08-14-201745828 SERVICE DATE — LATE RELEASE AUGUST 14, 2017
EB
SURFACE TRANSPORTATION BOARD
DECISION AND NOTICE OF INTERIM TRAIL USE OR ABANDONMENT
Docket No. AB 6 (Sub -No. 495X)
BNSF RAILWAY COMPANY —ABANDONMENT EXEMPTIONIN FLATHEAD
COUNTY, MONTANA
Di,;izest: ' This decision allows BNSF Railway Company to end its common carrier
obligation to provide freight rail service over a 2.7-mile rail line in Flathead
County, Mont., subject to conditions.
Decided: August 14, 2017
By petition filed on April 26, 2017, BNSF Railway Company (BNSF) seeks an
exemption under 49 U.S.C. § 10502 from the provisions of 49 U.S.C. § 10903 to abandon a
2.7-mile rail line extending from milepost 1225.19 to the south end of the line at milepost
1227.58 and to the west end of the line at Engineering Station 189+36 (milepost 1227.10), in
Kalispell, Flathead County, Mont. (the Line). Notice of the exemption was served and published
in the Federal Register on May 16, 2017 (82 Fed. Reg. 22,603).
On May 23, 2017, the City of Kalispell (the City) requested issuance of a notice of interim
trail use (NITU) for the Line. BNSF responded that it does not oppose the issuance of a NITU.
As discussed below, the Board will grant the exemption from 49 U.S.C. § 10903, subject
to historic preservation, trail use, public use, and standard employee protective conditions. In
addition, BNSF may not consummate the abandonment until the shippers on the line have been
relocated and the other railroad providing service has discontinued service over the Line.
BACKGROUND
In 2005, Mission Mountain Railroad (MMT) received Board authority to serve customers
over the Line. Mission Mountain R.R. Acquis. Exemption Burlington N. & Santa Fe Ry.,
FD 34634 (STB served Jan. 19, 2005). According to BNSF, MMT has since been providing
local service to the only two customers on the Line, Northwest Drywall & Building Supply
(Northwest Drywall) and CHS Inc. (CHS). (BNSF Pet. 3.) BNSF states that Northwest Drywall
and CHS are relocating to Glacier Rail Park and do not oppose the abandonment. (Id. at 3 &
1 The digest constitutes no part of the decision of the Board but has been prepared for the
convenience of the reader. It may not be cited to or relied upon as precedent. Policy Statement
on Plain Language Digests in Decisions, EP 696 (STB served Sept. 2, 2010).
Docket No. AB 6 (Sub -No. 495X)
Ex. B.) MMT has filed for an exemption from the statutory requirements to discontinue rail
service over the Linea Mission Mountain R.R.—Discontinuance of Serv. Exemption —in
Flathead Cty., Mont., AB 1009 (Sub -No. IX) (STB served June 23, 2017).
According to BNSF, there has been no overhead traffic on the Line and the Line does not
contain federally granted rights -of -way. (BNSF Pet. 2-3.)
According to CHS, the City and the Flathead County Economic Development Authority
have agreed to fund CHS's move to Glacier Rail Park. (BNSF Pet., Ex. B, CHS Letter at 1.) On
August 10, 2017, CHS filed a request asking that the Board defer ruling on BNSF's petition until
the funding agreements are finalized, which CHS anticipates will take 30 to 60 days. (CHS Pet.,
Aug. 10, 2017.) BNSF responded on August 11, 2017, stating that it does not intend to
consummate the abandonment before CHS and Northwest Drywall are relocated and consenting
to the imposition of a condition to that effect. (BNSF Reply, Aug. 11, 2017.)
DISCUSSION AND CONCLUSIONS
Exemption from 49 U.S.C. § 10903. Under 49 U.S.C. § 10903, a rail line may not be
abandoned without the Board's prior approval. Under 49 U.S.C. § 10502, however, the Board
must exempt a transaction or service from regulation when it finds that: (1) continued regulation
is not necessary to carry out the rail transportation policy (RTP) of 49 U.S.C. § 10101; and
(2) either (a) the transaction or service is of limited scope, or (b) regulation is not necessary to
protect shippers from the abuse of market power.
Here, detailed scrutiny of the proposed abandonment under 49 U.S.C. § 10903 is not
necessary to carry out the RTP. By minimizing the administrative expense of the application
process, an exemption would expedite regulatory decisions and reduce regulatory barriers to exit.
