Loading...
2nd Alley WN Sewer Replacement Project BidTab2nd Alley WN Sewer Replacement Project (#4378332) Owner: City of Kalispell Solicitor: City of Kalispell 04/07/2016 02:30 PM MDT Section Title Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Base Bid $683,138.00 $744,817.31 $968,538.00 1 1 Project Mob. And Demob.LS 1 $48,784.00 $48,784.00 $23,675.00 $23,675.00 $100,000.00 $100,000.00 2 2 Construction Traffic Control LS 1 $1,000.00 $1,000.00 $28,650.00 $28,650.00 $13,137.00 $13,137.00 3 3 Construction Survey LS 1 $11,000.00 $11,000.00 $21,225.00 $21,225.00 $3,800.00 $3,800.00 4a 4a 48" Basic Sanitary Manhole EA 7 $2,615.00 $18,305.00 $3,060.00 $21,420.00 $3,700.00 $25,900.00 4b 4b Additional Depth Sanitary Manhole VF 35.5 $385.00 $13,667.50 $470.00 $16,685.00 $200.00 $7,100.00 5 5 8" SDR 35 PVC Ln Ft 10 $195.00 $1,950.00 $185.22 $1,852.20 $318.00 $3,180.00 6 6 10" SDR 35 PVC Ln Ft 1485 $150.00 $222,750.00 $137.35 $203,964.75 $240.00 $356,400.00 7 7 12" SDR 35 PVC Ln Ft 243 $70.00 $17,010.00 $54.96 $13,355.28 $310.00 $75,330.00 8 8 15" SDR 35 PVC Ln Ft 10 $210.00 $2,100.00 $375.66 $3,756.60 $335.00 $3,350.00 9 9 18" Min Sch 40 Steel Casing Ln Ft 85 $725.00 $61,625.00 $827.00 $70,295.00 $670.00 $56,950.00 10 10 4" SS Service Connection Ea 27 $2,400.00 $64,800.00 $1,725.00 $46,575.00 $2,358.00 $63,666.00 11 11 6" SS Service Connection Ea 13 $2,500.00 $32,500.00 $1,710.00 $22,230.00 $2,416.00 $31,408.00 12 12 48" Storm Manhole Ea 2 $3,400.00 $6,800.00 $2,785.00 $5,570.00 $4,737.00 $9,474.00 13 13 Flowable Fill Ea 2 $600.00 $1,200.00 $860.00 $1,720.00 $618.00 $1,236.00 14 14 Manhole Abandonment Ea 1 $3,300.00 $3,300.00 $4,160.00 $4,160.00 $968.00 $968.00 15 15 Sanitary Sewer Bypass Pumping LS 1 $25,500.00 $25,500.00 $69,300.00 $69,300.00 $44,000.00 $44,000.00 16 16 Manhole Removal Ea 6 $1,700.00 $10,200.00 $495.00 $2,970.00 $1,650.00 $9,900.00 17 17 Type 2 Pipe Bedding Ln Ft 300 $4.00 $1,200.00 $11.76 $3,528.00 $25.00 $7,500.00 18 18 Pavement Removal Sq Yd 2251 $11.50 $25,886.50 $18.74 $42,183.74 $18.00 $40,518.00 19 19 Concrete Curb Removal Ln Ft 190 $3.50 $665.00 $20.31 $3,858.90 $12.00 $2,280.00 20 20 Concrete Flatwork Removal Sq Ft 1472 $1.25 $1,840.00 $5.16 $7,595.52 $6.00 $8,832.00 21 21 Asphalt Roadway Restoration Sq Yd 2251 $40.00 $90,040.00 $45.57 $102,578.07 $33.00 $74,283.00 22 22 Curb and Gutter Ln Ft 25 $23.00 $575.00 $48.24 $1,206.00 $152.00 $3,800.00 Sandry Construction LHC, Inc Downing Underground Inc. 23 23 Straight Curb Ln Ft 165 $20.00 $3,300.00 $36.17 $5,968.05 $58.00 $9,570.00 24 24 6" Concrete Flatwork Sq Ft 1472 $7.50 $11,040.00 $9.10 $13,395.20 $10.50 $15,456.00 26 25 Landscape, Topsoil, and Reseed LS 1 $6,100.00 $6,100.00 $7,100.00 $7,100.00 $500.00 $500.00 Base Bid Total:$683,138.00 $744,817.31 $968,538.00