Loading...
2021 SIA/Bridgeland Dev/Northland Ph 5D01 IIII1111IN Page: SI of37 °� Debbie Pierson, Flathead County MT by SM 1212312021 3:12 PM Return to: Aimee Brunckhorst Kalispell City Clerk 201 1" Avenue East Kalispell, MT 59901 APPENDIX E SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this day of 20 j( , by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and Bridgeland Development LLP (Name of Developer) a Company (Individual, Company or Corporation) located at 315 Parkland Drive #4 Kalispell MT 59937 (Street Address/P. O. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as Northland Phase 5D (Name of Subdivision) located at NW 1/4 Section 1, T28N, R22W, P.M.M., Flathead County Montana (Location of Subdivision) and, WHEREAS, the City has conditioned it's approval of the final plat of Northland Phase 5D , upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $ $, NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, o other acceptable collateral as determined by the City Council, in the amount of $ $� gSSaid Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: �l0t,13co a. That the creditor guarantees funds in the sum of $ $� ,z_the estimated cost of completing the required improvements in Northland Phase 5Q. (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by AUgUSt 20 , 2022-• 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of two (2) years from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. Bridgeland Development LLP (Name of Subdivision/Developer/Firm) b V u �� Ltd eu.-?t ame) (Title) STATE OF MONT NA COUNTY OF E(QJadd On this /0 A day of A , 20 before me, a Notary Public for the State of Montana personally, appeared re- of v.- � + ' M S known to me to be the v I(L ,(-fh4' of &jdqfjMcA W!Vmen-t UP, whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year first above written. Notary P blic for the State of Montana Printed Name ({t1 A h r 0` UA CL h Ali C, Residing at My Commission Exeires J2 Z131 2 0 2, MAYOR, CITY OF KALISPELL MAYOR �NNTUpy CYNTHIATUDHOPE Notary Public for the State of Montana * Sealed *= Residing at KALISPELL, MT My Commission Expires ofMd�`'� February 13, 2023 EXHIBIT A CONDITIONS OF APPROVAL Conditions: 1. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as anx additional conditions aygnriated with the relimin2rV plat as 2Wroyed bLV the city council. 2. The preliminary plat approval shall be valid for a period of three years from the date of approval. 3. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. 4. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. 5. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction. 6. The developer shall submit the street design to the Kalispell Public Works Department for review and approval prior to construction. 7. A letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. 8. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 9. The following statement shall appear on the final plat: -The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." 6 Developer's Signature 10. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat In addition the mail deltv_rysite and improvements all also he included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 11. A' temporary turnaround shall be required at the north terminus of Northridge Way to the satisfaction of the Public Works Director. 12. One additional Kalispell Bypass trail access point shall be installed (8-foot-wide concrete or 10-foot-wide asphalt surface) along the western property boundary. The trail access point can be installed anywhere north of Northridge Drive along the western property boundary. 