E2. LZ Tanks Roof Replacement and Rehab Bid Rejection RecommendationCITY OF KALISPELL MEMORANDUM To: Doug Russell, City Manager From: Susie Turner, PE, Director of Public Works Re: Lower Zone Storage Tanks Roof Replacement and Rehabilitation- Bid Rejection Meeting Date: February 6, 2023 BACKGROUND: The Lower Zone Roof Replacement Project generally consists of the replacement of the existing wooden roof structures on the 1.7 MG and 2.7 MG tanks located on Buffalo Hill in Kalispell. The project includes demolition of the existing roof structures, site utility modifications, construction of a new foundation, construction of a new concrete dome roof, and rehabilitation of existing concrete inside of the tanks. BIDDING RESULTS: Bids were opened on January 26, 2023, at City Hall. One responsive bid was received from DN Tanks, LLC ("DN Tanks") of Grand Prairie, TX. Below is a summary of bid amounts for each bid schedule. Schedule 1 is for the 1.7 MG tank and Schedule 2 is for the 2.7 MG tank. The Certified Bid Tabulation is attached to Morrison Maierle's Bid Recommendation Memo. Bid totals are listed low to high and summarized as follows: Schedule 1 Schedule 2 Total Bid Contractor Reservoir 1 Reservoir 2 Price 1.7 MG 2.7 MG) DN Tanks, LLC $4,822,400 $6,434,990 $11,257,390 Grand Prairie, TX Engineers Estimate $3,094,000 $4,373,290 $7,467,290 Morrison-Maierle, Inc. The contractor's cost to complete the project exceeds the engineers cost estimate by $3,790,100. Reasons for the differences between the engineer's estimate and contractors are summarized in the attached Morrison Maierle's Bid Recommendation Memo. RECOMMENDATION: Considering the higher -than -expected bids, the FY 23 budgeted amount for the project, and the information received from the bidder, staff recommends revisiting the alternative analysis to further investigate different roof types and rebidding the project at a later date. 201 1' Avenue E IPhone (406)758-7720 PO Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 www.kalispell.com FISCAL EFFECTS: None at this time. FY 23 Water Fund allocated $549,036 from line item 969 -Lower Zone Reservoirs Replacemnet for consultant fees and the construction cost of $7,270,000 was scheduled to be supported through a State Revolving Fund Loan. ACTION REQUESTED: Motion to reject all bids for the Lower Zone Storage Tanks Roof Replacement and Rehabilitation Project. ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: Morrison Maierle Bid Recommendation Memo 2 1 P a g e Morrison Maierle engineers surveyors planners scientists TO: Susie Turner, P.E., Public Works Director FROM: Jeff Cicon, P.E. DATE: January 31, 2023 JOB NO.: 0387.058 memo RE: Lower Storage Tanks Roof Replacement Recommendation of Award ❑Urgent El For Review ❑Please Comment ❑Please Reply ®For Your Use Background: The Lower Zone Roof Replacement Project generally consists of the replacement of the existing wooden roof structures on the 1.7 MG and 2.7 MG tanks located on Buffalo Hill in Kalispell. The project includes demolition of the existing roof structures, site utility modifications, construction of a new foundation, construction of anew concrete dome roof, and rehabilitation of existing concrete inside of the tanks. The basis for the recommendation to install a concrete roof was determined in an alternatives analysis report completed in March 2022. Bidding Results: Bids were received on January 26, 2023 and read aloud at 2:30 pm at City Hall. One responsive bid was received from DN Tanks, LLC ("DN Tanks") of Grand Prairie, TX. Below is a summary of bid amounts for each bid schedule. Schedule 