Parkline Trail Bid Results
<b>Kalispell Trail and Complete Street</b> (#7693223) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 04/22/2021 02:00 PM MDT Engineer Estimate Sandry Construction LHC, Inc Se( Line 11 Item ( Item Description UofM Quantl Unit Price Extension Unit Price Extension Unit Price Extension SCHEDULE 1: GENERAL REQUIREMENTS $388,515.00 $659,090.00 $486,557.00 1 101 Mobilization LS 1 $215,842.00 $2151842.00 $187,250.00 $187,250.00 $216,030.00 $216,030.00 2 102 Taxes, Bonds, & Insuranc LS 1 $1291505.00 $129,505.00 $294,000.00 $294,000.00 $82,727.00 $82,727.00 31 103 General Requirements LS 1 $43,168.00 $43,168.00 $177,840.00 $177,840.00 $187,800.00 $187,800.00 SCHEDULE 2: REMOVAL AND RESET $623,385.50 $579,576.50 $1,262,221.86 4 201 Erosion Control LS 1 $50,000.00 $50,000.00 $12,580.00 $12,580.00 $15,143.00 $15,143.00 5 202 Asphalt Removal SY 4843 $7.50 $36,322.50 $11.00 $53,273.00 $21.55 $104,366.65 6 203 Curb and Gutter Remova LF 1161 $10.00 $11,610.00 $4.50 $5,224.50 $10.21 $11,853.81 7 204 Sidewalk Removal SY 942 $22.50 $21,195.00 $12.50 $11,775.00 $35.89 $331808.38 8 205 Concrete Removal SY 571 $14.00 $7,994.00 $66.00 $37,686.00 $86.26 $49,254.46 9 206 Misc Demo LS 1 $15,000.00 $15,000.00 $12,560.00 $121560.00 $34,750.00 $34,750.00 10 207 Tree Preservation and Pr LS 1 $1,000.00 $1,000.00 $1,810.00 $1,810.00 $4,910.00 $4,910.00 11 208 Remove Rail Crossing in F EA 6 $25,000.00 $150,000.00 $51060.00 $30,360.00 $8,954.00 $53,724.00 12 209 Removal of Signing and S LS 1 $5,100.00 $5,100.00 $22,120.00 $22,120.00 $31,470.00 $31,470.00 13 210 Rail and Tie Removal LS 1 $75,000.00 $75,000.00 $113,000.00 $113,000.00 $567,655.00 $567,655.00 14 211 Earthwork CY 5118 $18.00 $92,124.00 $46.00 $235,428.00 $21.92 $112,186.56 15 212 ClearGrub AC 10 $15,629.00 $156,290.00 $1,680.00 $16,800.00 $21,740.00 $217,400.00 161 213 Salvaged Railroad Signal z LS 1 $1,750.00 $1,750.00 $26,960.00 $26,960.00 $25,700.00 $25,700.00 SCHEDULE 3: STORM WATER $59,170.00 $153,924.00 $871234.17 17 301 48" Manhole EA 2 $3,000.00 $6,000.00 $4,530.00 $9,060.00 $3,159.00 $6,318.00 18 302 Additional 48" Manhole I VF 3 $300.00 $900.00 $120.00 $360.00 $825.00 $2,475.00 19 303 30" Storm Drain Inlet EA 4 $1,000.00 $4,000.00 $320.00 $1,280.00 $2,110.00 $8,440.00 20 304 30" Curb Inlet Manhole EA 4 $1,300.00 $5,200.00 $9,660.00 $38,640.00 $11715.00 $6,860.00 21 305 30" Field Inlet EA 2 $2,000.00 $4,000.00 $4,010.00 $8,020.00 $2,360.00 $4,720.00 22 306 Additional 30" Field Inlet VF 2 $200.00 $400.00 $77.00 $154.00 $267.00 $534.00 23 307 48" Manhole Adjustment EA 2 $1,500.00 $3,000.00 $1,680.00 $3,360.00 $1,450.00 $2,900.00 24 308 