She provides solid waste master planning and collection system
evaluations. Gretchen is currently completing a solid waste master plan in Montana for
the City of Helena and Lewis and Clark County, Additional Recent Experience Relevant to Kalispell:
Solid waste planning projects for Larimer County, Campbell County, and the City of Sheridan.
Stephanie Beckert, PE I Great West Engineering
Stephanie has over 17 years of experience with solid waste projects in Montana. She has
provided clients with a wide array of facility planning and operational assistance at their
solid waste facilities. Examples include master planning, stormwater permitting, operation
and maintenance plans, engineering inspection, closure/post-closure plans, and financial assurance
updates.
Burns & McDonnell has been providing these requested services to numerous municipalities over many
decades. We have provided additional references below who can speak to the quality of our work.
City of Sheridan Campbell County Town of Queen Creek
Charles Martineau Matt Olsen, PE Ramona Simpson
Landfill Superintendent Executive Director of Public Works Environmental Program
cmartineau(a)sheridanwy.g matt ew,olsenC&campbellcounty3yy. Manager
ov ov ramona.sim sonCa>queencreek.
Providing services for 15 Providing services for 15 years or
years Providing services for 15 years
U� Contract
� Understanding
~� � .�� �� Approach
�� ������������� ����00���«������00N���� �� ���������������
�~� ~~��mm m���, ~~mm=��°m~� ��mm��mmm�� ~.� . .����mv�"���.��
A. Understanding of Current Needs
Burns and McDonnell understands the CK is seeking the completion of a Solid Waste Master Plan
(SWMP). The purpose of the SWMP will be to evaluate and analyze the Solid Waste Division's
operations and financial health, address or identify critical needs, provide key information for
stakeholders and policy makers to provide direction on program decisions and develop a plan that
provides the CK guidance for successful, long-term solid waste operations.
Further, the SVVMPshould address operational and routing efficiencies with the goal of offering solid
waste service options to all residents of the CK as well as an evaluation of commercial services for
opportunities toadd additional customers.
With a project team focused on both the financial and technical elements of solid waste managerne
simultaneously, we will provide the CK with an understanding of the financial impacts associated wit
potential operational changes, including routing configurations, recycling feasibility, fleet replacerne
best practices, and rate evaluations to support the revenues required to meet the CK's objectives. "I
Following receipt of the Notice to Proceed' we will provide the CK with a detailed initial data request
that will encompass data needs for completing the study. The data request will itemize our needs for
understanding the operational and financial considerations that must be addressed. This task also
includes organization and preliminary analysis of all data received. We recognize the CK may not have
all information requested readily available ur may track information differently than requested. Our
team will work with the appointed Project Manager 10arrive a1 reasonable substitutes for the key
data, if necessary.
Successful completion of this project will require hey input and support from the CK. We have
summarized this information below.
Review of Operational and Financial Data
analysis
~/ Request CNstaff assist in the provision of
necessary data.
*~ Key CKstaff toparticipate inkey meetings to
identify key issues and review findings and
recommendations
~~ PTF10participate inkey meetings and
workshops.
+' Collection staff to participate in focus groups to
provide perspective oncollection issues. CNtm
facilitate Burns & McDonnell's field observations.
~^ Request that CKstaff review the analysis being
completed.
~/ Review the draft and final reports and
presentation toCity Council.
"^ Facilitate timing for the meetings and introduce
key topics for discussion.
BURNS *�M'mOmmELL.
Burns & McDonnell has a proven methodology collaborating with our clients to mitigate potential
difficulties during a project.
Understanding the Key Issues fart e
City
Projecting Future Rate o
Price Increases
Develop
o
Multiple Alternatives
Viable Recycling Programs May be a
Challenge
Deliverables
Timely and Efficient Review
., TIT
ITITIZ111-1,111,
StrategyOutreach
✓ Establishing a Project Task Force allows CK staff
to communicate key issues and to review key
findings
✓ Share data published by the Federal Reserve
with CK staff
✓ Leverage findings from recent projects and
relationships with other cities in the region
✓ Leverage extensive experience developing
similar projects for governmental clients in the
western U. S.
✓ We have successfully advised many communities
in the western U.S. with evaluating and
implementing sustainable and cost-effective
recycling strategies
✓ Streamlined and on-line data request facilitates
timely communication
✓ Provide the CK with real time access to
deliverables via SharePoint, which allow for
concurrent reviews
✓ Leverage recent experience evaluating programs
for other clients and the Recycling Partnership.
BURNSMMONNELL.
C�
6. Approach to
A. Burns& McDonnell Approach
Contract
tt Management
This Scope mfServices isfor Burns & McDonnell t*complete e
financially and operationally focused solid waste master plan for
the CK.This section provides anoverview ofthe approach
Burns & McDonnell proposes tmaccomplish the CK'sobjectives
for this type ofengagement. The basic tenets ofour project
appnmach- which are depicted inthe graphic on the right -
have been time tested through the successful conduct of
numerous comprehensive solid waste financial and operational
plans for public entities throughout the nation.
Burris & McDonnell's philosophy isto deliver services that are
comprehensive and provide the highest level mfquality and
professional integrity. Our conclusions and recommendations
will be supported by appropriate data and ena|yses, with
comparisons made to both the internal metrics and the solid
Our project approach will provide a
comprehensive financial and operational
review of the CK's solid waste system.
waste industry. Our proposed approach and methodology are consistent with similar studies
completed by our team members in evaluating multiple residential and commercial collectior
Given the page requirements set forth with the CK's RFCJ, this section provides brief overview mJour
proposed scope of work. This outline is intended to complement the information included in the RFQ
and adetailed scope ofwork can beprovided upon request.
BURNS *�WDONNELL 0
Evaluate Potential
Collection Changes & Program Preferred
Develop 10 Year CIP Options Strategies
Project Initation Cost of Service Collection Develop Solid Waste
& Management & Rate Analysis Operations Review Implementation Plan Master Plan
Phase I I Project Initiation & Management
Task IA: Initial Data Request & Review: A detailed preliminary data request that will encompass data
needs for completing the study.
Task 113: Establish a Project Task Force (PTF): To get the best
information possible and increase buy -in for the outcomes of
this project, we recommend the CK establish a PTF. The PTF
would ideally include 5-7 key representatives from diverse
roles and levels of responsibility within the CK, including senior
management. The PTF will participate in the kick-off meeting,
help facilitate data collection, provide feedback on preliminary
findings, and provide support to our Project Team throughout
the project.
Task IC: Kick-off Meeting & Project Management: Discuss the
project work plan, key issues to be addressed, key findings
from previous engagements as well as confirm the timing
associated with the various project tasks.
Task 113- Project Communications: Combination of in -person
and virtual meetings and workshops with the PTF and
presentations to the City Council at key project intervals.
11 `4 G
The kick -of meeting will provide a forum
for establishing clear communication for
the project.
� Preliminary data request
� Electronic copies of the kick-off meeting agenda, handouts, and follow-up summary
10, Participation of Burns & McDonnell Project Manager and key staff in virtual meeting and on -site
kick-off meeting
IV, Multiple virtual and in -person meetings with the PTF and City Council
BURNS,MMON NELL. 0
Task 213: Evaluate Potential Collection Changes & Develop 10Year C|P:Wewill also account for the
potential changes that may be considered in the future, which will allow the CK to understand the
associated costs, as well as develop a 10-year CIP forecast. We will develop the model to provide the
flexibility to include or exclude a combination of service options and C|P. Based on the staffing and
equipment analysis 1obecompleted inPhase 3: Collection Operation Review, vvewill update the
model to provide an understanding of the financial impacts associated with changes that may include
but not be limited to equipment, staffing and maintenance changes for residential and commercial
collection operations.
