Loading...
Resolution 3646 - Design and Construction StandardsRESOLUTION NO. 3646 A RESOLUTION TO AMEND RESOLUTION NO 3396 , BY AMENDING THE STANDARDS AND GENERAL PROVISIONS FOR DESIGN AND CONSTRUCTION FOR THE CITY OF KALISPELL, MONTANA. WHEREAS, the City of Kalispell adopted on the' 15th day of March, 1982, pursuant to Ordinance No. 1003, the "Standards and General Provisions for Design and Construction," City of Kalispell , Montana, and WHEREAS, it has become necessary to amend and correct the "Standards-.... �# . �!�. al�l and General Provisions for the Design and Construe Vfo'n" for the eff;Fcientlqr� operation of the City of Kalispell Public Works. f. NOW THEREFORE, BE IT RESOLVED BY THE �ITY COUNCIL OF THE CITY OF KALISPELL THAT THE STANDARDS AND GENERAL PROVISIONS FOR DESIGN AND CONSTRUCTION OF THE CITY OF KALISPELL, MONTANA, ARE AMENDED AS FOLLOWS: SECTION 1. As set forth in Exhibit "A" attached hereto and thereby made a part hereof. SECT -ION II. This Resolution shall become effective immediately upon passage by the City Council and approval by the Mayor. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL AND APPROVED BY THE MAYOR THIS 7th DAY OF APRIL, 1986. VAhn "Ed" Kennedy Jr'.t Mayor ATTEST: City Clerk -Treasurer I, the undersigned, City Clerk of the City of Kalispell, certify that the foregoing is a true copy of the Resolution passed by the City Council of the City of Kalispell, Montana, at a regular meeting held City Clerk of the City of Kalispell, Montana EXHIBIT "A" Page 1-1 GP-03 City Fees Sewer Service Connection Fee. Change "Construction In/To Public Facilities" to "or before the utility excavation" Page 1-2 GP-04 Change title "Construction in/to Public Facilities Permit" to "Utility Excavation Permit and Public Right of Way Improve- ment Permit" Under the new ti6e add the following paragraph: 1. Utility Fxcavation Permit. All work affecting underground utility improvements -requires an utility excavation permit approved by the Director of Public Works or hi� authorized representative. The permit will not be �approved -until all licensing, insurance and bonding �irequirements have been met and necessary fees paid. Utility excavation permits are required for: In the paragraphs Water Tap and Sanitary Sewer Connection change "ConstructIon in/to Public Facilities Permit" to "Utility Excavation Permit" After the ' Sanitary Sewer Connection paragraph add the following paragraphs: Storm Sewer Connection. A utility exc avat ion. permit Y-oran individual service connection shall be obtained for any storm sewer service prior to connecting, extending or reconstructing the service to the structure or property to be served. The permittee, at the permittee's expense, shall perform all excavation, install an approved saddle on the main, install all piping, place all backfill and restore all surfaces. The City shall inspect the connection and service prior to backfill. Require- ments for restoration of paved surfaces shall be the same as for the water tap. Private Utility Taps and Connections. A utility excavation permit for an individual tap or connection to an underground private utility (gas, power, tele- phone, etc.) shall be obtained prior to tapping or connecting to said utility. The permittee shall perform all excavation, place all backfill and restore all surfaces. Requirements for restorations of paved surfaces shall be the same as for the water tap. 2. Public Right of Way Improvement Permit. All work within the public Tight of way, that is not a component of the utility excavation permit, shall -require a public right of way improvement permit approved by the Director of Public Works or his authorized representative. The permit will not be approved until all licensing, insurance and bonding requirements have been met and necessary fees paid. This permit shall include, but is not.limited to, street construction, sidewalk and curbing install- ation, driveway access, etc. Page T-5 GP-10 Guarantee for Equipment, Materials, and Workmanship. At the end of the paragraph add the following sentences: Until the -record drawings (described in Section II, Article DC-09) have been submitted to the City, the City will not accept the job or the project as completed. After the drawings have been submitted to the City, the City will issue written acceptance to the engineer. From the date of written acceptance by the City the one year guarantee period begins. Page 11-4 Storm Drainage Systems Change the first sentence to read as follows: For any