48" Manhole Adjustment EA 1 1 $1,000.00 1 $1,000.00 1 $1,690.00 1 $1,690.00 1 $725.00 1 $725.00 25 309 30" Curb Inlet Adjustmen EA 2 $1,000.00 $2,000.00 $580.00 $1,160.00 $725.00 $1,450.00 26 310 8" SDR35 LF 55 $50.00 $2,750.00 $240.00 $13,200.00 $108.33 $5,958.15 27 311 12" SDR35 LF 406 $70.00 $28,420.00 $170.00 $69,020.00 $97.67 $391654.02 28 312 Remove Existing Inlets an EA 3 $500.00 $1,500.00 $2,660.00 $7,980.00 $2,400.00 $7,200.00 SCHEDULE 4: TRAIL $1,086,816.01 $913,131.20 $1,032,344.27 29 401 3/4" Minus Crushed Base SY ##### $2.00 $23,926.00 $9.00 $107,667.00 $7.04 $84,219.52 30 402 1.5" - 3" Minus Sub -Base SY ##### $5.00 $59,620.00 $8.80 $104,931.20 $12.64 $1501719.36 31 403 Retaining Wall SF 182 $30.00 $5,460.00 $70.00 $12,740.00 $189.00 $34,398.00 32 404 Pedestrian Railing LF 236 $245.00 $57,820.00 $160.00 $37,760.00 $176.42 $41,635.12 33 405 2" Thickness of Asphalt C TON 4.5 $78.89 $355.01 $290.00 $1,305.00 $273.00 $1,228.50 34 406 2" Thickness of Asphalt C TON 4.5 $78.89 $355.01 $290.00 $1,305.00 $273.00 $1,228.50 35 407 5" Concrete Pavement SY ##### $60.00 $674,940.00 $39.00 $438,711.00 $41.06 $461,883.94 36 408 Stamped Concrete Boule SF 2901 $18.00 $52,218.00 $11.00 $31,911.00 $13.43 $381960.43 37 409 Concrete Plaza SY 1568 $60.00 $94,080.00 $44.00 $68,992.00 $63.13 $98,987.84 38 410 Plaza Pavers SF 1609 $51.00 $82,059.00 $35.00 $56,315.00 $39.32 $63,265.88 39 411 Paver Band SF 502 $48.00 $24,096.00 $56.00 $28,112.00 $60.05 $30,145.10 40 412 Sidewalk Paver Band LF 226 $37.00 $8,362.00 $87.00 $191662.00 $91.58 $20,697.08 41 413 Relocated Clock LS 1 $2,000.00 $2,000.00 $1,910.00 $1,910.00 $2,865.00 $2,865.00 42 414 Embedded Rail LS 1 $1,525.00 $1,525.00 $11810.00 $1,810.00 $2,110.00 $21110.00 SCHEDULE 5: ROADWAY AREA & CURB RAMP $487,920.22 $663,915.50 $807,989.93 43 501 3/4" minus Crushed Base SY 3301 $10.75 $35,485.75 $16.00 $52,816.00 $19.22 $63,445.22 44 502 Curb Ramps SY 313 $162.00 $50,706.00 $100.00 $31,300.00 $143.64 $44,959.32 45 503 6" Concrete Pavement SY 814 $70.00 $56,980.00 $42.00 $34,188.00 $76.16 $611994.24 46 504 2" Thickness of Asphalt C TON 312 $78.89 $24,574.24 $170.00 $52,955.00 $170.00 $52,955.00 47 505 2" Thickness of Asphalt C TON 312 $78.89 $24,574.24 $170.00 $52,955.00 $170.00 $52,955.00 48 506 Combined Concrete Curb LF 2039 $15.00 $30,585.00 $31.00 $63,209.00 $46.01 $93,814.39 49 507 Concrete Median Materiz SY 26 $26.00 $676.00 $60.00 $1,560.00 $84.17 $2,188.42 50 508 Concrete Sidewalk SY 1533 $68.00 $104,244.00 $40.00 $61,320.00 $65.15 $99,874.95 51 509 Concrete Valley Gutter SF 1197 $10.00 $11,970.00 $12.50 $14,962.50 $17.64 $21,115.08 52 510 Concrete Driveway Apror