Task 2C: Forecasted Cost of Service Analysis: Burns& McDonnell will project the future cost of
service for alD-yeartime frame and will allocate these costs tnthe appropriate cost centers. Burns &
McDonnell will work inconjunction with the CK10 develop anaccurate lO-yeerrevenue requirement
and billing unit forecast. Burns & McDonnell will define the assumptions used in projecting the revenue
requirement and billing units. We will also develop schedules for fleet purchase and replacement, debt
service and C|Pand reserve funds.
Task 213: Program Revenue Stream Analysis. Burns & McDonnell will evaluate hmvv much revenue is
currently generated by the current fee structure. We will independently estimate how much revenue
should be generated bythe current billing units 10estimate whether any under- recovering is
occurring. This analysis will provide the CK with an understanding of how current rates are either over-
orunderrecovering compared 10the various costs ofservices.
Task 2E- Rate Development- The objective of this task is to develop proposed rates that meet the
needs and objectives of the solid vvaa1e system. Burns & McDonnell will assess the existing rate
structure for its historical performance, overall equity, and ability tomeet CKobjectives for future
solid vvos1e rates. Rate alternatives for each rate category will be developed based on our industry
experience and collaboration with the PTF. For each alternative, rates will be designed to generate
adequate revenues in accordance with the financial forecast results, reflect the results of the cost of
services analysis, and further the objectives of the CK. Pricing objectives could include but would not
be limited to: escalation strategies; meeting revenue requirement in a stable and predictable manner;
fee structure equity; simple and understandable; and reserve policy and bonding coverage.
BURNS *�M'DONNELL 0
1 A S 2 ��D .......... ��� V A E_1 S 8", 111,11 E_ E_ . ..... 11 1����
� Meeting with CKstaff (same trip asthe kick-off meeting)
� Virtual Meeting with CK staff to discuss results ofTask 2/\
� Report section and schedules that include the Test Year revenue requirement, cost allocations,
cost of service, 10-yearfmreceat' revenue projections and rate design recommendations
The purpose mfthe operational review will be to evaluate whether key system components are
operating effectively, aswell astmidentify opportunities toreduce costs and increase revenue. During
the operations review, Burnsf\ McDonnell will review key operations as detailed in this phase.
Task 3A- Field Observations &4umakyshs- A key aspect of evaluating the routes for the CK will be to
obtain afundamental understanding ofthe CK^scollection system. Burns & McDonnell will attain this
understanding through the following methods: data review and analysis, field observations and
interviews, computer modeling, and banchnnarking.
Task 3B: Residential & Commercial Collection Operation Review: Metrics to be addressed during the
review include, but are not limited to, the following:
� Collection efficiency (curbside and
alleyways for residential and rear load
and side arm for commercial)
� On -route collection process
p Non -collection time
� Daily work schedules
� Staffing |eve|s, including overtime and
temporary personnel
� Configuration of equipment
It- Vehicle replacement schedule
It- Vehicle maintenance schedule and costs
It- Trigger levels for increased staffing and
equipment needs
� Routing process
� Average waste per route
� Collection practices
� Operational reports
Task 3C: Spring Cleanup & Residential Alley Cleanup Evaluation: Providing a clean community is an
important aspect of the CK's program. We will evaluate the cost (as a part of Phase 2A) of these
programs, as well as their operational effectiveness. To the extent applicable, we will evaluate these
programs based on factors identified in Task 2B.
Tash3D- Public Education& Outreach Strategy Eva|uation-Pruvidinyeffectiveoutreach.
engagement and public education to residential and commercial customers is important for the
ongoing and future success of the CK's solid waste and recycling programs. In our experience
developing solid waste master plans for other cities, Burns& McDonnell has identified the components
of strategic education and outreach program. For Ka|ispeU, we will evaluate how effectively the
following key components are being addressed:
0. Establish program goals
IF- Determine financial commitment
IF- Identify target audience(s)
0. Develop messaging content
01 Content distribution and public outreach
� Evaluate program effectiveness
� Deploy compliance
� Regional collaboration
We also maintain an on -going relationship with the Recycling Partnership and will advise the CK of
potential collaboration and funding opportunities from this organization. Additionally, vvewill advise
the CK on the potential viability of future recycling program and education grants from the U5 EPA. as
US EPA is in the first of five-year grant program that will provide millions of dollars to communities
across the country.
Task 3E: Recycling Program Analysis: Due to volatile recycling markets and distances to recycling
facilities, the financial feasibility of recycling programs can be challenging. We will evaluate the costs
and diversion potential for the CK to implement a recycling program. Costs to be accounted for and
included in the financial modeling will include but not be limited to public education and outreach,
collection equipment/fuel/maintenance and personnel, containers, processing, as well as revenue
offsets based on fewer landfill tons and potential revenue from the sale of recovered materials. Since
we are presently advising the cities of Helena and Bozeman with similar efforts, we can effectively and
efficiently provide sound analyses for the CK
Task 3F: Business Strategy to Summarize & Prioritize Options, CIP and Scenarios: The range of
solid waste management strategies and practices to be considered will include key options available
to the CK. Based on work completed, we will compile a summary of alternative scenarios and options
that the CK may wish to consider including in the Master Plan. The analysis will evaluate CIP and
operational costs of programs being considered via the cost of service model. Scenarios and options
may be enhancements 1ocurrent services or new initiatives. We will present the initial list of
scenarios/options to the PTF during one of the Project Team Workshops.
Task 3G:Implementation Plan: Burns & McDonnell will conduct aworkshop with the PTF 1oreview
the initial operational review findings and draft strategy from Phase 3. The working group meeting will
provide us with an opportunity to report on the operational study findings, and to discuss possible
operational improvements. During the workshop, Burns& McDonnell will also collaborate with the PTF
to develop an implementation plan.
Based on the preferred alternatives for the multiple operational, financial, and policy issues, we will
provide a planning level implementation plan that will describe the specific activities associated withl
implementing the preferred alternatives. This will provide a prioritization and timing for each of the
strategies. Based on the workshop, we will develop a recommended implementation plan and
schedule the CK can use going forward to implement the preferred alternatives. This highly -function
implementation plan will include roles, responsibilities, schedules, and costs.
�D 1 3 ��D .......... ��� V Ell ��R A 'E'', S 8 "d 'E''����""4����
V, Bulleted summary of key findings and recommendations for each program area reviewed
01 Working group meeting to discuss key findings, business strategy and implementation plan
� Multiple report sections on operational issues to be included in the draft and final reports
Phase 4 1 Report & Presentation Development
Task 4A-. Draft & Final Report: As phases are completed, we will provide the CK with draft sections.
We will also provide a complete Draft Report, Second Draft Report and Final Report (following CK
comments).
Task 413: Develop PowerPoint & Conduct Presentations: Burns & McDonnell will develop a
J1AfWMt"-Ae4-K*--R.-G
present findings and recommendations to your City Council.
tD II-11 4, V I3 II S & "11 . ..... If ,,4 G S
Electronic version of the Draft Report, Second Draft Report and Final Report
Virtual meetings to discuss the Draft Report and Second Draft Report
PowerPoint presentation
Participation in City Council presentation
We understand the CK has planned for a project duration of approximately one year. Based on our
experience and capacity of our solid waste and resource recovery team, we can meet the CK's
schedule requirements. Our proposed project schedule, complete with deliverables and milestones has
been provided on the following page.
Ilk.
BURNS �%%,M51130114 NELL. 0
a
IS
0
q,
1—
U
IV
c
C
rf,
CIf
IM
W
LJ
w
M
p
lu
co
17,
C>
0
rZ
U c "I",
c
0
U Q 01
> t
IV
1.0
iri
.17
Lr%
HIM
o
U)
(j
Ell R
0 CF
(D �z 0 :3 c
q;
U r V m
w u m E
Tc
u 0)
r-4
a
r-4
V) N OL o a
E :C3 .2
u u a
m
C,
<
Cr_
E
7 Other
Factors
We have a long history of consistently meeting client schedules. Timely execution of work is one of
the most influential factors for obtaining repeat work from clients. For instance, in February2Ol9' the
cities nfBozeman and Billings retained Burns& McDonnell tmcomplete solid waste cost ofservice
studies. Each City needed to adopt new rates in advance of the upcoming fiscal year (July l). We
completed both projects in June, allowing sufficient time for their respective commissions to approve
the proposed rates. VVeare proposing the same key team for the CK.
