Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2nd Alley WN Sewer Replacement Project BidTab
2nd Alley WN Sewer Replacement Project (#4378332) Owner: City of Kalispell Solicitor: City of Kalispell 04/07/2016 02:30 PM MDT Section Title Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Base Bid $683,138.00 $744,817.31 $968,538.00 1 1 Project Mob. And Demob.LS 1 $48,784.00 $48,784.00 $23,675.00 $23,675.00 $100,000.00 $100,000.00 2 2 Construction Traffic Control LS 1 $1,000.00 $1,000.00 $28,650.00 $28,650.00 $13,137.00 $13,137.00 3 3 Construction Survey LS 1 $11,000.00 $11,000.00 $21,225.00 $21,225.00 $3,800.00 $3,800.00 4a 4a 48" Basic Sanitary Manhole EA 7 $2,615.00 $18,305.00 $3,060.00 $21,420.00 $3,700.00 $25,900.00 4b 4b Additional Depth Sanitary Manhole VF 35.5 $385.00 $13,667.50 $470.00 $16,685.00 $200.00 $7,100.00 5 5 8" SDR 35 PVC Ln Ft 10 $195.00 $1,950.00 $185.22 $1,852.20 $318.00 $3,180.00 6 6 10" SDR 35 PVC Ln Ft 1485 $150.00 $222,750.00 $137.35 $203,964.75 $240.00 $356,400.00 7 7 12" SDR 35 PVC Ln Ft 243 $70.00 $17,010.00 $54.96 $13,355.28 $310.00 $75,330.00 8 8 15" SDR 35 PVC Ln Ft 10 $210.00 $2,100.00 $375.66 $3,756.60 $335.00 $3,350.00 9 9 18" Min Sch 40 Steel Casing Ln Ft 85 $725.00 $61,625.00 $827.00 $70,295.00 $670.00 $56,950.00 10 10 4" SS Service Connection Ea 27 $2,400.00 $64,800.00 $1,725.00 $46,575.00 $2,358.00 $63,666.00 11 11 6" SS Service Connection Ea 13 $2,500.00 $32,500.00 $1,710.00 $22,230.00 $2,416.00 $31,408.00 12 12 48" Storm Manhole Ea 2 $3,400.00 $6,800.00 $2,785.00 $5,570.00 $4,737.00 $9,474.00 13 13 Flowable Fill Ea 2 $600.00 $1,200.00 $860.00 $1,720.00 $618.00 $1,236.00 14 14 Manhole Abandonment Ea 1 $3,300.00 $3,300.00 $4,160.00 $4,160.00 $968.00 $968.00 15 15 Sanitary Sewer Bypass Pumping LS 1 $25,500.00 $25,500.00 $69,300.00 $69,300.00 $44,000.00 $44,000.00 16 16 Manhole Removal Ea 6 $1,700.00 $10,200.00 $495.00 $2,970.00 $1,650.00 $9,900.00 17 17 Type 2 Pipe Bedding Ln Ft 300 $4.00 $1,200.00 $11.76 $3,528.00 $25.00 $7,500.00 18 18 Pavement Removal Sq Yd 2251 $11.50 $25,886.50 $18.74 $42,183.74 $18.00 $40,518.00 19 19 Concrete Curb Removal Ln Ft 190 $3.50 $665.00 $20.31 $3,858.90 $12.00 $2,280.00 20 20 Concrete Flatwork Removal Sq Ft 1472 $1.25 $1,840.00 $5.16 $7,595.52 $6.00 $8,832.00 21 21 Asphalt Roadway Restoration Sq Yd 2251 $40.00 $90,040.00 $45.57 $102,578.07 $33.00 $74,283.00 22 22 Curb and Gutter Ln Ft 25 $23.00 $575.00 $48.24 $1,206.00 $152.00 $3,800.00 Sandry Construction LHC, Inc Downing Underground Inc. 23 23 Straight Curb Ln Ft 165 $20.00 $3,300.00 $36.17 $5,968.05 $58.00 $9,570.00 24 24 6" Concrete Flatwork Sq Ft 1472 $7.50 $11,040.00 $9.10 $13,395.20 $10.50 $15,456.00 26 25 Landscape, Topsoil, and Reseed LS 1 $6,100.00 $6,100.00 $7,100.00 $7,100.00 $500.00 $500.00 Base Bid Total:$683,138.00 $744,817.31 $968,538.00