SY 157 $70.00 $10,990.00 $50.00 $7,850.00 $84.06 $13,197.42 53 511 Traffic Control LS 1 $50,000.00 $50,000.00 $182,470.00 $182,470.00 $158,500.00 $1581500.00 54 512 9" Concrete Pavement SY 471 $185.00 $87,135.00 $230.00 $108,330.00 $303.59 $142,990.89 SCHEDULE 6: SIGNING AND STRIPING $26,685.01 $60,105.00 $65,500.35 551 601 Posts -Tubular Steel-Sq-P LB 1250 $7.01 $8,762.50 $15.50 $19,375.00 $16.79 $20,987.50 56 602 Words and Symbols -Whit GAL 12 $295.94 $3,551.28 $390.00 $4,680.00 $426.00 $5,112.00 57 603 Striping -White Epoxy GAL 39 $65.51 $2,554.89 $390.00 $15,210.00 $426.00 $16,614.00 58 604 Striping -Yellow Epoxy GAL 19 $56.12 $1,066.28 $390.00 $7,410.00 $426.00 $8,094.00 59 605 Signs -Alum Refl Sheet IV SF 401 $26.06 $10,450.06 $30.00 $12,030.00 $32.85 $13,172.85 601 606 Solid White Delineators EA 10 $30.00 $300.00 $140.00 $1,400.00 $152.00 $11520.00 SCHEDULE 7: SIGNALS $303,049.44 $294,782.80 $328,593.16 61 701 Conduit -Plastic 2in LF 335 $10.00 $3,350.00 $15.50 $5,192.50 $16.79 $5,624.65 62 702 Conduit -Plastic 3in LF 525 $13.00 $6,825.00 $18.50 $9,712.50 $20.20 $10,605.00 63 703 Pull Box -Composite Type EA 11 $638.79 $7,026.69 $710.00 $7,810.00 $780.00 $8,580.00 64 704 Pull Box -Composite Type EA 1 $974.53 $974.53 $860.00 $860.00 $943.00 $943.00 65 705 Foundation -Concrete CY 5.67 $1,000.37 $5,672.10 $11490.00 $8,448.30 $1,643.00 $91315.81 66 706 Cable -Copper 3AWG14-6 LF 1014 $1.07 $1,084.98 $1.60 $1,622.40 $1.70 $11723.80 67 707 Cable -Copper 7AWG14-6 LF 275 $1.98 $544.50 $2.40 $660.00 $2.68 $737.00 68 708 Cable -Copper 16AWG14- LF 370 $2.82 $1,043.40 $4.80 $1,776.00 $5.23 $1,935.10 69 709 Conductor -Copper AWGE LF 947 $0.82 $776.54 $1.30 $1,231.10 $1.40 $1,325.80 70 710 Controller -Cab Pedestal I EA 1 $1,439.42 $1,439.42 $1,790.00 $1,790.00 $1,971.00 $1,971.00 71 711 Luminaire Assembly-250N EA 2 $389.69 $779.38 $960.00 $1,920.00 $1,059.00 $2,118.00 72 712 Sery Assemb-100 Amp EA 0 $1,549.32 $0.00 $0.00 $0.00 $0.00 $0.00 73 713 Pedestrian Hybrid Beacor EA 8 $1,068.58 $8,548.64 $1,160.00 $9,280.00 $1,278.00 $10,224.00 74 714 Sig -Pedestrian Type 2 EA 4 $932.90 $3,731.60 $960.00 $3,840.00 $1,059.00 $4,236.00 75 715 Contlr/Traf-Actuat Type Z EA 2 $1,276.33 $2,552.66 $29,970.00 $59,940.00 $32,975.00 $65,950.00 76 716 Sig Standard Type 1-120 EA 4 $800.00 $3,200.00 $1,380.00 $5,520.00 $1,521.00 $6,084.00 77 717 Sig Standard Type 1-160 EA 2 $1,000.00 $2,000.00 $1,270.00 $2,540.00 $1,400.00 $2,800.00 78 718 Sig Standard Type 3-A-90 EA 2 $1,500.00 $3,000.00 $12,670.00 $25,340.00 $13,945.00 $271890.00 79 719 Blankout Sign EA 1 $5,000.00 $5,000.00 $5,600.00 $5,600.00 $6,163.00 $6,163.00 80 720 Microwave