49 U.S.C. § 10101(2), (7). Granting BNSF's petition would therefore foster sound economic
conditions and would encourage efficient management. 49 U.S.C. § 10101(5), (9). Other
aspects of the RTP would not be adversely affected by the use of the exemption process.
The Board also finds that regulation of the proposed transaction is not necessary to
protect shippers from the abuse of market power.3 As discussed above, the two shippers on the
Line, Northwest Drywall and CHS, plan to relocate to a rail park, although CHS has asked that
the Board delay granting the abandonment until it has finalized its funding arrangements for its
BNSF may not consummate the abandonment or conduct any salvage activities until
MMT has confirmed to BNSF that MMT has received and exercised authority to discontinue
service over the Line.
Because the Board finds that regulation of the proposed abandonment is not necessary
to protect shippers from the abuse of market power, the Board need not determine whether the
proposed abandonment is limited in scope.
M
Docket No. AB 6 (Sub -No. 495X)
move. Given BNSF's agreement that it will not consummate the abandonment until the two
shippers have been relocated, the Board finds that granting the petition subject to such a
condition is sufficient to protect the shippers from the abuse of market power. See Union Pac.
R.R.Aban. Exemption & Discontinuance of Serv.in Tarrant Cty., Tex., AB 33 (Sub -No.
280X) et al., slip op. at 3 (STB served Nov. 25, 2009). The Board will direct BNSF to serve
copies of this decision on Northwest Drywall and CHS so that they receive it within five days of
the service date, and to certify to the Board contemporaneously that it has done so.
Employee Protection. Under 49 U.S.C. § 10502(g), the Board may not use its exemption
authority to relieve a carrier of its statutory obligation to protect the interests of its employees.
Accordingly, as a condition to granting this exemption, the Board will impose on BNSF the
employee protective conditions set forth in Oregon Short Line Railroad —Abandonment Portion
Goshen Branch Between Firth & Ammon, in Bingham & Bonneville Counties, Idaho (Ord
Short Line), 360 I.C.C. 91 (1979).
Environmental and Historic Review. BNSF has submitted a combined environmental
and historic report with its petition and has notified the appropriate federal, state, and local
agencies of the opportunity to submit information concerning the environmental impacts of the
proposed abandonment. See 49 C.F.R. §§ 1105.7, 1105.8, & 1105.11. The Board's Office of
Environmental Analysis (OEA) has reviewed the report, investigated the environmental record,
and analyzed the probable effects of the proposed action on the quality of the human
environment.
In an Environmental Assessment (EA) issued on June 23, 2017, OEA concluded that, as
proposed, the abandonment of the Line would not significantly affect the quality of the human
environment. Comments on the EA were due by July 24, 2017, and no comments were filed. In
the Final EA, issued July 27, 2017, OEA recommended one condition pursuant to Section 106 of
the National Historic Preservation Act, 54 U.S.C. § 306108.
OEA provided a copy of the EA to the Montana Historical Society (the State Historic
Preservation Office, or SHPO) for comment. The SHPO indicates that a report by the Federal
Railroad Administration (FRA) under Section 106 of the National Historic Preservation Act,
54 U.S.C. § 306108, exists for the section of the Line from milepost 1225.19 to milepost
1226.79.4 The SHPO considers Section 106 consultation with the FRA for that portion of the
Line to be complete, and FRA has submitted an executed Memorandum of Agreements to
mitigate the adverse historic effects of the abandonment on that portion.
4 FRA undertook the Section 106 review because the City will be receiving federal funds
administered by FRA for this portion of track.
' The Director of OEA is a signatory to the Memorandum of Agreement, which can be
found on the Board's website at www.stb.gov, To access the memo, choose drop -down menu
"Environmental Matters," then "Environmental Correspondence," then "AB_6_495X," and then
(continued ...
Docket No. AB 6 (Sub -No. 495X)
However, the sections of the Line from milepost 1226.79 to mileposts 1227.10 and
1227.58 have not undergone Section 106 review. Accordingly, OEA recommends imposing a
condition providing that, with respect to these portions of the Line, BNSF will be prohibited from
initiating any salvage activities related to abandonment (including removal of tracks and ties)
and required to retain its interest in, and take no steps to alter the historic integrity of, all historic
properties including sites, buildings, structures, and objects within the project right-of-way (the Area
of Potential Effect) that are eligible for listing or listed in the National Register of Historic Places
until the Section 106 process has been completed. BNSF shall report back to OEA regarding any
consultations with the SHPO and the public. BNSF will be prohibited from filing its consummation
notice for any portion of the Line until the Section 106 process has been completed and the Board
has removed this condition.
