Loading...
E2. Center Street West Bid RecommendationCITY OF KALISPELL MEMORANDUM To: Doug Russell, City Manager Cc: Susie Turner, PE, Director of Public Works From: Tom Tabler, PE, Civil Engineer Re: Center Street West Improvement Project Date: May 3, 2021 BACKGROUND: The City of Kalispell has received sealed unit price bids for the Center Street West Improvement Project. The project includes furnishing labor, materials and equipment required to reconstruct approximately 1,590 feet of Center Street West from Meridian Road to 7th Avenue West. Also included in the project is storm sewer manholes, drainage inlets, storm main installation, paved surface restoration, concrete flatwork and landscape restoration. Bids were received on Wednesday, April 28, 2021 at 9:00 AM. 3 responsive bids were received from local contractors: Contractor: LHC Sandry Construction Knife River Corp Total Bid Price $834,839.86 $863,000.00 $1,568,151.60 Engineer's Estimate $1,160,530.80 LHC has been determined to be a responsive and responsible contractor successfully completing similar projects in Northwest Montana. ACTION REQUESTED: Motion to award the Center Street West Improvement Project to LHC with the execution of the total amount bid for $834,839.86. FISCAL EFFECTS: The total project construction cost will be funded as allocated in the FY 21 budget including BARSAA Funds (2421-421-430240-354), and Storm Fund line items (5349-453- 430247-968) / (5349-453-430246-968). ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: Bid Analysis. 201 1' Avenue E Phone (406)758-7720 PO Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 1 www.kalispell.com BID TAB - Bids Opened April 28, 2021 @ 9:00 am Center Street West Improvement Project Kalispell, MT 59901 City Proj. No. 20-1110 Base Bid Engineers Estimate No. Item Unit Quantity Unit Price Total Price 1 Mobilization/Demobilization LS 1 $ 70,000.00 $ 70,OOO.0 2 Construction Traffic Control LS 1 $ 20,000.00 $ 20,OOO.0 3 Construction Survey LS 1 $ 10,000.00 $ 10,OOO.0 4 Remove Asphalt Pavement SY 8935 $ 15.00 $ 134,025.0 5 Remove Concrete (All Depths) SF 272 $ 3.00 $ 816.0 6 Remove Curb LF 2954 $ 3.00 $ 8,862.0 7 Remove Storm Manhole EA 2 $ 2,500.00 $ S,OOO.0 8 lRemove Storm Inlet EA 3 $ 1,500.00 $ 4,500.0 9 Remove Existing Storm Pipe LF 384 $ 20.00 $ 7,680.0 10 Remove Tree/Bush Each 1 $ 500.00 $ 500.0 11 Reset Mailbox Cluster Each 4 $ 500.00 $ 2,OOO.0 12 Adjust Water Service Each 7 $ 500.00 $ 3,500.0 13 IType 2 Pipe Bedding LF 50 $ 10.00 $ 500.0 14 Flowable Fill Each 2 $ 2,500.00 $ S,OOO.0 15 Concrete Curb and Gutter LF 2955 $ 30.00 $ 88,650.0 16 6 inch Concrete Sidewalk SF 5987 $ 15.00 $ 89,805.0 17 8 inch Concrete Valley Gutter SF 790 $ 25.00 $ 19,750.0 18 lConnect to Existing Storm Structure EA 2 $ 2,000.00 $ 4,OOO.0 19 Connect to Existing Storm Pipe EA 1 $ 200.00 $ 200.0 20 Plug Abandoned Storm Pipe EA 2 $ 750.00 $ 1,500.0 21 18 inch SDR 35 Storm Sewer Pipe LF 1041 $ 220.00 $ 229,020.0 22 12 inch SDR 35 Storm Sewer Pipe LF 163 $ 200.00 $ 32,600.0 23 148 inch Storm Manhole EA 4 $ 6,000.00 $ 24,OOO.0 24 30 inch Storm Inlet EA 8 $ 3,500.00 $ 28,OOO.0 25 Concrete Collar Each 14 $ 1,000.00 $ 14,OOO.0 26 4 inch Asphalt Restoration SY 6801 $ 50.00 $ 340,050.0 27 Reset Street Sign Each 4 $ 500.00 $ 2,OOO.0 28 14 inch Wide Double Yellow Line (Epoxy) LF 1348 $ 2.10 $ 2,830.8 29 8 inch Wide Traffic Lane Line of Crosswalk Line (Epoxy) LF 190 $ 4.50 $ 855.0 30 24 inch Wide White Crosswalk or Stop Bar (Epoxy) LF 26 $ 12.00 $ 312.0 31 White Turn Arrow (Epoxy) EA 1 $ 150.00 $ 150.0 32 White Turn/Straight Combination Arrow (Epoxy) EA 1 $ 175.00 $ 175.0 33 IThe Word "Only" (Epoxy) EA I 1 $ 250.00 $ 250.0 34 Landscape Restoration (10234 SF) LS 1 $ 10,000.00 $ 10,OOO.0 Sub -Total = $ 1,160,530.E