Resolution 3923 - Change Order - KPD Renovationr ��
HpNNp, 3923
A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF
CONTRACT WITH
Greg Bain & QMXn ny IN Interior Police De nt Remodel
WHEREAS. the City did, on 12-1=89 . enter into a contract with Greg Bain & Co. of
3577 Hwy 93 N.. Kalispell. Montana 59901 for Renovation of Police Department
Interior on the Police Department: and
WHEREAS, upon the advise and recommendation of___• Ken L. Williams
who is the City's consultant and engineer on said project, certain changes and
alterations of design and specifications have been found necessary and Advisable in the
best Interests of the City; and said changes and alterations could not have been
necessarily foreseeable when the original design and speciRcations were prepared on
this phase of the Police_ Department Renovation. and said changes are contained
in Exhibit &attached hereto and are by this reference made a part hereof; and
WHEREAS• it appears in the best interests of the City to approve said changes and
alterations.
NOW THEREFORE, pursuant to the provisions of Section 7-5-4308 (1) MCA be It hereby
resolved:
1. The alterations and modifications of the specifications and plans of the
contract between the City of Kalispell and Greg Bain & Ca=j1Wz._dated 12- l-89. asset
out in Exhibit -&attached hereto, are hereby approved; and
2. As soon as the price to be paid for said alterations and modifications are
agreed to in writing, signed by the contractor, and hereby approved by the Council, this
approval thereof shall be in effect.
PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR OF THE CITY OF
mmam.LTHIB 20th Dwor,
ATTEST:
Acting City Clerk
FEBRUARY
• I
yor
Ilk
LX1IIliI f "All
7 Vc11. 1990
'I'IIe oily of Kalispcll
1)raWer 1997
Kalispell, NIT
59901
.Ilia: The C,111ital 1r1111rovement.
re: Applicaliorr Conultce
for C'onslructinn Altcr
i'unclinl; - alliorts in tite scope of wclrk
The Iulproverue111% in the Kalispell City Police 13c11.1rintent
Applications for supplirrlental funding:
ltem:
Deseription Amount
Change Order One
Fund steel plate on sides o $409.60
Reception Enclosure.
($259.60 ncgt)tiatcd fig. incl.P/Ov.) -.
Further, to fund relocation wilcn
additional electrical services
uncovered when material was removed
for future door ( $150.00 )
Proposed
Choose Urdwr Two'i'hc
Contractor was unaware of mechanical $440.00
Illterltiorv; regUirccl when original lighting
was removed. '1'llis figure is for duet
Housing and grill it) lit in ceiling.
( $383.00 + $57.O0 P/ov.)
propPrcl ed
p[n;e Order Three
iclephone company has donated a $475.00
electrical air filter to the department.
Work involved will tic donation into the
electrical system and mount fixture on llte wall.
($413.00 + $62.00 Nov.)
Note: An alternate is being pur,ued.
Total or three Construclion Items
arising during the course of construction
$1324.60