I7. Resolution 5970, KNTC PH 3, 4 Prelim PlatDevelopment Services Department
201 1st Avenue East
Kalispell, MT 59901
Phone: (406) 758-7940
Fax: (406) 758-7739
www.kalispell.com/plannine
REPORT TO: Doug Russell, City Manager
FROM: PJ Sorensen, Senior Planner
SUBJECT: KPP-19-04 — Kalispell North Town Center Phases 3 & 4
MEETING DATE: April 6, 2020
BACKGROUND: This matter is a request from Eagle Valley Ranch Apartments, LLC and
Stillwater Corporation for major subdivision approval of Kalispell North Town Center, Phase 3 and
4. The subdivision is located within Kalispell North Town Center and is generally located east of
Kalispell Ford, east of the Kalispell Armory, west of Jefferson Boulevard and north of Lincoln Street.
Kalispell North Town Center is 485.5 acres and includes four zoning designations of R-3 (single-
family residential), R-4 (two-family residential), B-1 (neighborhood business), and B-2 (general
business). The subdivision request encompasses a portion of the commercial component of the PUD.
Phase 3 and 4 contains 39.3-acres and includes 26 commercial lots (23 in Phase 3 and 3 in Phase 4),
common area, and new city street. The lots range in size from .57 acres to 3.23 acres. The new city
street will be constructed to city standards.
The property can be legally described as Lot lA of the amended plat of Block 3 of Kalispell North
Town Center — Phase 2 and Lots 8 & 9, Block I and Lot 1, Block 2 of Kalispell North Town Center —
Phase 2 located in portions of the S1/2 of Section 19 and the N1/2 of Section 30, Township 29 North,
Range 21 West, P.M.M., Flathead County, Montana.
The Kalispell Planning Board held a duly noticed public hearings on March 10, 2020, to consider the
preliminary plat request. Staff presented staff report KPP-19-04 providing details of the proposal and
evaluation. Staff recommended that the Planning Board adopt the staff report as findings of fact and
recommend to the Council that the request be granted.
At the public hearing, a representative for the applicant spoke. There were no other public comments
received. The public hearing was closed, and a motion was presented to adopt staff report KPP-19-
04 as findings of fact and recommend to the Kalispell City Council that the preliminary plat for the
property be approved. Two proposed conditions were amended. Condition 19, which stated that "The
trail crossings at Lincoln Street, Cascade Loop, and Jefferson Boulevard are permitted only at
designated intersections" was amended to include "as agreed upon by Public Works." Condition 20,
which stated that "Lots 8, 9, and 10 shall only gain access off of Cascade Loop" was amended to
include "as approved by Public Works." Board discussion concluded that the request was
appropriate, and the motion passed unanimously on roll call vote.
RECOMMENDATION: It is recommended that the Kalispell City Council approve Resolution
5970, a resolution approving a request from Eagle Valley Ranch Apartments, LLC and Stillwater
Corporation for a major subdivision (Preliminary Plat KPP-19-04) with 20 conditions of approval,
located in Lot IA of the amended plat of Block 3 of Kalispell North Town Center — Phase 2 and Lots
8 & 9, Block 1 and Lot 1, Block 2 of Kalispell North Town Center — Phase 2 located in portions of
the S1/2 of Section 19 and the N1/2 of Section 30, Township 29 North, Range 21 West, P.M.M.,
Flathead County, Montana.
FISCAL EFFECTS: There are no anticipated fiscal impacts at this time.
ALTERNATIVES: Deny the request.
ATTACHMENTS: Resolution 5970
March 10, 2020, Kalispell Planning Board Minutes
Staff Report
Application Materials & Maps
c: Aimee Brunckhorst, Kalispell City Clerk
RESOLUTION NO. 5970
A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF
KALISPELL NORTH TOWN CENTER, PHASES 3 AND 4, DESCRIBED AS LOT IA OF THE
AMENDED PLAT OF BLOCK 3 OF KALISPELL NORTH TOWN CENTER - PHASE 2 AND
LOTS 8 AND 9, BLOCK 1 AND LOT 1, BLOCK 2 OF KALISPELL NORTH TOWN CENTER —
PHASE 2 LOCATED IN PORTIONS OF THE SOUTH HALF OF SECTION 19 AND THE
NORTH HALF OF SECTION 30, TOWNSHIP 29 NORTH, RANGE 21 WEST, P.M.M.,
FLATHEAD COUNTY, MONTANA.
WHEREAS, Eagle Valley Ranch Apartments, LLC and Stillwater Corporation, the owners of the
certain real property described above, has petitioned for approval of the Subdivision Plat
of said property; and
WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on
March 10, 2020 on the proposal and reviewed Subdivision Report #KPP-19-04 issued by
the Kalispell Planning Department; and
WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval
of the Preliminary Plat of Kalispell North Town Center, Phases 3 and 4, subject to
certain conditions and recommendations; and
WHEREAS, the city council of the City of Kalispell at its regular council meeting of April 6, 2020,
reviewed the Kalispell Planning Department Report #KPP-19-04, reviewed the
recommendations of the Kalispell City Planning Board and Zoning Commission, and
found from the Preliminary Plat, and evidence, that the subdivision is in the public
interest.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL,
MONTANA AS FOLLOWS:
SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report
#KPP-19-04 are hereby adopted as the Findings of Fact of the city council.
SECTION 2. That the application of Eagle Valley Ranch Apartments, LLC and Stillwater
Corporation for approval of the Preliminary Plat of Kalispell Town Center,
Phases 3 and 4, Kalispell, Flathead County, Montana is hereby approved subject
to the following conditions:
1. The development of the site shall be in substantial compliance with the application submitted, the
site plan, materials and other specifications as well as any additional conditions associated with
the preliminary plat as approved by the city council.
2. All applicable conditions within Ordinance 1630 (Kalispell North Town Center PUD) shall
apply.