13. The townhouse lots located along the westerly property boundary shall have a street frontage density of 40 feet/unit or larger. If the density is less than 40 feet/unit an alley shall be incorporated into the design of those lots. 14. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. 15. A parks plan for the areas designated as "open space and storm water management area" shall be approved by the Parks and Recreation Director. 16. A park maintenance district shall be formed incorporating all the lots within the subdivision. The park maintenance district shall not be effective until such time as any open space or parks are accepted by the city. In this case an assessment would be levied within the maintenance district to be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 17. A homeowner's association (HOA) shall be formed and established for the common areas prior to final plat. 18. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal. 19. All utilities shall be installed underground. 20. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 7 Project Name: NORTHLAND PHASE 5D WGM Project Number: 160330 Owner: BRIDGELAND DEVELOPMENT, LLP Bonding Date: December 9, 2021 EXHIBIT "B" CERTIFICATION OF WORK TO BE ♦� WG M G R O U P COMPLETED Completed as of Bonding Date Total Final Construction Construction Quantity Costs Quantities and Costs Line Item Item Description Unit Quantity Unit Price Total Quantity Current Total Schedule 1- Site Work - 1.1 Mobilization. Submittals & Permits LS 1 $26,500.00 $26,5W.00 1.0000 $26,500.00 1.2 Erosion Control Measures LS 1 $1M.00 $18,500.00 1.0000 $18,500.00 . 13 Traffic Control LS 1 $41,750.00 $41,7S0.00 1.0000 $41,750.00 1A Material Testing LS 1 S39,000.00 $39,000.00 1.0000 $39,000.00 1.5 Exp:oratosy Excavation Hr. 16 $324.00 $5,184.00 16 $5,184.00 1.6 Demolition and Pro,r Disposal SY 735 $15.56 $11,436.60 735 $11,436.60 1.7 relocate portion of exisUng TS CY 17000 $3.50 $59,500.00 17000 $59,50o.00 1.8 Strip, Stockpile & Respread Top Soil CY 12000 $5.00 $60,00D.00 6000 $30,000.00 1.9 Earthwork Embankment & Excavation CY 13100 $5.25 $69,775. 13100 $68,775.00 1.10 Seeding and Restoration LS 1 $4,675.00 $4,675.00 0 $0.00 1.11 Misc Work Fence Deno/storm Regrade LS 1 $2,000.00 $2,000.00 0 $0.00 SCHEDULE 1 TOTAL $337,320.60 $3W.645.60 Schedule 2 - Roads & Sidewalks 2.1 Geotextile Fabric SY 5363 $0.90 $4,846.97 5,363 $4,946.97 22 1.5" Minus Select Subbase Material (9" depth) CY 2080 $30.50 $63,440.00 2,080 $63,440.00 23 3/4" Minus Base Course Material (6" depth] CY 1113 $32.50 $36,17250 1, M $36,172.50 2A 4"Aszwwlt SY 5850 $19.00 $111,150.00 5,850 $111,150.00 2A Muhi-Use Path, SY 1842 $26.00 $47,892.00 1,727 $44,902.00 2.4 Muki-Use Patf.Concrete ACC SF 288 $14.56 $4,193.28 298 $4,193.28 2.5 Curb &Gutter LF 2983 $17.591 $52,441.14 2,9W $52,441.14 2.5 Street Intersection Gutter SF 1094 $7.54 $8,249.76 1,094 $8,248.76 2.6 Sidewalks 4" Concrete, 6" base, 5' width] SF 17230 $5.31 $91,491.30 17,230 $91,491.30 r 2.7 Detectable Warning Devices EA 16 $264-00 $4,224.00 16 $4,224.00 2.8 Boulevard W tops Ll, seeding, 9' width] SY 2759 $4.34 $11,974.06 2,759 $11,974.06 - 29 Street Signs EA 3 $953.00 $2,559.00 3 $2,559.00 2.10 6" Bollards EA 3 $725.00 $2,175.DD 0 $0.00 SCHEDULE 2 TOTAL $440,808.01 $435,643.01 Schedule 3 - Water System 3.1 8' C900 PVC Water Main LF 15S4 557.00 $88,578.00 1,554 $89,578.00 3.2 a" MJ Bend EA 4 $461.00 $1.844.00 4 $1,844.00 3.3 8" x 8° x 8" MJ Tee EA 2 $771.00 $1,542.00 2 $1,542.00 3.4 8" x 8" x 8' x 8" Ml Cross EA 1 $1,065.00 $1,065.00 1 $1,065.00 3.5 8" MJ End Cap w. Slowoff EA 1 $3,015.00 $3,015.Oo 1 $3,015.00 3.6 8" M1xM1 Gate Valve W. Box and Collar EA 15 $1,930.00 $29,950.00 15 $28,950.00 3.7 Connect to Existing Water MN MN Ext. EA 2 $2,000.00 $4,000.00 2 $4,0D0. 