Loading...
Sidewalk and Curbing Construction Bid from Sandon 2021Sidewalk and Curbing Construction for Year Ending Dec 31, 2021 (#7697295) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 04/08/2021 04:00 PM MDT Engineer Estimate sandon construction co inc Section Tit Line Item Item Code Item Description UofM Quant Unit Price Extension Unit Price Extension Base Bid 50.00 55,522.80 1 1 Project Mobilization LS 1 $3,800.00 $3,800.00 2.A 2.A 4" Concrete Pavement, 100 SF or Less SF 1 $11.00 $11.00 2.B 2.B 4" Concrete Pavement, 101 to 240 SF SF 1 $6.20 $6.20 2.0 2.0 4" Concrete Pavement, 241 SF or More SF 1 $6.00 $6.00 3 3 6" Concrete Pavement SF 1 $9.20 $9.20 4 4 8" Concrete Pavement SF 1 $18.10 $18.10 5.A 5.A Concrete Curb & Gutter, 50 LF or Less LF 1 $23.75 $23.75 5.B 5.B Concrete Curb & Gutter, 51 LF or More LF 1 $20.75 $20.75 6.A 6.A Concrete Standup Curb, 50 LF or Less LF 1 $21.75 $21.75 6.B 6.B Concrete Standup Curb, 51 LF or More LF 1 $20.75 $20.75 7 7 Concrete Valve Collar EA 1 $525.00 $525.00 8 8 Concrete Manhole Collar EA 1 $575.00 $575.00 9.A 9.A Concrete Removal, 4 Inches and Less SF 1 $1.90 $1.90 9.B 9.B Concrete Removal, More Than 4 Inches SF 1 $2.50 $2.50 10 10 Concrete Curb Removal LF 1 $3.70 $3.70 11 11 4" Irrigation Sidewalk Sleeve EA 1 $35.00 $35.00 12 12 Landscape - Reseed SF 1 $2.20 $2.20 13 13 Truncated Dome Panel EA 1 $290.00 $290.00 14 14 3/4" Crush Gravel CY 1 $80.00 $80.00 15 15 Laborer HR 1 $70.00 $70.00 Base Bid Total: I I I I 1 1 $0.00 1 F$5,522.80