Detection EA 9 $8,500.00 $76,500.00 $1,740.00 $15,660.00 $11911.00 $17,199.00 81 721 Rectangular Rapid Flashir EA 16 $7,500.00 $120,000.00 $5,730.00 $91,680.00 $6,303.00 $100,848.00 82 722 Push Button - Pedestrian EA 12 $750.00 $9,000.00 $1,170.00 $14,040.00 $1,290.00 $151480.00 831 7231 Remove and Relocate Exi EA 4 $10,000.00 $40,000.00 $5,080.00 $20,320.00 $6,710.00 $26,840.00 SCHEDULE 8: ELECTRICAL $810,645.60 $985,152.50 $1,083,540.50 84 801 Conduit -Steel 1/2in Rigid LF 245 $4.00 $980.00 $10.00 $2,450.00 $10.95 $2,682.75 85 802 Conduit -Plastic 2in LF 8515 $10.00 $85,150.00 $11.50 $97,922.50 $12.65 $107,714.75 86 803 Conduit -Plastic 3in LF 472 $12.00 $5,664.00 $18.50 $8,732.00 $20.20 $9,534.40 87 804 Pull Box -Composite Type EA 1 $600.00 $600.00 $710.00 $710.00 $779.00 $779.00 88 805 Pull Box -Composite Type EA 5 $700.00 $3,500.00 $860.00 $4,300.00 $943.00 $4,715.00 89 806 Foundation -Concrete CY 97 $1,000.00 $97,000.00 $1,490.00 $144,530.00 $1,643.00 $159,371.00 90 807 Conductor -Copper AWG4 LF ##### $1.50 $40,875.00 $2.00 $54,500.00 $2.19 $591677.50 91 808 Conductor -Copper AWG6 LF 7730 $1.32 $10,203.60 $1.70 $13,141.00 $1.83 $14,145.90 92 809 Conductor -Copper AWGE LF 9550 $1.17 $11,173.50 $1.30 $121415.00 $1.40 $131370.00 93 810 Conductor -Copper AWG1 LF 2720 $0.90 $2,448.00 $1.10 $2,992.00 $1.16 $3,155.20 94 811 Bridge Light EA 3 $1,500.00 $4,500.00 $1,900.00 $5,700.00 $2,087.00 $6,261.00 95 812 Sery Assemb-200 Amp EA 6 $3,500.00 $21,000.00 $2,810.00 $16,860.00 $3,091.00 $18,546.00 96 813 Path Light EA 66 $5,116.00 $337,656.00 $51990.00 $3951340.00 $6,595.00 $435,270.00 97 814 Path Light, with G FCI EA 32 $5,347.00 $171,104.00 $6,410.00 $205,120.00 $7,057.00 $225,824.00 98 815 Path Light, with Two Lum EA 2 $6,895.75 $131791.50 $7,820.00 $15,640.00 $8,602.00 $171204.00 99 816 Power Station EA 2 $2,200.00 $4,400.00 $2,120.00 $4,240.00 $2,340.00 $4,680.00 1001 8171 High Voltage Outlet EA 2 $300.00 $600.00 $280.00 $560.00 $305.00 $610.00 SCHEDULE 9: LANDSCAPING $474,238.54 $887,002.10 $980,674.93 101 901 Trash Receptacle EA 5 $1,800.00 $9,000.00 $1,960.00 $9,800.00 $2,160.00 $10,800.00 102 902 Bike Rack EA 3 $650.00 $1,950.00 $830.00 $2,490.00 $915.00 $2,745.00 103 903 Interpretive Sign EA 6 $3,500.00 $21,000.00 $41200.00 $25,200.00 $4,624.00 $271744.00 104 904 Tree Grate EA 2 $1,350.00 $2,700.00 $1,810.00 $3,620.00 $21865.00 $5,730.00 105 905 Soil Amendment and FinE CY 2180 $40.00 $87,200.00 $75.00 $163,500.00 $1.22 $2,659.60 106 906 Trees EA 238 $275.00 $65,450.00 $810.00 $192,780.00 $874.00 $208,012.00 107 907 Trees (Cherry) EA 72 $550.00 $39,600.00 $810.00 $58,320.00 $874.00 $62,928.00 108 908 