We are known for staying on schedule. In the words of one client: "The project for which we
contracted was completed on time and within the budget despite difficulties by us [the client] t*
provide the necessary inputs and guidance in a timely manner. Overall, very good work."
It isour understanding that this engagement will have duration February2O23-2Q24. Asummary of
our team members' commitment to other contracts and availability for Kalispell follows.
Scott Pasternak
60%
4096
Matt Evans
70%
30%
Bob Craggs
80%
20%
JonathanGhyoe|o
7096
3{)%
Eric Weiss
50%
50%
Gretchen Mathiason
60%
40%
Burns & McDonnell is a lU-time recipient of the Professional Services
ManagennentJmurna|(PSMJ)'sPrennierAvvardforC|ientSatistaction.The
award recognizes A/E/Cfirms that goabove and beyond inclient
communication, project delivery performance, and cost-effective solutions
and receive award -winning ratings in key client service categories. PSMJ, the
leading publisher, trainer and consultancy tothe A/E/C industry, annually
conducts anindependent survey ofA/E/Cservice provider clients 10
determine overall satisfaction levels in seven categories: helpfulness,
responsiveness, quality, accuracy, schedule adherence, budget adherence and scope and fees.
Burns & McDonnell takes pride in our experience in budgeting projects and adhering to those
expectations. For all the project descriptions provided in our submittal we completed the original
scopes of work without requesting change orders. We will bring this same level of dedication and
efficiency tmthe CK.
BURNS *�M'DONNELL 0
�� Examples
��� �������0��)0�hNes
Burns and McDonnell understands the CK is seeking the completion of a Solid Waste Master Plan
(SWMP). The purpose of the SWMP will be to evaluate and analyze the Solid Waste Division's
operations and financial health, address or identify critical needs, provide key information for
stakeholders and policy makers to provide direction on program decisions and develop a plan that
provides the CK guidance for successful, long-term solid waste operations.
We have provided a representative sampling of our recent work for several clients who have similar
needs as the CK. This section contains excerpts for the following categories:
Demonstrates writing style and ability tocommunicate important
financial information clearly and concisely.
Communicating with City Councils isacritical part ofour projects,
vvefocus ondeveloping graphic -based content for clear
communication.
Communicates our understanding ofkey criteria toevaluate and
writing styles.
Understanding the relationship between operational and financial
issues is key.
Shows our abilities tu evaluate capital costs and how these costs
need tobeaccounted for within amaster plan.
Benchmadkingprovides anunderstanding ofnot only how much
other cities charge for services, but also compares service levels.
Communicating the steps and requirements for implementing
recommendations isanimportant aspects ofprogram
implementation.
Given page restrictions set forth in the RFCJ' we can provide more detailed examples as requested to
further demonstrate our depth ofknowledge with solid waste systems.
Executive Summary Excerpts
We provided the City of Bozeman with an understanding of how costs would change over the next
five years, which allowed the City Commission to adjust rates. Collection studies detailed the costs,
environmental benefits and implementation steps for composting and recycling programs. Below is an
excerpt from the Executive Summary of our final report.
Solid Wasle Rate StUdy Ex,,ernlrve SLEMmairy
Se&ion 2 desci-ibey,,, the tasL7�,. iinoll:ed candnefing the solid. -waste cost of sa-aice anal TSis T'llis section
detdOs steps, todevelop an amnuil re,�,,enue requirement .for a Test YewThe reyeimereq*enient
velar-sents the total re,�-enue that solid waste operations ivillneed to:recover diming a year in order to Rind
all expenses associated witil the pTovisicn, of solid waste sex -,Aces. After developing the revenue
requirenlinit for the, Test Yew, Biuns & P&DcTniell cteveloped a file -year f6recast dmd rojected costs fbT
P
ciistonier classes that in.chWLe i:-esidefilial, recycling,, , temporirr thin pste.r,, cotiunercial dimilpster, ,and
c anitnere Ml roll -off. Valle ES-1 rov, iciLes M overview, of the revenne vetliurement fix the five-yedu-
f6recast .
TalAe ES-1: S,ofid Waste Revenue Requkenient Forecast
F Y 20,20
FY,2021
FY20,2
lFY 2043,
Fv!, 2102-4,
A&iiinistnatloli'
$997796
$1,020:9 10
$170'57739
$1,06174.50
$17113.069
OperatInZ, &'
Capital7-
$3716197,203
I
$37760:611
$378587074
I
$3,958794,6
I
70637 3591
I
I—Tota]3
[ $4,1607,067
$4,781,521
[ $4,908,813,
1 S5,040,39,55
[ S4 176 428
I Includes buddimgnaaintemance,, coLlechnu equipmenr mute software, ind vreYhead far the CLry's
PublLc Works Department,
2 Includes casts of CLry callecton, reftise. duposal,recyCIMf PTOCeSSLUX, and equipmew
repLacemew,
3 7,,Aues m2y not udjr.Wate exactly due to ramdmg,
Table ES slicras the five-year revenue recliiiienie"t allocated by the cost centers. has shom-aa its. the first
callulm) Chi average,, City expeines weTeprajecteJ togrow dent ially by tIn-ee peTcent,.. Citystaff
provided a, f6tecast of the mmmil cost of eqiiipnwnt replazement -and ofliff, capital inipi-crvenient PrqJ . ects
(CIP) Amnual contf ibufiafn,to CEP were incliukd III the revenue f eTire nient to enstwe the Cltv Carl
sufficienfly Rind the casts afupdating and expmkkng fleet as its, cintonler base grcm;s
BURNS,MMON NELL. 0
Solid Waste Rate StUdy Executive SLUrnmairy
Table ES-2. Reventie Requkement Iby Cost Center
Post,C,enWr,
IFY2020(,,
IFY20,2111,
fY2,0,,2,2,
FY2,023,
FY20(,,2,,4
amimstfahon
$997n64
$L0207,910
$1 .0507'739
$17,OS1.450
$L 111069
Resideutial
RefuFe
$1.396, 184
$L442732O
$1 .47 7 7,905
$17,514.796,
$1.553.015
Recycling
$44,11827
$456.641
$4697,363
$4,82.519
$496.133
Bulk—,
$29nO13
$47 119
$497,000
$ 50.948
$ 5 2 965
'%',ird IMaste
$179JO9
$186.210
$1917,392
S196.720
$202.198
Tote Deliveq
$11 '7.813
$1237114
$12167394
S129,774
$133-258
Conuilercial
Retwe
$709,039
$729430
$74,6.0019
$7163. 15 3
$78,M66
OCC Collecticm
$116,572
$122354
$12167655
$131.124
$135.769
Dialipstef Delh,M�
$96,192
$89.74,6
$927,178
$94.695
$97268
Conmierml Roll- off
$399n657
$404.078
$415 7,44 5
$4,27.245
$4.39.498
Compost
$134372
$139.417
$14.37,046
S146.738
$150646,
Special Events
$19n225
$,2G182
$207,686
$21.20-4
531. 734
Total'
S4,607,067
$4,781,5521
1 $4,908,813
55,0410,396
S55,176,42S I
TlLe,621xii increana in IttmEly empensies in FY!202 ➢ is the to theSalid WaFf.e Division acqWnW a tnLik owfitled with a
kinickleboom crane md hirmg a &Lver for buLk nem colectwu
'I v2lues ME, y not C2111flate exactly due to roundmg,
Mable ES-3 snumvuizes how, the c.o,,.A center . wereJlcuqteJ to the custonlerclasses. Cbstomerclan see
repres,,ent the billing categories, fcT cm.,:tonm- mki include re,sidenfial, fec3mling, tempofary dimnpster:,
conmiercial dimiplef. . wid coninmrial roll -off.