3. The preliminary plat approval shall be valid for a period of three years from the date of approval.
4. The developer shall submit to the Kalispell Public Works Department for review and approval a
storm water report and an engineered drainage plan that meets the requirements of the current
city standards for design and construction. Prior to final plat, a certification shall be submitted to
the public works department stating that the drainage plan for the subdivision has been installed
as designed and approved, or a proper bond is in place for said improvements.
5. The developer shall submit to the Kalispell Public Works Department prior to construction an
erosion/sediment control plan for review and approval and a copy of all documents submitted to
Montana Department of Environmental Quality for the General Permit for Storm Water
Discharge Associated with Construction Activities.
6. The developer shall submit water and sanitary sewer plans, applicable specifications, and design
reports to the Kalispell Public Works Department and the Montana Department of
Environmental Quality for concurrent review, with approval of both required prior to
construction of any new mains located within the new unnamed street located between Cascade
Loop and Lincoln Street as well as any extensions necessary to serve Lots 11, 14, 15, and 16.
7. The developer shall submit the street designs to the Kalispell Public Works Department for
review and approval prior to construction of the new unnamed street located between Cascade
Loop and Lincoln Street.
8. A letter from the Kalispell Public Works Department shall be submitted stating that all new
infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for
unfinished work.
9. All existing and proposed easements shall be indicated on the face of the final plat. Utility
easements for city water and sewer shall be provided to allow for the logical extension of utilities
from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department
shall be obtained stating that the required easements are being shown on the final plat.
10. The following statement shall appear on the final plat: "The undersigned hereby grants unto each
and every person, firm or corporation, whether public or private, providing or offering to provide
telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the
right to the j oint use of an easement for the construction, maintenance, repair, and removal of their
lines and other facilities, in, over, under, and across each area designated on this plat as "Utility
Easement" to have and to hold forever."
Developer's Signature
11. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the
Service has reviewed and approved of the design and location of the mail delivery site. The mail
delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site
and improvements shall also be included in the preliminary and final engineering plans to be
reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or
proposed boulevard area.
12. A homeowner's association (HOA) shall be formed and established for the common areas prior
to final plat. The HOA should include provisions for the maintenance of all common areas
including the storm water ponds and open space areas.
13. A note shall be placed on the final plat stating that owners waive their right to protest a Special
Improvement District for maintenance of common areas. A district shall only be activated in the
event that the homeowner's association defaults on their common area maintenance obligations.
The taxes levied within the special improvement district shall be determined by the appropriate
city department with approvals by the Kalispell City Council.
14. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a
landscape plan for the placement of trees and landscaping materials within the landscape
boulevards of the streets serving the subdivision. The approved landscape plan shall be
implemented or a cash in lieu payment for installation of the street trees and groundcover be
provided to the Kalispell Parks and Recreation Department.
15. All utilities shall be installed underground.
16. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately
after development.
17. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants
and fire flows within the subdivision shall be submitted prior to final plat.
18. The trail crossing at Rose Crossing shall include the installation of a pedestrian -actuated
rectangular rapid flashing beacon.
19. The trail crossings at Lincoln Street, Cascade Loop and Jefferson Boulevard are permitted only
at designated intersections as agreed upon by Public Works.
20. Lots 8, 9, and 10 shall only gain access off of Cascade Loop as approved by Public Works.
SECTION 3. Upon proper review and filing of the Final Plat of said subdivision in the office
of the Flathead County Clerk and Recorder, said premises shall be a subdivision
of the City of Kalispell.
PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE
CITY OF KALISPELL THIS 6TH DAY OF APRIL, 2020.
Mark Johnson
Mayor
ATTEST:
Aimee Brunckhorst, CMC
City Clerk
KALISPELL CITY PLANNING BOARD & ZONING COMMISSION
MINUTES OF REGULAR MEETING
March 10, 2020
CALL TO ORDER AND ROLL CALL
The regular meeting of the Kalispell City Planning Board and Zoning
Commission was called to order at 6:00 p.m. Board members present
were Chad Graham, Kurt Vomfell, Rory Young, Doug Kauffman,
Ronalee Skees, George Giavasis and Joshua Borgardt was absent. Jarod
Nygren represented the Kalispell Planning Department.
APPROVAL OF MINUTES
Vomfell moved and Kauffman seconded a motion to approve the
minutes of the February 11, 2020 meeting of the Kalispell City Planning
Board and Zoning Commission.
VOTE BY ACCLAMATION
The motion passed unanimously on a vote of acclamation.
HEAR THE PUBLIC
None.
KCU-20-01— OWL CORPORATION —
File #KCU-20-01 - A request from Owl Corporation for a conditional
CONDITIONAL USE PERMIT
use permit to allow a multi -family development as a second phase of an
existing multi -family development. The project would contain ten
buildings with a total of 120 dwelling units. The property is located on
the west end of Sawyer Lane/Owl View Subdivision near West View
Estates and is located in an RA-2 (Residential Apartment/Office) zone.
STAFF REPORT
Jarod Nygren representing the Kalispell Planning Department reviewed
Staff Report # KCU-20-01.
Nygren presented the project location, surrounding land uses, existing
zoning, City services and Growth Policy. Nygren recommended to the
board that they strike condition # 12. Nygren went on to explain the
condition was based off the preliminary plat of Westview, completed
back in 2003. Since that time Old Reserve was improved, so the
additional 10-foot right-of-way is not needed now.
Staff recommends that the Kalispell City Planning Board and Zoning
Commission adopt Staff Report #KCU-20-01 as findings of fact and
recommend to the Kalispell City Council that the conditional use permit
be approved subject to the conditions (removing 12) listed in the staff
report.
BOARD DISCUSSION
Graham asked if the impact fees go towards the placement of sewer and
water utilities in this development. Nygren advised that any water and
sewer extensions that are provided to this development will be paid for
by the developer, roads included.
PUBLIC HEARING
Dan Stetler — 228 Rosewood, speaking on behalf of his sister Cheryl
Main who lives at 128 All Loop 996 — she is concerned with a 3-story
building height, increased traffic & congestion as well as pedestrian
traffic increase on walking trail by her house.
