Loading...
09/20/06 Burnham/System Development ChargesCity of Kalispell Public Works Department Post Office Box 19971, Kalispell, Montana 59903-1997 - Telephone (406)758-7720, Fax (406)758-7831 September 20, 2006 Craig Kerzman, Building Official Building Department City of Kalispell RE: Hilton Garden Inn Water and Sanitary Sewer System Development Charges Dear Craig, Attached is the calculation sheet used to determine the System Development Charges for the referenced project. These charges are as follows: Sanitary Sewer ............................................... $ 149,899 Water ......... 4" Meter ........................................ $41,740 Total $ 191,639 If you have any questions, please do not hesitate to contact this office. Sincerely, Paul E. Burnham, P.E. Civil Engineer Wastewater ERU Determination Schedule Project Name: Hilton Garden Inn Date: 9/20/2006 Calculated By: Paul Burnham TYPE OF BUILDING AND SEWER USE # OF FIXTURES ERU UNITS TOTAL 1. Single Family Residence 0 1.00 each 0.000 2. Multiple Family Residence 0 0.75 each 0.000 Mobile Home Space in Mobil Home Park 3. 0 0.65 each 0.000 Recreational Vehicle Waste Dumping Station 4. 0 0.65 each 0.000 5. Schools 0 0.03 per student capacity 0.000 Churches 6. 0 0.64 each 0.000 7. Hospitals - general 0 1.00 per bed 0.000 8. Convalescent Hospitals 0 0.50 per bed 0.000 Residential Care/Boarding Facilities 9. 0 0.25 per bed 0.000 Hotels and Motels 10 144 0.25 per unit 36.000 Food Preparation and/or Serving Areas 11. 129 0.15 100 sq. ft. 19.305 12a. Self -Service Vehicle Wash 0 1.17 per bay 0.000 12b. Full -Service Vehicle Wash 0 15.66 per bay 0.000 12c. All Other Vehicle Washes 0 tbd tbd tbd Laundries & Laundromats 13a. 0 0.30 sq. ft. 0.000 13b. Industrial Laundries 0 tbd tbd tbd Commercial, Office and Dry Industrial: 14. 14a. Bath tub w/or w/o shower 0 0.13 each 0.000 14b. Dental unit or cuspidor 0 0.10 each 0.000 14c. Dishwasher 2 0.10 each 0.200 14d. Disposal 0 0.10 each 0.000 14e. Drinking Fountain 6 0.05 each 0.300 14C Floor Drain 25 0.013 each 0.325 14g. Fountain/Backwash 1 0.10 each 0.100 14h. Kitchen Sink 6 0.08 each 0.480 14i. Laundry Tray 0 0.08 each 0.000 14j. Lavatory 28 0.05 each 1.400 14k. Service Sink 26 0.08 each 2.080 141. Shower 0 0.13 each 0.000 14m. Swimming Pool/Backwash 1 0.10 each 0.100 14n. Urinal 1 0.17 each 0.170 14o. Urinal Trough 0 0.17 each 0.000 14p. Wash Sink 0 0.08 each 0.000 14q. Washing Machine 3 0.07 each 0.210 14r. Water Closet 23 0.33 each 7.590 Wet Industrial 15. 0 tbd tbd tbd 16. Undefined Building and Sewer Use 0 tbd tbd tbd 17. Additional Loading or Change of Use 0 tbd tbd tbd TOTAL ERU 68.260 Total Sewer System Development Charge ($) 2006: 2196.00 $/eru 1 $149,899 Total Water System Development Charge ($) 2006: 4 Meter Size 1 $41,740 Total Project System Development Charge ($) 2006: 1 $191,639 Note: All items marked "tbd" will be determined on an individual basis by the City.