Table ES-3,. Recovery Baisis, for Cost Centers by Ctistomer CVas,s
cati ciftter,
Re'siden'tial
Recyc"'fing",
'TeM(pOr4WFY'
um
D:pMeir
COMMfeMigil
D mmoster,
C01131"eFfelfal
R
Adm=Anition
Rem&rat ial Refii,,.,,e
-V
Re&nt,ual Recycling
Bulky
Yafd Wmte
Ceniniercial
v
Ceniniercial Rell-Off
Tote Deh-veiy,
DumpAer E*Iilvery
Special Events
czImpost
OCC Collection
City of Bozeman, Mon taina ES-3 lBurns & IMcDoruneilll
BURNS,MMON NELL. 0
The City infomially imintains a resex-ve fuuid goal equal to 90 days of ailnual operational and capital
expenses. Table ES-5 shows the fall ill the C"ity's reserve fund each year of the five-year fixecast imder
cm-rentrates- By FY 2021„ the City will not mailitama 90-day resene fiend balance, and by FY 2023, the
City will have a negative reset -se filtid balance- Figime ES-2 proxides a visual representation of the fall ill
resei-use, days under current rates.
Tablle ES-,5: Five. -Year Reserve Forecast Based on Current Rates
FV, 21020,
fY 2021
FY 2022',
FY, 2023,
f Y 2,0,24,
Begintung Balance
$1,606,283
$1,244,90'2
$750,462
$170,541
($498,734)
Net Revenue
($36,1,381)
($494,440)
($579,921)
($669,275)
($762,658),
ReseiTe Fluid Balaiwel
$1,244,90'2
$750,462
$170,541
($498,734)
($1,261,392)
Resel-ve Days
9,9
57
13
-36
1. Vllilesarray riot cilcul.-tteexictlyslime torotuldig.
City of Bozeman, Moi'Aana I Bumis & McDonnell
Where. phccr Table ES - 5 commmicates a steady declimein. the. City'sreserve fiord div- under ctum-ent.
rates, Table ES-6, demonstiares hour propo-Aid, mate re,.venue would buiM theresez-ve filild to covem the
City 's opeiatioml and c3pitalcosts for at least 119 days.
Figme ES-2 under recommended, rates,
Table ES-7: IF iv,&-Yeair Reseime Forerast Barsed on Recommendied I
?PY2120
Y2021
022
FY202
2,04
B4.-ginming Balance.
$17606.283
$17591,084
$1.567,S,68
S1,6777052
13'et Re,,,enue
(S2.3 7,216)
$27,746
S8174.39,
$97.161
REIL,eOCe FUlld, Balance
$1759171084
$17,567786,8
$17595,61.3
$1,677:052
S1,7747213
Resenve Days
126
1 1210
1 1,19
1 121,
1 125
vmhesmyml cKkulme mictly due M Mumdumg.
BURNS,M5111301114 NELL. 0
Cost of Service and Rate DesignPresentation
Burns & McDonnell supports clients to evaluate the cost of service and design rates for the provision
of solid waste management services including collection, processing and disposal. Our team worked
with the City of Bozeman, Montana to evaluate the current cost of service for residential and
commercial collection identified the revenue requirement to support services. Working closely with
City staff, our team developed a series of rate scenarios and implementation strategies and presented
the options to the City commission. The excerpted slides below show the revenue based on current
rates, the forecasted reserves based on projected net revenues, and how the recommended rate
adjustments would impact the City's reserve fund balance.
Five -dear Reserve Forecast Eased can Current Rates
`j"110,000
�r1ON M:7
snla ow)
I 11W0 fY"(01 Y ' 2 f'Y 1.0Kk F(;1024
pangA eW MA flriv.r rcf rF2u ci I v, d F70aL ,j 1.f4,v),yr D-,
G
Fs�
� I50
o
777o tY tozq I v mzz I v r-v ,17,1a
R ,Mr,a,,,l i i i i i (;o rniin(,r I U Limp5l(jr —R,my, IIny
imr),,,l Hol I Olt I-.rtif) yl) Tipster R,venu P ) anent
Five -Year Reserve Forecast Based on Recommended Rates
V 1100,ppp 130
BURNS MMONNELL. 0
Public Education, Outreach, and Compliance Program Evaluations
Burns@ McDonnell has developed several public education, outreach, and compliance programs to
support clients to engage and inform residential and commercial generators about how to best
manage materials. As part of these efforts, our team has evaluated existing municipal programs and
supported the development and implementation of expanded efforts. This has included the creation of
content deployed through traditional and digital media channels as well as support on compliance
efforts and enforcement tactics.
Burns & McDonnell understands that effective education, outreach and compliance is a multi -
departmental effort that is critical to program success and effective policy implementation. The
following table provides of key criteria of a robust program that has been used to evaluate existing
materials management education, outreach, and compliance programs.
Overview ofKey Components ofanEducation, Outreach and Compliance Program
Program goals identify how the program will be evaluated over time and the intended
outcomes including specific quantitative metrics, programmatic improvements, and
definitions ofsuccess.
The financial commitment determines the ability of the City to support the program
financially including target annual costs, dedicated staffing, and funding sources. These
should be established before content iogenerated and distributed 10ensure that a
sustained effort is realistic, and outreach efforts can be deployed on a sustained basis.
Target audiences may include broader categories of customers including residential
customers, multi -family, and commercial customers or focus on more targeted audiences
such as specific housing types, collection routes, businesses, or home -owner
associations.
Messaging content should include program -specific information (e.g., dates of service,
acceptable materials, set -out instructions) and general environmental services
information (e.g., why recycling is beneficial, impacts of contamination). The messaging
content should be determined based on data -driven analysis and crafted with simple and
easily understood language and graphics to communicate information in a succinct and
effective manner.
Distribution channels should be based on the target audience deployed where the
audience already consumes information. This may require many diverse forms of content
distribution, including traditional bill stuffers, traditional advertising (e.g., billboards, bus
stops' radio advertising), in -person meetings orevents, social media platforms (e.g,
Facebook.|nstagram.NextDoor)orotherpub|icationssuchasnews|ettersorother|oca|
print media.
Evaluation of program effectiveness may include activities such as tracking data (e.g.,
program costs over time, engagement from target audience), establishing a meaningful
feedback loop, and consistently evaluating progress toward goals.
Holding material generators accountable iaacomponent ofhaving asuccessful long-
term education, outreach and compliance program. Compliance activities may include
po|ycarttagging. skipping service or removing po|ycaksfrom consistently bad actors,
implementing service fees, and/or otherwise enforcing local regulations orordinances.
BURNS *�WDONNELL 0
Collection and Operational Analyses
We are deeply experienced with all variations of service provisions and can guide our clients through
the process of considering collection and operational changes. Below is an excerpt from analyses we
completed for the City of Salina, Kansas.
Since the City was considering multiple changes at the same time, we developed the below figure that
was included in a PowerPoint presentation that Scott Pasternak delivered to the City's Commission.
This graphic summarizes key financial and operational analysis, communicating the monthly costs per
household for the status quo and multiple service options being considered by the City of Salina.
9
a
1�2
;S
1112 IIIR I F.1�11 Il I [I] ILI] 11111144,11TIM,
I/
V
Vol',
voe
10 Muse
IN RtKydng
No and agile
1 Sip dal Pickups
111)111, (art Work
TKOIRITIooed
11.lh�', vnrjMhlycog pe.rhooftldtot sanitftiii set viirodo(5 rM irr 19001'10, adMI01116 MD11011Y 9jbj(rij%ofl te(Vrflrq fpt" for IN1ffi(ij,Wifiriqj rpSid(vWS, (0rrerMVj,5A(j pa ¢nonffi.
