E4. 11th Street Bid RejectionCITY OF
KALISPELL
MEMORANDUM
To: Doug Russell, City Manager
Cc: Susie Turner, PE, Director of Public Works
From: Tom Tabler, PE, Civil Engineer
Re: 1 la' Street West Sanitary Sewer Reconstruction Project
Date: June 1, 2020
BACKGROUND: The City of Kalispell has received sealed unit price bids for the 1 l th Street W Sanitary
Sewer Replacement Project. The project includes furnishing labor, materials and equipment required to
replace deteriorated sewer main with approximately 730 linear feet of new fifteen (15) inch SDR 35 PVC
sewer main.
Bids were received on Thursday May 26, 2020 at 4:00 PM. One responsive bid was received from a local
contractor:
Contractor:
LHC, Inc.
Engineer's Estimate
Total Bid Price
$595,654.40
$471,055.00
The contractor's cost to complete the project exceeds the engineers cost estimate of $471,055.00 by
$124,649.40. The contractor's bid includes some uncertainty (costs) in response to the bypass pumping
specification and the completion timeline. Considering the submittal of one bid, which is over the engineers
estimate, Public Works recommends re -bidding the project with updated by-pass pumping specifications,
and a lengthened construction schedule, in an effort to potentially receive more competitive bid prices.
REQUESTED ACTION: Motion to reject bids received for the IIth Street West Sanitary Sewer
Reconstruction Project.
FISCAL EFFECTS: None at this time. The total project construction cost will be funded by the Sewer
Project, Replacement, and Repair Fund (5310-454-430630-948), which has a current balance of
$599,430.40.
ALTERNATIVES: As suggested and approved by the City Council.
ATTACHMENTS: Bid Analysis.
201 1' Avenue E Phone (406)758-7720
PO Box 1997 Public Works Department Fax (406)758-7831
Kalispell, MT 59903 1 1 www.kalispell.com
Bid Analysis
11th Street West Sanitary Sewer Replacement Project
Kalispell, MT 59901
City Proj. No. 19-1203
Base Bid
Engineers Estimate
LHC, Inc
1179 Stillwater Road
Kalispell, MT 59901
No.
Item
Unit
Quantity
Unit Price
Total Price
Unit Price
Total Price
1
MobiIization/Demobi Iization
LS
1
$ 2D,DDD.DD
$ 20,000.00
$ 43,675.00
$ 43,675.0D
2
Construction Traffic Control
LS
1
$ 20,000.0D
$ 20,000.00
$ 7,925.0D
$ 7,925.0D
3
Construction Survey
LS
1
$ 7,500.0D
$ 7,500.00
$ 4,875.0D
$ 4,875.0D
4
Remove Asphalt Pavement
SY
1729
$ 15.0D
$ 25,935.0D
$ 21.47
$ 37,121.63
5
Remove Concrete
SF
320
$ 6.0D
$ 1,920DD
$ 11.19
$ 3,577.60
6
Remove Sanitary Manhole
Each
4
$ 80D.0D
$ 3,200.00
$ 4,661.0D
$ 18,644.0D
7
Remove Sanitary Main Pipe
LF
762
$ 10.0D
$ 7,620DD
$ 19.70
$ 14,249.40
8
Remove Sanitary Service Pipe
LF
60
$ 12.0D
$ 720DD
$ 10.01
$ 60D.60
9
8" SDR 35 PVC
LF
15
$ 150.0D
$ 2,250.00
$ 443.43
$ 6,651.45
10
10" SDR 35 PVC
LF
10
$ 230DD
$ 2,300.00
$ 451.43
$ 4,514.30
11
15" SDR 35 PVC
LF
732
$ 330DD
$ 241,560.00
$ 366.0D
$ 267,912.0D
12
19" SDR 35 PVC
LF
25
$ 650.0D
$ 16,250.00
$ 396.09
$ 9,652.25
13
49" Basic Sanitary Manhole
Each
4
$ 6,500.0D
$ 26,000.00
$ 2,828.00
$ 11,312.0D
14
Additional Depth Sanitary Manhole
VF
21.4
$ 250.0D
$ 5,350.00
$ 686.0D
$ 14,690.40
15
4" SS Service and Connection
Each
2
$ 2,200.0D
$ 4,400.00
$ 4,255.0D
$ 8,510.00
16
Connect to Existing Sewer Manhole
Each
1
$ 1,80D.0D
$ 1,800.00
$ 1,390DD
$ 1,390.00
17
Connect to Existing Sewer Pipe
Each
8
$ 650.0D
$ 5,200.00
$ 501.0D
$ 4,008.00
18
Type 2 Pipe Bedding
LF
50
$ 35.0D
$ 1,750.00
$ 11.39
$ 569.50
19
Flowable Fill
Each
2
$ 1,000.0D
$ 2,000.00
$ 2,583.0D
$ 5,166.00
20
8" Concrete Valley Gutter
SF
320
$ 12.0D
$ 3,840.00
$ 28.0D
$ 8,960.00
21
Concrete Collar
Each
4
$ 50D.0D
$ 2,000.00
$ 882.0D
$ 3,528.0D
22
4" Asphalt Restoration
SY
1729
$ 40.0D
$ 69,160.00
$ 67.63
$ 116,932.27
23
Landscape Restoration
LS
1
$ 30D.0D
$ 300.00
$ 1,20D.0D
$ 1,20D.0D
Sub -Total = $ 471,055.00