MOTION
Vomfell moved and Giavasis seconded a motion that the Kalispell City
Planning Board and Zoning Commission adopt Staff Report #KCU-20-01
Kalispell City Planning Board
Minutes of the meeting of March 10, 2020
Pagel
as findings of fact and recommend to the Kalispell City Council that the
conditional use permit be approved subject to the conditions in the staff
report.
BOARD DISCUSSION
Vomfell asked for clarification of recommendation to strike condition #
12. Nygren advised because the Right of Way had already been acquired
with the earlier improvements of Old Reserve. Nygren also clarified the
project boundary in relation to the public comment received.
MOTION — STRIKE CONDITION #12
Skees moved and Vomfell seconded a motion that the Kalispell City
Planning Board and Zoning Commission amend Staff Report #KCU-20-
01 by striking condition 412 from the conditions of approval listed in the
staff report.
BOARD DISCUSSION — AMENDED
None.
MOTION
ROLL CALL — AMENDED MOTION
Motion passed unanimously on a roll call vote.
BOARD DISCUSSION — ORIGINAL
Motion passed unanimously on a roll call vote.
MOTION
ROLL CALL — ORIGINAL MOTION
Motion passed unanimously on a roll call vote.
BOARD MEMBER SEATED
Doug Kauffman recused himself from KCU-20-02 because he is a
representative for the applicant.
KCU-20-02 — THE MERIDIAN
File #KCU-20-02 — A request from The Meridian Apartments, LLC for a
APTS — CONDITIONAL USE
conditional use permit to allow a multi -family development with four
PERMIT
building and a clubhouse, with a total of 144 dwelling units. The
property is located at 41 Meridian Court in a B-1 (Neighborhood
Business) zone.
STAFF REPORT
Jarod Nygren representing the Kalispell Planning Department reviewed
Staff Report # KCU-20-02.
Nygren noted the new site plan submitted after the original submittal.
Nygren presented the project location, surrounding land uses, existing
zoning, City services and Growth Policy. Staff recommends that the
Kalispell City Planning Board and Zoning Commission adopt Staff Report
#KCU-20-02 as findings of fact and recommend to the Kalispell City
Council that the conditional use permit be approved subject to the
conditions listed in the staff report.
BOARD DISCUSSION
Graham asked for clarification on new vs. old site plan. Nygren advised
that the new site plan gives the current homeowners to the south more
space than the previous site plan.
PUBLIC HEARING
Doug Peppmeier — TD&H Engineering — representative for applicant —
offered to answer any questions and noted that the driving force behind
the new site plan design was from the public comments and concerns
they have received.
Kalispell City Planning Board
Minutes of the meeting of March 10, 2020
Page 12
MOTION
Vomfell moved and Skees seconded a motion that the Kalispell City
Planning Board and Zoning Commission adopt Staff Report #KCU-20-02
as findings of fact and recommend to the Kalispell City Council that the
conditional use permit be approved subject to the conditions listed in the
staff report.
BOARD DISCUSSION
None.
ROLL CALL
Motion passed unanimously on a roll call vote.
BOARD MEMBER RE -SEATED
Kauffman re -seated
BOARD MEMBER SEATED
Young recused himself from KPP-19-04 because he is a representative
for the applicant
KPP-19-04 — KNTC PHASE 3&4 —
File #KPP-19-04— A request from Eagle Valley Ranch Apartments, LLC
PRELIMINARY PLAT
and Stillwater Corporation for major subdivision approval of Kalispell
North Town Center, Phases 3 and 4. The subdivision is located within
Kalispell North Town Center and is generally located east of Kalispell
Ford, east of the Kalispell Armory, west of Jefferson Boulevard and
north of Lincoln Street.
STAFF REPORT
Jarod Nygren representing the Kalispell Planning Department reviewed
Staff Report # KPP-19-04.
Nygren presented the project location, surrounding land uses, existing
zoning, City services and Growth Policy. Staff recommends that the
Kalispell City Planning Board and Zoning Commission adopt staff
report #KPP-19-04 as findings of fact and recommend to the Kalispell
City Council that the preliminary plat Kalispell North Town Center —
Phases 3 and 4 be approved, subject to the conditions listed in the staff
report.
BOARD DISCUSSION
None.
PUBLIC HEARING
Rory Young- Jackola Engineering — representative for applicant — noted
that he has spoken with staff regarding some concerns with condition
919 & #20 in the staff report and asked the board to consider changing
some verbiage in them.
MOTION - ORIGINAL
Kauffman moved and Giavasis seconded a motion that the Kalispell City
Planning Board and Zoning Commission adopt staff report #KPP-19-04
as findings of fact and recommend to the Kalispell City Council that the
preliminary plat Kalispell North Town Center — Phases 3 and 4 be
approved, subject to the conditions listed in the staff report.
BOARD DISCUSSION
Discussed some minor language changes in conditions 919 & 920.
MOTION — AMEND CONDITION #19
Skees moved and Vomfell seconded a motion that the Kalispell City
Planning Board and Zoning Commission amend Staff Report #KPP-19-
04 by amending condition #19 to state the trail crossings at Lincoln Street,
Cascade Loop and Jefferson Boulevard are permitted as agreed upon by
Public Works.
Kalispell City Planning Board
Minutes of the meeting of March 10, 2020
Page13
BOARD DISCUSSION
None.
ROLL CALL
Motion passed unanimously on a roll call vote.
MOTION — AMEND CONDITION #20
Skees moved and Kauffman seconded a motion that the Kalispell City
Planning Board and Zoning Commission, amend Staff Report #KPP-19-
04 by amending condition #20 to state Lots 8, 9, and 10 shall only gain
access as approved by Public Works.
BOARD DISCUSSION
None.
ROLL CALL
Motion passed unanimously on a roll call vote.
BOARD DISCUSSION — MAIN
MOTION
None.
ROLL CALL — MAIN MOTION
Motion passed unanimously on a roll call vote.
BOARD MEMBER RE -SEATED
Young re -seated.
OLD BUSINESS
None.
NEW BUSINESS
The new Planner II position has been filled; new hire will start April 6'.