development, irrespective of the number of lots, containing 28,000 or more square feet, the Professional Engineer shall submit a Page 11-9 Drawing Submittal In the first paragraph change "Construction Permit" to "Excava- tion Permit" In the third paragraph after the second sentence add the following sentences: The drawings shall define the typ'e and size of pipe. They shall show the location of all underground f ittings. Vertical distances shall be tied to a bench mark approved by the City. The drawings shall show the testing results. The drawings shall be certified by a licensed engineer from the State of Montana. Page 111-3 Fittings Remove the old description and add the following: for copper service piping shall be either Mueller 110 compression connections or flared connections equal and similar to Mueller H-15400. Fittings for PE service tubing shall be either Mueller 110 compression connections or Mueller Instatite connections. Page 111-6 Trench Maintenance change "Completion of Work" to "Acceptance by City" Page 1.11-20 R-04 Excavation In the first paragraph add the following words in front of "Permit": "Utility Excavation Permit or Public Right of Way". New Standards Add the attached new standard R-13 and SS-6A Standard SD-3 Change Caird to Neenah 2112 Standard SD-4 11 Add to the beginning of the upper note the following sentences: Manhole ring and cover Neenah R-1390 or R-1733 with a one inch pick -hole located off -center. The cover shall be marked "SANITARY SEWER" or "STORM DRATN" according to application. Standard SS-1 In the upper note change the first sentence to read as follows: Manhole ring and cover Neenah R-1390 or R-1733 with a one inch pick -hole located off -center. The cover shall be marked "SANITARY SEWER" or "STORM DRAIN" according to application. Standard SS-3 In the upper note add the following sentences: Manhole ring and covey shall be Neenah R-1390 or R-1733 or equal with a one inch pick -hole located off -center. The cover shall be marked "SANITARY SEWER" or "STORM DRAIN" according to application. Standard W-1 Remove the old standard drawing and add the new drawing. Standard W-2 Remove the old standard drawing and add the new drawing. Standard W-3 Remove the old standard drawing and add the new drawing. Standard W-4 Remove the old standard drawing and add the new drawing. Standards R-7, R-8, R-9, and R-10 Add the following statement to the notes: "The City may accept an alternate street design from a professional engineer if the traffic loads and soil analysis determine different requirements. The final street design must be approved by the Director -of Public Works or his representative." Remove the application for construction in/to public facilities and add the public right of way permit and utility excavation permit. Page 11-9 Bottom line Change "from" to "by" Page II-k Purpbse of Design Change waived by the City" to waiver by the Director of Public Works or his representative." TYPE SUPPI VARI TYPE I eARRICADE NOTE: For diry shown, TYPE M BARRICADE 3* MINIMUM A45 A 1� I I ro _61 M-7 6- TA.ULE VI-1 Darricades—Characteristies Type TYPE 11 BARR[CADE O'l PORTABLE FLASHER SUPPORT 11 II IT III Width of Rail 1 8, min-12, max 8' min-12' max 8' min-12' max Length of Rail 60-81 3' min—V max 3' min —variable Tnax Width of Stripes 6 in. 6 in. 6 in. Height 3 ft. min 3 ft. min 5 ft. min Type of Frame Demountable or Heavy "A" Frame Light "A" Frame Post or Skids Flexibility Essenti.villy movable Portable Essentially permanent NOTE: Refer to section 1, article GP-08 Safety of "Kalispells Standards And General Provisions For Design And Construction" and the "Manu On Uniform Traffic Control Devicesit. I I It I I I Hub or bell of equal diameter as service line. 1. Hub or bell of equal diameter and type of pipe which -will be used for . the service line shall be used for the connection to the existing main. 2. Hub or bell must not protrude more than 1/4 inch into existing mains. 3. All connections to mains shall be watertight. A filet of grout shall be applied around the diameter of the hub or bell to assure a water- tight or leakproof connection. 4. This type of connection shall be approved by the City,prior to installation. .5. This type of connection shall be used on mains of 15 inches or larger diameter. 6. All construction phases of this type of connection shall be inspected by the City of Kalispell's Public Works Department. CONSTRUCT1011-1 STA,'MARDS STORM DRAIN & SANITARY SEWER CITY OF KALISPELL I SERVICE CONNECTIONS ISS-6A 3­86