Bloomstone Ph 3-6 Preliminary Plat Materials
Development Services Department
201 1st Avenue East
Kalispell, MT 59901
Phone: (406) 758-7940
Fax: (406) 758-7739
www.kalispell.com/planning
REPORT TO: Doug Russell, City Manager
FROM: PJ Sorensen, Senior Planner
SUBJECT: KPP-20-06– Bloomstone Phases 3-6 Preliminary Plat
MEETING DATE: February 1, 2021
BACKGROUND: Kalispell National Investment Co., LLC, has submitted a request for major
preliminary plat approval for Phases 3-6 of the Bloomstone subdivision, with a total of 57 lots on
approximately 33.73 acres of land. Phase 3 would contain 47 single-family lots, Phase 4 would contain
4 multi-family lots with 104 dwelling units, Phase 5 would contain 3 multi-family lots with 88 dwelling
units, and Phase 6 would contain 3 multi-family lots with 126 dwelling units. The property is located
within an R-4 (Residential) zoning district with a Planned Unit Development (“PUD”) overlay, which
included plans for a total of 569 dwelling units on 85.2 acres. Phases 1 and 2 have been constructed with
96 multi-family and 71 single-family dwelling units. Prior preliminary plats for additional phases were
approved in 2008 and 2017 but have since expired.
The property is located at 1070 Treeline Road and can be described as Assessor’s Tract 5C in the
Southwest Quarter of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County,
Montana.
The Kalispell Planning Board held a duly noticed public hearing on January 12, 2021, to consider the
preliminary plat request. Staff presented staff report KPP-20-06 providing details of the proposal and
evaluation. Staff recommended that the Planning Board adopt the staff report as findings of fact and
recommend to the Council that the request be granted subject to 30 listed conditions.
No public comments were received. The public hearing was closed, and a motion was presented to
adopt staff report KPP-20-06 as findings of fact and recommend to the Kalispell City Council that the
preliminary plat be approved subject to the 30 conditions. Board discussion concluded that the
request was appropriate, and the motion was approved on a unanimous vote.
RECOMMENDATION: It is recommended that the Kalispell City Council approve Resolution
6012, a resolution conditionally approving the Preliminary Plat of Bloomstone Subdivision Phases 3-
6, described as assessor’s tract 5C in the Southwest Quarter of Section 36, Township 29 North, Range
22 West, P.M.M., Flathead County, Montana and as more particularly described on Exhibit A.
FISCAL EFFECTS: There are no anticipated fiscal impacts at this time.
ALTERNATIVES: Deny the request.
ATTACHMENTS: Resolution 6012
January 12, 2021, Kalispell Planning Board Minutes
Staff Report
Application Materials & Maps
c: Aimee Brunckhorst, Kalispell City Clerk
RESOLUTION NO. 6012 A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF BLOOMSTONE SUBDIVISION PHASES 3-6, DESCRIBED AS ASSESSOR’S TRACT 5C IN THE SOUTHWEST QUARTER OF SECTION 36, TOWNSHIP 29 NORTH, RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA AND AS MORE PARTICULARLY DESCRIBED ON EXHIBIT “A”. WHEREAS, Kalispell National Investment Company, LLC, the owners of the certain real
property described above, have petitioned for approval of the Subdivision Plat of said property; and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on January 12, 2021, on the proposal and reviewed Subdivision Report #KPP-20-06
issued by the Kalispell Planning Department; and WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval of the Preliminary Plat of Bloomstone Subdivision, Phases 3-6, subject to certain conditions and recommendations; and
WHEREAS, the City Council of the City of Kalispell at its regular Council Meeting of February 1, 2021, reviewed the Kalispell Planning Department Report #KPP-20-06, reviewed the recommendations of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public
interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS:
SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-20-06 are hereby adopted as the Findings of Fact of the City Council. SECTION 2. That the application of Kalispell National Investment Company, LLC for approval of the Preliminary Plat of Bloomstone Subdivision, Phases 3-6,
Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: 1. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional
conditions associated with the preliminary plat as approved by the city council. 2. All applicable conditions within Ordinance 1635 (Bloomstone PUD) shall apply. 3. The preliminary plat approval shall be valid for a period of three years from the date of
approval. 4. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell’s Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department
prior to construction. This infrastructure shall include but not be limited to streets, street
lighting, street signage, curb, gutter, boulevard and sidewalks. 5. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell’s Standards for Design and Construction and in compliance with the city’s
facilities update and extensions of services plans. The water and sewer main extension plans
shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved.
6. The developer shall submit water and sanitary sewer plans, applicable specifications, and
design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction.
7. The extension from the location of the existing water main in Treeline Road to the south
within Treeline Road connecting to Four Mile Drive and to the east in Four Mile Drive shall be completed prior to final plat of phase 4. The water main within Treeline Road and Four Mile Drive shall be sized in accordance with the Water Facility Plan. There are possible alternatives to routing the main extension in Four Mile Drive while still providing the
necessary looping. Those alternatives could be addressed during review of the engineering
plans for the water mains and implemented subject to the review and consent of the Kalispell Public Works Department. 8. Any water rights associated with the property shall be transferred to the City of Kalispell
prior to final plat.
9. A 30 foot easement shall be provided along the length of the northern property line of Lot 106 for a location complying with City Design and Construction Standards for future sanitary sewer and water main extensions to the west as shown on the water and wastewater
facility plans. Additionally, the water and sewer mains within Treeline shall be laid out in a
manner to allow for the future sanitary sewer force main provided for in the Wastewater Facility Plan Update (Project WW-M-01). 10. The developer shall submit to the Kalispell Public Works Department for review and
approval a storm water report and an engineered drainage plan that meets the requirements of
the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved.
11. Stormwater initiating within the northern half of Four Mile Drive adjacent to Bloomstone
shall be treated and detained within the Bloomstone subdivision. 12. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents
submitted to Montana Department of Environmental Quality for the General Permit for
Storm Water Discharge Associated with Construction Activities.
13. A letter from the Kalispell Public Works Department shall be submitted stating that all new
infrastructure has been accepted by the City of Kalispell, any private infrastructure has been constructed per city standards, and a proper bond has been accepted for unfinished work. 14. All easements and/or rights-of-way shall be indicated on the face of the final plat. Utility
easements for City water and sewer shall be provided to allow for the logical extension of
utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat.
15. An updated Traffic Impact Study shall be completed prior to the final plat of Phase 3. Any
recommendations from the study shall be implemented. 16. The extension of Treeline Road shall be constructed per city standards as an urban collector, while Foxglove Drive shall be constructed as a local street. Both roads shall have three lanes
at their intersections with Four Mile Drive. All other streets will be constructed to the
appropriate city standards. 17. Four Mile Drive will need to be improved to an urban standard along its frontage with Bloomstone, including a left turn land at both Treeline Road and Foxglove Drive. No
additional public or private accesses are permitted onto Four Mile Drive other than Treeline
Road and Foxglove Drive. Any additional right-of-way necessary for improvements shall be dedicated to the City. 18. The construction of the extension of Foxglove Drive to Four Mile Drive shall occur as part
of Phase 3, along with a portion of Waterleaf Lane. A temporary cul-de-sac shall be installed
at the end of Waterleaf Lane. Phase 4 would include the extension of Treeline Road to Four Mile Drive, along with all of the required improvements in Four Mile Drive. Prior to final plat of Phase 4, all street improvements, including, but not limited to, the full street profiles and all water and sanitary sewer main extensions, shall be installed.
19. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 20. The following statement shall appear on the final plat: "The undersigned hereby grants unto
each and every person, firm or corporation, whether public or private, providing or offering
to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever."
____________________
Developer's Signature 21. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The
mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail
delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area.
22. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover be
provided to the Kalispell Parks and Recreation Department.
23. A parks plan for the areas designated as “park/walking trail” shall be approved by the Parks and Recreation Director, and the plan shall show that the parkland dedication requirement is met for each phase.
24. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners’ association defaults on their park and open space amenity conditions. The taxes levied within the maintenance district shall be determined by the Parks and Recreation
Department with approvals by the Kalispell City Council.
25. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a stormwater maintenance district. This district shall only be activated in the event that the property owner(s) default on the maintenance of the approved stormwater facilities. The
taxes levied within the maintenance district shall be determined by the Public Works
Department with approvals by the Kalispell City Council. 26. A sound study shall be submitted prior to construction showing the specific design for highway sound mitigation for the subdivision and that the design reduces the noise impacts
to no more than 60 dBA at any lot line within the subdivision. The design of the noise
mitigation measures shall be reviewed and approved by the City of Kalispell Architectural Review Committee prior to construction. The sound mitigation shall extend along the highway right-of-way from the southern end of the property to the north end of Bloomstone Phase 1A-West. The measures shall be completed along the Phase 1 frontage prior to final
plat of any additional phases. The remainder of the frontage shall be constructed in
conjunction with the adjoining phase. However, if the sound study shows a 60dBA or lower level at any lot line being final platted, sound mitigation shall be developed regardless of whether that phase is adjoining the highway right-of-way or not.
27. A homeowner’s association (HOA) shall be formed and established to provide for the
maintenance of the common areas. 28. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal.
29. All utilities shall be placed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction.
30. All areas disturbed during development shall be re-vegetated with a weed-free mix
immediately after development.
SECTION 3. Upon proper review and filing of the Final Plat of said subdivision in the
office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF
THE CITY OF KALISPELL, THIS 1ST DAY OF FEBRUARY, 2021.
_____________________________________ Mark Johnson
Mayor
ATTEST: ____________________________
Aimee Brunckhorst, CMC
City Clerk EXHIBIT “A”
Bloomstone Phases 3, 4, 5, 6 & Remainder Legal Description:
That portion of the SW 1/4 of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana, described as follows:
Commencing at the Center ¼ Corner of Section 36; Thence along the East line of the SW ¼ of
Section 36, S 00°04’04” E 940.10 feet; Thence N 89°48’52” W 24.85 feet; Thence S 00°04’05” E 237.97 feet to the POINT OF BEGINNING; Thence S 89°55’55” W 130.00 feet; Thence S 85°10’06” W 60.21 feet; Thence S 89°55’55” W 240.00 feet; Thence N 00°04’05” W 59.32 feet to a point on a 835.00 foot radius curve, concave Southwesterly/Southerly, having a radial bearing of S
37°27’16” W; Thence Northwesterly along the curve through a central angle of 37°27’16” along an
arc length of 545.84 feet; Thence N 90°00’00” W 143.27 feet; Thence S 00°00’00” E 105.00 feet; Thence N 90°00’00” W 39.53 feet to a point on a 220.00 foot radius curve, concave Southeasterly, having a radial bearing of S 88°38’38” E; Thence Southwesterly along the curve through a central angle of 01°21’22” along an arc length of 5.21 feet; Thence S 00°00’00” E 204.22 feet; Thence N
90°00’00” W 516.15 feet; Thence S 03°35’40” E 812.31 feet; Thence S 15°13’16” E 524.67 feet;
Thence S 89°51’13” E 636.95 feet to a point on a 8268.81 foot radius curve, concave Southerly, having a radial bearing of S 00°10’19” W; Thence along the curve through a central angle of 02°02’38” along an arc length of 294.97 feet to a point on a 8144.08 foot radius curve, concave Northerly, having a radial bearing of N 02°13’03” E; Thence Southeasterly along the curve through
a central angle of 03°31’54” along an arc length of 502.01 feet; Thence N 88°37’05” E 16.12 feet;
Thence N 00°04’05” W 1416.78 feet to the POINT OF BEGINNING, containing 52.95 acres of land, all as shown hereon. Subject to and together with easements as shown. Subject to and together with easements of record.
Kalispell City Planning Board Minutes of the meeting of January 12, 2021 Page | 1
KALISPELL CITY PLANNING BOARD & ZONING COMMISSION MINUTES OF REGULAR MEETING January 12, 2021
CALL TO ORDER AND ROLL CALL The regular meeting of the Kalispell City Planning Board and Zoning Commission was called to order at 6:00 p.m. Board members present were Chad Graham, Doug Kauffman, Rory Young and Joshua Borgardt. Ronalee Skees attended via Zoom. George Giavasis and Kurt Vomfell were absent. PJ Sorensen and Jarod Nygren represented the Kalispell Planning Department.
MOTION TO DEFER AGENDA ITEM #3 Young moved and Graham seconded a motion to defer file #KA-20-04, #KPUD-20-03 and #KPP-20-05 to a future planning board. The applicant, Four Mile Farmstead, LLC is making changes to the design and needs more time to properly present the project to the Planning Board. VOTE BY ACCLAMATION The motion passed unanimously on a vote of acclamation. APPROVAL OF MINUTES Young moved and Kauffman seconded a motion to approve the minutes of the December 15, 2020 meeting of the Kalispell City Planning Board
and Zoning Commission. VOTE BY ACCLAMATION The motion passed unanimously on a vote of acclamation. HEAR THE PUBLIC None.
BOARD MEMBER SEATED Doug Kauffman recused himself from KA-20-05, he is a representative
for the applicant. KA-20-05 – EDGE ANNEXATION A request from Layne Massie for annexation and initial zoning of B-2 (General Business) for property located at 2015 and 2105 Third Avenue East, containing approximately 2.04 acres. The request is in anticipation of a multi-family development that would require city services. STAFF REPORT PJ Sorensen representing the Kalispell Planning Department reviewed Staff Report #KA-20-05.
Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Staff Report #KA-20-05 as findings of fact and recommend to the Kalispell City Council that the property be annexed and the zoning for the entire property be city B-2 (General Business). BOARD DISCUSSION None
PUBLIC HEARING Michael Zattosky – 2102 5th Ave E – concerned that his property will become a walkway for future tenants if a fence is not put up. Carol Thill – 2141 3rd Ave E – spoke about new tenants possibly coming
in and having concerns about the dog noise at her doggy day care. Would like to see a sound wall between her property and the subject property.
Dyanna Goldizen – 2075 3rd Ave E – concerned with additional traffic.
Kalispell City Planning Board Minutes of the meeting of January 12, 2021 Page | 2
MOTION Young moved and Borgardt seconded a motion that the Kalispell City Planning Board and Zoning Commission adopt Staff Report #KA-20-05 as findings of fact and recommend to the Kalispell City Council that the
property be annexed and the zoning for the entire property be city B-2 (General Business).
BOARD DISCUSSION None
ROLL CALL Motion passed unanimously on a roll call vote.
BOARD MEMBER RE-SEATED Doug Kauffman re-seated. KPP-20-06 – BLOOMSTONE PHASES 3-6 A request from Kalispell National Investment Co., LLC for major preliminary plat approval for Phases 3-6 of the Bloomstone subdivision, with a total of 57 lots on approximately 33.73 acres of land. STAFF REPORT PJ Sorensen representing the Kalispell Planning Department reviewed Staff Report # KPP-20-06. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Staff Report #KPP-20-06 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for Bloomstone Phases 3-6be approved subject to the conditions listed in the staff report.
BOARD DISCUSSION Board discussed phasing plan, road extensions and how the sound wall would be phased into the project. PUBLIC HEARING None
MOTION Kauffman moved and Young seconded a motion that the Kalispell City Planning Board and Zoning Commission adopt Staff Report #KPP-20-06 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for Bloomstone Phases 3-6 be approved subject to the conditions listed in the staff report. BOARD DISCUSSION None ROLL CALL Motion passed unanimously on a roll call vote.
OLD BUSINESS Nygren updated the board on the ADU text amendments and the transportation plan. NEW BUSINESS Nygren updated the board on the February 9th agenda ADJOURNMENT The meeting adjourned at approximately 6:45pm.