May be looking to do a work session in April on the pedestrian plan.
ADJOURNMENT
The meeting adjourned at approximately 7:02pm.
NEXT MEETING
The next meeting of the Kalispell Planning Board will be on Tuesday,
April 14, 2020 at 6:00 p.m. and is in the Kalispell City Council
Chambers, 201 1st Ave East.
Chad Graham
President
APPROVED as submitted/amended:
Kari Hernandez
Recording Secretary
Kalispell City Planning Board
Minutes of the meeting of March 10, 2020
Page 14
KALISPELL NORTH TOWN CENTER - PHASE 3 & 4
REQUEST FOR MAJOR SUBDIVISION APPROVAL
STAFF REPORT #KPP-19-04
KALISPELL PLANNING DEPARTMENT
March 4, 2020
A report to the Kalispell City Planning Board and the Kalispell City Council regarding a
preliminary plat application to create 26 lots within Kalispell North Town Center. A public
hearing has been scheduled before the planning board for March 10, 2020, beginning at
6:00 PM in the Kalispell City Council Chambers. The planning board will forward a
recommendation to the Kalispell City Council for final action.
BACKGROUND INFORMATION:
A request from Eagle Valley Ranch Apartments, LLC and Stillwater Corporation for major
subdivision approval of Kalispell North Town Center, Phase 3 and 4. The subdivision is
located within Kalispell North Town Center and is generally located east of Kalispell Ford,
east of the Kalispell Armory, west of Jefferson Boulevard and north of Lincoln Street.
Kalispell North Town Center is 485.5 acres and includes four zoning designations of R-3
(single-family residential), R-4 (two-family residential), B-1 (neighborhood business), and
B-2 (general business). The subdivision request encompasses a portion of the commercial
component of the PUD. Phase 3 and 4 contains 39.3-acres and includes 26 commercial
lots (23 in Phase 3 and 3 in Phase 4), common area, and new city street. The lots range
in size from .57 acres to 3.23 acres. The new city street will be constructed to city
standards. The application will be reviewed in accordance with Section 28.2.06 of the
Kalispell Subdivision Regulations.
A. Petitioner and Owners: Stillwater Corporation
P.O. Box 7338
Kalispell, MT 59904
Eagle Valley Ranch Apartments
341 W. Second Street #1
San Bernardino, CA 92401
Technical Assistance: Jackola Engineering
2250 HWY 93 South
Kalispell, MT 59901
B. Location and Legal Description of Property: The property can be legally
described as Lot lA of the amended plat of Block 3 of Kalispell North Town Center
- Phase 2 and Lots 8 & 9, Block 1 and Lot 1, Block 2 of Kalispell North Town
Center - Phase 2 located in portions of the S 1 /2 of Section 19 and the N 1 /2 of
Section 30, Section 19, Township 29 North, Range 21 West, P.M.M., Flathead
County, Montana.
1
C. Size:
Total area: 39.3 acres
Lots: 36.25 acres
Roads/Streets: 1.16 acres
Open Space: 1.9 acres
D. Existing Land Use and Zoning: The subject property is undeveloped grass lands
with city infrastructure in place including, streets, water and sewer. The area to be
subdivided has a PUD overlay that contains the zoning designations B-2/PUD.
E. Adjacent Land Uses:
North: Vacant land, MDT Facility and National Guard Armory
East: Vacant Land
South: Vacant land
West: Ford dealer, U.S. 93 and vacant land
2
F. Adjacent Zoning:
North: City P-1 and RA-2/PUD
East: City B-2/PUD and R-3/PUD
South: City B-2/PUD
West: City B-2/PUD
G. General Land Use Character: The area can be largely described as rural but in
transition. The subject property was annexed into the city prior to the recession
with the plan of developing the property into a mixed development consisting of
commercial development, multi -family, townhouses, open space and single-family
residential. The development will be of urban scale and be an extension of the
already developed city.
F. Utilities and Public Services:
Sewer: City of Kalispell
Water: City of Kalispell
Refuse: Private
Electricity: Flathead Electric Cooperative
Gas: NorthWestern Energy
Telephone: Centurylink
Schools: School District No. 5, Edgerton Elementary
Fire: City of Kalispell
Police: City of Kalispell
REVIEW AND FINDINGS OF FACT FOR THE PRELIMINARY PLAT KALISPELL NORTH
TOWN CENTER - PHASE 3 AND 4 SUBDIVISION
A. Effects on Health and Safety:
Fire: The property would be considered to be at low risk of fire because any
building constructed within the subdivision would be built in accordance with the
International Fire Code and have access which meets city standards. The property
does not have steep slopes or woody fuels. Hydrants will be required to be placed
in compliance with the requirements of the Uniform Fire Code and approved by
the Fire Chief. Fire station 62 is located approximately 1.6 miles away providing
good response time.
Flooding: Flood Insurance Rate Map, panel number 30029C 1415J shows the
entire subdivision to be outside of the 100-year floodplain.
Access: Access to the subdivision will be provided by U.S. 93 North, a four lane
highway. Two access roads (Rose Crossing and Lincoln Street) provide access into
the subdivision off of U.S. 93 North. Rose Crossing has been constructed through
the property to the east connecting with Whitefish Stage Road. Rose Crossing will
include a fully lighted intersection when warrants are met. Lincoln Street has been
constructed and its intersection with U.S. 93 North has a 3/4 movement. Cascade
Loop and Jefferson Boulevard have been constructed providing direct access to the
lots within the phase. Phase 4 includes the construction of a new north/south
unnamed street located between Cascade Loop and Lincoln Street providing
3
additional connectivity. In order to maintain the functionality of Rose Crossing as
an arterial roadway, which should have access control, staff is recommending that
Lots 8-10 only gain their access off of Cascade Loop. Cascade Loop connects to
Jefferson Boulevard and provides for access onto Rose Crossing via a controlled
street intersection.
