09/20/06 Burnham/System Development ChargesCity of Kalispell Public Works Department
Post Office Box 19971, Kalispell, Montana 59903-1997 - Telephone (406)758-7720, Fax (406)758-7831
September 20, 2006
Craig Kerzman, Building Official
Building Department
City of Kalispell
RE: Hilton Garden Inn
Water and Sanitary Sewer System Development Charges
Dear Craig,
Attached is the calculation sheet used to determine the System Development Charges for
the referenced project. These charges are as follows:
Sanitary Sewer ............................................... $ 149,899
Water ......... 4" Meter ........................................ $41,740
Total $ 191,639
If you have any questions, please do not hesitate to contact this office.
Sincerely,
Paul E. Burnham, P.E.
Civil Engineer
Wastewater ERU Determination Schedule
Project Name: Hilton Garden Inn
Date: 9/20/2006
Calculated By: Paul Burnham
TYPE OF BUILDING AND SEWER USE
# OF FIXTURES
ERU
UNITS
TOTAL
1.
Single Family Residence
0
1.00
each
0.000
2.
Multiple Family Residence
0
0.75
each
0.000
Mobile Home Space in Mobil Home Park
3.
0
0.65
each
0.000
Recreational Vehicle Waste Dumping Station
4.
0
0.65
each
0.000
5.
Schools
0
0.03
per student capacity
0.000
Churches
6.
0
0.64
each
0.000
7.
Hospitals - general
0
1.00
per bed
0.000
8.
Convalescent Hospitals
0
0.50
per bed
0.000
Residential Care/Boarding Facilities
9.
0
0.25
per bed
0.000
Hotels and Motels
10
144
0.25
per unit
36.000
Food Preparation and/or Serving Areas
11.
129
0.15
100 sq. ft.
19.305
12a.
Self -Service Vehicle Wash
0
1.17
per bay
0.000
12b.
Full -Service Vehicle Wash
0
15.66
per bay
0.000
12c.
All Other Vehicle Washes
0
tbd
tbd
tbd
Laundries & Laundromats
13a.
0
0.30
sq. ft.
0.000
13b.
Industrial Laundries
0
tbd
tbd
tbd
Commercial, Office and Dry Industrial:
14.
14a.
Bath tub w/or w/o shower
0
0.13
each
0.000
14b.
Dental unit or cuspidor
0
0.10
each
0.000
14c.
Dishwasher
2
0.10
each
0.200
14d.
Disposal
0
0.10
each
0.000
14e.
Drinking Fountain
6
0.05
each
0.300
14C
Floor Drain
25
0.013
each
0.325
14g.
Fountain/Backwash
1
0.10
each
0.100
14h.
Kitchen Sink
6
0.08
each
0.480
14i.
Laundry Tray
0
0.08
each
0.000
14j.
Lavatory
28
0.05
each
1.400
14k.
Service Sink
26
0.08
each
2.080
141.
Shower
0
0.13
each
0.000
14m.
Swimming Pool/Backwash
1
0.10
each
0.100
14n.
Urinal
1
0.17
each
0.170
14o.
Urinal Trough
0
0.17
each
0.000
14p.
Wash Sink
0
0.08
each
0.000
14q.
Washing Machine
3
0.07
each
0.210
14r.
Water Closet
23
0.33
each
7.590
Wet Industrial
15.
0
tbd
tbd
tbd
16.
Undefined Building and Sewer Use
0
tbd
tbd
tbd
17.
Additional Loading or Change of Use
0
tbd
tbd
tbd
TOTAL ERU
68.260
Total Sewer System Development Charge ($) 2006: 2196.00 $/eru 1 $149,899
Total Water System Development Charge ($) 2006: 4 Meter Size 1 $41,740
Total Project System Development Charge ($) 2006: 1 $191,639
Note: All items marked "tbd" will be determined on an individual basis by the City.