Loading...
11-03-22 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, November 3, 2022 First Floor Conference Room 201 First Avenue East ATTENDING: Kari Barnhart, Planner II PJ Sorenson, Senior Planner Patrick Jentz, Engineer Rick Parker, Commercial Plan Reviewer Dan Pearce, Fire Chief Keith Haskins, Deputy Public Works Director GUESTS: 3 HEAR THE PUBLIC: None. PERFORMANCE BOND REMINDERS: Sunshine Factory and Kalispell Foot & Ankle bonds have been released. Meridian Apartments bond expired 11/1 but the work is almost complete. Planning will follow up with them next week. Plan Review advised that they have a PTAC shortage that will delay their C of O. Big Sky IV will send a new PIA with no expiration. Public Works will follow up with Parks regarding Meadows Edge bond reduction request. The Landings wants to remove the trash enclosure gates. Kari will follow up with ARC. The Landings Phase 2 will be coming in for Final Plat soon and cannot bond due to a waiver on the preliminary plat. Owl View will send a new bond that expires in June 2023. OLD BUSINESS: The Harper/Jiffy Lube- 1280/1290 Highway 2 E; new 40-unit multifamily development/Lube Center – Public Works is still waiting for DEQ review. Plan Review has not received a response to their comments. This will be on the agenda next week. Parkland Meadows (Lots 5&7 - Bldgs A,B,D&E) – Airport Rd; new multifamily apartment buildings – Public Works has a resubmittal for Lot 7 to review and sent questions regarding a conduit discrepancy between electrical and civil plans to Jackola. This will be on the agenda next week. NW MT Head Start – 79 7th Ave EN; addition – Nothing new. This will be on the agenda next week. Eagle Valley Ranch Apartments – Bldgs E,F,G&H – 2000 Jefferson Blvd – Public Works, Parks, Planning, and Fire Department signed off. Parks will be providing Jackola with irrigation plan comments. Public Works will need the Record Drawing Deposit before for sending the DEQ approval. Creekside Commons – Glenwood Dr; new apartment building – Public Works has questions for the engineer. This will be on the agenda next week. Laird Noller Truck & RV – 3178 Hwy 93 S; new truck & RV service center –Public Works is close to completing the review and will be sending comments out. No update regarding Hwy 93 access from MDT. This will be on the agenda next week. Gateway Mall Parking Lot – 1203 Hwy 2 W – parking lot remodel – Planning received updated plans and received the floodplain permit application. Updated landscape architectural plans have not been received. This will be on the agenda next week. Logan ED Parking Lot – 310 Sunnyview Lane – parking lot remodel – Public Works is still waiting for as-builts. This will be on the agenda next week. NEW BUSINESS: PRELIMINARY COMMENTS: Tooth Booth – 455 Cascade Loop (E of Sherwin Williams – KNTC) – Planning presented preliminary site plan. Jackola will be moving the trash enclosure location. Jackola stated that there is an existing hydrant, power, storm, and boulevard trees nearby and that sewer was stubbed in somewhere on the site. Public Works will accept the misalignment of the center lines of the driveway connecting Sherwin Williams and the building. The building will not be sprinkled but Fire Department is ok with access and distance from the hydrant. PUD Amendment – Parkland Meadows – building permits issued prior to final plat – Discussion was held whether the PUD amendment is major or minor. Planning clarified that this would not approve release of permits; it’s only to issue permits once complete Final Plat application is received. Planning also advised that this approval is consistent with previous PUD amendments being considered minor. The committee agreed that this is a minor amendment. OTHER COMMENTS: Stillwater Village preliminary plat was postponed until at least December since geo-tech, TIS, and other items are pending. The latest submittal date to make the December Planning Board Meeting is 11/23. The Public Works Plan Review Software RFP has several companies looking to bid but one requested it remain open until 11/18 (was 11/15). The committee did not any issues with leaving the bid open for an additional 3 days. The meeting was adjourned at 10:26 AM. cc: Police City Manager City Clerk Building Fire Community Development Planning Parks Public Works MDT