The preliminary plat includes common area that will include a trail system,
providing additional connectivity/access. Staff recommends that the trail system
only cross the public right-of-ways of Cascade Loop, Jefferson Boulevard and
Lincoln Street at designated intersections for pedestrian safety. Where the trail
heading north/south crosses Rose Crossing staff recommends that the crossing
include a pedestrian -actuated rectangular rapid flashing beacon to alert drivers of
pedestrian crossing along the major roadway.
B. Effects on Wildlife and Wildlife Habitat: Map 7.8 located within Appendix A of
the Growth Policy does not show this area as active wildlife habitat. Additionally,
this phase of the development is not located adjacent the Stillwater River Riparian
Corridor. Therefore, one can reasonably assume there will not be an effect on the
wildlife and wildlife habitat.
C. Effects on the Natural Environment:
Topography, Geology and Soils: There are no areas of shallow bedrock within the
proposed development. There are no areas with rock falls, slides or slumps, or
rock outcroppings. Best Management Practices, such as appropriate grading and
vegetation establishment will preclude erosion problems and standard good
operating procedures during construction will inhibit any nuisance dust problems.
Based off of a previous field study completed by CMG Engineering the site is
suitable for commercial development. The study did have concern with the
presence of loose sand and silts encountered at anticipated foundation bearing
elevations of Lots 28-33. Depending on the foundation loads, some sort of soil
treatment, such as over excavation and replacement with structural fill is
anticipated. The proposed project site is within Seismic Hazard Zone 3. All
buildings will be designed to the appropriate seismic engineering standard for the
area and reviewed by the building department.
Surface and Groundwater: The only natural surface water with this project is the
Stillwater River which is located approximately .5 miles from the proposed
subdivision to the south. There is a shallow perched aquifer table located on the
northeast section of the entire Kalispell North Town Center property. The
minimum depth to the water table was observed and was approximately 6'. The
limits of the perched aquifer do not protrude into the proposed subdivision where
development would be expected.
Drainage: The applicant has developed a subdivision level storm drainage system
with a detention pond located south of the subdivision. Curbs and gutter are
installed along the streets throughout the subdivision and the storm water will be
conveyed to the detention pond. A final storm water design will be reviewed and
approved by Kalispell Public Works prior to construction and final plat submittal.
A condition of approval requires that a homeowner's association be created for the
maintenance of the common area which would include the common area drainage
C!
easements. As part of the storm easement areas the association will be required to
mow the area to reduce fire hazard and reduce spread of noxious weeds. Lastly,
the developer is required to submit for review to the Kalispell Public Works
Department an erosion/sediment control plan for review and approval. These
plans provide for managing storm water on the site and include stabilizing the
construction site through an approved revegetation plan after site grading is
completed.
Noise: U.S. 93 North is approximately 10 feet below the proposed elevation of the
subdivision. The Federal Highway Administration recognizes depressing the
highway below grade as a common noise mitigation measure. In addition, there is
an approximately 100' open space buffer located between the highway and the
nearest parcel already platted with Phase 2. Lastly, the nearest proposed land use
is commercial which is not considered as noise sensitive as residential
development and therefore is considered as additional noise mitigation for the
overall development.
D. Effects on Local Services:
Water: Phases 3 and 4 will be provided water service via an existing 14" water
main located within the right-of-way boundary of U.S. Hwy 93 North and water
mains located within Lincoln Street, Jefferson Boulevard and Cascade Loop. The
water system has been designed in accordance with the City of Kalispell Standards
for Design and Construction and Montana Department of Environmental Quality
Design Standards for Water Works. There is adequate capacity within the city's
water system to accommodate this development. There is a latecomers fee
associated with this 14" main.
Sewer: Phases 3 and 4 will convey sewer via gravity flow into an existing 18"
sanitary sewer main located within the right-of-way boundary of U.S. Hwy 93
North and existing as well as proposed sewer mains located within Lincoln Street,
Jefferson Boulevard, Cascade Loop, and a new proposed road running north to
south between Cascade and Lincoln. The sanitary sewer system has been designed
in accordance with City of Kalispell Standards for Design and Construction and
Montana Department of Environmental Quality Design Standards for Public
Sewage Systems, and any new extensions will need to meet the same design
requirements. There is adequate capacity within the city's sewer system to
accommodate this development. There is a latecomers fee associated with this 18"
sewer main. Due to reconfigurations of lots/lot sizes as phasing has progressed,
Lots 11, 14, 15, and 16 have no existing sewer main available to them. The
developer will need to extend existing mains to serve these lots. Any road surfaces
disturbed will require an overlay or chip seal to restore the surface to acceptable
standards.
Roads: As discussed under the "Access" section of this document, U.S. 93 North
will provide access to the subdivision in coordination with an internal road
system. All of the roads are designed and constructed in accordance with the City
of Kalispell Standards for Design and Construction. All private internal road
systems providing access to the lots will require Site Review Committee approval
for pedestrian and vehicular access prior to building permit issuance of any
structures on the lots.
5
Schools: This development is within the boundaries of Kalispell School District No.
5., Edgerton Elementary. The commercial lots will not have an impact on the
school district. Lots 29-33 will likely develop with as many as 300 multi -family
units. The multi -family lots have the potential to have a minor impact on the
district, as 150 students can be expected by the development on average.
Section 76-3-608(1) of the Montana Code Annotated states that the governing
body may not deny approval of a proposed subdivision based solely on the
subdivision's impacts on educational services.
Parks and Open Space: 3.6-acres of open space is proposed (primarily within
Phase 4) in addition to the open space that was already platted with Phase 1 and
Phase 2 of the subdivision. No parkland or open space is required for those lots.
The 3.6-acres includes common area that will be used for trail connectors and a
pond within the development. Phase 1 and Phase 2 included the 100' wide open
space buffer area located along U.S. Hwy 93 and an open space buffer area located
between the multi -family residential lot and the National Guard Armory (Lots 29-33).
The open space areas will have a path located within them for recreation and
pedestrian connectivity. Overall the PUD requires that a minimum of 72.3 acres of
open space and parkland shall be provided within the development.
Police: This subdivision is in the jurisdiction of the City of Kalispell Police
Department. The department can adequately provide service to this subdivision.