____________________ ____________________
Chad Graham Kari Barnhart
Kalispell City Planning Board Minutes of the meeting of January 12, 2021 Page | 3
President Recording Secretary
APPROVED as submitted/amended:
1
BLOOMSTONE PHASES 3-6
REQUEST FOR MAJOR SUBDIVISION STAFF REPORT #KPP-20-06 KALISPELL PLANNING DEPARTMENT JANUARY 6, 2021
A report to the Kalispell City Planning Board and the Kalispell City Council regarding a request
from Kalispell National Investment CO, LLC for major preliminary plat approval of Bloomstone Phases 3 through 6 on a total of 33.73 acres. A public hearing has been scheduled before the Planning Board for January 12, 2021, beginning at 6:00 PM in the Kalispell City Council Chambers. The Planning Board will forward a recommendation to the Kalispell City Council for
final action.
BACKGROUND INFORMATION Kalispell National Investment Co., LLC, has submitted a request for major preliminary plat
approval for Phases 3-6 of the Bloomstone subdivision, with a total of 57 lots on approximately
33.73 acres of land. Phase 3 would contain 47 single-family lots, Phase 4 would contain 4 multi-family lots with 104 dwelling units, Phase 5 would contain 3 multi-family lots with 88 dwelling units, and Phase 6 would contain 3 multi-family lots with 126 dwelling units. The property is located within an R-4 (Residential) zoning district with a Planned Unit Development (“PUD”)
overlay, which included plans for a total of 569 dwelling units on 85.2 acres. Phases 1 and 2 have
been constructed with 96 multi-family and 71 single-family dwelling units. Prior preliminary plats for additional phases were approved in 2008 and 2017, but have since expired. A: Applicant: Kalispell National Investment Co., LLC
124 Swan Ridge Court
Kalispell, MT 59901 Technical Assistance: A2Z Engineering 138 E Center St
Kalispell, MT 59901 B: Location: The property is located at 1070 Treeline Road and can be described as Assessor’s Tract 5C in the SW ¼ of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana.
2
C: Existing Land Use and Zoning: The zoning of the subject property is R-4 (Residential)
with a PUD overlay. It is part of a multi-phase development approved by the City
Council in 2008 providing for 569 dwelling units, including both single-family and multi-family dwellings. Phase 1 is located to the northwest of the subject property and consists of a 96 unit multi-family development and 25 single-family residences. Phase 2 is to the north of the subject property and has 36 townhome lots and 10 single-family lots. The
subject property itself is currently vacant.
D. Size: The subject property for all four
proposed phases is approximately
33.73 acres. E: Adjacent Zoning:
North: City R-4/PUD
East: City P-1 South: County SAG-10; City R-3, R-4 and RA-1 West: City R-4/PUD
F: Adjacent Land Uses: North: Single-family and multi- family residential
East: Kidsports
South: Single-family; vacant land West: Bypass
G: General Land Use Character: The area can be described as a transitional area with residential development to the south and a mix of single-family, multi-family, and commercial development to the north with the Kidsports athletic fields immediately east of
3
the project site. There have been recent approvals for additional single-family and multi-family development to the west of the bypass at the corner of Four Mile Drive and Stillwater
Road.
H: Availability of Public Services and Extension of Services: The property is currently located within the City of Kalispell and all services are available to the property. The subdivision will require an extension of existing water and sewer services to serve Phases 3
through 6.
Sewer: City of Kalispell Water: City of Kalispell Refuse: City of Kalispell Electricity: Flathead Electric Cooperative Gas: NorthWestern Energy
Telephone: CenturyTel Schools: School District #1 (West Valley)/Glacier High School Fire: City of Kalispell Police: City of Kalispell
4
REVIEW AND FINDINGS OF FACT FOR THE MAJOR PRELIMINARY PLAT
A. Effects on Health and Safety: Fire: The property is considered to be at low risk of fire. Buildings within the subdivision would be constructed in accordance with the International Fire Code and have access which meets city standards. The area to be built upon does not have steep slopes or woody fuels. Hydrants will be required to be placed in compliance with the requirements of the Uniform Fire Code and approved by the Fire Chief. Flooding: The subject property is located entirely outside of the 100-year floodplain per the Flood Insurance Rate Map (panel number 30029C1805J, effective date November 4, 2015). Access: Access to the subdivision will be provided via Treeline Road running north/south through the subdivision from Old Reserve to Four Mile Drive. Additional roads in the
subdivision include Foxglove Drive. Foxglove Drive extends north/south intersecting
with Four Mile Drive as well. All of the proposed roads will be constructed to city standards and provide adequate access for the subdivision. While a Traffic Impact Study was completed in 2008, it should be updated to reflect current conditions and any
5
recommendations should be implemented. Therefore, staff is recommending a condition that a new Traffic Study be submitted prior to final plat of Phase 3.
Highway Sound Mitigation: When there is a proposed residential subdivision abutting an existing major arterial (e.g. the Highway 93 bypass) capable of generating noise in excess of 60dBA, noise mitigation shall be utilized. The regulations allow a variety of noise mitigation techniques. A sound study should be submitted prior to construction
showing the specific design and that it reduces the noise impacts to no more than 60 dBA
at any lot line within the subdivision. The design of the noise mitigation measures should be reviewed and approved by the City of Kalispell Architectural Review Committee prior to construction.
The sound mitigation should extend along the highway right-of-way from the southern
end of the property to the north end of Bloomstone Phase 1A-West, which was a previously platted phase of the subdivision. Construction of sound mitigation measures along a portion of that stretch have been partially installed. A portion was deferred previously pending development of the area, but should be addressed at this point. The
measures should be completed along the Phase 1 frontage prior to final plat of any
additional phases. The remainder of the frontage should be constructed in conjunction with the adjoining phase. However, if the sound study shows a 60dBA or lower level at any lot line being final platted, sound mitigation should be developed regardless of whether that phase is adjoining the highway right-of-way or not. Staff is recommending
inclusion of a condition to this effect relating to sound mitigation.
B. Effects on Wildlife and Wildlife Habitat:
There are no water features which would provide aquatic or riparian habitat. There also does not appear to be any significant wildlife impacts. The Resources and Analysis Section of the Kalispell Growth Policy includes information from the Montana Department of Fish, Wildlife and Parks relating to deer, elk and moose habitat. As with
the majority of the Kalispell area outside of the core downtown, the maps show a
whitetail deer density of 5 to 30 per square mile, but no significant elk or moose habitat. C. Effects on the Natural Environment: Topography, Geology and Soils: The overall site is generally flat on the northern portion of the property and a slope running generally down from Four Mile Drive to the flatter portion of the property. It does not appear that there are topographical issues or slopes significantly impacting development. A Geotech report was prepared as part of the original review of the project. The report included recommendation for design and
construction of the site and buildings, but no significant issues impacting development. The recommendations should be followed as the site is developed. Surface and Groundwater: This subdivision will be served by public water and sewer thereby minimizing any potential impacts to the groundwater. No surface water creates concerns regarding this development. There is no floodplain in the area or on the property.
6
A Depth to Water Table map indicates the water table for the site is greater than 50 feet below the surface. Therefore, the Planning Department is not recommending any conditions which may limit basements or crawl spaces within the project site. Information in the Depth to Water Table was provided by the Flathead Lakers in consultation with the Flathead Lake Biological Station. Drainage: Curbs and gutters will be installed and a storm management plan will have to be developed to address the runoff from the site. There is no city storm drain system in the area, so the storm water will need to be managed on-site. Stormwater initiating within the northern half of Four Mile Drive adjacent to Bloomstone shall be treated and detained within the subdivision. The drainage plan will have to comply with the City of Kalispell standards and standards and designed by a professional engineer. A homeowner’s association has been created for the maintenance of the open space and storm water management area. Also, a waiver of right to protest the creation of a Special Improvement District (“SID”) for stormwater maintenance shall be included on the final plat. The SID would only be implemented in the event that stormwater facilities are not maintained in a manner consistent with the approved drainage plan. Lastly, the developer is required to submit for review to the Kalispell Public Works Department an erosion/sediment control plan for review and approval. These plans provide for managing storm water on the site and include stabilizing the construction site through an approved revegetation plan after site grading is completed. D. Effects on Local Services:
Water: Water service to the subdivision would be provided by the City of Kalispell from an existing water main located within Treeline Road that the developer would extend throughout the subdivision within the new streets being created and ultimately looped between Foxglove Drive and Treeline Road within Four Mile Drive. The extension from
the location of the existing water main in Treeline Road to the south through Treeline
connecting to Four Mile Drive and to the east in Four Mile Drive shall be completed prior to final plat of Phase 4. The water main within Treeline Road and Four Mile Drive shall be sized in accordance with the Water Facility Plan. The Water Facility Plan shows this main as 16” (W-M-12). The City will participate in the oversizing of this line utilizing
impact fees. If impact fees are not available, the developer can recoup the costs to oversize the main beyond the needs of the development via a latecomer agreement. There are possible alternatives to routing the main extension in Four Mile Drive while still providing the necessary looping. Those alternatives could be addressed during review of the engineering plans for the water mains and implemented with Public Works’
consent. The water system facilities plan for the city shows a need for a connection to the west for a main extension. The 30 foot easement along the north of Lot 106 on the proposed plat would meet that requirement.
