Loading...
05-12-22 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, May 12, 2022 First Floor Conference Room 201 First Avenue East ATTENDING: Kari Barnhart, Planner II Rick Parker, Commercial Plan Reviewer Chad Fincher, Parks & Rec Director PJ Sorensen, Senior Planner Keith Haskins, City Engineer Patrick Jentz, Engineer II GUESTS: None HEAR THE PUBLIC: None PERFORMANCE BOND REMINDERS: Bee Hive homes updated the PIA but Public Works has not received the Letter of Credit, Mark Crowley to follow up. OLD BUSINESS: Owl View Ph 2 Building 2 - 210 Sawyer Ln; new apartment building – Nothing new. This will be on the agenda next week. Junegrass Place- 1079 N Meridian; multi-family development (138 units and community building) – Only sign off committee was waiting for is landscaping. Chad emailed approval on 5/11/2022. Building is still working through some comments on the Community Building. Pretreatment still needs to be taken care of and a stormwater permit will be needed. There has been no DEQ approval either. This has passed through site review. First Interstate Bank- 2 S Main St; new drive thru teller lanes and ATM – Nothing new, no building plans. This will be on the agenda next week. SD#5 Transportation and Maintenance Facility- 120 School Station Ct; School bus storage and maintenance – The seeding that has been proposed does not match the Public Works standards. Per Chad the front is ok, but the back needs corrected on the plans. Chad has comments on landscaping revisions he is waiting for a response on. Pretreatment comments went out on 04/06/2022. This will be on the agenda next week. Kohls- 2248 Highway 93 N; new retail shell – Does not appear a sewer service was stubbed out for the building; one will need to be provided. This will be on the agenda next week. Meridian Apartments (Bldg E)- 50 Meridian Ct; Building 5 of Meridian Apartments (36 units) – Public Works is working on getting comments out. This will be on the agenda next week. Flathead Liquor- 1121 Hwy 2 W; parking lot modification –The backflow preventer is not high enough off the ground, it must be 12 inches off the ground. Elevations will need to be provided. Public Works really has nothing other than tracking the disturbance. This will be on the agenda next week. The Silos Ph 2 (Building D&G)- 655 Center St; new 36-unit multifamily building – Still waiting on a new civil submittal, the civils that Public Works currently has on file is from March 2022 and per Keith, Toby with Jackola advised him those were just preliminary and to not use them. The same encroachment letter that was used on Phase 1 will also be used on Phase 2. This will be on the agenda next week. Airport Hangar- 900 Ryan St; new airport hangar – PJ is signing off on their COS today. Per Keith their ROW permit was cancelled so they will need to apply for a new one. Building still needs to review. This will be on the agenda next week. The Harper – 1280 Hwy 2 East; new 40-unit multifamily development – Concerns with the 50-foot drainage easement that comes right up to Mudman Burgers and any access easements that are proposed with this development may cause overlapping easements. Keith advised since the stormwater that is being installed involves all three of these sites/lots that the easement should incumber them all. A floodplain permit may be required. This will be on the agenda next week. Jiffy Lube – 1290 Hwy 2 East; new/auto service/repair facility – Concerns with the 50-foot drainage easement that comes right up to Mudman Burgers and any access easements that are proposed with this development may cause overlapping easements. Keith advised since the stormwater that is being installed involves all three of these sites/lots that the easement should incumber them all. A floodplain permit may be required. This will be on the agenda next week. Diamond Aire Hangar Addition – 1893 Airport Rd; addition to existing hangar – Pretreatment comments sent out on 5/5/2022. Easement issues are still being worked out. This will be on the agenda next week. Taco Bell – 535 E Idaho St; building remodel and parking lot modification – Doug with TD&H is sending a new site plan. Chad advised if they are doing an interior remodel, they will have to update the mulching around the building. This will be on the agenda next week. NEW BUSINESS: Sunrift – called Public Works about the food truck area and asked about submitting for site review approval and about the issue of serving alcohol in a building where people must cross a public alley to get to another building and may have alcohol on their person. They will need to contact the Department of Revenue regarding this. A beer garden may need to be included in design for the food truck area. The 5% parking lot landscaping requirement would apply. PLANNING OFFICE ITEMS: None The meeting was adjourned at 10:50 am cc: Police City Manager City Clerk Building. Fire Community Development Planning Parks Public Works MDT