Fire Protection: Fire protection services will be provided by the Kalispell Fire
Department. The department can adequately provide service to this subdivision.
Additionally, the road network to the subdivision will provide adequate access for
fire protection. Fire station 62 is located approximately 1.6 miles away providing
good response time.
Solid Waste: Solid waste will be private disposal. There is sufficient capacity
within the landfill to accommodate this additional solid waste generated from this
subdivision.
Medical Services: Ambulance service is available from the fire department and
ALERT helicopter service. Kalispell Regional Medical Center is approximately 2.7
miles from the site.
E. Effects on Agriculture and agricultural water user facilities: The proposed
subdivision site was previously used for agricultural purposes. The location and
proximity to urban services and surrounding urban development make this
property suited for commercial development as recommended in the Kalispell
Growth Policy Future Land Use map. By allowing higher density development
within the City's growth policy area, it could reasonably be expected that more
farmland could be conserved because the availability of residential and
commercial lots within the Kalispell Growth Policy boundary, limiting sprawl
development further out into the county.
E. Relation to the Kalispell Growth Policy: The Kalispell Growth Policy Future
Land Use Map designates this area as Urban Mixed Use, which anticipates a mix
of commercial, single-family and multi -family residential development. The
subdivision is proposing commercial 26 commercial lots; therefore the proposed
uses are in compliance with the Kalispell Growth Policy.
F. Compliance with Zoning: In 2008 the city council approved the Glacier Town
Center PUD which provided a master plan for a 485.5 acre site. The subject
subdivision is a 39.3-acre portion of the master plan. The area to be subdivided
contains the zoning designations B-2/PUD, for which the proposed subdivision
complies. In addition, as the properties develop additional standards will be
applied in regards to open space, landscaping, architecture, signage, etc. as
outlined in Ordinance No. 1630. The Site Review Committee will evaluate
compliance with those standards at time of overall site layout for the subdivision
and building permit issuance.
H. Compliance with the Kalispell Subdivision Regulations: This subdivision
complies with the Kalispell Subdivision Regulations and no variances have been
requested.
RECOMMENDATION
Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt
staff report KPP-19-04 as findings of fact and recommend to the Kalispell City Council
that the preliminary plat Kalispell North Town Center - Phases 3 and 4 be approved,
subject to the conditions listed below:
CONDITIONS OF APPROVAL
Conditions:
1. The development of the site shall be in substantial compliance with the application
submitted, the site plan, materials and other specifications as well as any
additional conditions associated with the preliminary plat as approved by the city
council.
2. All applicable conditions within Ordinance 1630 (Kalispell North Town Center
PUD) shall apply.
3. The preliminary plat approval shall be valid for a period of three years from the
date of approval.
4. The developer shall submit to the Kalispell Public Works Department for review
and approval a storm water report and an engineered drainage plan that meets the
requirements of the current city standards for design and construction. Prior to
final plat, a certification shall be submitted to the public works department stating
that the drainage plan for the subdivision has been installed as designed and
approved, or a proper bond is in place for said improvements.
rA
5. The developer shall submit to the Kalispell Public Works Department prior to
construction an erosion/sediment control plan for review and approval and a copy
of all documents submitted to Montana Department of Environmental Quality for
the General Permit for Storm Water Discharge Associated with Construction
Activities.
6. The developer shall submit water and sanitary sewer plans, applicable
specifications, and design reports to the Kalispell Public Works Department and
the Montana Department of Environmental Quality for concurrent review, with
approval of both required prior to construction of any new mains located within
the new unnamed street located between Cascade Loop and Lincoln Street as well
as any extensions necessary to serve Lots 11, 14, 15, and 16.
7. The developer shall submit the street designs to the Kalispell Public Works
Department for review and approval prior to construction of the new unnamed
street located between Cascade Loop and Lincoln Street.
8. A letter from the Kalispell Public Works Department shall be submitted stating
that all new infrastructure has been accepted by the City of Kalispell or a proper
bond has been accepted for unfinished work.
9. All existing and proposed easements shall be indicated on the face of the final plat.
Utility easements for city water and sewer shall be provided to allow for the logical
extension of utilities from this subdivision to adjoining properties. A letter from the
Kalispell Public Works Department shall be obtained stating that the required
easements are being shown on the final plat.
10. The following statement shall appear on the final plat: "The undersigned hereby
grants unto each and every person, firm or corporation, whether public or private,
providing or offering to provide telephone, telegraph, electric power, gas, cable
television, water or sewer service to the public, the right to the joint use of an
easement for the construction, maintenance, repair, and removal of their lines and
other facilities, in, over, under, and across each area designated on this plat as
"Utility Easement" to have and to hold forever."
Developer's Signature
11. Prior to filing the final plat, a letter from the US Postal Service shall be included
stating the Service has reviewed and approved of the design and location of the
mail delivery site. The mail delivery site shall be installed or bonded for prior to
final plat. In addition, the mail delivery site and improvements shall also be
included in the preliminary and final engineering plans to be reviewed by the
Public Works Department. The mail delivery site shall not impact a sidewalk or
proposed boulevard area.
12. A homeowner's association (HOA) shall be formed and established for the common
areas prior to final plat. The HOA should include provisions for the maintenance of
all common areas including the storm water ponds and open space areas.
E:
13. A note shall be placed on the final plat stating that owners waive their right to
protest a Special Improvement District for maintenance of common areas. A
district shall only be activated in the event that the homeowner's association
defaults on their common area maintenance obligations. The taxes levied within
the special improvement district shall be determined by the appropriate city
department with approvals by the Kalispell City Council.
14. A letter shall be obtained from the Kalispell Parks and Recreation Director
approving a landscape plan for the placement of trees and landscaping materials
within the landscape boulevards of the streets serving the subdivision. The
approved landscape plan shall be implemented or a cash in lieu payment for
installation of the street trees and groundcover be provided to the Kalispell Parks
and Recreation Department.
15. All utilities shall be installed underground.
16. All areas disturbed during development shall be re -vegetated with a weed -free mix
immediately after development.