7
The water system for the subdivision will be reviewed and approved by the Kalispell Public Works Department and Kalispell Fire Department as part of the development of
the subdivision. There is adequate capacity within the city’s water system to
accommodate this development. Per the subdivision regulations, any water rights associated with the property shall be transferred to the City of Kalispell prior to final plat. Sewer: Sewer service will be provided by the City of Kalispell with an extension of
existing sanitary sewer mains that the developer would extend into the subdivision within
the new streets being created. The extension of the main in Foxglove Drive would occur with Phase 3 and the extension of the main in Treeline Road would occur with phase 4. A gravity sewer main is not required to be extended within Four Mile Drive due to existing topography and its impact on future design of sewer mains in the area.
However, as with the water system, the city’s wastewater facilities plan shows a need for a connection to the west for a sanitary sewer main extension. The 30 foot easement along the north of Lot 106 on the proposed plat would meet that requirement in addition to meeting the need for the water main. Additionally, the facility plan calls for a future
force main from Four Mile Drive down Treeline Road to the easement. No additional
right-of-way is necessary, but the utilities within Treeline (both water and sewer) should be laid out in a manner to allow for the future main. The sewer system for the subdivision will be reviewed and approved by the Kalispell
Public Works Department as part of the development of the subdivision. There is
adequate capacity within the city’s sewer system to accommodate this development. Access and Roads: These phases include the north/south extension of Treeline Road to Four Mile Drive, which shall be constructed per city standards as an urban collector.
Foxglove Drive will also extend north/south and connect with Four Mile Drive, along
with the first portion of Waterleaf Lane. Treeline Road and Foxglove Drive both need to have three lanes at their intersections with Four Mile Drive. All streets will be constructed to the appropriate city standards.
Four Mile Drive will need to be improved to an urban standard along its frontage with
Bloomstone, including a left turn lane at both Treeline Road and Foxglove Drive. As an arterial street, no additional public or private accesses are permitted onto Four Mile Drive other than Treeline Road and Foxglove Drive. Any additional right-of-way necessary for improvements shall be dedicated to the City.
The construction of the extension of Foxglove Drive to Four Mile Drive shall occur as part of Phase 3, along with a portion of Waterleaf Lane. A temporary cul-de-sac will need to be installed at the end of Waterleaf Lane to provide an emergency vehicle turn-around. Phase 4 would include the extension of Treeline Road to Four Mile Drive, along
with all of the required improvements in Four Mile Drive. Prior to final plat of Phase 4,
all street improvements, including, but not limited to, the full street profile and all water and sanitary sewer main extensions, shall be installed.
8
Schools: The property is within the boundaries of School District #1 (West Valley and Glacier High School). On average, it would be anticipated that there would be about 183
students from Phase 2 at full build-out. Section 76-3-608(1) of the Montana Code
Annotated states that the governing body may not deny approval of a proposed subdivision based solely on the subdivision’s impacts on educational services. Police: Police services will be provided by the Kalispell Police Department. The
department can adequately provide service to this subdivision.
Fire Protection: Fire protection services will be provided by the Kalispell Fire Department. The department can adequately provide service to this development. Additionally, the road network to the subdivision provides adequate access for fire
protection. As part of subdivision review, fire protection, including access, fire flow and
hydrant location, will be reviewed. Fire station 62 is located approximately 0.5 miles away providing good response time. Parks and Recreation: The developer was required to provide a minimum of 17.07 acres
of parkland for the entire Bloomstone Project. This subdivision is proposing 2.3 acres of
parkland, which includes a trail system that connects the different phases of the development. As part of Phase 1 the developer developed a 1 acre park and the multi-family project also developed a park area to accommodate the recreational amenity requirement, with additional park space in Phase 2. Phase 3 will include a park/walking
trail along the boundary with Kidsports. Phases 4-6, which are multi-family lots, will
have a recreational amenity requirement that is a standard condition for multi-family projects. The amenity will be reviewed as part of the building permit/site review process. Prior to final plat of each phase, the developer will need to show that the parkland dedication requirement has been met.
Solid Waste: Solid waste will be handled by the City of Kalispell. There is sufficient capacity within the landfill to accommodate this additional solid waste generated from this subdivision.
Medical Services: Ambulance service is available from the fire department and ALERT
helicopter service. Kalispell Regional Medical Center is approximately 1.1 miles from the site. E. Effects on Agriculture and agricultural water user facilities:
This property was actively farmed for several decades under a state managed lease program with proceeds going to the State School Trust, but has not been used for agricultural purposes in recent years as the property has developed. Section 36 has already gone through a Montana Environmental Protection Act (MEPA) analysis by the
State in anticipation of commercial development of this site. While there is an impact to
agriculture, the proposed subdivision is a planned and anticipated project in the path of the planned urban expansion of Kalispell
9
Current policies in the Kalispell Growth Policy Plan-It 2035, Chapter 5, Land Use: Natural Environment, state the following:
Policy – Encourage urban growth only on agriculture lands entirely within the city’s annexation policy boundary. By providing a growth area boundary, the city can encourage the extension of city water
and sewer service, as well as other city services, which enables more growth to come into
the City of Kalispell with higher density. By allowing higher density development within the city’s growth policy area, it could reasonably be expected that more farmland could be conserved because the availability of residential and commercial lots within the Kalispell Growth Policy boundary, limiting sprawl/leapfrog development. In this
particular case, the land is already located within the city limits and partially developed. F: Relation to the Growth
Policy: The Kalispell Growth
Policy Future Land Use Map
designates the subject property as
high density residential. Areas
designated as High Density
Residential are served by urban
infrastructure and services and are
located near schools, employment
and service centers, and urban
arterials. This land use designation
anticipates a residential density up
to 20 dwelling units per acre, with
some as high as 40 units per acre.
The proposed density does not
exceed the density limits of High
Density Residential land use
designation. The proposed
subdivision and the associated
dwelling unit types complies with
the land use designation and can be
found to be in compliance with the
Kalispell Growth Policy and its
goals and policies.
10
G. Compliance with Zoning: The request complies with the R-4/PUD zoning regulations.
H. Compliance with the Kalispell Subdivision Regulations: This request complies with provisions of the Kalispell Subdivision Regulations. RECOMMENDATION
Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff
report #KPP-20-06 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for Bloomstone Phases 3-6 be approved subject to the conditions listed below: CONDITIONS OF APPROVAL
1. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council.
2. All applicable conditions within Ordinance 1635 (Bloomstone PUD) shall apply.
3. The preliminary plat approval shall be valid for a period of three years from the date of approval.
4. New infrastructure required to serve the subdivision shall be designed and constructed in
accordance with the City of Kalispell’s Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks.
5. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell’s Standards for Design and Construction and in compliance with the city’s facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works
Department. Prior to final plat, a certification shall be submitted to the Public Works
Department stating that the water and sewer mains have been built and tested as designed and approved. 6. The developer shall submit water and sanitary sewer plans, applicable specifications, and
design reports to the Kalispell Public Works Department and the Montana Department of
Environmental Quality for concurrent review, with approval of both required prior to construction. 7. The extension from the location of the existing water main in Treeline Road to the south
within Treeline Road connecting to Four Mile Drive and to the east in Four Mile Drive
shall be completed prior to final plat of phase 4. The water main within Treeline Road and Four Mile Drive shall be sized in accordance with the Water Facility Plan. There are possible alternatives to routing the main extension in Four Mile Drive while still
11
providing the necessary looping. Those alternatives could be addressed during review of the engineering plans for the water mains and implemented subject to the review and
consent of the Kalispell Public Works Department.
8. Any water rights associated with the property shall be transferred to the City of Kalispell prior to final plat.
9. A 30 foot easement shall be provided along the length of the northern property line of Lot
106 for a location complying with City Design and Construction Standards for future sanitary sewer and water main extensions to the west as shown on the water and wastewater facility plans. Additionally, the water and sewer mains within Treeline shall be laid out in a manner to allow for the future sanitary sewer force main provided for in
the Wastewater Facility Plan Update (Project WW-M-01).
10. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat,
a certification shall be submitted to the public works department stating that the drainage
plan for the subdivision has been installed as designed and approved. 11. Stormwater initiating within the northern half of Four Mile Drive adjacent to Bloomstone shall be treated and detained within the Bloomstone subdivision.
12. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities.
13. A letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell, any private infrastructure has been constructed per city standards, and a proper bond has been accepted for unfinished work.
14. All easements and/or rights-of-way shall be indicated on the face of the final plat. Utility easements for City water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown
on the final plat.
15. An updated Traffic Impact Study shall be completed prior to the final plat of Phase 3. Any recommendations from the study shall be implemented.
16. The extension of Treeline Road shall be constructed per city standards as an urban
collector, while Foxglove Drive shall be constructed as a local street. Both roads shall have three lanes at their intersections with Four Mile Drive. All other streets will be constructed to the appropriate city standards.
12
17. Four Mile Drive will need to be improved to an urban standard along its frontage with
Bloomstone, including a left turn land at both Treeline Road and Foxglove Drive. No
additional public or private accesses are permitted onto Four Mile Drive other than Treeline Road and Foxglove Drive. Any additional right-of-way necessary for improvements shall be dedicated to the City.
18. The construction of the extension of Foxglove Drive to Four Mile Drive shall occur as
part of Phase 3, along with a portion of Waterleaf Lane. A temporary cul-de-sac shall be installed at the end of Waterleaf Lane. Phase 4 would include the extension of Treeline Road to Four Mile Drive, along with all of the required improvements in Four Mile Drive. Prior to final plat of Phase 4, all street improvements, including, but not limited
to, the full street profiles and all water and sanitary sewer main extensions, shall be
installed. 19. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat.
20. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction,
maintenance, repair, and removal of their lines and other facilities, in, over, under, and
across each area designated on this plat as "Utility Easement" to have and to hold forever." _____________________
Developer's Signature
21. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition,
the mail delivery site and improvements shall also be included in the preliminary and
final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 22. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a
landscape plan for the placement of trees and landscaping materials within the landscape
boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department.
23. A parks plan for the areas designated as “park/walking trail” shall be approved by the
Parks and Recreation Director, and the plan shall show that the parkland dedication requirement is met for each phase.
13
24. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the
property owners’ association defaults on their park and open space amenity conditions.
The taxes levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 25. A note shall be placed on the final plat indicating a waiver of the right to protest creation
of a stormwater maintenance district. This district shall only be activated in the event that
the property owner(s) default on the maintenance of the approved stormwater facilities. The taxes levied within the maintenance district shall be determined by the Public Works Department with approvals by the Kalispell City Council.
26. A sound study shall be submitted prior to construction showing the specific design for
highway sound mitigation for the subdivision and that the design reduces the noise impacts to no more than 60 dBA at any lot line within the subdivision. The design of the noise mitigation measures shall be reviewed and approved by the City of Kalispell Architectural Review Committee prior to construction. The sound mitigation shall extend
along the highway right-of-way from the southern end of the property to the north end of
Bloomstone Phase 1A-West. The measures shall be completed along the Phase 1 frontage prior to final plat of any additional phases. The remainder of the frontage shall be constructed in conjunction with the adjoining phase. However, if the sound study shows a 60dBA or lower level at any lot line being final platted, sound mitigation shall be
developed regardless of whether that phase is adjoining the highway right-of-way or not.
27. A homeowner’s association (HOA) shall be formed and established to provide for the maintenance of the common areas.
28. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be
completed prior to final plat submittal. 29. All utilities shall be placed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for
Design and Construction.
30. All areas disturbed during development shall be re-vegetated with a weed-free mix immediately after development.
TaelorRd
OldReserveDr
93
StillwaterRd
W
olf
p
a
c
k
Wa
y
FourMileDr
StillwaterRd
548
ArbourDr
ArbourDrW
GardenDr
Dai r y Dr
ReservePl
TrailridgeRd
548
93
FourMileDr
T r eelineRd
TreelineRd
OldReserveDr HuttonRanchRdUSHighway93N
KalispellYouth
Athletic
Complex
FlatheadValley
Community
College
Parkway
Dr
N
orthridgeDr
SummitRidgeDr
USHighway93N
NorthridgePark
Esri Community Maps Contributors, Esri, HERE, Garmin,
SafeGraph, INCREMENT P, METI/NASA, USGS, Bureau of Land
Management, EPA, NPS, US Census Bureau, USDA
Kalispell Mailing List - Dec. 10th, 2020
1070 Treeline Rd
Date: 11-10-2020
FilePath: J/2020/1210-3rd
Kalispell Planning Dept.
0 1,000500Feet
N
Subject Property
Mailing List Parcels
ST
I
L
L
W
A
T
E
R
R
D
FOUR MILE DR
HIGHW
A
Y
9
3
A
L
T
E
R
N
A
T
E
TREELINE RD
TIMBERWOLF PKWY
O
L
D
R
E
S
E
R
V
E
D
R
NO
R
T
H
L
A
N
D
D
R
B
L
U
E
B
E
L
L
R
D
CH
A
M
P
I
O
N
W
A
Y
N HAVEN DR
SUMMIT RIDGE DR
WOLFPACK WAY
FOXGLOVE DR
MEADO
W
V
I
S
T
A
L
O
O
P
LINDEN LN
Kalispell Planning Dept.
0 1,000500Feet
N
Commercial
UrbanMixedUse
SubjectProperty
UrbanResidential
Date: Deceber 10th, 2020FilePath: J\2020\1210Treeline
Public
Kalispell GrowthPolicy Exhibit - December 10th, 20201070 Treeline Rd
HighDensityResidential
Urban Mixed Use
High Density Residential
Urban Residential
Suburban Residential
City Airport-Gov.
