Resolution 3350 - Contract Amendment - Pack & Co - Swimming Pool-
5/80-
RESOLUTION NO.
A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH
31.5
Pack and. Company
Contractor
ON - Repair Municipal Swimming Pool.
Project
WHEREAS, the City did, .on April 23, 1.981 enter into a contract with
Date
Pack and. Company ,of Kalispell, Montana
Contractor Address
for repair of municipal swimming pool
Description of. Work
on the MMCI:PAL SWD=G POOL PROJECT and
Project
hliEREAS, Upon the advice and recommendation of
Director of Public Works, Robert Haffemman who is the City's consultant and
Engineer or Architect
engineer on said project, certain changes and alterations of design and specifica-
tions have been found necessary and adviseable.and in the best interests of the
City; and said changes and alterations could not have been necessarily forseeable
when the original design and specifications were prepared on this phase of the-
MUIiTICIPAL SWING POOL and said changes are contained in
Project
Exhibit "All attached hereto and are by this reference made a part hereof; and'
KHEREAS, it appears.in the best interests of the City to approve said.changes
and alterations,
NOW THEREFORE, pursuant to the provisions of Section 7 - 5 - 4308(l) MCA
be it hereby resolved:
I. The alterations and modifications of the specifications and plans of the
contract between the City of Kalispell and Pack and Company ,
Contractor...
dated April 23, 1981 as 'set out in Exhibit "A" attached hereto, are
hereby approved; and
2. As soon as the price to be paid for said alterations and modifications
are agreed to in writing, signed by the contractor, as hereby approved by the
Council, this approval thereof shall be in effect.
PASSED BY THE CITY COUNCIL AND APPROVED BY THE MAYOR OF "IE CITY OF KALISPELL THIS
DAY OF 9 19 81
Mayor
ATTEST:
City Clerk
�? ~ CHANCE OFMM NO. 2
PROJECT Repair_ the Municipal. Swimming Pool
OMM City of Kalispell
CONTRACTOR Pack Co an
The following changes) axe hereby made to the contract dated Aril 23 19
1. Provide labor to a l a second seal coat to the side walls of the .
shallow end of pool Amount of Change S 180.00
2. The City- to_purchase materials for future use by the_City($153.17) and in-
crease in .actual quantities in place ($81.38) Amount of Chaff 234.55
The total. amount (added) &W ) hereby is 414.55
The amended contract price'ineluding this change order now is 6,283.7-5
The contract time is changed by (acl-ding) (deleting) 0 calendar days thereto.
The amended date for completion of all work now is June 15 1981.
,TgSTIFICATION (1) After application -of the first seal coat, the side walls were con-
sidered too abrasive for swimming; therefore it was necessary to apply a second seal .
coat. (2) The Contractor ordered extra'material over the amount needed to comply with
t}ie Specifications. The City has use for these materials, and the .materials are avail-
able at the Contractor cost. Purchased were: 2 cans of Thoroseal $34.00 Ac 1 60
051.67), 14 tubes of caulking ($59.50) and 2 cans of primer($8.00). The actual quan-
tities�of items 2 through _5 were caulking _456. L.P. patching. 36 sq. -d—.-, undercoating
640 sq. yds. and .seal 640- sq. yds.
ACCEPTANCE
inh City of Kalispell, oimer, and � Pack & Company �- �eox�tractor,
- 1-.
in the above referenced contract, do hereby agree.to the terms and conditions of -
the instant char order number 2 " and sane is effective this date in eccorrlar�ce
,rdth Resolution No.. and said contract is amended accordingly.
ACCEPTED _ Pack $ Comp any . .
ACCFP-j'IM BY THE CITY: OF KALISPELL
A'PfEEST:
PROPOSED CHANCE ORDER NO. 2
Cont tJjpr I s/ Name
WMIA M�
Contractor's Signature M. �
., Mayor -r— Pate
ty Clexk
PROTECT Re air the Muni! j al Swimming Pool
DATE July 2, 1981
1
OWNER City of Kalispell
CONTRACTOR Pack & Company
The following change are hereby proposed to the Contract dated
123, 1981
_. i. _Provide labor to apply _a second seal coat to the side walls of the w
--_ shallow end of pool._ . . . --- --Amount of Change $ 180.00
2. The City to purchase materials for future use by the City ($153,17) and
increase in actual quantities in place ($81.38) .Amount of Change � 234.55
1
The
total amount to be (added (Aximboo
hereby. is
414.55
The
contract price including this change
order will be:
$ 6
28-475
The contract time is changed _by (adding) (deleting) 0 calendar clays thereto:
The tended date for completion of all work will be June 15.�81
JUSTIFICATION (1l After application of the first �seal �coat, the side walls were con-
sidered too abrasive for swimming, therefore it was necessary to apply a second seal
coat. 2 The Contractor ordered extra material over the amount needed to co 1 .-
with the Specifications. The City has use for these materials, and the materials are
_availahl e at the Contractor cost. Purchased were _2 bags of Thoroseal ($34.00) , _
Acryl [.0 ($51.67), 14 tubes of caulking ($59.50) and 2 cans of primer ($8.00). The
actual quantities of items 2-through 5 were: caulking 456 L.F. , patchi.njZ 36 sq. yd..,
undercoating 640 sq. yds. and seal 640 sq. yds.
t
1, the undersigned, City Clerk of the City of Kalispell certify that the foregoing is a true
COPY of the Resolution passed by the City Council of the City of Kalispell, Montana at a
.regular meeting held n SAL&,-ZIM a,,4 ;a..)
City Cl rk of the City of Kalispell