1 is for the 1.7 MG tank and Schedule 2 is for the 2.7 MG tank. The Certified Bid Tabulation is attached to this memorandum. Bid totals are listed low to high and summarized as follows: Schedule 1 Schedule 2 Contractor Reservoir 1 Reservoir 2 Total Bid Price (1.7 MG) (2.7 MG) DN Tanks, LLC $4,822,400 $6,434,990 $11,257,390 Grand Prairie, TX Engineers Estimate $3,094,000 $4,373,290 $7,467,290 Morrison-Maierle, Inc. The low bid of $11,257,390 exceeds the Engineer's Estimate by $3,790,100, or approximately 50%. Morrison-Maierle has previous work experience with DN Tanks and their site work contractor, S&L Underground. DN Tanks qualification questionnaire shows they have completed recent projects of similar size and scope and are qualified to complete this project. Based on previous experience, Morrison- Maierle has no concerns with regards to DN Tanks or their ability to complete the project. Since this is a specialized rehabilitation project, the number of qualified contractors is limited and receiving only one bid was not unexpected. However, the bid exceeding the estimate by such a large margin that further investigation is warranted. The construction estimate was prepared based on quotes from material suppliers, contractors, and recent project bid tabulations. In some cases, these quotes were adjusted to account anticipated inflation. Page 1 Lower Storage Tanks Roof Replacement Recommendation of Award J Morrison Maierle After discussion with their subcontractors and suppliers, DN Tanks offered the following potential explanations for the higher -than -expected bid: • Construction Schedule: The bid package required both tanks to remain in service through the peak water demand in the summer, requiring most of the work to be completed in the spring of fall. This gave potential contractors limited flexibility for scheduling the work and drove the price up. • Existing Site Conditions: The existing sites do not provide adequate space for construction staging or lay -down areas (especially on Tank #1). As such, DN Tanks anticipated staging and hauling materials off -site, driving the price up. • Material Cost Increases: While the cost estimates were prepared using the best information at the time, it is difficult to keep ahead of material costs in the current bidding environment. As such, these estimates oftentimes lag behind the bid prices. • Deep Foundation Costs: Due to the age of the tanks, the existing conditions of the subgrade was inconsistent and could not be relied upon to support the new roof system. Therefore, micropiles were designed to support the load of the new roof structure. Because Kalispell is in a high seismic zone, these piles also needed to withstand lateral loads, which increased the price. Summary of Budgeted Funds The project is funded through a combination of local funds and a State Revolving Fund Loan. The overall project budget is $9,058,600, with a construction budget as follows: Construction: $7,462,000 Contingency: $746,000 Total Construction Budget $8,208,000 Therefore, the low bid of $11,257,390 exceeds the budgeted funds by $3,049,390 (without allowing a contingency). Potential Cost Saving Alternatives Potential cost saving alternatives could include the following (exact savings would need to be negotiated with DN Tanks): • Remove stairs and railing from the dome and replace with a ladder and safety cable. • Remove the requirement to import trench backfill since the pipe will not be installed below a driving surface. Award Options The City has the options available in terms of awarding a contract for this project: 1. Award Schedule 1-Reservoir 1 in the amount of $4,822,400. 