Public/Quasi Public, Openspace
Floodway
Subject Property
Commercial
Neighborhood Commercial
Industrial
NeighborhoodCommercial
STILLWATER RD
FOUR MILE DR
HIGHWAY 93 ALTERNATE
TREELINE RD
NORTHLAND DR
TIMBERWOLF PKWY
O
L
D R
E
S
E
R
V
E D
R
B
L
U
E
B
E
L
L R
D
CHAMPION WAY
N HAVEN DR
SUMMIT RIDGE DR
FOXGLOVE DR
L I N D E N L N
WILLOW WAY
MEADOW VISTA LOOP
Kalispell Zoning Exhibit - December 10th, 20201070 Treeline Rd
Date: Deceber 10th, 2020FilePath: J\2020\Treeline Kalispell Planning Dept.0 750375Feet
N
Zoning
Commercial
Neighborhood Business
Light or Heavy industrial
Health Care
Residential/Professional Office
Residential
Two Family Residential
Multi-family Residential
Residential Apartment/Office
Public
SubjectProperty
R-5/PUD
COUNTY
Subject Property
R-4/PUD
B-5/PUD
R-3/PUD
PUBLIC
RA-1
COUNTY
A2Z Engineering, PLLC • 138 East Center Street, Suite A • Kalispell, MT 59901
Phone: (406) 755-7888 • Fax: (406) 755-7880 • www.a2z-engineering.com
Bloomstone Phases 3, 4, 5, 6 & Remainder Legal Description:
That portion of the SW1/4 of Section 36, Township 29 North, Range 22 West, P.M.,M., Flathead
County, Montana, described as follows:
Commencing at the Center ¼ Corner of Section 36; Thence along the East line of the SW ¼ of
Section 36, S 00°04’04” E 940.10 feet; Thence N 89°48’52” W 24.85 feet; Thence S 00°04’05” E 237.97
feet to the POINT OF BEGINNING; Thence S 89°55’55” W 130.00 feet; Thence S 85°10’06” W 60.21
feet; Thence S 89°55’55” W 240.00 feet; Thence N 00°04’05” W 59.32 feet to a point on a 835.00
foot radius curve, concave Southwesterly/Southerly, having a radial bearing of S 37°27’16” W;
Thence Northwesterly along the curve through a central angle of 37°27’16” along an arc length
of 545.84 feet; Thence N 90°00’00” W 143.27 feet; Thence S 00°00’00” E 105.00 feet; Thence N
90°00’00” W 39.53 feet to a point on a 220.00 foot radius curve, concave Southeasterly, having a
radial bearing of S 88°38’38” E; Thence Southwesterly along the curve through a central angle of
01°21’22” along an arc length of 5.21 feet; Thence S 00°00’00” E 204.22 feet; Thence N 90°00’00”
W 516.15 feet; Thence S 03°35’40” E 812.31 feet; Thence S 15°13’16”E 524.67 feet; Thence S
89°51’13” E 636.95 feet to a point on a 8268.81 foot radius curve, concave Southerly, having a
radial bearing of S 00°10’19” W; Thence along the curve through a central angle of 02°02’38”
along an arc length of 294.97 feet to a point on a 8144.08 foot radius curve, concave Northerly,
having a radial bearing of N 02°13’03” E; Thence Southeasterly along the curve through a central
angle of 03°31’54” along an arc length of 502.01 feet; Thence N 88°37’05” E 16.12 feet; Thence N
00°04’05” W 1416.78 feet to the POINT OF BEGINNING, containing 52.95 acres of land, all as shown
hereon. Subject to and together with easements as shown. Subject to and together with
easements of record.
A2Z Engineering, PLLC • 138 East Center Street, Suite A • Kalispell, MT 59901
Phone: (406) 755-7888 • Fax: (406) 755-7880 • www.a2z-engineering.com
BLOOMSTONE PHASING PLAN
Bloomstone Phase 3
Expected Date of Development: 2021 - 2022
Phase 3 will be free standing without need to develop further phases. Installation of Foxglove Drive
from Phase 2 to 4 Mile Drive will provide two egresses for the new phase. With these connections
at each end the only emergency vehicle turn-around will be on the short piece of Waterleaf Lane.
Bloomstone Phase 4
Expected Date of Development: 2022 - 2023
Phase 4 will be free standing without need to develop further phases given that utilities are
extended along Treeline Road right-of-way. Access to the phase will be provided from a common
entrance onto existing 4 Mile Drive. There should not be any need for emergency vehicle turn-
arounds.
Bloomstone Phase 5
Expected Date of Development: 2023 - 2024
Phase 5 will be free standing without need to develop further phases. Extension of Treeline Road
to meet 4 Mile Drive will provide for access by vehicles and utilities. Emergency vehicle turn-
arounds will not be necessary with access at both ends of Treeline Road.
Bloomstone Phase 6
Expected Date of Development: 2024 - 2025
Phase 6 will be free standing without need to develop further phases. With the connections to
Treeline and 4 Mile Drive there should not be any need for emergency vehicle turn-arounds.
Phase 5
7.08 Ac
Phase 4
9.74 Ac
Phase 6
6.68 Ac
Phase 3
10.23 Ac
D
t
F
2
0
0
s l a u q E hcnI
e
n
O
e
lacSgniwar
N
E
W
S
Bl
o
o
m
s
t
o
n
e
D
e
v
e
l
o
p
m
e
n
t
Pr
e
l
i
m
i
n
a
r
y
P
l
a
t
Di
m
e
n
s
i
o
n
a
l
L
a
y
o
u
t
Ka
l
i
s
p
e
l
l
,
M
o
n
t
a
n
a
1 of 2
Foxglove Drive
Treeline Road
Bl
u
e
b
e
l
l
R
o
a
d
Fo
x
g
l
o
v
e
D
r
i
v
e
Blueb
e
l
l
R
o
a
d
T
r
e
e
l
i
n
e
R
o
a
d
Foxglove Drive
Scale: 1 inch = 100 feet
200 300 400015040100
SW Corner of Sec
36, T29N, R22W
US Hi
g
h
w
a
y
9
3
B
y
p
a
s
s
US Highway
9
3
B
y
p
a
s
s
O
n
-
r
a
m
p
4
M
i
l
e
D
r
i
v
e
4
M
i
l
e
D
r
i
v
e
Treeline Road
10
0
f
t
65 ft
Lo
t
#
5
5
0.
1
5
a
c
150 ft
Lot #106
1.56 ac
150 ft
45
6
f
t
44
7
f
t
289 ft
288 ft
42
9
f
t
183 ft
182 ft
41
8
f
t
Lot #107
2.90 ac
Lot #108
1.77 ac
220 ft
26
9
f
t
228 ft
221 ft
Lot #110
1.86 ac
Lot #105
2.38 ac
Lot #104
2.39 ac
Lot #103
2.41 ac
Lot #102
2.56 ac
504 ft
507 ft
508 ft
515 ft
520 ft
21
6
f
t
20
5
f
t
20
5
f
t
20
5
f
t
PARK WALKING TRAIL
60
f
t
60
f
t
60
f
t
60
f
t
60 ft60 ft
60
f
t
Exterior Boundary Keyed Notes: .
A.1168.69 ft.................................South 89°44'43" East
B.62.34 ft.....................................North 00°37'36" East
C.Parcel point of beginning
D.634.71 ft...................................South 89°44'07" East
E.Curve #1....R=8,264.44 ft, L=292.62 ft, D=02°02'38"
F.Curve #2....R=8,264.44 ft, L=506.56 ft, D=03°31'56"
G.16.33 ft.....................................North 88°46'00" East
H.1,416.78 ft...............................North 00°04'05" West
I.130.00 ft.................................South 89°55'55" West
J.60.21 ft...................................South 85°10'06" West
K.240.00 ft.................................South 89°55'55" West
L.59.32 ft....................................North 00°04'05" West
M.Curve #3............R=835 ft, L=545.84 ft, D=52°32'44"
N.143.27 ft..................................North 00°00'00" West
O.105.00 ft...................................South 00°00'00" East
P.39.53 ft...................................North 00°00'00" West
Q.Curve #4................R=220 ft, L=5.21 ft, D=01°21'22"
R.204.22 ft.................................South 00°00'00" West
S.516.15 ft.................................South 90°00'00" West
T.812.31 ft...................................South 03°35'40" East
U.524.16 ft...................................South 15°13'16" East
Linetype Legend: .
Phase Boundary
Lot Boundary
Gas & Dry Utility Easement
Phasing and Lot Notes: .
Phase 3 - 10.23 acres with 1.09 acres parkland
Lots 55 - 101...................47 Single Family Residential Lots
Phase 4 - 9.74 acres
Lots 102 - 105.........................104 Total Multifamily Units
Phase 5 - 7.08 acres
Lot 106 - 108............................88 Total Multifamily Units
Phase 6 - 6.68 acres
Lot 109 - 111..........................126 Total Multifamily Units
FEMA 1% Floodplain Notes: .
The preliminary plat area contains no mapped 1% chance
floodway or floodplains per FEMA FIRM 30029C1805J panel
effective November 04, 2015.
Surface Waters Notes: .
The preliminary plat area contains no rivers, streams, springs,
ponds, wetlands or lakes.