17. A letter from the Kalispell Fire Department approving the access, placement of the
fire hydrants and fire flows within the subdivision shall be submitted prior to final
plat.
18. The trail crossing at Rose Crossing shall include the installation of a pedestrian -
actuated rectangular rapid flashing beacon.
19. The trail crossings at Lincoln Street, Cascade Loop and Jefferson Boulevard are
permitted only at designated intersections.
20. Lots 8, 9, and 10 shall only gain access off of Cascade Loop.
I
STILLWATER CORPORATION
KALISPELL NORTH TOWN CENTER
REVISED PHASE 3 & 4 PRELIMINARY PLAT APPLICATION
Kalispell, Montana
Prepared By:
'Q' c0
�J
e
� 4rch'tecTure, SuNeyinq,�'a�a 5
Jackola Engineering & Architecture
PO Box 1134
Kalispell, MT 59903
Project No. 190906
Contact: Toby McIntosh, PE
406-755-3208
Date
February 7, 2020
KNTC Phase 3 & 4 Preliminary Plat Application
TABLE OF CONTENTS
Project Summary
City of Kalispell Major Subdivision Preliminary Plat Application
Preliminary Plat
KNTC Phases 3 & 4 — Plans
Title Sheet
Existing Site Survey
Preliminary Plat
Site and Utility Plan
Vicinity Maps
Adjacent Property Information
Vicinity Zoning
KNTC Phase 3 & 4 Preliminary Plat Application
PROJECT SUMMARY
Kalispell North Town Center (KNTC) is a Planned Unit Development located on the
east side of US Highway 93, on the north and south sides of Rose Crossing. Phases 3
and 4 of the KNTC development covers 39.31 acres. The project proposes a re -
subdivision of 4 existing lots within the KNTC Phase 2 subdivision and includes the
addition of 23 new commercial lots ranging in size from 0.57 to 3.23 acres. The
project is located within the B-2 zone in the commercial overlay of the KNTC Planned
Unit Development. The development is proposed to be completed in two phases,
Phase 3 and Phase 4. Phase 3 would include Lots 13-23 on Block 1, Lots 11, 12, and
27 on Block 2, Lots 8-10 and the Common Area on Block 3, and Lots 28-33 on Block 4.
Phase 4 includes Lots 24, 25, and the common area on Block 1, and Lot 25 and the
common area on Block 2.
The project includes the development of a new roadway connecting from Lincoln
Street to Cascade Loop through the subdivision, which is proposed to be completed
as part of Phase 4. Public utilities will be extended from Lincoln and Cascade to the
development within the ROW.
The previously platted KNTC Phase 2 subdivision addressed flow control and
treatment of stormwater run-off from the Project area. Additionally, the Project
area was covered in the overall KNTC Common Area Management Plan, Traffic Impact
Study (TIS), and Environmental Assessment. Therefore, these documents are not
provided as a part of this Preliminary Plat submittal package.
KNTC Phase 3 & 4 Preliminary Plat Application
PLANNING FOR THE FUTURE
M011 T"A
Planning Department
201 1st Avenue East
Kalispell, MT 59901
Phone: (406) 758-7940
Fax: (406) 758-7739
www.kalispcll.com/planning
MAJOR SUBDIVISION PRELIMINARY PLAT APPLICATION
FEE SCHEDULE: FEE ATTACHED
Major Subdivision (6 or more lots) $1,000 + $125/lot
Major Subdivision Resubmittal $1,000
For each original lot unchanged add $10/lot
For each lot redesigned/added add $125/lot
Mobile Home Parks & Campgrounds (6 or more spaces) $1,000 + $250/space
(5 or fewer spaces) $400 + $125/space
Amended Preliminary Plat
Amendment to Conditions Only
$400 base fee
Re -configured Proposed Lots
Base fee + $40/lot
Add Additional Lots or Sublots
Base fee + $125/lot
Subdivision Variance
$100 (per variance)
Commercial and Industrial Subdivision
$1,000 + $125/lot
SUBDIVISION NAME: KALISPELL NORTH TOWN CENTER
OWNER(S) OF RECORD:
Name STILLWATER CORPORATION; EAGLE VALLEY RANCH APARTMENTS LLC phone
Mailing Address PO BOX 7338; 341 W SECOND ST #1
City KALISPELL; SAN BERARDNIO
State MT; CA Zip 59904; 92401
TECHNICAL/PROFESSIONAL PARTICIPANTS (Surveyor/Designer/Engineer, etc):
Name & Address JACKOLA ENGINEERING & ARCHITECURE
Name & Address 2250 HWY 93 SOUTH, KALISPELL, MT
Name & Addres
LEGAL DESCRIPTION OF PROPERTY:
Property Address
Assessor's Tract No(s)
Lot No(s)
1/4 Sec Section 30 Township 29N Range 21
GENERAL DESCRIPTION OF SUBDIVISION:
Number of Lots or Rental Spaces 22 Total Acreage in Subdivision
39.31
1
Total Acreage in Lots 38-25 Minimum Size of Lots or Spaces 0.52 AC
Total Acreage in Streets or Roads 1.16 Maximum Size of Lots or Spaces 4.7Ac
Total Acreage in Parks, Open Spaces and/or Common Areas 1.9
PROPOSED USE(S) AND NUMBER OF ASSOCIATED LOTS/SPACES:
Single Family Townhouse Mobile Home Park
Duplex Apartment Recreational Vehicle Park
Commercial 22 Industrial
Condominium Multi -Family
Planned Unit Development
Other
APPLICABLE ZONING DESIGNATION & DISTRICT B-ZPUD
ESTIMATE OF MARKET VALUE BEFORE IMPROVEMENTS
IMPROVEMENTS TO BE PROVIDED:
Roads: Gravel Paved X
Curb X Gutter X Sidewalks X
Alleys Other .