2. Award Schedule 2-Reservoir 2 in the amount of $6,434,990. 3. Award Schedule 1-Reservoir 1 + Schedule 2-Reservoir 2 in the amount of $11,257,390. 4. Reject all bids and re -bid the project at a later date. Page 2 Lower Storage Tanks Roof Replacement Recommendation of Award J Morrison Maierle Recommendation Morrison-Maierle believes that revisiting the original alternatives analysis to further investigate different roof types would benefit the City. Therefore, it is our recommendation to reject all bids and re -bid at a later date. Page 3 Site Preparation LS 1 $340,000.00 $340,000.00 $385,600.00 $385, Micropile Installation LS 1 $275,000.00 $275,000.00 $857,600.00 $857, Design and Installation of Foundation and Stem Wall LS 1 $730,000.00 $730,000.00 $584,300.00 $584, Existing Roof Demolition LS 1 $180,000.00 $180,000.00 $351,600.00 $351, Existing Outlet Baffle Structure Demolition LS 1 $5,000.00 $5,000.00 $26,700.00 $26, Design and Installation of New Free -span Dome LS 1 $910,000.00 $910,000.00 $1,483,000.00 $1,483, Access Stairs and Slab LS 1 $45,000.00 $45,000.00 $41,600.00 $41, Joint Waterproofing LS 1 $182,000.00 $182,000.00 $103,400.00 $103, Outlet and Overflow Pipe Improvements LS 1 $35,000.00 $35,000.00 $266,700.00 $266, Inlet Pipe Improvements LS 1 $25,000.00 $25,000.00 $48,500.00 $48, Site Electrical LS 1 $25,000.00 $25,000.00 $41,300.00 $41, Landscape, Topsoil, and Reseed LS 1 $45,000.00 $45,000.00 $115,200.00 $115, Tank Cleaning, Disinfection, and Startup LS 1 $5,000.00 $5,000.00 $7,100.00 $7, Schedule 1 Total: $3,094,000.00 $4,822, Engineer Estimate DN Tanks We Item Description UofM Quantity Unit Price Extension Unit Price Exten 2 - Reservoir 2 Mobilization/Demobilization (10%) LS 1 $397,000.00 $397,000.00 $577,100.00 $577, Construction Surveying LS 1 $5,000.00 $5,000.00 $22,000.00 $22, Exploratory Excavation HR 20 $300.00 $6,000.00 $976.00 $19, Site Preparation LS 1 $340,000.00 $340,000.00 $390,300.00 $390, Micropile Installation LS 1 $320,000.00 $320,000.00 $1,219,200.00 $1,219) Design and Installation of Foundation, Stem Wall, and Internal Slab LS 1 $1,100,000.00 $1,100,000.00 $764,500.00 $764, Existing Roof Demolition LS 1 $200,000.00 $200,000.00 $365,900.00 $365, Existing Outlet Baffle Structure Demolition LS 1 $5,000.00 $5,000.00 $31,800.00 $31, Design and Installation of New Free -span Dome LS 1 $1,420,000.00 $1,420,000.00 $2,267,400.00 $2,267, Access Stairs and Slab LS 1 $45,000.00 $45,000.00 $43,800.00 $43, Joint Waterproofing LS 1 $230,000.00 $230,000.00 $124,100.00 $124, Overflow Pipe Improvements LS 1 $25,000.00 $25,000.00 $115,900.00 $115, 24" Butterfly Valve LS 1 $30,000.00 $30,000.00 $41,500.00 $41, Floor Drain Piping LS 1 $20,000.00 $20,000.00 $48,800.00 $48, 12" DR 18 C900 PVC Bypass Water Main LF 392 $120.00 $47,040.00 $300.00 $117, 12" Ductile Iron Bypass Water Main LF 75 $130.00 $9,750.00 $330.00 $24, 12" MJ Gate Valve EA 5 $5,000.00 $25,000.00 $8,000.00 $40, 12" MJ Bend EA 8 $3,000.00 $24,000.00 $2,690.00 $21, 12" MJ Tee EA 2 $4,000.00 $8,000.00 $3,200.00 $6, 12" Water Main Connection to Cl Pipe EA 2 $5,000.00 $10,000.00 $5,800.00 $11, 12" Water Main Connection to Ex. 18"x12" Reducer EA 1 $7,500.00 $7,500.00 $7,400.00 $7, 12" Water Main Connection to Ex. 12" HDPE Pipe EA 1 $10,000.00 $10,000.00 $7,400.00 $7, Relocate Existing Air Release Valve and Vault LS 1 $10,000.00 $10,000.00 $12,200.00 $12, Type 2 Pipe Bedding LF 200 $20.00 $4,000.00 $20.00 $4, Abandon Existing Bypass Main LS 1 $5,000.00 $5,000.00 $4,900.00 $4, Site Electrical LS 1 $15,000.00 $15,000.00 $22,000.00 $22,