Certificate of Exclusion from Montana
Department of Environmental Quality Review
BLOOMSTONE SUBDIVISION, PHASES 3 - 6, are within the
City of Kalispell, Montana, a first-class municipality, and within
the planning area of the Kalispell growth policy which was
adopted pursuant to MCA 76-1-601 et seq., and can be
provided with adequate storm water drainage and adequate
municipal facilities. Therefore, under the provisions of MCA
76-4-125(2)(d), this subdivision is excluded from the
requirement for Montana Department of Environmental Quality
review.
B
A
D
E
F
G
H
J
M
O
S
P
C
T
U
220 ft 257 ft
265 ft
39
8
f
t
33
8
f
t
Lot #109
2.06 ac
Lot #111
1.79 ac
21
6
f
t
20
5
f
t
20
5
f
t
20
5
f
t
Remainder
19.22 Ac
Owner: Kalispell National Investment Company LLC
Located in SW Quarter of Section 36, Township 29 North, Range 22 West, P.M., M.,, Flathead County, Montana
Bloomstone Phases 3, 4, 5, & 6 Preliminary Plat
South Quarter Corner of
Section 36, T29N, R22W
T
ROBERT
SMITH
No. 12592 PE
NOM**ANA
AL E N G INEERP
R
O
F
E
SSION
NS E DLICE
Plan Sheet Number:
REVISIONS:
DRAWN BY: R Smith
CHECKED BY: R Smith
138 E. Center St., Ste A
Kalispell, MT 59901
Phone 406.755.7888
A2Z-Engineering.com
BLLAC !
G
I
D
UOYEROFE
C
a
l
l
8
1
1
B
L
L
A
C !GIDUOYEROFE
65 ft
10
0
f
t
60 ft
Lo
t
#
5
6
0.
1
4
a
c
60 ft
10
0
f
t
10
0
f
t
60 ft
Lo
t
#
5
7
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
5
8
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
5
9
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
5
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
6
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
7
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
8
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
9
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
5
0.
1
4
a
c
60 ft
10
0
f
t
104.3 ft
Lo
t
#
7
6
0.
2
4
a
c
101.5 ft
40 ft
40 ft
10
0
f
t
60 ft
Lo
t
#
9
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
5
0.
1
4
a
c
60 ft
10
0
f
t
70 ft
0.
1
6
a
c
70 ft
10
0
f
t
60 ft
Lo
t
#
9
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
9
0.
1
4
a
c
60 ft
10
0
f
t
70 ft
Lo
t
#
8
8
0.
1
6
a
c
70 ft
10
0
f
t
70 ft
0.
1
6
a
c
70 ft
10
0
f
t
Lo
t
#
8
7
10
0
f
t
60 ft
Lo
t
#
8
6
0.
1
4
a
c
60 ft
60
f
t
60
f
t
100 ft
100 ft
Lot #97
0.14 ac
60
f
t Foxglove Drive
10
0
f
t
60 ft
Lo
t
#
8
5
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
9
0.
1
4
a
c
60 ft
10
0
f
t
85.7 ft
Lo
t
#
7
8
0.
2
0
a
c
85 ft
I
K
L
N
R
Q
60
f
t
60
f
t
100 ft
Lot #98
0.14 ac
60
f
t
60
f
t
100 ft
Lot #99
0.14 ac
60
f
t
60
f
t
100 ft
0.14 ac
60
f
t
60
f
t
100 ft
100 ft
Lot #1010.14 ac
60
f
t
60
f
t
100 ft
Lot #1000.14 acWa
t
e
r
l
e
a
f
L
a
n
e
Lo
t
#
7
7
Lot #96
STM
STM
STM
STM
STM
W
W
W
W
W
W
SEW
SEW
SEW
SEW
SEW
SEW SEW
SE
W
S
E
W
S
E
W
S
E
W
SE
W
SEW
SEW SEW SEW
STM STM
ST
M
S
T
M
S
T
M
S
T
M
ST
M
STM
STM STM STM
W W
W
W
W
W
W
W
W
W W W W
S
T
M
S
E
W
W STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW
W W W W W W W W W W W W W W W W W W
ST
M
ST
M
ST
M
W
W
W
W
STM
ST
M
ST
M
ST
M
ST
M
STM
STM
ST
M
ST
M
ST
M
ST
M
W
W
W
W
W
W
W
W
W
W
W
W
SEW
SE
W
SE
W
SE
W
SE
W
SEW
SEW
SE
W
SE
W
SE
W
SE
W
STM
S
T
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W W W W
SEW
S
E
W
SE
W
SE
W
SE
W
SE
W
SE
W
SE
W
SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW
ST
M
W
W
SE
W
311
0
309
03088
3060
310
0
308
0307
0
3080305
0
3068
3044 30463042
3040
30
4
2
3040
3040
3036
303
8
30
4
2
30
4
0
304
2
3
0
4
4
30
4
8
304
6
3046
305430
5
0
SE
W
SE
W
SE
W
3050
3056
30
4
6
30
4
8
3050
3052
30
5
0
3066
3058
3060
3070
3076
3080
3086
3090
3094
3098
3102
31
0
6
3
0
5
0
3
0
6
0
3
0
7
0
3
0
8
0
3
0
6
6
30
5
4
30
7
6
3080
309
0
309
0
31
0
0
30
9
0
30
8
6
30
8
0
30
7
6
30
7
2
30
6
8
3
0
6
4
30
4
8
3050
305
4
305
2
3050
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
SE
W
SE
W
SE
W
SE
W
SE
W
SE
W
SE
W
SE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SE
W
SE
W
SEW
Bl
o
o
m
s
t
o
n
e
D
e
v
e
l
o
p
m
e
n
t
Pr
e
l
i
m
i
n
a
r
y
P
l
a
t
Co
n
t
o
u
r
s
&
U
t
i
l
i
t
i
e
s
Ka
l
i
s
p
e
l
l
,
M
o
n
t
a
n
a
2 of 2
T
ROBERT
SMITH
No. 12592 PE
NOM**ANA
AL E N G INEERP
R
O
F
E
SSION
NS E DLICE
Plan Sheet Number:
REVISIONS:
DRAWN BY: R Smith
CHECKED BY: R Smith
138 E. Center St., Ste A
Kalispell, MT 59901
Phone 406.755.7888
A2Z-Engineering.com
BLLAC !
G
I
D
UOYEROFE
C
a
l
l
8
1
1
B
L
L
A
C !GIDUOYEROFE
Phase 5
7.08 Ac
Phase 4
9.74 Ac
Phase 6
6.68 Ac
Phase 3
10.23 Ac
D
t
F
2
0
0
s l a u q E hcnI
e
n
O
e
lacSgniwar
N
E
W
S
Foxglove Drive
Treeline Road
Bl
u
e
b
e
l
l
R
o
a
d
Fo
x
g
l
o
v
e
D
r
i
v
e
Blueb
e
l
l
R
o
a
d
T
r
e
e
l
i
n
e
R
o
a
d
Foxglove Drive
Scale: 1 inch = 100 feet
200 300 400015040100
SW Corner of Sec
36, T29N, R22W
US Hi
g
h
w
a
y
9
3
B
y
p
a
s
s
US Highway
9
3
B
y
p
a
s
s
O
n
-
r
a
m
p
4
M
i
l
e
D
r
i
v
e
4
M
i
l
e
D
r
i
v
e
Treeline Road
10
0
f
t
65 ft
Lo
t
#
5
5
0.
1
5
a
c
150 ft
Lot #106
1.56 ac
150 ft
45
6
f
t
44
7
f
t
289 ft
288 ft
42
9
f
t
183 ft
182 ft
41
8
f
t
Lot #107
2.90 ac
Lot #108
1.77 ac
220 ft
26
9
f
t
228 ft
221 ft
Lot #110
1.86 ac
Lot #105
2.38 ac
Lot #104
2.39 ac
Lot #103
2.41 ac
Lot #102
2.56 ac
504 ft
507 ft
508 ft
515 ft
520 ft
21
6
f
t
20
5
f
t
20
5
f
t
20
5
f
t
PARK WALKING TRAIL
60
f
t
60
f
t
60
f
t
60
f
t
60 ft60 ft
60
f
t
Exterior Boundary Keyed Notes: .
