Sidewalk and Curbing Construction Bid from Sandon 2021Sidewalk and Curbing Construction for Year Ending Dec 31, 2021 (#7697295)
Owner: Kalispell MT, City of
Solicitor: Kalispell MT, City of
04/08/2021 04:00 PM MDT
Engineer Estimate sandon construction co inc
Section Tit Line Item Item Code Item Description UofM Quant Unit Price Extension Unit Price Extension
Base Bid 50.00 55,522.80
1
1
Project Mobilization
LS
1
$3,800.00
$3,800.00
2.A
2.A
4" Concrete Pavement, 100 SF or Less
SF
1
$11.00
$11.00
2.B
2.B
4" Concrete Pavement, 101 to 240 SF
SF
1
$6.20
$6.20
2.0
2.0
4" Concrete Pavement, 241 SF or More
SF
1
$6.00
$6.00
3
3
6" Concrete Pavement
SF
1
$9.20
$9.20
4
4
8" Concrete Pavement
SF
1
$18.10
$18.10
5.A
5.A
Concrete Curb & Gutter, 50 LF or Less
LF
1
$23.75
$23.75
5.B
5.B
Concrete Curb & Gutter, 51 LF or More
LF
1
$20.75
$20.75
6.A
6.A
Concrete Standup Curb, 50 LF or Less
LF
1
$21.75
$21.75
6.B
6.B
Concrete Standup Curb, 51 LF or More
LF
1
$20.75
$20.75
7
7
Concrete Valve Collar
EA
1
$525.00
$525.00
8
8
Concrete Manhole Collar
EA
1
$575.00
$575.00
9.A
9.A
Concrete Removal, 4 Inches and Less
SF
1
$1.90
$1.90
9.B
9.B
Concrete Removal, More Than 4 Inches
SF
1
$2.50
$2.50
10
10
Concrete Curb Removal
LF
1
$3.70
$3.70
11
11
4" Irrigation Sidewalk Sleeve
EA
1
$35.00
$35.00
12
12
Landscape - Reseed
SF
1
$2.20
$2.20
13
13
Truncated Dome Panel
EA
1
$290.00
$290.00
14
14
3/4" Crush Gravel
CY
1
$80.00
$80.00
15
15
Laborer
HR
1
$70.00
$70.00
Base Bid Total:
I
I
I
I
1
1 $0.00
1
F$5,522.80