LHC Change Order 2Date of Issuance: 10/23/2017 Project: Glacier Rail Park Contract: Glacier Rail Park Contractor: LHC, Inc. Change Order No. 2 Effective Date: 10/23/2017 Owner: City of Kalispell The Contract Documents are modified as follows upon execution of this Change Order: Owner's Contract No.: na Date of Contract: 8/2/2017 Engineer's Project No.: 15414035 Description: DECREASE INCREASE In Contract Price) In Contract Price) 1. KAL-6: Item #319'/4" PE Water Service 0.00 4,725.82 Connection 2. Temporary water service to 651 and 653 0.00 369.15 Whitefish Stage Road residents 3. FRA -1: Site Work Item #106 Abandon 0.00 779.53 4. FRA -1: Site Work Item #108 Flush 688.82 0.00 TOTALS: 688.82 5,185.68 NET CHANGE IN CONTRACT PRICE 688.82 5,874.50 Attachments/Justification (list documents supporting change): The Public Works Department has requested a change to water service to two (2) residences along Whitefish Stage Road. The addresses are 651 and 653. The residents are currently serviced by a 2" line originating at the intersection of East California Street and Whitefish Stage Road. The current plan directed the contractor to reconnect the 2" line, if necessary. The Public Works Department has requested that the two — 3/4" residential water services be connected to the new 12" water main being installed along Whitefish Stage Road. The existing 2" water line shall be abandoned in place and the pipe capped at the existing water main. Temporary water service shall be provided to the homes at 651 and 653 Whitefish Stage Road. Contract price for temporary water service (KAL-3, Item #329) is a lump sum of $3,691.49. This item represents 20 residential services. A per residential price is $184.575. For two additional residential temporary services the costs is $369.15. Please refer to the attached revised Plan Sheet W-15 for changes proposed in this change order. 2. After finalizing which monitoring wells must be modified and how with the DEQ, this change order reflects the differences between the bid quantity and final DEQ approval (1 less abandonment and 2 additional flush mounted) . Please refer to the attached exhibit and table showing the final monitoring well modifications. Glacier Rail Park Change Order #2 Form C-941 Project Description: Infrastructure construction Page I of 2 Project # 15414035.1 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: Working days Calendar days 11,229,261.03 Substantial completion (days or date): na Ready for final payment (days or date): na Decrease from previously approved Change Increase from previously approved Change Orders Orders No. 1 to No. 1: No. # to No. #: 125,467.56 Substantial completion (days): n/a Ready for final payment (days): n/a Contract Price prior to this Change Order: Contract Times prior to this Change Order: 11,103,793.56 Substantial completion (days or date): n/a Ready for final payment (days or date): n/a Increase of this Change Order: Increase of this Change Order: 5,185.68 Substantial completion (days or date): n/a Ready for final payment (days or date): n/a Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: 11,108,979.24 Substantial completion (days or date): na Ready for final payment (days or date): na AVhf V° RECOMMEN D: ACCEP ACCE w . ............ iBy: B Engineer (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature) Date: /J0 7 Date: Date: 141? f./, Approved by Funding Agency Cif applicable): Date: Glacier Rail Park Change Order #2 Form C-941 Project Description: Infrastructure construction Page 2 of 2 Project # 15414035.1 ri ME' I'Ally, NEW G c LACIER,RAIL PARK ay OF, MI ; MWELL,:MCWMA I: WATER MMN,1,EXTEN ON,,S 7,4 T(II E 0, S TA +00 N rr dr FY 7 1 V4 FYY 1 FW ME' I'Ally, NEW G c LACIER,RAIL PARK ay OF, MI ; MWELL,:MCWMA I: WATER MMN,1,EXTEN ON,,S 7,4 T(II E 0, S TA +00 N rr dr FY 7 1 G c LACIER,RAIL PARK ay OF, MI ; MWELL,:MCWMA I: WATER MMN,1,EXTEN ON,,S 7,4 T(II E 0, S TA +00 N e g GLACIER RAIL PARK,', am ^ P 9 CITY OF K%WSPELL Nwil-m MONITORING WELLS EXHIBIT + v Monitoring Well Proposed Action Schedule KRY 102 AH Abandon ASAP KRY 104A Abandon ASAP KRY 107 AU Abandon ASAP SB -4-14 Flush Winter 2018 KRY 111 AH Extend Winter 2018 KRY 112 AH Abandon ASAP GWRR 8 Abandon ASAP KRY 115 AFtB Flush Winter 2018 KRY 133A Flush Winter 2018 SB -3-14 Flush Winter 2018 PRW-2011 Abandon ASAP SB -7-14 Flush Winter 2018 SB -8-14 Flush Winter 2018 MW 6 Extend Winter 2018 MW 8 Extend Winter 2018 KPT -16 Extend Winter 2018 KRY 137A Flush Winter 2018 KRY 138A Abandon ASAP MW 40 Flush Winter 2018 MW 41 Flush Winter 2018 MW 42 Flush Winter 2018 IW -8 Abandon ASAP