Water System: Individual
Multiple User
Neighborhood
Public X Other
Sewer System: Individual
Multiple User
Neighborhood
Public X Other
Other Utilities: Cable TV X
Telephone X
Electric X
Gas X Other
Solid Waste: Home Pick Up
Central Storage
Contract Hauler x Owner Haul
Mail Delivery: Central X
Individual School District:
Fire Protection: Hydrants X
Tanker Recharge
Fire District:
Drainage System: Slormwater oonrnyansa will be installed. 5104wwafer bealmenl was
accounled for In the design of earlier
phases of KNTC
PROPOSED EROSION/SEDIMENTATION CONTROL; Conbacw will submit a City Stmmwaler Management Pennll
end will Ulu. the City'a 51omn.aler Management Plaris hest sanagemenl practices- Pnor to an ygrom d dmtvrba . the Comt.dor will Suhmil a Ur Conetrud— Stwmwaler Oiamarge Pemril NOI and 54VPPP.
VARIANCES; ARE ANY VARIANCES REQUESTED? NO (yes/no) If yes,
please complete the information below:
SECTION OF REGULATIONS CREATING HARDSHIP:
EXPLAIN THE HARDSHIP THAT WOULD BE CREATED WITH STRICT COMPLIANCE
WITH REGULATIONS
PROPOSED ALTERNATIVE(S) TO STRICT COMPLIANCES WITH ABOVE
REGULATIONS;
2
PLEASE ANSWER THE FOLLOWING QUESTIONS IN THE SPACES PROVIDED
Will the granting of the variance be detrimental to the public health, safety or
general welfare or injurious to other adjoining properties?
2. Will the variance cause a substantial increase in public costs?
3. Will the variance affect, in any manner, the provisions of any adopted zoning
regulations, Master Plan or Growth Policy?
4. Are there special circumstances related to the physical characteristics of the site
(topography, shape, etc.) that create the hardship?
5. What other conditions are unique to this property that create the need for a
variance?
3
APPLICATION CONTENTS:
The subdivider shall submit a complete application addressing items below to the
Kalispell Planning Department at least thirty five (35) days prior to the date of the
Planning Board meeting at which it will be heard.
1, Completed preliminary plat application.
2. 4 copies of the preliminary plat.
3. One reproducible set of supplemental information. (See Appendix A of
Subdivision Regulations for the city where the subdivision is proposed.)
4. One reduced copy of the preliminary plat not to exceed 1 V x 17" in
size,
5. Electronic copy of the application materials, including the preliminary
plat, either copied onto a disk or emailed to planning(ibkalispell.com
(Please note the maximum file size to email is 20mg)
6. A bona fide legal description of the subject property and a map showing
the location and boundaries of the property.
7. Application fee based on the schedule on page 1 of this application and
made payable to the City of Kalispell.
I hereby certify under penalty of perjury and the laws of the State of Montana that the
information submitted herein, on all other submitted forms, documents, plans or any
other information submitted as a part of this application, to be true, complete, and
accurate to the best of my knowledge. Should any information or representation
submitted in connection with this application be untrue, I understand that any
approval based thereon may be rescinded, and other appropriate action taken, The
signing of this application signifies approval for the Kalispell Planning staff to be
present on, the property for routine monitoring and inspection during the approval and
development process.
pl (Dat
VNVINOW `113dSIlVN E
'&JOD b31VMllIIS
a31ND NMOl HiWN 113dSllV)l °"'A
LL
m n
J �
W
U
Q
a
a
a
Z
z
_U
,.. VIPs
0
vi
� o �
dr a
vi
U
M �
CAlJ NOSd3:Id3f -- --
vi
O
ao a
r
� � Z
Z
m
O ow z
££ AVMH9IH
xtcxnvuRo� saxid NaaxsZIoN
i
„5
S
ffi
8
8
'o
iN
�f
oz
oz
mN
n�
$o
mz
aom
y0
Oprei
mv
Ozry
m�
m�om�d
m1-
�eiEi
faro
�
�m_LL
3a
�3mz
mm
oN�
a
°m-
d
dmNo
��
m
o
o
o
o
o
o
o
a
-
o
o
0
0
z°
�a
3
3
3
3
3
3
3
3
3
3-
of
6
N
F
F
F
F
G
F
F
a#
b
N
ry
C
G
x
s
• �" p VNVINOW '113dSIlVN
'&J0:) d31Y/M1111S
0 b31N3) NMOl Hi2ION 113dSIIV>l
W J
a
o:
\ ❑ I i
a
a a
= x
d 4A19 NOSUN33f
5
a \
N
Q
K
I
1
1� 1
PRELIMINARY PLAT OF
KALISPELL NORTH TOWNCENTERPHASE 3
I II I I I
I� a
I
I I
�I I
I I'
—
y.
°aa
I��sl
cX 4Tas
dea T°wP C�`r I
o B
Pn'cN°r �
Il a��s
II I
III
II
I
---- -- --=�a-sue
- —_—--
Ilr
`I I�
cEN2FF 12
mogN 9°
loll,
4H e 0
77�-
7=R�
g 9Z4
loll T,
G7107i — _ --
�04 I
V °I ssaoo ,moo moo TowNPBE 2
I XoRTx z �, I
II �If €I I
-_ _ ---------JI
-- -- -- --�-- --
I CO$ I
r
R`; ,LU 9 ad UMN33 HAM M H.LHOO H 113dSMVx
i
R
s
os
a ss =ss
a mmm 3� o000o wwwwwwwww a ::: _ xfx�
Q e e m mSS .. Sa o 0000o w wwwwwwwww u u � ��� _ _ £ �ff
=s
Hh
a s
- � i o�ls�3wmiim
05=
d 0000; age®a avae.0®*��s.®000�
��esLU
-
I�—
R,
s , LU 9 ad UMN33 HAM H.LHOO H 113dSMVX
E
G IIII IIII I
1
_
4 ' IT�II IIII I
IIII pl II 71
II.. ------------- ------- a.,
IIII I� I —11-I , I
1/I 11 11 1 --- T--I— -
II if I I I _ --- 1 Q
II 11 I 1 m I
e
I,I I 1 _
IIII III I `; 1 11 i
---
---__ — -_ - W
_---- =�-
pll
Iv I a
IIII, I ',' III L
III �I III � a