A.1168.69 ft.................................South 89°44'43" East
B.62.34 ft.....................................North 00°37'36" East
C.Parcel point of beginning
D.634.71 ft...................................South 89°44'07" East
E.Curve #1....R=8,264.44 ft, L=292.62 ft, D=02°02'38"
F.Curve #2....R=8,264.44 ft, L=506.56 ft, D=03°31'56"
G.16.33 ft.....................................North 88°46'00" East
H.1,416.78 ft...............................North 00°04'05" West
I.130.00 ft.................................South 89°55'55" West
J.60.21 ft...................................South 85°10'06" West
K.240.00 ft.................................South 89°55'55" West
L.59.32 ft....................................North 00°04'05" West
M.Curve #3............R=835 ft, L=545.84 ft, D=52°32'44"
N.143.27 ft..................................North 00°00'00" West
O.105.00 ft...................................South 00°00'00" East
P.39.53 ft...................................North 00°00'00" West
Q.Curve #4................R=220 ft, L=5.21 ft, D=01°21'22"
R.204.22 ft.................................South 00°00'00" West
S.516.15 ft.................................South 90°00'00" West
T.812.31 ft...................................South 03°35'40" East
U.524.16 ft...................................South 15°13'16" East
Linetype Legend: .
Phase Boundary
Lot Boundary
Gas & Dry Utility Easement
Phasing and Lot Notes: .
Phase 3 - 10.23 acres with 1.09 acres parkland
Lots 55 - 101...................47 Single Family Residential Lots
Phase 4 - 9.74 acres
Lots 102 - 105.........................104 Total Multifamily Units
Phase 5 - 7.08 acres
Lot 106 - 108............................88 Total Multifamily Units
Phase 6 - 6.68 acres
Lot 109 - 111..........................126 Total Multifamily Units
FEMA 1% Floodplain Notes: .
The preliminary plat area contains no mapped 1% chance
floodway or floodplains per FEMA FIRM 30029C1805J panel
effective November 04, 2015.
Surface Waters Notes: .
The preliminary plat area contains no rivers, streams, springs,
ponds, wetlands or lakes.
Certificate of Exclusion from Montana
Department of Environmental Quality Review
BLOOMSTONE SUBDIVISION, PHASES 3 - 6, are within the
City of Kalispell, Montana, a first-class municipality, and within
the planning area of the Kalispell growth policy which was
adopted pursuant to MCA 76-1-601 et seq., and can be
provided with adequate storm water drainage and adequate
municipal facilities. Therefore, under the provisions of MCA
76-4-125(2)(d), this subdivision is excluded from the
requirement for Montana Department of Environmental Quality
review.
B
A
D
E
F
G
H
J
M
O
S
P
C
T
U
220 ft 257 ft
265 ft
39
8
f
t
33
8
f
t
Lot #109
2.06 ac
Lot #111
1.79 ac
21
6
f
t
20
5
f
t
20
5
f
t
20
5
f
t
Remainder
19.22 Ac
Owner: Kalispell National Investment Company LLC
Located in SW Quarter of Section 36, Township 29 North, Range 22 West, P.M., M.,, Flathead County, Montana
Bloomstone Phases 3, 4, 5, & 6 Preliminary Plat
South Quarter Corner of
Section 36, T29N, R22W
65 ft
10
0
f
t
60 ft
Lo
t
#
5
6
0.
1
4
a
c
60 ft
10
0
f
t
10
0
f
t
60 ft
Lo
t
#
5
7
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
5
8
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
5
9
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
5
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
6
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
7
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
8
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
6
9
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
5
0.
1
4
a
c
60 ft
10
0
f
t
104.3 ft
Lo
t
#
7
6
0.
2
4
a
c
101.5 ft
40 ft
40 ft
10
0
f
t
60 ft
Lo
t
#
9
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
5
0.
1
4
a
c
60 ft
10
0
f
t
70 ft
0.
1
6
a
c
70 ft
10
0
f
t
60 ft
Lo
t
#
9
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
9
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
9
0.
1
4
a
c
60 ft
10
0
f
t
70 ft
Lo
t
#
8
8
0.
1
6
a
c
70 ft
10
0
f
t
70 ft
0.
1
6
a
c
70 ft
10
0
f
t
Lo
t
#
8
7
10
0
f
t
60 ft
Lo
t
#
8
6
0.
1
4
a
c
60 ft
60
f
t
60
f
t
100 ft
100 ft
Lot #97
0.14 ac
60
f
t Foxglove Drive
10
0
f
t
60 ft
Lo
t
#
8
5
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
4
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
3
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
2
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
1
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
8
0
0.
1
4
a
c
60 ft
10
0
f
t
60 ft
Lo
t
#
7
9
0.
1
4
a
c
60 ft
10
0
f
t
85.7 ft
Lo
t
#
7
8
0.
2
0
a
c
85 ft
I
K
L
N
R
Q
60
f
t
60
f
t
100 ft
Lot #98
0.14 ac
60
f
t
60
f
t
100 ft
Lot #99
0.14 ac
60
f
t
60
f
t
100 ft
0.14 ac
60
f
t
60
f
t
100 ft
100 ft
Lot #1010.14 ac
60
f
t
60
f
t
100 ft
Lot #1000.14 acWa
t
e
r
l
e
a
f
L
a
n
e
Lo
t
#
7
7
Lot #96
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
Adjoining Streets: .
A.US Highway 93 Bypass
B.US Highway 93 Bypass Ramp
C.4 Mile Drive
D.Northland Drive
E.Treeline Road
F.Bluebell Road
G.Hollyhock Lane
H.Potential Ingress / Egress Point
Adjoining Features: .
I.Bloomstone Detention Pond
J.BPA Transmission Lines
Adjoining Property Owners: .
a.Treeline Village LLC
PO Box 534
Bigfork, MT 59911
Lot 26 of Amended Plat of Lot
26 of Bloomstone, Phase 1-A
West
b.Kalispell Natl Investment Co LLC
124 Swan Ridge Ct
Kalispell, MT 59901
Bloomstone Phase 1-A West
c.MT DNRC
655 Timberwolf Way, Suite 1
Kalispell, MT 59901
Parcel 1 of COS#17217
d.Touchmark at Summit Ridge LLC
5150 SW Griffith Drive
Beaverton, OR 97005
Parcel A-1 of COS#19653
e.Touchmark at Summit Ridge LLC
5150 SW Griffith Drive
Beaverton, OR 97005
Tract 1 of COS#13923
f.MT DNRC
655 Timberwolf Way, Suite 1
Kalispell, MT 59901
Described in document no.
20100009740
B
A
B
A
C
E
F
G
I
BB
D
E
H
H
H
H
J
Bloomstone
Phases 3 - 6 &
Remainder
Zoned R-4/PUD
Bl
o
o
m
s
t
o
n
e
D
e
v
e
l
o
p
m
e
n
t
Pr
e
l
i
m
i
n
a
r
y
P
l
a
t
Vi
c
i
n
i
t
y
M
a
p
Ka
l
i
s
p
e
l
l
,
M
o
n
t
a
n
a
MAP
J
a
b
c
c
de
f
T
ROBERTSMITH
No. 12592 PE
NOM**ANA
AL E N GINEERPRO
F
E
SSION
NSE DLICE
Plan Sheet Number:
REVISIONS:
DRAWN BY: R Smith
CHECKED BY: R Smith
138 E. Center St., Ste AKalispell, MT 59901
Phone 406.755.7888A2Z-Engineering.com
BLLAC !
G
I
D
UOYEROFE
Call 811
B
L
L
A
C !GIDUOYEROFE
DtF
00
4
s
l
a
u
q
E
hcnI e n O e lacS
g
n
i
w
a
rN
S
EW
Scale: 1" = 400 ft
0 200 400 600