Loading...
11-10-22 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, November 10, 2022 First Floor Conference Room 201 First Avenue East ATTENDING: Kari Barnhart, Planner II PJ Sorenson, Senior Planner Chad Fincher, Parks Director Rick Parker, Commercial Plan Reviewer Dan Pearce, Fire Chief Keith Haskins, Deputy Public Works Dir. Shane Cooke, Building Inspector GUESTS: 4 HEAR THE PUBLIC: Margaret Davis (160 Charlotte) had comments regarding Logan Health’s Conway Drive & Sunnyview Lane – she would like them to be connected. Also regarding the Gateway Community Center Parking Lot, she would also like the streets connected and access improved and felt that this should be under continual oversight by the City. PERFORMANCE BOND REMINDERS: Planning received a bond extension from Big Sky IV. Public Works and Parks will be looking at The Landings Building 5 for completion soon. Public Works is tracking Beehive Homes and they are not hitting milestones. TD&H is helping them. DEQ approval is still pending. Public Works to advise status of the warranty bonds at Husky St Apartments and the Apartments @ 2 Mile to Planning. OLD BUSINESS: The Harper/Jiffy Lube- 1280/1290 Highway 2 W; new 40-unit multifamily development/Lube Center – Per Public Works, DEQ approval, waiver of SID, reimbursable deposit, and Stormwater Maintenance Permit are still pending. Pre-treatment still has comments out since April. Parks requested irrigation plans and more information on landscaping plans on July 19th and again on October 17th. This will be on the agenda next week. Parkland Meadows (Lots 5&7 - Bldgs A,B,D&E) – Airport Rd; new multifamily apartment buildings – Planning received irrigation plans for Lot 7 and offsite. Parks has not reviewed plans. Public Works sent comments out on September 20th for Lot 7 and on October 7th for Lot 5. Public Works is working on the lift station with Jackola. This will be on the agenda next week. NW MT Head Start – 79 7th Ave EN; addition – Planning is still waiting on landscaping. Pre-treatment sent comments out in June on the existing building. This will be on the agenda next week. Creekside Commons – Glenwood Dr; new apartment building – Public Works sent comments out on October 10th. Plan Review is in the process of reviewing. Parks emailed a request for updated details on October 7th. This will be on the agenda next week. Laird Noller Truck & RV – 3178 Hwy 93 S; new truck & RV service center – Planning received new building plans and confirmed there are no changes to the site. Public Works sent comments out on November 4th. Pre- treatment sent comments out on July 22nd and re-sent on November 10th. Parks sent comments out in June and re-sent in October. This will be on the agenda next week. Gateway Mall Parking Lot – 1203 Hwy 2 W – parking lot remodel – The Floodplain permit is being processed. Beargrass Landscaping is doing the internal landscaping plans and will likely send plans soon. This will be on the agenda next week. Logan ED Parking Lot – 310 Sunnyview Lane – parking lot remodel – Public Works will not be reviewing until record drawings have been received. This will be on the agenda next week. NEW BUSINESS: PRELIMINARY COMMENTS: LC Staffing – Treeline Rd – Fire Department approved the plans. Planning will request plans to have setbacks and labeled contours on sheet G002. Public Works will require the approach and sidewalk to be concrete and match City standard, the meter pit to be moved to the boulevard, and the stub out on the water main to be used for fire or be abandoned. Some of the slopes have suspect elevations that need to be addressed. Public Works to review the solid waste location. The sidewalk ramps should be relocated for the crossing and the approach should be aligned with Treeline Center. Their project refers to a project that Public Works does not have so they need to include it into their plans. OTHER COMMENTS: Planning advised that MDT will not accept a 4-way stop at Meadows Edge and Spring Creek Park. Spring Creek Park will be applying for preliminary plat soon; Planning would like to have a meeting with 11/11 and Farm to Market and SW corner property owners to meet to discuss this intersection. Wade Rademacher from Edge, LLC stated that MDT wanted to separate the right of way permit for the entrance to Meadows Edge Phase 3 and the right of way for utility work. Public Works received a Right of Way Permit for 417 E Idaho and asked if it would be coming to Site Review. Planning is working with them and will add it to the agenda once more information is provided. Public Works has not yet reviewed the Airport Checklist but will soon. Stillwater Village should be on the December 13th Planning Board Meeting as well as 2 CUPS (group home and residential apartments). Starling final plat is in process. Planning received updated plans with adjusted sizes after Parks signed off; Parks and Planning to review together. Starling Apartments should be coming through Site Review next week for preliminary comments. Public Works’ RFP for review software is due 11/18. The meeting was adjourned at 10:35 AM. cc: Police City Manager City Clerk Building Fire Community Development Planning Parks Public Works MDT