Loading...
Resolution 3711A - Carver Engineering Contract Amendment3, IT, S 0 L Ul TII 0 N N 0 - 3 -7 1 1 A I A RESOLUTTON TO ALTER AND AMEND THE PLANS AND SPECIFICATTONS OF CONTRACT WTIH Carver Engineering, Inc. ON Woodland Sewer Froiect Contractor Project WHEREAS, the City did, on June 10, 1985 enter into a Date contract with Carver Engineering, Inc. Contractor of 720 Second Street East, Kalispell, MT 59901 Address f or engineering for lift station and sewer mains Description of Work on the Woodland Sewer Project and Project WHEREAS, upon the advice and recommendation of Dennis F. Carver who is the City's consultant and Engineer or Architect engineer on said project, certain changes and alterations of design and specifications have been found necessar y and adviseable and in the best interests of the City; and said changes and alterations could not have been necessarily forseeable when the original design and specifications were prepared on this phase of the Woodland Sewer Project and said changes are contained in Exhibit Project A attached hereto and are by this reference made a part hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations, NOW THEREFORE, pursuant to the provisions of Section 7-5-4308(l) MCA be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Carver Engineering, Inc. dated June 10, 1985 Contractor as set out in Exhibit A attached 'hereto, are hereby approved; and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the contractor, as hereby approved by the Council, �his approval thereof shall be in effect. PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR OF THE CITY OF KALISPELL THIS 19th DAY OF January 1987. Mayory ATTEST: City Clerk-Tr-e-a-surer I, the undersigned, City Clerk of the City of Xalispell, certify that the I foregoing is a true copy of the Resolution passed by the City Counai'L of the City of 4".alispell, Montana at a regular meeting held City Clerk- of the City of Xalispell I I I I AMENDMENT TO ENGINEERING AGREEMENT FOR WOODLAND SEWER PROJECT CITY OF KALISPELL (OWNER) CARVER ENGINEERING, INC. (ENGINEER) DATE: JANUARY 19, 1987 In accordance with the Agreement dated June 10, 1985, authorization to proceed with Items B-9 through B-22 for Engineering Services Durino the Construction Phase (EPA Step 3 Work) for the Woodland Sewer Project (SID No. 337) is required. Carver Engineering, Inc., is hereby authorized to proceed as noted above. Compensation shall be in accordance with the EPA Form 5700-41 as attached and as stated in SECTION E - COMPENSATION FOR STEP 3 ENGINEERING SERVICES of the A&reement. As stated in SECTION E, the cost ceiling of $26,806.9�2 may not be exceeded without amendment, and the fixed profit amount of $2,905.79 may not changed without a change in scope of services and an amendment to the Agreement. Authorization is also given to proceed with SECTION C, ADDITIONAL SERVICES, for Preparation of an Operation and Maintenance Manual and for Project Certification. Compensation shall be by the cost plus fixed fee method as estimated on the attached EPA Form 5700-41. The cost ceiling of $3,956.82 may not be exceeded without amendment and the fixed profit amount of $500.39 may not be changed without a change in scope of services and an amendment to the Agreement. 