01-16-20 Site Development Review Committee MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY
Thursday, January 16, 2020
First Floor Conference Room
201 First Avenue East
ATTENDING:
P.J. Sorensen, Chairman
Jarod Nygren, Planning Director
Rick Parker, Building Plans Examiner
Tim Falkner, Administrative Captain
Chad Fincher, Parks & Rec Director
Tom Tabler, Senior Civil Engineer
Jeff Clawson, Building Official
Patrick Jentz, Engineer II
GUESTS: James Freyholtz (MDT); Mark Johnson (Architect); Kyle Reddig (AMI Development)
HEAR THE PUBLIC: None.
PERFORMANCE BOND REMINDERS: KNTC Phase 1 bond is being released this week;
Parks & Rec is waiting on a landscape bond for Glacier Eye before a C of O can be issued.
OLD BUSINESS:
Frontier Village Apartments — Treeline; new apartment complex. Parks is still reviewing the
landscape plan, Public Works is completed with their review and Building Dept. has completed the
garages and is very close to completing building 1. Per Rick the buildings are all the same with the
exception of 2 story or 3 story structure, once building 1 plan review is completed he will just need
site plans for the remaining buildings for approval. At this point since final plat has not been
approved the permits cannot be issued. This will be on the agenda for next week.
CHS/Bridgewater — 150 1 St Ave EN: remodel. Architect Mark Johnson met with Tom Tabler
1 / 15/20 and comments have been sent out. Planning also met with Mark the same day to discuss the
courtyard and parking in front of Alpine lighting. The coffee kiosk is still in question but the owners
are still committed to building that in the future. For now the site plan will not include the kiosk.
This will be on the agenda for next week.
The Crossings — Two Mile Drive; new apartment complex. Public Works has sent out comments,
the lift station drawings are almost complete and ready to be turned in. The developer is planning on
connecting the water connection to the existing line on Hawthorne and Liberty. This will be on the
agenda for next week.
4th and Zuri — 55 4th Ave V N; remodel existing building to multi -use. Public Works is still waiting
for the design calculations. Initial comments were sent out by Public Works. Rick is still waiting for
the mechanical drawings. This will be on the agenda for next week.
Flathead Industries — 40 E Idaho; drive-through/drop-off addition. Nothing new. This will be on
the agenda for next week.
UPS —1151 N Meridian; expansion of existing facility. Public Works submitted comments early this
week. Planning and PD are working on access into the expanded site on the west side of gas station
which may include an easement. Planning will be sending out comments this week. This will be on
the agenda for next week.
Morrison-Maierle —174 Timberwolf; new office building. Public Works is still reviewing. Planning
has a few minor changes to send out about the handicap parking. This will be on the agenda for next
week.
NEW BUSINESS:
Kalispell Family Dental — 720 2nd Street E; exterior remodel & small addition. Planning has started
review, there is currently no handicap parking which they will have to provide. A sidewalk may have
to be added in front along the roadway. This will be on the agenda for next week.
PLANNING OFFICE ITEMS: Stillwater Bend Phase 1 PUD & Pre -Plat was approved at the
Planning Board level and will move forward to the February 3rd City Council meeting.
OTHER REPORTS:
Immanuel Lutheran Home — preliminary comments on potential assisted living units. Owners are
looking to build a duplex to include approximately 8 additional parking spots.
The meeting was adjourned at 10 :42 a.m.
cc: Police City Manager Fairgrounds MDOT
Bldg. Fire City Clerk City Airport
Planning Parks Comm. Dev. Public Works