06-23-20 Architectural Review Committee MinutesMINUTES
ARCHITECTURAL REVIEW COMMITTEE
DATE: Tuesday, June 23, 2020 @ 7:30 AM
Kalispell City Hall, 201 1st Ave E
MEMBERS PRESENT: Julia Pierrottet; Janet Clark; Mark Pirrie; John Hinchey; Cara
Lemire; Susanne Wigginton; Sarah Turner
OTHERS PRESENT: City Staff – PJ Sorensen, Rachel Ezell
# of Guests: 2
Hear the Public: None
Approval of Minutes: Susanne noted that the minutes should be amended to say “Susanne
moved to approve”. Susanne moved to approve the June 9 minutes
as amended; Janet seconded (approved 6-0).
New Business:
Building Permits:
Signs: Northwest Drywall – 1105 E. Oregon; freestanding sign located at
south entrance along E. Oregon. There was discussion about
distance of the sign from the ROW and property boundaries. John
moved to approve; Susanne seconded (approved 7-0).
Old Business: Sherwin Williams – 430 Cascade Loop; new retail store. Ned with
Jackola presented the elevations and landscaping and provided
material samples of the building. There was discussion about
screening the utilities which will be visible on or by the building.
Sarah moved to approve with the condition that utilities be
screened; John seconded. John moved to amend the motion to add
consideration for trash door enclosures to match the aesthetic of
the building, either black metal or cedar-like wood (preference for
wood tones); Janet seconded. (Approved 7-0). The main motion to
approve the project with conditions was approved 7-0.
Other Discussion: Rachel gave the board updates on the timeline of the project and
the board discussed potential boundaries for the district.
Meeting Adjourned @ 7:55 AM