Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Sidewalk and Curbing for Year Ending Dec. 31, 2020 Bid Tabulation
Sidewalk and Curbing Construction for the Year Ending Dec. 31, 2020 (#6839188) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 03/04/2020 03:00 PM MST sandon construction co inc Knife River Corporation - Kalispell Section Tit Line Item Item Code Item Descr UofM Quantity Unit Price Extension Unit Price Extension Base Bid $4,501.55 $10,186.20 1 1 Project Mc LS 1 $2,800.00 $2,800.00 $8,500.00 $8,500.00 2.A 2.A 4" Concret SF 1 $10.95 $10.95 $13.00 $13.00 2. B 2. B 4" Concret SF 1 $6.15 $6.15 $9.00 $9.00 2.0 2.0 4" Concret SF 1 $5.95 $5.95 $7.50 $7.50 3 3 6" Concret SF 1 $9.10 $9.10 $14.00 $14.00 4 4 8" Concret SF 1 $18.05 $18.05 $15.00 $15.00 5.A 5.A Concrete C LF 1 $23.60 $23.60 $37.00 $37.00 5. B 5. B Concrete C LF 1 $20.60 $20.60 $28.00 $28.00 6.A 6.A Concrete S LF 1 $21.60 $21.60 $34.00 $34.00 6. B 6. B Concrete S LF 1 $20.60 $20.60 $26.00 $26.00 7 7 Concrete EA 1 $525.00 $525.00 $350.00 $350.00 8 8 Concrete N EA 1 $575.00 $575.00 $600.00 $600.00 9.A 9.A Concrete ISF SF 1 $1.85 $1.85 $1.80 $1.80 9. B 9. B Concrete 1 $2.40 $2.40 $3.00 $3.00 10 10 Concrete C LF 1 $3.60 $3.60 $4.50 $4.50 11 11 4" I rrigatio EA 1 $30.00 $30.00 $80.00 $80.00 12 12 Landscape SF 1 $2.10 $2.10 $3.40 $3.40 13 13 Truncated EA 1 $285.00 $285.00 $300.00 $300.00 14 14 3/4" Crush CY 1 $75.00 $75.00 $90.00 $90.00 15 15 Laborer HR 1 $65.00 $65.00 $70.00 $70.00 Base Bid Total: $4,501.55 $10,186.20