08-26-21 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY
Thursday, August 26, 2021
First Floor Conference Room
201 First Avenue East
ATTENDING:
Rachel Ezell, Planner II PJ Sorenson, Senior Planner
Grace Kurtz, Engineer I Jeff Clawson, Building Official
Dan Pierce, Fire Chief Keith Haskins, City Engineer
Tim Falkner, Admin Captain
GUESTS: Margaret Davis
HEAR THE PUBLIC: None
PERFORMANCE BOND REMINDERS:
Big Sky IV- 560 Cascade Loop Suite 1; Dumpster Enclosure, Privacy Fencing, Landscaping, Sidewalk,
Lower Meter Pit, Parapet Wall (PIA Exp. 8/28/21; Performance Bond)
Eagle Valley Ranch Apts- 1910 Jefferson Blvd; Sidewalks, Landscaping, Trash Enclosure Doors (PIA
Exp. 8/30/21; Cashier’s check)
Eagle Valley Ranch Ph 1- Jefferson Blvd; Infrastructure, paving, curb, gutter, see bond (PIA Exp.
8/31/21; Letter of Credit)
Town Pump- 2910 Hwy 93 S; Building Demo, Curb, Gutter, Landscaping, RV Dump (PIA Exp. 9/1/21;
Performance Bond)
Clark Nissan & Clark Hyundai- 2915 Highway 93 S; Storm Pond, Manhole, Asphalt, Landscaping
(Original PIA Exp. 9/24/2021; Performance Bond)
OLD BUSINESS:
Kalispell Tap and Games- 2400 Hwy 93 S: remodel to arcade/tap house – Nothing new. This will be on
the agenda next week.
Owl View Ph 2 Building 2- 210 Sawyer Ln; new apartment building – Nothing new. This will be on the
agenda next week.
Penco- 2310 Hwy 93 S; building addition. Public Works sent out comments on 08/18, waiting on
response. This will be on the agenda next week.
RDO- 3145 Hwy 93 S; enclose existing covered outdoor storage. Public Works will not sign off until the
1st phase is completed. This will be on the agenda next week.
Glacier Eye - 155 Timberwolf Parkway; new medical office. All departments are ready to sign off. This
has passed through site review.
Northwest Energy – 890 N Meridian; shop addition to existing building. Nothing new. This will be on
the agenda next week.
Highline Dermatology – 475 Cascade Loop; new office. Nothing new. This will be on the agenda next
week.
Black Kaiju/Black Rifle Coffee – 305-313 2nd Ave W; new coffee shop, remodeled office, studio, and
residential apartment. Building plans have not been received. This will be on the agenda next week.
3rd Ave East Apartments - 2015 3rd Ave E- 48-unit apartment complex – Nothing new. This will be on
the agenda next week.
Whitefish Credit Union - 2000 Hwy 93 S; new credit union with drive thru – Zoning has sent out
comments regarding parking and the 20ft highway corridor. This will be on the agenda next week.
NEW BUSINESS:
The Silos- 501 W Center St; Apartment buildings A&B – Departments are still under review. This will be
on the agenda next week.
PLANNING OFFICE ITEMS:
The meeting was adjourned at 10:24 am.
cc: Police City Manager City Clerk
Bldg. Fire Comm. Dev.
Planning Parks Public Works