BURNS ,MMON NELL.
Capital Improvement Plan(CIP) Development
Capital planning is an active blueprint for sustaining and improving infrastructure by coordinating
strategic planning, financial capacity and physical development. We have provided an excerpt below
from a report detailing the client's high priority capital projects and the impacts ontotal cash and
capital balances.
The City identified five prioritized capital projects with an annualized cost (FY2022) of $7,062,207
$2.15 per residential customer per month) as shown in the table below.
Prioritized Capital Project
FY2022
Annualized Cost
Master Plan Recommendation
$4s usu
Evaluation`
Vehicle Replacement (Facilities
$l4szusz
& City c|eanino)
' '
Additional Illegal Dumping Crew
$407J05
vve,tsiuenrop-nff Station
$1.250.000
Future Land and Facilities for
$Landfill'
Landfill
'000
Total Cost
$7,062'207
mm
pn
mm�
rymm m)(M n?I'o m,')ca
mmm
mmn
m,70?6
wxm
m2fm
nm?,�
1111111111111111111111111 Be*"ning,m°/mmmCapital lie. allun
=el"',mel
Kc,�enue
The figure above and 10the right provides a forecast ofthe []ty'sending cash balance when funding
high priority capital projects beginning in FY2022^ assuming the City implements alternative funding
strategies beginning in FY202l. Funding high priority capital projects with current revenue and
alternative funding strategies will not maintain 25 percent operating reserve after FY2O22.
10-Year Ending Total Cash &
Capital Balance with Capital
Projects and EPF Transfer
------------------------
ON
Burns & McDonnell evaluated the financial impact of w» -
shift in programs from the Solid Waste Fund to the nmm �mo n2M nmo nmm nm� nm� nom �mm nmo
Environmental Protection Fund (EPF) in FY2O2l in mwm"lq�n�lm^&m*°l Ralk,,,e I—w^m~��
order for the Solid Waste Fund to support capital --ma���lm,^um�°dmlari --zYX,"�°��R°,
costs for identified high priority capital projects. The City identified seven total programs eligible 10 be
transferred to the EPF.
The secondary figure above provides the impact of alternative funding strategies implemented and a
seven -program transfer tmthe EPF in FY2O2l and high priority capital projects funded in FY2022.
Given both alternative funding strategies and a seven -program transfer to the EPF, the City would be
able to maintain e 25 percent operating reserve through FY2O29 while funding capital with cash
beginning in FY2022 without residential rate increase.
BURNS *�WDONNELL 0
BenchM0arking Analyses
Our familiarity with the region, coupled with our extensive solid waste experience, allows us1oprovide
benchnnarkin0 services tVassist our clients in making informed decisions. Benchrnarking is an
important aspect of solid waste management used to compare programs, identify potential areas of
improvement and to assess innovations. Below is an excerpt from benchnnarking activities performed
for the City of Billings in 2019 as a part of solid waste cost of service and rate design study.
Billings, MT
$10.98
0
-
0
0
Bozeman, MT
$24.45
0
0
0
0
Great Falls, MT
$1270
0
-
0
0
Helena, MT
$14.68
0
-
-
-
Kalispell, MT
$925
0
-
N/A
N/A
Missoula, MT
N/A
N/A
N/A
N/A
N/A
Cheyenne, WY
$29]5
0
0
0
0
Eugene, OR
$5275
0
0
0
Sioux Falls, SD
Varies by
0
0
Varies by
0
hauler
hauler
Bou|der, CO
Varies by
�
�
Varies by
0
'
hauler
hauler
Fort Collins, CO
Varies by
�
�
Varies by
Varies by
hauler
hauler
hauler
Implementation
We work with clients to incorporate key findings, recommendations and funding requirements in
implementation plans. We have developed detailed, dynamic (sortable) implementation plans and can
provide a full example, if requested. Typically, recommendations from our plans are provided with the
following indicators.
� Goal io. Financial impacts
iv, Priority or, Funding source
iv, Recycling potential ir� Implementation timing
iv, Difficulty of implementation ir� Responsible party
al „{ti:nCef,,,
cSdirriirrikntfr k aa%.
„�
B3EtwA1W' tr paw""',
Increase transfer trucks
and drivers required
to meet needs of a
separated brush and bulky
item collection program.
3 V°I igh
Increase- rapacity of
Dry GuIc.h to dwarf haul
and man uaI unload
customers from the transfer
building at Bachman..
:3 0°I igh
Upgrade transfer buildings
roadways as needed.
including repairing
building shells, upgra�ding/lntegrating
scaling
hardware and software,
and reeronf"Igurhng Internal
N/A l°ligh
Increase communication
material are heading
„ 1=Atitt4$�t' ftt'1Arv'if'r't
protocols and leverage
to one or more transfer
�+8�tf'tftMNriLL7��t'ktitiCS"Gi#YAtiX��S'�fa'rv��rfi;iarti
on -board vehicle
stations)..
technology to support
�'f'stft5".k 15i5�
operating capacity (e.g..,
anticipate when surges of
3 Vligh
Separately receive and
manage separately
collected brush and yard
trimmings at Bachman
using the existing
equipment and staffing. 3, 7 VIIgh
,,;,
process separated brush/yard
operation, until an available
�Y+6Id`k�,latt, krwtC�,`�g�#5,,,�&L6fi,Ih1Jd'f1EGf:
trimmings
composting facility
material through Bachman
is l den�tified.
:�p!lt'&jfF7€IC'k�4kt
on a regular basis
�.., 5'hGf r,lf�i6`ftiitf3lS
for transfer to the Landfill's
4%If+d 9Ask`I'�PbAlilY�rt4f"C�NfN�M1.
existing brush grinding
B, 7 High
SAMU, ., .
cYcfi
bfif ,,,,�,
SPr
! uiCf�
I°figh
Low
Medium
SAN Enterprise
Fund
Near term
SAN
I°ligh
I°sigh
Ifigh
SAN Enterprise
Fund
Mid-term
SAN
Consider providing enhanced residential customer drop-off at each
transfer station..
N/A
High
High
SAN Enterprise.
SANMid-termSAN
Ongoing effort onepairSoutttwest4'ansferstatiaro.
N/A
Medium
Low
SAN Enterprise
Fund
Near -term
SAN
I-liglt
high
High
SAN Enterprise
Fund
Mid-term
SAN
Contingent on upgrading Dry Gulch and adjusting schedule consistent
vritln any changes to refuse/recycling and brush/bulky item collection
service to make this operationally feasible..
Inigh
high
High
SAN Enterprise
Fund
Mich -term
SAN
Concurrently with Inipiententatlon of key operational and/or capital
upgrades.
High
N/A
I9igh
SAN Enterprise
Fund
Near -term
SAN
Options evaluation should include tasks to study the feasibility of
leveraging existing organics processing in the region that Support the
transfer station systeirr upgrades.
BURNS MMONNELL. 0
Experience
� 25years of
experience
WFITINUM,
� MS, Community
and Regional
Planning
01 BA, Government
with Honors
Project Related
Qualifications
N. Cost ofService
and Rate Design
Studies
N. Strategic and
Business
Planning
� Recycling
Feasibility
� Economic
Impact Studies
� Recycling
Market
Development
� Stakeholder
Communication
N. Implementation
and Transition
Assistance
10. Procurement
and Contracting
Scott Pasternak has more than 25 years of solid waste and recycling
recycling issues for public sector clients. Scott is the past Director for
SWANA's Planning and Management Division, serves on the Editorial
Advisory Board for MSW Management and is a member of the Municipa,
Solid Waste and Resource Advisory Council for the State of Texas and
serves on the Board of Directors for the Lone Star Chapter of SWANA.