Additionally, pursuant to 36 C.F.R. § 800.2, OEA conducted a search of the Native
American Consultation Database to identify federally -recognized tribes that may have ancestral
connections to the area. The database identified two tribes as having a possible interest in the
project area. OEA provided a copy of the EA to the tribes for comment. As noted above, no
comments were filed.
Interim trail use. As indicated above, the City filed a request for the issuance of a NITU
for the Line under the National Trails System Act, 16 U.S.C. § 1247(d), and 49 C.F.R. § 1152.29
to provide time to negotiate with BNSF for acquisition of the right-of-way for use as a
recreational trail and for rail banking. The City has submitted a statement of willingness to
assume full responsibility for the management of the right-of-way, for any legal liability arising
out of the transfer or use of the right-of-way (unless the sponsor is immune from liability, in
which case it need only indemnify the railroad against any potential liability), and for the
payment of any and all taxes that may be levied or assessed against the right-of-way, as required
by 49 C.F.R. § 1152.29. The City has also acknowledged that the use of the right-of-way for
trail purposes is subject to the trail sponsor's continuing to meet its responsibilities described
above and subject to possible future reconstruction and reactivation of the right-of-way for rail
service. In a response filed on June 1, 2017, BNSF states that it does not object to the issuance
of a NITU to the City.
Because the City's request complies with the requirements of 49 C.F.R. § 1152.29 and
BNSF does not object, the Board will issue a NITU for the Line. The parties may negotiate an
agreement during the 180-day period prescribed below. If an interim trail use agreement is
reached (and thus interim trail use is established), the parties shall jointly notify the Board within
10 days that an agreement has been reached. 49 C.F.R. § 1152.29(d)(2) & (h). If no agreement
is reached within 180 days, BNSF may fully abandon the Line, subject to the conditions imposed
( ... continued)
"EL-26147."
M
Docket No. AB 6 (Sub -No. 495X)
below. See 49 C.F.R § 1152.29(d)(1). Use of the right-of-way for trail purposes is subject to
possible future reconstruction and reactivation of the right-of-way for rail service.
Public use. In the EA, OEA stated that the right-of-way may be suitable for other public
use following abandonment and salvage of the Line. In its May 23, 2017 filing, the City asks
that BNSF be prohibited from disposing of the corridor, other than the tracks, ties, and signal
equipment, except for public use on reasonable terms, for a 180-day period from the effective
date of the abandonment authorization. The City also asks that BNSF be prohibited from
removing or destroying potential trail -related structures such as bridges, trestles, and tunnels.
The City's justification for its request is that the rail corridor is suitable for other public use,
specifically trail use, and that the 180-day period is needed to complete negotiations with BNSF.
As an alternative to interim trail use under the Trails Act, the right-of-way may be
acquired for public use as a trail under 49 U.S.C. § 10905. See Rail Abans.—Use of Ri htg s-of-
Way as Trails, 2 I.C.C.2d 591, 609 (1986). Under § 10905, the Board may prohibit the disposal
of rail properties that are proposed to be abandoned and are appropriate for public purposes for a
period of not more than 180 days after the effective date of the decision approving or exempting
the abandonment.
To justify a public use condition, a party must set forth: (1) the condition sought; (ii) the
public importance of the condition; (iii) the period of time for which the condition would be
effective; and (iv) justification for the imposition of the period of time requested. 49 C.F.R.
§ 1152.28(a)(2). Because the City has satisfied these requirements, a 180-day public use
condition will be unposed, requiring BNSF to keep intact the right-of-way (including trail -
related structures such as bridges, trestles, culverts, and tunnels) and to refrain from disposing of
the corridor (other than tracks, ties, and signal equipment), commencing from September 13,
2017, the effective date of the exemption. A public use condition is not imposed for the benefit
of any one potential purchaser, but rather to provide an opportunity for any interested person to
acquire the right-of-way that has been found suitable for public purposes, including trail use.
Therefore, with respect to the public use condition, BNSF is not required to deal exclusively with
the City, but may engage in negotiations with other interested persons.
The parties should note that operation of public use or trail use procedures could be
delayed, or even foreclosed, by the offer of financial assistance (OFA) process under 49 U.S.C.