00 3.8 6" Fire Hydrant Assembly EA 4 $6,380.00 $25520.00 4 $25,520.00 3.9 Lower W Water Main EA 2 $3,535.00 $7,070.00 2 $7,070.00 3.10 3/4" Domestic Water Services _ EA 40 $3,235.00 $129,40000 40 $129,400.00 SCHEDULE3TOTAL . $290,984.00 $290,984.00 Schedule 4 - Sewer System EA 3 $2,080.00 $6,240.00 3 $6,240.00 4.1 Conned to Existing City Sewer 4.2 8' SDR 35 Sewer Main LF 1962 $49.00 $96,138.00 1,962 $96,138.00 4.3 49" Sewer Manhole w. Frame Cover and Collar EA 14 $3,715.00 $5Z010001 14 $52,010.00 4.4 4' Sewer Services EA 40 $1,855.00 $74,200.00 41.1 SCHEDULE 4 TOTAL $228,588.00 $228,588.00 Schedule 5 - Stormwater Management 5.1 30" I.D. Catchbasin (with Casting Apron, and Rin ) EA 4 $2,371.00 $9,494.00 4 $9,494.00 5.2 48" I.D. Manhole (with Casting, Apron, and Rings] EA 4 $3, 150.00 $12.600.00 4 $12,600.00 5.3 48" I.O. Manhole (with Casting, Apron, and Rings i-TYPE 2 EA 1 $2,770.00 $2,770.00 1 $2,770.00 5.4 12" Storm Drain - SOR 35 LF SOB $39.00 $31,512.00 am $31,512.00 53 Flared End Section w. Pond Reshape. EA 4 $1,515.00 $6,060.D0 4 $6,060.00 SCHEDULE 5 TOTAL $62p2640 $62A26.00 Schedule 6 - Dry Utilities, Street Lighting, and Signage 6.1 Utility Trench w. Bedding LF 2390 $9.00 $21,510.00 2,390 $21510.00 6.2 1" Sch 40 PVC LF 297 $3S6 $1,057.32 297 $1,057.32 63 Street!,ght Concrete Base EA 6 $1,200.00 $7,200.00 6 $7,200.00 6.4 3" Sch 40 PVC Electrical Conduit LF 3761 $5.07 $19,068.27 3,761 $19,068.27 63 Single Phase Concrete Vault EA 5 $1.005.00 $5,025.00 5 $5,025.00 6.6 Secondary Electrical Pedestal EA 17 $143.00 $2,431.00 17 $2,431.00 6.7 Three Phase Concrete Vault EA 1 $1,535.00 $1,535.00 1 $1,535.00 6.8 '5: 2�Sch 40 PVC Communication Conduit LF 2390 $3.00 $7,170.001 2,390 $7,170.00 SCHEDULE 6 TOTAL S64,996.59 $64,9%.59 Schedule 7 - Closeout Engineering Services 7.1 Record Drawings LS 1 $5,000.00 $5,000.00 1 $5,000.00 SCHEDULE 7 TOTAL $S,000.00 SSA0o.00 Schedule 8 - Open Space Landscape Services 8.1 Open Space Treas EA 28 S800.00 $22,400.00 0 $800.00 SCHEDULE 7 TOTAL _ $22,400.00 $800.00 CIVIL TOTAL PROJECT BUDGET TOTAL ESTIMATED COST OF CONSTRUCTION $1,452,523.20 AMOUNT COMPLETED PRIOR TO BONDING $1,389,093.20 AMOUNT OF REMAINING WORK PRIOR TO BONDING 63,440.00 AMOUNT OF BOND (125%OF REMAINING WORK)" $79,300.00 AS PROJECT ENGINEER FOR NORTHLAND PHASE 50, 1 CERTIFY THAT THE WORK LISTED HEREIN IS CORRECT. IN ADDITION, I CERTIFY THAT THE ASSOCIATED COSTS ARE REASONABLY ACCURATE ESTIMATES OF THE RESPECTIVE COSTS OF THE WORK. THE VALUE OF CONSTRUCTION AND OTHER WORK COMPLETED TO DATE IS ESTIMATED TO BE: $1,389,093.20 THE TOTAL VALUE OF REMAINING WORK, SERVICES AND FEES IS ESTIMATED TO BE: $63,440.00 SECURITY HELD AT 125% OF THE REMAINING COSTS SHOULD BE IN THE AMOUNT OF: $79,300.00 REDUCED BOND FROM SA/58 (INCLUDING LANDSCAPE AT 125%) $54,3SB.63 TOTAL BONDING REQUIRED SA, 56, 5D $133,659.63 CASHIERS CHECK SENT TO KALISPELL PUBLIC WORKS (2020) $29,465.97 EXISTING BOND FROM SA/511 (INCLUDING LANDSCAPE AT 12S%) $79,992.00 BOND FOR REMAINING PHASE SO WORK $24,300.76 Ben Rankin, P.E. 'ALL IMPROVEMENTS SHALL BE COMPLETED BY: August 20, 2022 Approximate percentage of completed work as of bonding date: 95.5%