Scott has led urcontributed 10several solid waste financial, planning and
operational studies for governmental clients in the region. He has managed
solid waste cost ofservice and feasibility studies for the cities of Billings and
Bozeman. For Cheyenne, hecontributed toresidential and commercial
operational reviews and was technical advisor for the cost of service study
and solid waste management plan. He's also contributed to recent financial
and operational studies for Denver.
Scott has completed more than 100 economic, financial feasibility and
cost of service studies for solid waste and recycling clients. He has
cost -of -service, evaluate financial feasibility, compare proposals for services
and evaluate competitiveness versus the private sector. These projects range
from national studies to advising individual cities regarding the funding levels
needed to sustain solid waste and recycling operations. Annual budgets for
these clients are as high as $130 million.
� Cost mfService and Rate Design Studies- Separate projects in Texas
(Amarillo, Austin, Big Spring, College Station, Corpus Christi, DaUas,
Denton, B Paso' Fort Worth, Garland, Huntsville, Irving, Lufkin. McKinney,
Mid|an6, San Antonio and Weatherford), Alaska (North Slope Borough
and Matanuska SusitnaBorough).Arizona (Casa Grande, Coolidge,
Goodyear, Glendale, Phoenix, Queen Creek, Tempe, Tucsmn)'aswell us
the cities of Denver, CO; Hono|u|u, H|; Lavvrence, KS; Little Rock, AR;
Oklahoma City, 0K; Olathe, KS; Rapid City, SD and Collier County.
� The Econommic|rnpactsofRecyc|ing-TexaaConnrniosionon
Environmental Qua|i1y(TCEQ).
� Size and Economic Impacts ofthe Home Appliance Recycling Industry
1nthe H.S.and Canada. Association mfHome Appliance Manufacturers
(AHAM).
� Mixed Waste Processing Economic Evaluation: American Forest &Paper
Ascociatimn(AF&P/\).
With a master's degree in community and regional planning, Scott started his career asa solid waste
planner for the TCEQ, where he developed the statewide solid waste strategic plan and annual
report for the State of Texas. Since becoming a consultant in 2000. he has advised many local and
regional governments on solid waste planning issues. He is past Director for the Planning and
Management Technical Division for the Solid Waste Association of North America. Representative
projects include Colorado Department ofPublic Health and Environment, Johnson County, KS;
Pulaski County Solid Waste Management District, AR; Region 2000 Services Authority, VA and the
cities ofDallas, TX; Denton, TX; BPaso, TX; Phoenix, AZ and San Antonio, TX
Collection and Facility Operational Reviews
Scott has assisted many communities in evaluating existing solid waste and recycling collection,
processing and disposal systems and identifying opportunities toimprove operations ineffective and
efficient manners. These projects have included studies that develop and/or improve the efficiency
of residential collection systems, evaluating the feasibility of regional facilities and routing and
service balance issues.
His recommendations have led clients to save millions of dollars and to provide cost effective
delivery solutions. Scott has led solid waste and recycling focused operational reviews for clients in
the following states: Alaska (North Slope Borough and Matanuska Susitna Borough), Arizona (Casa
Grande, Coolidge, Goodyear, Glendale, Phoenix, Queen Creek, Tempe), Texas (Amarillo, Austin,
Corpus Christi, Dallas, Denton, El Paso, Fort Worth, Midland) as well as the cities of Denver, CO;
Honolulu, Hl; Oklahoma City, OK; Olathe, KS; Rapid City, SD; Little Rock, AR; Shreveport, LA and
Fulsa, OK as well as Collier County, FL.
City Council Meetings and Stakeholder Outreach
Many projects benefit from and require meaningful input from a comprehensive array of community
representatives. Sco11'aexperience includes workshop and focus group facilitation, presentations
and meetings with elected officials, written and telephone surveys, videos, factsheets and websites.
He is adept at communicating with stakeholders during in -person and virtual settings. Scott has led
many projects that have required substantial public involvement.
Implementation and Transition Assistance
While developing plans and studies is an important portion of Scott's efforts to advise clients,
assisting them with implementation and transition assistance is a very important aspect of his efforts.
For example, Som11 not only developed the strategy for the City ofDallas 10develop a public -private
partnership for its $20 million MRF, but he has continued to advise the city on the development,
construction and ongoing operations of the MRF continuously since 2016. He has also developed
implementation plans for clients such as Phoenix, AZ; Denver, CO; Kanas City; KS and San Antonio,
TXonarange ofimportant issues.
� 24years of
experience
Education
W, BS Civil
Engineering
Registrations
1k, Professional
Engineer (GA,
MN' MT, ND'5O'
TX, WY)
Project Related
Qualifications
N. Solid Waste
Master Planning
� Collection
System Reviews
� Operational
Understanding
p Facility Design
and Permitting
� Facility
Efficiency
� Cost of Service
� Safety
Matt is a civil engineer providing engineering services and solutions in solid
waste management for nearly 25 years. He's an experienced solid waste
planner, providing consulting services to municipalities including the
preparation of solid waste master plans, collection studies, facility reviews,
and financial analyses. He is a project manager and lead engineer for the
development, permitting, design, and construction of landfills and landfill -
related facilities, including landfill cells, leachate management systems,
landfill gas systems, public drop-off areas, compost pads, haul roads, storm.
water structures, and other supporting landfill infrastructure.
|nMontana, Matt isthe Burns & McDonnell project manager for the solid
waste master plan for the City mfHelena and previously contributed to solid
waste master plan and cost ofservice study for the City ufBillings.
Additionally, Matt has led or contributed to several solid waste planning,
financial, and operational studies for clients in the region for clients such as
Cheyenne, WY; Sheridan, WY; Sioux Falls, SD; and Williston, ND.
Matt has conducted a range of solid waste and recycling planning studies for
municipal solid waste clients. Example projects have included evaluating
increased diversion of construction and demolition materials, landfill master
plans, the use of transfer stations versus landfills, wasteshed analyses,
feasibility studies and other evaluations to plan for future recycling and
disposal activities. Representative clients include the cities of: Helena, MT;
Billings, MT; Cheyenne, WY; Sheridan, WY; Vermillion, SD; Yankton, SD;
Huron, SD; Sioux Falls, SD; Rapid City. SD; Williston, ND; Honolulu, HI; and the
counties of Kaua'i (HI), Hennepin (MN), Hall (GA) and Fremont (WY).
Matt has conducted a range of collection and solid waste facility operational
reviews that were focused on streamlining existing operations, introducing
new cost-effective programs and increasing revenue opportunities.
Operations addressed have included commercial and residential refuse,
recycling and bulk collection, aswell asfacilities such astransfer stations,
MRFs and landfills. Representative clients include the Cities ofHelena, MT;
Matt has provided cost of service and financial feasibility services to numerous clients covering a
range ofcollection, |andfiU, transfer station, recycling faci|ities, and other solid waste services.
Representative clients include the cities of: Billings, MT; Big Sprin0, TX; Grand Forks, N[); VViUiston,
NU; Sioux Falls, SD; and McKenzie County, ND.
Facility Design & Permitting
Utilizing his planning, operational and financial skills, Matt has managed and advised on multiple
waste and recycling infrastructure projects. Many of these projects have followed planning and
feasibility studies. These projects have evaluated, designed and permitted infrastructure
requirements for recycling facilities, transfer stations and landfills. Representative clients include the
cities of: Hulett, WY; Pierre, S[); Rapid City, SD; VernniUion, SD; VVaterf*vvn' VV|; B Pasm, TX; Sioux
Falls, SD; and the counties of Washington (MN)' Fremont (CO) and Clay (MN).