Shrub, #5 EA 179 $55.00 $9,845.00 $77.00 $13,783.00 $83.00 $14,857.00 109 909 Shrub, #2 EA 281 $35.00 $9,835.00 $69.00 $19,389.00 $74.00 $201794.00 110 910 Shrub, #1 EA 2045 $25.00 $51,125.00 $30.00 $61,350.00 $33.00 $67,485.00 111 911 Vine, #5 EA 29 $60.00 $11740.00 $77.00 $2,233.00 $83.00 $2,407.00 112 912 Ground Cover, 3?? cells EA 3756 $15.00 $56,340.00 $20.50 $76,998.00 $22.00 $82,632.00 113 913 Grass, Sod SF ##### $0.30 $3,209.10 $1.50 $161045.50 $3.40 $361369.80 114 914 Seed Mix, Whitefish Blvd SF ##### $0.10 $4,338.60 $0.40 $17,354.40 $2.16 $93,713.76 115 915 Seed Mix, Low Grow Dry SF ##### $0.08 $5,625.84 $0.20 $141064.60 $1.70 $1191549.10 116 916 Rail Landscape Divider LF 388 $15.00 $5,820.00 $55.00 $21,340.00 $48.67 $18,883.96 117 917 Split Rail Fence LF 1133 $20.00 $22,660.00 $16.00 $18,128.00 $17.64 $19,986.12 118 918 Chain Link Fence LF 210 $35.00 $7,350.00 $46.00 $9,660.00 $51.10 $10,731.00 119 919 Crushed Rock SF 5416 $0.75 $4,062.00 $1.10 $5,957.60 $1.16 $6,282.56 120 920 Landscape Edger LF 5571 $3.00 $16,713.00 $14.00 $77,994.00 $14.93 $83,175.03 1211 921 Mulch CY 885 $55.00 $48,675.00 $87.00 $76,995.00 $94.00 $83,190.00 SCHEDULE 10: IRRIGATION $258,000.00 $260,000.00 $331,900.00 122110011 Irrigation System LS 1 $258,000.00 $2581000.00 $260,000.00 $260,000.00 $331,900.00 $331,900.00 SCHEDULE 11: BRIDGE CONVERSION $250,115.00 $536,998.00 $590,710.30 123 1101 Curb Removal LF 364 $30.00 $10,920.00 $140.00 $50,960.00 $152.00 $551328.00 124 1102 12 in Curb CY 13.5 $700.00 $9,450.00 $1,940.00 $26,190.00 $2,130.00 $28,755.00 125 1103 Class A Bridge Deck Repa SY 155 $250.00 $38,750.00 $11550.00 $2401250.00 $1,704.00 $2641120.00 126 1104 Class A Abutment Repair SY 2 $350.00 $700.00 $1,660.00 $3,320.00 $1,825.00 $3,650.00 127 1105 Gutter -Removal and Repl LF 364 $20.00 $71280.00 $200.00 $72,800.00 $225.00 $81,900.00 128 1106 Reinforcing Steel LB 1800 $3.00 $5,400.00 $5.50 $9,900.00 $6.08 $10,944.00 129 1107 Waterproofing SY 243 $5.00 $1,215.00 $46.00 $11,178.00 $51.10 $12,417.30 130 1108 Bridge Railing LF 360 $490.00 $176,400.00 $340.00 $122,400.00 $371.10 $133,596.00 SCHEDULE A: HIGHWAY 2 BRIDGE IMPROVEMENTS ADDITIVE $118,690.07 $171,480.00 $202,094.00 131 A01 Mobilization LS 1 $5,444.48 $5,444.48 $550.00 $550.00 $735.00 $735.00 132 A02 Taxes, Bonds, & Insuranci LS 1 $3,266.69 $31266.69 $550.00 $550.00 $1,869.00 $1,869.00 133 A03 General Requirements LS 1 $1,088.90 $1,088.90 $21,500.00 $21,500.00 $23,653.00 $23,653.00 134 A04 Painting Structural Steel SY 150 $200.00 $30,000.00 $690.00 $103,500.00 $761.00 $114,150.00 135 A05 Class A Pier Repair SY 24 $300.00 $7,200.00 $1,660.00 $39,840.00 $1,825.00 $43,800.00 136 A06 Paint Galvanized Drain Gt LS 1 $500.00 $500.00 $5,530.00 $5,530.00 $17,886.00 $17,886.00 137 A07 I Powder Coat Railings LS 1 $71,190.00 $71,190.00 $10.00 $10.00 $1.00 $1.00 SCHEDULE B: WEST END ADDITIVE $50,393.96 $51,993.70 $61,316.18 138 B01 Mobilization LS 1 $2,311.64 $2,311.64 $550.00 $550.00 $2,562.00 $2,562.00 139 B02 Taxes, Bonds, & Insuranc LS 1 $1,386.99 $1,386.99 $550.00 $550.00 $570.00 $570.00 140 B03 General Requirements LS 1 $462.33 $462.33 $550.00 $550.00 $1,400.00 $1,400.00 141 B04 Concrete Driveway Apror SY 46.9 $70.00 $3,283.00 $63.00 $2,954.70 $85.21 $3,996.35 142 B05 Combined Concrete Curb LF 117 $15.00 $1,755.00 $39.00 $4,563.00 $46.02 $5,384.34 143 B06 Chain link Fence LF 1013 $35.00 $35,455.00 $38.00 $38,494.00 $41.37 $41,907.81 144 B07 Split Rail Fence LF 112 $20.00 $2,240.00 $16.00 $1,792.00 $17.64 $1,975.68 145 B08 Dry Stream Bed at Meridi LS 1 $3,500.00 $3,500.00 $2,540.00 $2,540.00 $3,520.00 $3,520.00 SCHEDULE C: SEEDED/IRRIGATED AREAS ADDITIVE $654,456.42 $938,065.20 $986,014.93 146 C01 Mobilization LS 1 $29,794.31 $29,794.31 $550.00 $550.00 $2,935.00 $21935.00 147 CO2 Taxes, Bonds, & Insuranc LS 1 $17,876.59 $17,876.59 $550.00 $550.00 $8,300.00 $8,300.00 148 CO3 General Requirements LS 1 $5,958.86 $5,958.86 $550.00 $550.00 $635.00 $635.00 149 C04 ClearGrub ACRE 4.9 $15,629.00 $76,582.10 $1,680.00 $8,232.00 $8,426.00 $41,287.40 150 C05 Earthwork CY 3952 $18.00 $71,136.00 $31.00 $122,512.00 $10.47 $41,377.44 151 C06 Soil Amendment and FinE CY 3952 $40.00 $158,080.00 $88.00 $347,776.00 $32.11 $126,898.72 152 C07 Irrigation System LS 1 $240,000.00 $2401000.00 $267,940.00 $267,940.00 $289,800.00 $2891800.00 153 C08 Trees EA 89 $275.00 $24,475.00 $990.00 $88,110.00 $1,072.00 $95,408.00 1541 C09 ISeed Mix, Kwik Fine Law SF 3E+05 $0.12 $30,553.56 $0.40 $101,845.20 $1.49 $3791373.37 SCHEDULE D: SITE FURNISHINGS ADDITIVE $72,058.33 $83,360.00 $121,336.00 155 D01 Mobilization LS 1 $3,440.74 $3,440.74 $550.00 $550.00 $21935.00 $2,935.00 156 D02 Taxes, Bonds, & Insuranci LS 1 $2,064.44 $2,064.44 $550.00 $550.00 $1,140.00 $1,140.00 157 D03 General Requirements LS 1 $688.15 $688.15 $550.00 $550.00 $634.00 $634.00 158 D04 Drinking Fountain EA 1 $15,000.00 $15,000.00 $17,960.00 $17,960.00 $28,576.00 $28,576.00 159 D05 Bench EA 11 $2,500.00 $27,500.00 $2,960.00 $321560.00 $3,255.00 $35,805.00 160 D06 Bike Repair Station with EA 1 $10,500.00 $10,500.00 $5,760.00 $5,760.00 $24,286.00 $24,286.00 161 D07 Wayfinding Sign, V2.1 EA 1 $2,950.00 $2,950.00 $5,750.00 $5,750.00 $61327.00 $6,327.00 162 D08 Wayfinding Sign, V3.2 EA 1 $2,950.00 $2,950.00 $5,750.00 $5,750.00 $6,327.00 $6,327.00 