11 CARVER ENGINEERING, INC. Dennis F. Carver, President Attachment: EPA Form 5700-41 CITY OF KALISPELL J h, E. KennedyV Jr. Mayor COST OR PRICE SUMMARY FORMAT FOR SUBACREEME14TS UNDER U.S. EPA GRANTS Form. Approved (See accorr-panying i I risiruct, . ons before completing this form) 0.11B lVo. 1_'3-R01-'-1 Z 0 PARTI-GENERAL I. GRANTEE 2. C;RANT NumBER CITY OF KALISPELL, MONTANA EPA C300263-95 3. NAME OF CONTRACTOR OR SUBCONTRACTOR I&. DATE OF PRCPOSAL CARVER ENGINEERING, INC. January 19, 1987 (Include ZJ.P cadej 6. TYPE OF $ERVICE TO E3E FURNISHED .%. ADDRESS OF CONTRACTOR OR 51.15CONTRACTOR 720 Second Street East Preparation -of O&M.Manual Kalispell, Montana 59901 and Project Certification PART 11- COST SWiMARY EST I - HOURLY ESTIMATED TOTALS 7. DIRECT LABOR (Speeffir labor categari-N) MATED RATE COST HOURS 20 Is 27.28' s 545.60 Office Engineer 48 17-2Q 853-20 Field Engineer 16 17-90 286 0 Drafting 4 13.51 e r —Jc_a_F__ 22 8.78 DIRECT LABOR TOTAL: 7777= ESTIMATED a. INDIRECT COSTS (Specify indiPect camt pools) RATE BASE COST sl 843.42 Company 0.951 1,938.40 71 I H D I R E C T C 0 S T S T 0 s 1;.843.42 9. OrHr_R DIRECT COSTS E s T I M A T E 0 2.TRAvEL COST S PER vtc%o r L TRAVEL -SUBTOTAL- _I ESTIMATED 0 Ty COST b. EOUIPMENT. MATERIALS. SUPPILIES (Spaciff cmiagaries) COST EOUIPMENT SUBTOTAL: ESTIMATED COST ,SUBCONTRACTS _17 SUBCONTRACTS SUBTOTAL: ESTIMATED d. OTI-4ER f5PecJ17 cA#eq*rrrm# COST PT Ell Fe­I`ep--Fo—ne(TbU); Postage ks2b); Printing (slUU) 175-00 15 175.00 OTHER suaTOTALz OTHER DIRSCT COSTS TOTAL; 175.00 lo. TOTAL ESTIMATED COST 3 _355-8Z_ _O _'7 1 �_7 is Lag- 7 EO'TfA L PRICE ;s 2� EPA F...5no"I Q-74) PART III -PRICE SUMMARY ES71.�-rrs. PRIOpt cuolrs """'AtOr find,car, boao- fol PfAce c0mP­'bmR) PART TV -CERTIFICATIONS r Av", - - ' __' %, J3)-':')JJJ ----------- — — i PA^ RKET PP a POSE. Z) ;-R I C F_! SO J7 �4' �k C X� CONTRAC - TOR - OR LOCAL AGENCY PERFORMED ANY .9EVIEW OF YOUR KAS A FEDERAL AGE%4CY OR A FEDERALLY CERTIFIED STATE UT OR CONTRACT WITHIN THE PAST TVELv�- )ACKTHS? ACCOUNTS OR RECORDS IN CONNECTION WITH ANY OTHER FEDERAL GRA 'r r 3 Cc, No t7l "Yes" giva JMAM. add.&Zip Nnd reluphan. numb.r of. rVir-i'ng attic&) iLb.THIS SUMMARY CONFORmS w4TX THE FOLLOWING COST PRINCIPLES '=Z_ This proposal 12% . submitted for u-;e'in . connection with and in response to (1) Request from City of Kalispc This is to C-Ltify to the best of my knowle�.g.e._ and 'Delief th2t thl' COST and p,ricing d2t2 summarized rierein are cornPlete, current, and accurate as of d that a financial man-agernent Capa V exists to ful (,2)__.8UQUSt 1, .1986 -a n . bilit. ly ond acc-u-_ Tateiv Lccount for zhe finar'621' trans2ct'ons under this project. I further certify that I understand that the -_ -_-_ d subagreement price may be subject to downward rene0oti2tiOn and/or TeCcumment where the above ccst an current and accurate as pricing data have been deternined. as a result of audit, not to-1,2ve been c;mpletn, of the date above. (3) January 19, 1987 =XTE OF EJLZr_VT10p4 President, Carver Engineering, Inc. T-9T.-M OF PROPCISFER Iii. CPANTEE PCVIEWEPt r ID E 0 S/pr1ce aPPear' Cr ,rtifv that I have reviewed the cost/price summan., set Earth fierein and the p a as d c st acctatable. for siibnSmernent award. =&-.E OF EAECUTION Z;r V�A :11 AvAliciblel A T L C, pr X a L CIL: T4 Oft Mayor, City of Kalispell _: T. '- X 0 - W. F V! IE It -_� -r%r-z'_cp-