Experience
lv� 30years of
experience
Education
11� JuhsDoctorate
Ito MA, Urban and
Regional
Planning
� BA, Political
Science and
Public
Administration
Project Related
Qualifications
0. Solid Waste
Management
Planning
� Stakeholder
Engagement
� Implementation
and Transition
Assistance
� Strategic and
Business
Planning
� Recycling
Feasibility
� Cost of Services
and Rate
Studies
Robert Creggsserves asthe National Solid Waste and Resource Recovery
Technical Services Leader. With nearly 30 years of industry experience, he
has assisted local and state governments throughout the United States
address various solid waste and resource recovery challenges. Possessing a
law degree, he provides a unique perspective assisting clients with public
policy, business planning and financial projects ranging from refuse collection
to landfill operations. Bob presently serves as the Planning and Management
Technical Division Director on SVV&N/\'s International Advisory Board.
Robert has managed or contributed to numerous solid waste projects in the
region including an integrated solid waste management plan for the City of
Cheyenne Wyoming, astrategic master plan and cost ofservice studies for
Sheridan Wyoming, and solid waste cost of services studies for Denver,
Colorado.
Robert has |e6 the development of more than 50 solid waste and recycling
planning studies for public clients throughout the United States, including
Wyoming and Colorado inthe Mountain Region and Texas and Arizona inthe
Southwest Region. Heiscurrently leading the development ofthe NE
Minnesota Regional Solid Waste Management Plan representing seven
diverse demographic and large geographic counties inthe Upper Midwest. |r
addition, as the Project Manager, he just initiated a solid vveete operational
and costs of service analysis for the City of West Fargo' North Dakota.
Robert previously assisted the City ofSheridan, Wyoming with the
development of their solid waste strategic plan and the City of Denver with a
pay-as-youthrow and recycling study.
Robert has led numerous projects that have required stakeholder
engagement involving City Council workshops, public meetings/forums,
focus groups, stakeholder surveys, and solid waste advisory committees. In
addition, he has substantial experience designing and implementing
stakeholder engagement programs. Most recently, he designed and led the
stakeholder engagement process for the development of seven county solid
waste management plan that included in -person and virtual meetings,
presentations, and stakeholder surveys assisting a regional advisory
committee composed of more than 40 stakeholders representing various
He also previously led a sustainable materials management visioning project for the Iowa
Department of Natural Resources that included a series of advisory committee meetings with public
and private stakeholders from throughout the state.
F21"AM, "Awl
Robert has led or contributed to numerous solid waste cost-of-service/rate studies and operation
reviews for local governments throughout the United States. Some of the local governmental clien
include Sheridan, WY; Oklahoma City, OK; Rapid City, SD; Grand Forks, ND; Olathe, KS; West Farg
ND and Denver, CO. These projects included characterizing existing programs and services,
calculating the cost of current services, identifying planned program changes, forecasting the
financial impacts, and collaborating with the client to define needed rate adjustments. Bob routinel
serves as a senior technical adviser and QA/QC lead for cost of services and rate studies. I
BURNS *�M'DONNELL 0
Experience
� 8years of
experience
Education
� EiS.'|ntegrated
Engineehng,
Arts and
Sciences
Project Related
Qualifications
� Financial
Feasibility
Studies
� Cost ofService
and Rate Design
Studies
� Privatization
Studies
p Recycling
Markets Analysis
� Procurement
Management
Eric Weiss has served both public and private sector clients by working on
solid waste technology review and analysis, strategic and business planning
projects, project due diligence and financing, greenhouse gas emission
ana|ysis, procurements for waste coUec1ion, processing and disposal systems
and waste characterization studies. Heprovides technical and subject matter
expertise insupporting the planning, development, implementation,
operation and optimization ofsolid waste management systems and all
integrated components.
Eric has supported recent solid waste projects in Montana for the City mf
Bozeman tmanalyze the cost nfservice for solid waste collection and
processing services. Additionally, heevaluated the technical and financial
feasibility of implementing a city-wide recycling and source separated
organics collection program. Leveraging the cost of service ena|ysis. Eric
supported the development ofrate scenarios and recommendations that
vvmu|d support the nnininnunn revenue requirements to meet the solid waste
collection needs of the current system and potential new programs under
consideration.
Eric has led a range of program evaluations for municipal clients that focus
oncollection and analyzing data related tmthe solid waste system including
coUec1ionandprocessingopena1ions.educa1ionandmu1reachprograrns.Pay-
as-you-Thr*vv(P/\YT)pnograrns.organioso*Uec1imnend*therhey
considerations of solid waste management. Additionally, he has conducted
program evaluations aspart mfseveral Solid Waste Management Plans
(SWMP) including evaluation of the benefits of leasing vehicles as compared
tnpurchasing and maintaining a municipally -owned fleet. Representative
SVVMPprojects include the cities ofDallas, TX; Denton, TX; McKinney, TX;
Enid, OK; Frisco, TX; and Marion County, TX
Eric develops financial analysis 10help clients understand the full cost of
services that are provided to both residential and cmrnnnencia| customers.
This includes municipalities that provide collection and processing service in-
house and those that contract with private haulers. Heworks with clients to
allocate costs among various cost centers and customer classes to provide a
detailed technical and financial understanding of the solid waste system and
the revenue requirements necessary to meet those needs. Representative
clients include the Cities of Bozeman, MT; Fort Worth, TX; Frisco, TX; Town of
Queen Creek, AZ; Garland, TX; Lawrence, KSand Weatherford, TX
Eric has led and supported operational and financial evaluations to help clients to compare the
impacts of changing the operator of their solid waste hauler from a municipal operator to a private
sector hauler. Aspart ofthese efforts, hehas collected and analyzed data tocompare the
operational, financial and environmental benefits and drawbacks of making changes 10the collection,
processing or disposal facilities within the solid waste system. Key considerations for these
evaluations include the impact of planned growth of a municipality and how that changes the
economics mfproviding service in-house versus privatizing service. Representative clients have
included the City ofFayetteville, NCand the Town ofQueen Creek, AZ.
Solid Waste Refuse and Recycling Management Procurement
Eric leads the development of procurement documents for solid waste collection services and
evaluation of responses to solicitations for services including residential and commercial coUection,
processing and disposal of solid waste. He provides detailed technical analysis of the responses to
support evaluation committees review and helps clients to develop a clear understanding of the
responsiveness of each submittal and comparative value. Additionally, Eric supports procurement
efforts through outreach and market research. Representative clients include the Cities of Corpus
Christi, TX; Georgetown, TX; Cedar Park, TX; Baton Rouge, LA; Queen Creek, AZ and Fort Worth, TX
Experience
lv� 5years of
experience
Education
� BA, Economics,
English
Project Related
Qualifications
� Cost of Service
and Rate Design
Studies
� Solid Waste
Jonathan Ghysels has served municipal clients by working on solid waste cost
of service and strategic planning studies. He is experienced in supporting the
financial optimization of solid waste management systems and all integrated
components. He specializes in solid waste rate design' cost of service, service
benchrnerking'financial analyses and technical writing.
Jonathan has contributed torecent solid waste projects inMontana for the
cities of Billings and Bozeman. For the City of Billings, he completed a five-
year financial plan for the City, which provides residential and cornnnenoia|
solid waste collection services and operates a landfill. Healso completed a
henchrnarkingeffort for the dty'ssolid waste services.
For the City of Bozeman, Jonathan has provided ongoing solid waste
consulting services for four years, including 20l9and 2U22financial planning
and rate design studies' an operational study to determine the feasibility of
the City developing a forthcoming automated organics collection pilot, and
federal grant application assistance.
Planning Jonathan has supported numerous solid waste cost of service and rate
design study projects asafinancial analyst covering arange ofcollection,
landfill, transfer station, recycling facility and other solid waste services.
Representative clients include the cities mfBillings, MT; Bozeman, Ml; Corpus Christi, T>; Dallas, T>;
Denver, CO; Fort Worth, TX; Lawrence, KS; Little Rock, AR; Town of Queen Creek, AZ; Siloam
Springs, AR; Sugar Land, TX; and Weatherford, TX.
