Loading...
08-26-21 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, August 26, 2021 First Floor Conference Room 201 First Avenue East ATTENDING: Rachel Ezell, Planner II PJ Sorenson, Senior Planner Grace Kurtz, Engineer I Jeff Clawson, Building Official Dan Pierce, Fire Chief Keith Haskins, City Engineer Tim Falkner, Admin Captain GUESTS: Margaret Davis HEAR THE PUBLIC: None PERFORMANCE BOND REMINDERS: Big Sky IV- 560 Cascade Loop Suite 1; Dumpster Enclosure, Privacy Fencing, Landscaping, Sidewalk, Lower Meter Pit, Parapet Wall (PIA Exp. 8/28/21; Performance Bond) Eagle Valley Ranch Apts- 1910 Jefferson Blvd; Sidewalks, Landscaping, Trash Enclosure Doors (PIA Exp. 8/30/21; Cashier’s check) Eagle Valley Ranch Ph 1- Jefferson Blvd; Infrastructure, paving, curb, gutter, see bond (PIA Exp. 8/31/21; Letter of Credit) Town Pump- 2910 Hwy 93 S; Building Demo, Curb, Gutter, Landscaping, RV Dump (PIA Exp. 9/1/21; Performance Bond) Clark Nissan & Clark Hyundai- 2915 Highway 93 S; Storm Pond, Manhole, Asphalt, Landscaping (Original PIA Exp. 9/24/2021; Performance Bond) OLD BUSINESS: Kalispell Tap and Games- 2400 Hwy 93 S: remodel to arcade/tap house – Nothing new. This will be on the agenda next week. Owl View Ph 2 Building 2- 210 Sawyer Ln; new apartment building – Nothing new. This will be on the agenda next week. Penco- 2310 Hwy 93 S; building addition. Public Works sent out comments on 08/18, waiting on response. This will be on the agenda next week. RDO- 3145 Hwy 93 S; enclose existing covered outdoor storage. Public Works will not sign off until the 1st phase is completed. This will be on the agenda next week. Glacier Eye - 155 Timberwolf Parkway; new medical office. All departments are ready to sign off. This has passed through site review. Northwest Energy – 890 N Meridian; shop addition to existing building. Nothing new. This will be on the agenda next week. Highline Dermatology – 475 Cascade Loop; new office. Nothing new. This will be on the agenda next week. Black Kaiju/Black Rifle Coffee – 305-313 2nd Ave W; new coffee shop, remodeled office, studio, and residential apartment. Building plans have not been received. This will be on the agenda next week. 3rd Ave East Apartments - 2015 3rd Ave E- 48-unit apartment complex – Nothing new. This will be on the agenda next week. Whitefish Credit Union - 2000 Hwy 93 S; new credit union with drive thru – Zoning has sent out comments regarding parking and the 20ft highway corridor. This will be on the agenda next week. NEW BUSINESS: The Silos- 501 W Center St; Apartment buildings A&B – Departments are still under review. This will be on the agenda next week. PLANNING OFFICE ITEMS: The meeting was adjourned at 10:24 am. cc: Police City Manager City Clerk Bldg. Fire Comm. Dev. Planning Parks Public Works MDOT