E2. Award Bid for 1st and 2nd Ave EN Sanitary SewerCITY OF KALISPELL MEMORANDUM To: Doug Russell, City Manager Cc: Susie Turner, PE, Director of Public Works From: Grace Kurtz, EI, Engineer I Re: 1st and 2nd Ave EN Sanitary Sewer Replacement Meeting Date: June 6, 2022 BACKGROUND: The City of Kalispell has received sealed unit price bids for the 1st and 2nd Ave EN Sanitary Sewer Replacement. The project includes furnishing labor, materials and equipment required to replace an existing 6-inch and 8-inch vitrified clay pipe (VCP) and concrete sewer main with approximately 2,030 linear feet of 8-inch PVC sewer main. The project was bid with an additive alternate for an additional 440 linear feet of 8-inch PVC sewer main replacement. Both the base bid and additive alternative include manhole removal and replacement, bypass pumping, sewer service connections, paved surface restoration, and landscape and sidewalk restoration. Bids received were opened on Thursday, March 19, 2022, at 2:00 PM. Two responsive bids were received from local contractors. The bids and engineer's estimate are summarized below: Contractor. Total Base Bid Price Total Base Bid +Add Alt.I Sandry Construction $1,123,647.00 $1,314,961.00 LHC $1,318,447.50 $1,644,105.00 Engineer's Estimate $921,344.00 $1,154,494.00 Sandry Construction has been determined to be a responsive and responsible contractor successfully completing similar projects in Northwest Montana. FISCAL EFFECTS: 1st and 2nd Ave EN Sanitary Sewer Replacement Project allocation totals $1,196,414, as shown in the FY 22 Sewer Fund Capital Outlay line items (5310-454-430630-954). The line item has a current balance of $1,192,456. There is a difference of $122,505 between the FY 22 budget amount remaining and the low bid amount. The budgeted short coming is temporary, as the City was successful in receiving ARPA competitive grant funding totaling $694,000 for this project. The grant funds are scheduled to be distributed in the summer of 2022. Additionally, FY 23 Sewer Budget allocates an additional $283,000 to support the anticipated inflationary construction costs for this project. Nonetheless, the FY 22 Sewer Budget, line item —954, will need to be administratively amended, with an increase of $122,505, to support the additional expenditure amount being awarded in FY 22. The amendment will allow the contract to be awarded for this project without delaying construction. Construction is anticipated to begin at the end of June and will be completed in the fall of 2022. ACTION REQUESTED: Motion to award the Base Bid and Additive Alternate 1 for the 1st and 2nd Ave EN Sanitary Sewer Replacement to Sandry Construction for $1,314,961.00. ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: Bid Analysis. 201 1' Avenue E IPhone (406)758-7720 PO BOX 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 www.kalispell.com KALISPELL PUBLIC WORKS DEPT 1st Ave Alley EN Sanitary Sewer Replacement (AKA 1st and 2nd Ave EN Sanitary Sewer Replacement) Tabulation of Bids Received Base Bid - 1st Alley EN, Arizona, and 1st Ave EN Cul-de-sac Sandry Construction NCC Neumann Construction Co. Engineer Estimate Item Item Description Unit Quantity Un't PrIre 'ctal Unit Price Total Unit Price Total 1 Mobilization LS 1 $68,000.DD $68,DDO.00 $44,BSo.00 $44,850.00 $89,000.00 $89,000.00 2 Traffic Control BLOCK 5 $4,985,00 $24,925.00 $3,850.00 $19,250.00 $5,000.00 $25,000.00 3 Construction Surveying LS 1 $28,730.00 $28,730.00 $21,000.00 $21,000.00 $3,200.00 $3,200.00 4 8" SOR 35 PVC LF 1600 $260.00 $416,000.00 $332.00 $531,200.00 $200.00 $320,000 00 5 4' Basic Manhole EA 8 $4,862.00 $38,896.00 $8,750.00 $70,000.00 $4,670.00 $37,360.00 6 4' Additional Depth Manhole VF 50 $282.00 $14,100.00 $240.00 $12,000.00 $250.DO $12,500.00 7 4" Sanitary Sewer Service EA 50 $2,254.DO $112,700.00 $4,250.00 $212,500.00 $2,500.00 $125,000.00 8 6" Sanitary Sewer Service EA 5 $2,510.00 $12,550.00 $5,250.00 $26,250.00 $3,000,00 $15,000.00 9 Remove Manhole EA 4 $1,733,DO $6,932.00 $825.00 $3,300.00 $1,720,00 $6,880.00 10 Sanitary Bypass Pumping LS 1 $84,5115.00 $84,518.00 $115,000.00 $115,000.00 $72,000.00 $72,000.00 11 Remove Concrete (All Depths) SF IIOD $2.42 $2,662.00 $4.20 $4,620.00 $8.00 $8,800.00 12 Remove Curb LF 150 $6.82 $1,023.00 $12,00 $1,800.00 $5.00 $750.00 13 Remove Pavement SY 250D $33.97 $84,925.D0 $5.20 $13,000.00 $15.00 $37,500.00 14 4" Asphalt Pavement SY 2S00 $72.16 $180,400.00 $75.00 $187,500.00 $52.00 $130,00D.00 15 Landscaping SY 104 $39.00 $4,056.00 $85.00 $8,840.DO $21,00 $2,184.00 16 Curb and Gutter LF 120 $50 OD $6,000.00 $36.00 $4,320.00 $25.00 $3,000.00 17 Straight Curb LF 100 $50.00 $5,000.00 $31.80 $3,180,00 $30.00 $3,D00.00 18 4" Concrete Sidewalk SF 250 $21.00 $5,250.00 $12.80 $3,200.00 $11,00 $2,750.00 19 6" Concrete Sidewalk SF 850 $18.00 $15,300.00 $18.75 $15,937.50 $18.00 $15,300.00 20 Flowable Fill Crossing EA 2 $2,740.00 $S,480.00 $3,600.00 $7,200.00 $1,260.00 $2,520.00 21 Type 2 Bedding LF 500 $6.20 $3,100.DO $18.DO $9,000.00 $8.00 $4,000.00 22 Sanitary Sewer Connection I EA 1 $3,100 00 $3,100.00 $4,500.00 $4,500.00 $5,600.00 $5,600,00 Base Bid Total = $1,223,647.00 $1,318,447.50 $921,344.00 Additive Alternate 1- Northern block of 1st Ave EN Sandry Construction NCC Neumann Construction Co. Engineer Estimate Item Item Description Unit Quantity t I i A Pr if.,, rotal Unit Price Total Unit Price Total is Mobilization LS 1 $2,500.00 $2,SDO.00 $18,500.00 $18,500.00 $22,000.00 $22,000.00 2a Traffic Control BLOCK 1 $3,835.00 $3,835.00 $3,850.00 $3,850.00 $5,000.00 $5,000,00 3a Construction Surveying LS 1 $2,954.00 $2,954.00 $8,850.DO $8,850.OD $4,000.00 $4,000.00 4a 8" SDR 35 PVC LF 440 $182,00 $80,080.00 $332.00 $146,080.DO $200.00 $88,000.00 5a 4' Basic Manhole EA 1 $3,666.00 $3,666.00 $8,750.00 $8,750.00 $4,670.00 $4,670.00 68 4' Additional Depth Manhole VF 6 $211.00 $1,266.00 $240.00 $1,440.00 $250.00 $1,5DO.00 7a 4" Sanitary Sewer Service EA 12 $1,732.00 $20,784.00 $4,250.00 $51,000.00 $2,500.00 $30,000.00 9a Remove Manhole EA 1 $1,333.00 $1,333.00 $825.00 $825.00 $1,720.00 $1,720.00 10a Sanitary Bypass Pumping LS 1 $4,000.00 $4,000.00 $16,500.00 $16,500.D0 $18,DDO.00 $18,000,00 lla Remove Concrete (All Depths) SF 250 $1.86 $465.00 $4.25 $1,062.50 $8.00 $2,000.00 12a Remove Curb LF 50 $5.21 $260.50 $20.00 $1,000.00 $5,00 $250,00 13a Remove Pavement SY 650 $26.13 $16,984.50 S5.20 $3,380.D0 $15.00 $9,75000 14a 4" Asphalt Pavement SY 650 $61.00 $39,650.00 $75.00 $48,7SO.00 $52.00 $33,800.00 15a Landscaping SY 10 $30.00 $300.00 $98.00 $980.00 $21.00 $210.00 17a Straight Curb LF 50 $39.D0 $1,950.00 $31.80 $1,590.00 $30.00 $1,500.00 18a 4" Concrete Sidewalk Sf 250 $30.00 $7,50D.00 $12,80 $3,200.00 $11.00 $2,750,00 21a Type 2 Bedding LF 300 $4.75 $1,425.00 $18.00 $5,400.00 $8.00 $2,400,00 22a I Sanitary Sewer Connection I EA 1 $2,361.00 $2,361.00 $4,500.00 $4,500.00 $5,600.00 $5,600.00 Additive Alternate 1 Total = $191,314.00 Total Bid Price with Base Bid and Additive Alternative 1 = $1,314,961.00 TRUE TABULATION OF BIDS RECEIVED 1st Ave Alley EN Sanitary Sewer Replacement (#6198059) Owner: City of Kalispell, MT Solicitor: City of Kalispell, MT 05/19/2022 02:00 PM MDT $325,657.50 $1,644,105.00 • ONrati0 .• DOUGLAS • ; • KEITH i 7 HASKIN S •� i :A'_ No.28612PE -ale, - ��•• `SYON • i 1Ct� y.. I ( ' 1•ZZ $233,150.00 $1,154,494.00