163 D09 Wayfinding Sign, V4.3 EA 2 $2,950.00 $5,900.00 $51750.00 $11,500.00 $6,327.00 $121654.00 164 D10 Park Ordinance Sign with EA 3 $195.00 $585.00 $430.00 $1,290.00 $470.00 $1,410.00 165 D11 I Park Ordinance Sign Attai EA 6 $80.00 $480.00 $190.00 $1,140.00 $207.00 $11242.00 SCHEDULE E: LIGHTING ADDITIVE $48,559.49 $69,855.00 $76,783.75 166 E01 Mobilization LS 1 $2,227.49 $2,227.49 $11650.00 $1,650.00 $1,819.00 $11819.00 167 E02 Taxes, Bonds, & Insuranci LS 1 $1,336.50 $1,336.50 $550.00 $550.00 $700.00 $700.00 168 E03 General Requirements LS 1 $445.50 $445.50 $550.00 $550.00 $634.00 $634.00 169 E04 Hybrid Planter/Banner Ar EA 28 $1,500.00 $42,000.00 $2,300.00 $64,400.00 $2,523.00 $70,644.00 170 E05 Micro Flood Lights EA 2 $500.00 $1,000.00 $580.00 $1,160.00 $633.00 $1,266.00 171 E06 Conduit -Plastic 2in LF 35 $10.00 $350.00 $11.00 $385.00 $12.65 $442.75 172 E07 j Pull Box -Composite Type EA 2 $600.00 $1,200.00 $580.00 $1,160.00 $639.00 $11278.00 SCHEDULE F: PLAZA MAP $103,549.98 $81,690.00 $90,324.00 173 F01 Mobilization LS 1 $4,749.99 $4,749.99 $550.00 $550.00 $735.00 $735.00 174 F02 Taxes, Bonds, & Insuranci LS 1 $2,849.99 $21849.99 $550.00 $550.00 $855.00 $855.00 175 F03 General Requirements LS 1 $950.00 $950.00 $550.00 $550.00 $634.00 $634.00 176 F04 Valley Map Etched into C LS 1 $95,000.00 $95,000.00 $801040.00 $80,040.00 $88,100.00 $88,100.00 SCHEDULE G: FIRST SPARE CONDUIT ADDITIVE $88,746.69 $62,102.50 $69,483.19 177 G01 Mobilization LS 1 $4,070.94 $4,070.94 $1,650.00 $1,650.00 $1,819.00 $1,819.00 178 G02 Taxes, Bonds, & Insuranci LS 1 $2,442.56 $2,442.56 $550.00 $550.00 $665.00 $665.00 179 G03 lGeneral Requirements ILS 1 $814.19 $814.19 $550.00 $550.00 $634.00 $634.00 180 G04 Conduit -Plastic 2in LF 6388 $10.00 $63,875.00 $6.60 $42,157.50 $7.42 $47,395.25 181 G05 Conduit -Plastic 3in LF 262 $12.00 $3,144.00 $12.50 $3,275.00 $13.87 $3,633.94 182 G06 jPull Box -Composite Type EA 1 24 $600.00 $14,400.00 $580.00 $13,920.00 $639.00 $151336.00 SCHEDULE H : SECOND SPARE CONDUIT ADDITIVE $84,700.61 $55,658.10 $62,397.19 183 H01 Mobilization LS 1 $3,885.34 $3,885.34 $1,650.00 $1,650.00 $1,819.00 $1,819.00 184 H02 Taxes, Bonds, & Insuranc LS 1 $2,331.20 $2,331.20 $550.00 $550.00 $602.00 $602.00 185 H03 General Requirements LS 1 $777.07 $777.07 $550.00 $550.00 $634.00 $634.00 186 H04 Conduit -Plastic 2in LF 6804 $10.00 $68,035.00 $6.60 $44,903.10 $7.42 $50,481.97 187 H05 Conduit -Plastic 3in LF 506 $12.00 $6,072.00 $12.50 $6,325.00 $13.87 $7,018.22 188 H06 Pull Box -Composite Type EA 6 $600.00 $3,600.00 $280.00 $1,680.00 $307.00 $1,842.00 Base Bid Total: I F 1 1 1$4,1768,1540.32 1 1$5,993,1677.60]47