Jonathan played a key role in recommending operational and rate changes for these communities
and has worked directly with all levels of city staff to identify revenue enhancements and
opportunities for cost reduction.
IPI a in ini in g IE x 1p e ri e in c e
Jonathan has experience working with municipalities and councils of government on solid waste
planning studies. This experience includes developing 20-year waste generation projections,
identifying barriers and incentives related torecycling and waste minimization, and presenting
analysis of recycling and disposal capacity for various materials in a community's respective region.
Experience
� lyear of
experience
Education
� BS' Civil
Engineering
Registrations
� Engineer in
Training (CO)
Giretchein Mathiasoin
Gretchen Ma1hiason is a civil engineer -in -training specializing in solid waste
management planning and engineering. She provides solid waste master
planning and collection system evaluations.
Gretchen played akey role onthe for the City mfHelena's Integrated Solid
Waste Master Plan (|SWMP).Gretchen led the technical writing onthe
communication plan tobeimplemented bythe client toproduce public
engagement with the project. She has also created detailed notes onthe
functionality of the current solid waste system within the City and County to
be used in the assessment for potential alternative solutions. She will be
assisting in the development ofthese alternatives and remaining in close
contact with the client tuensure their needs have been incorporated into the
solutions.
eo^*41�
,"OoGreatWest
11 111 G 1 14 11 11 R I III G
Stephanie Beckert, PE
I ocal industiry I ead
Stephanie has 16 years of engineering
experience, ranging In many disciplines,
17yeors with Great WeSII. including solid waste, water, wastewater,
17years ofexperience site development, and trails. While with
Education
>> Carroll College, 113A, Civii1l 11.:.:ngiineeiriing, 2006
Professional Registrations
>s Prof(ss'ioinal 1Einilineer, MI, K)
Professional Affiliations
>> 11:�oaii-,do-Fll')ii'ii-'ec-t.oirs Alf'WAIf-RoclkyMouintaiinClhalpter.,
2014 Present
>> Idalho Sohd Waste Association (ISWA)
>> 1Board of I'Nrectoirs l lelena Area Charnbeir of Commerce
2013 2019
Professional Certifications
>> SaiI 11 andfill IDesiign
>> Nuclear IDensiity Gauge User "T"raming
FEATURED EXPERIENCE
Great West Engineering, Stephanie's
responsibilities have included project
management, design, construction,
construction inspection, operations and
maintenance plans, stormwater pollution
prevention plans, landfill licensing,
landfill expansions and closures, and
environmental assessments. Stephanie
is a licensed professional engineer in
Montana and Idaho.
Gallatin Solid Waste Management District Regional Transfer Station Feasibility Study, Gallatin County, Montana
Project manager workinp, on a feasibility study of a regional transfer station in the area. The study involved doing a
preliminary design of the transfer station, roads, stormwater controls, maintenance building, office building, scales,
access roads and z-wall.
RELATED EXPERIENCE
Gallatin Solid Waste Management District Landfill License Expansion, Gallatin County, Montana
Project Manager on the landfill license expansion application. The license expansion includes hydrogeologic
and soils investigation, master plan, groundwater and methane sampling plans, closure plan, cultural survey, and
Operations Plan.
City -County of Butte -Silver Bow Phase 4 Landfill Expansion, Liner and Leachate Collection and Leachate on,
Design and Construction, City -County of Butte -Silver Bow, Montana
Project manager working on design and construction for a 13-acre landfill expansion. The new landfill cell included
an alternative liner consisting of a geosynthetic clay liner and an HDPE liner with leachate collection system and
new leachate pond.
MIII III
UMME 111M.
Project manager working developing a GCCS master plan for the Bonneville County Landfill. This included
determining the gas phases of the landfill and sizing the infrastructure of the gas system. The GCCS master
plan also involved doing a preliminary design of all landfill gas components, which consists of headers, collectors,
subheaders, condensate collection, and flare station.
Gallatin County Phase 4 Landfill Expansion, Liner and Leachate Collection and Pumping System, Design and
Construction, Gallatin County, Montana
Project manager working on design and construction for an 9-acre landfill expansion. The new landfill cell included
an alternative liner consisting of a geosynthetic clay liner and an HDPE liner with leachate collection system.
Construction uFthis project iscomplete; however, currently working with the District onseveral other projects
including: Corrective Measures Assessment,evaluating long term alternatives fvr landfillexpansion un �k e
properties adjacent to the landfill, and conducting groundwater and gas monitoring on the site.
Bonneville County Landfill Master Plan, Bonneville County, Idaho
Project manager working developing a master plan for the Bonneville County Landfill. This included determining
the future phases of the landfill, fill sequencing, life of the landfill expansion area, and evaluating sequencing of the
|an65U expansion. The master plan also involved doing a preliminary design of all landfill components, which consists
of storm water ponds, |eac6ate ponds, and roads.
T,i County Disposal Valley View Landfill Phase 4 Expansion, Liner and Leac6ate Collection, Design and
Construction Management, Helena, Montana
Project J� 6 6 construction for 14 landfill The landfill Uincluded
rr�e mana8�rwo working design con ru /on ra -ace an expanuon� e an cell
seismic stability analysis, an alternative liner consisting of an HDPE liner with leachate collection system,^n6
drainage ts
/mprovemen
Centennial Park Master Plan, Development of City Park Over Closed Landfill Area, Design and Construction,
Helena, Montana (Su6cmnau|tant)
Project engineer working on the closure cap design and obtaining Montana DE[) approval. The Centennial Pork
project consists of the design and construction ofa City Park on reUsofa closedmunicipal landfill. The park
includes features such asathletic fields, 6o8 parks, new road, new parking areas, trails, free -style bicycle course,
utormwater6etention pond, day use buildings and water and sanitary sewer services, The project was constructed
with all trails 4D4compliant.
City wfBillings Landfill Solid Waste Landfill Expansion Master Plan, BiUinga Montana
Project �� developing te | fo t6 landfill T�determining
rr�ec en�meerwn workinga master r e new an expansion. /o included
life of the fume |an66U expansion area, and evaluating sequencing of the landfill expansion. The master plan also
involved doing a preliminary design of all |an65U components, which consists of storm water ponds, |ear6ate ponds,
and roads.
Lake County Solid Waste District Container Safety Improvements Analysis, Lake County Montana
Projectworking t� | t6 �i for t for � n�eo manaB�rnn e evaluation /on an reporting recommendations r/mpmvemen s r vecontainer
sites located throughout the County.
Lincoln Solid Waste District Container Site Expansion° Unmm|n'Mpntana
Project kt� evaluation, design 6 t tadministration fo t 6 tt�
�ec mana�crwur working on eevaua mn'an contract ranewc�n container bay e
existing container site. The project consisted of one bay for a container, wing wall, and top of wall fencing for safety
of the 6|
pu /c
City of Billings Landfill Phase 5 Expansion, Liner and Leac6ate Collection, Design and Construction, Billings,
Montana
Project �� 6 6 construction for 14 landfill T6 landfill Uincluded rr�e engmeerwo working design con� ru mn ra -acre an exponoon� e an re an
alternative linerconsisting of anHDPEliner w/��|eaohatecollection system, drainage improvements, and an access
road. The City has completed construction of this project.
Lake County Solid Waste District Solid Waste System Eva|uauiom,Container Site Upgrades Design and
Cmvstruc6on'Pn»cto4h6onumnm
Project design 6 � 6 for three containerbays consisting f �� k t
�ec engmearworkingonan construction on r nsenewcon amero earthwork, 'cvncre m
walls, concrete slabs, and concrete valley gutter. The County has completed construction onthis project. This
project was designed tomeet MAC{)building code standards for safety. The fencing along the top ofthe concrete
walls provided a 42-inch fall protection barrier. Gates were installed along the front edge of the container walls to
U the � staff 6 k f h 6 |6 k k 6 fence, allow e County to pus waste into the / the resident nott throw ewa,teovert e