§ 10904. As stated in Rail Abandonments —Use of Rights -of -Way as Trails, 2 LC.C.2d 591, 608
(1986), an OFA to acquire rail lines for continued rail service or to subsidize rail operations takes
priority over public use or interim trail use/rail banking. Accordingly, if an OFA is timely filed
under 49 C.F.R. § 1152.27(c)(1), the effective date of this decision and notice will be postponed
beyond the effective date indicated here. See 49 C.F.R. § 1152.27(e)(2). In addition, the
effective date may be further postponed at later stages in the OFA process. See 49 C.F.R.
§ 1152.27(f). Finally, if the Line is sold under the OFA procedures, the petition for
abandonment exemption will be dismissed and public and trail use precluded. Alternatively, if a
sale under the OFA procedures does not occur, the public and trail use processes may proceed.
Docket No. AB 6 (Sub -No. 495X)
This action will not significantly impact the quality of the human environment or the
conservation of energy resources.
It is ordered:
1. Under 49 U.S.C. § 10502, the Board exempts from the prior approval requirements of
49 U.S.C. § 10903 the abandonment by BNSF of the above -described Line, subject to the
employee protective conditions set forth in Oregon Short Line and the condition that, with
respect to the portion of the Line from milepost 1226.79 to mileposts 1227.10 and 1227.58,
BNSF shall not initiate any salvage activities related to abandonment (including removal of
tracks and ties) and shall retain its interest in and take no steps to alter the historic integrity of all
historic properties including sites, buildings, structures, and objects within the project right-of-
way (the Area of Potential Effect) that are eligible for listing or listed in the National Register of
Historic Places until the Section 106 process has been completed. BNSF shall report back to OEA
regarding any consultations with the SHPO and the public. BNSF may not file its consummation
notice for any portion of the Line until the Section 106 process has been completed and the Board
has removed this condition.
2. BNSF may not consummate the abandonment or conduct any salvage activities until
MMT has confirmed to BNSF that MMT has received and exercised authority to discontinue
service over the Line.
3. BNSF may not consummate the abandonment until Northwest Drywall and CHS have
been relocated.
4. BNSF is directed to serve copies of this decision on Northwest Drywall and CHS so
that they receive the decision within five days of the service date, and to certify to the Board
contemporaneously that it has done so.
5. An OFA under 49 C.F.R. § 1152.27(c)(1) to allow rail service to continue must be
received by the railroad and the Board by August 24, 2017, subject to time extensions authorized
under 49 C.F.R. § 1152.27(c)(1)(i)(C). The offeror must comply with 49 U.S.C. § 10904 and
49 C.F.R. § 1152.27(c)(1).6 Each OFA must be accompanied by the filing fee of $1,700.7 See
49 C.F.R. § 1002.2(f)(25).
The Board's regulations regarding OFAs have recently been modified. See Offers of
Financial Assistance, EP 729 (STB served June 29, 2017). Among other modifications, any
person now seeking to file an OFA must provide evidence of a continued need for rail service on
the line subject to the OFA. 49 C.F.R. § 1152.27(c)(1)(iv)(E).
' Effective September 1, 2017, the fee will be $1,800. See Regulations Governing Fees
for Servs. Performed in Connection with Licensing & Related Servs.2017 Update, EP 542
(continued ...
6
Docket No. AB 6 (Sub -No. 495X)
6. OFAs and related correspondence to the Board must refer to this proceeding. The
following notation must be typed in boldface on the lower left-hand corner of the envelope:
"Office of Proceedings, AB-OFA."
2017.
7. Provided no OFA has been received, this exemption will be effective September 13,
8. Petitions to stay and petitions to reopen must be filed by August 29, 2017.
9. Pursuant to 49 C.F.R. § I I52.29(e)(2), BNSF shall file a notice of consummation with
the Board to signify that it has exercised the authority granted and fully abandoned the Line. If
consummation has not been effected by BNSF's filing of a notice of consummation by
August 14, 2018, and there are no legal or regulatory barriers to consummation, the authority to
abandon will automatically expire. If a legal or regulatory barrier to consummation exists at the
end of the one-year period, the notice of consummation must be filed no later than 60 days after
satisfaction, expiration, or removal of the legal or regulatory barrier.
By the Board, Board Members Begeman, Elliott, and Miller.
( ... continued)
(Sub -No. 25), slip op. app. C at 20 (STB served July 28, 2017).