Loading...
Resolution 4334 - Change Order - Meridian Road Reconstruction Project16:0 5 RESOLUTION NO. 4314 A RESOLUTION TO ALTER AND AMEND THE CONTRACT WITS ROBERT PECCIA AND ASSOCIATES ON THE NORTH MERIDIAN ROAD RECONSTRUCTION PROJECT, STPU 6701(5). WHEREAS, the City on October 10, 1995 did enter into a contract with Robert Peccia and Associates, Helena, MT for the reconstruction of North Meridian Road and WHEREAS, certain elements in the project required additional work, as well as time to complete; and said additional work and time requirements could not have been necessarily foreseeable when the original construction contract was entered into, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, upon the advise and recommendation of John Wilson, Assistant City Engineer, it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(l) MCA be it hereby resolved: 1. The alterations and modifications of the contract between the City of Kalispell and Robert Peccia and Associates, dated October 10, 1995, as set out in Exhibit "A" attached hereto are hereby approved, and 2. As soon as the alterations and modifications are agreed to in writing, signed by the City Manager, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS nd DAY OF , 1997. U 6F�) Dougl s D. Rauthe, Mayor ATTEST: �i Debbie Gifford, Clerk of Council j:\wp\cling\Peccia 1606 Q 0 Irtcorporwad 1892 Telephaa (alibi 736MM Douglas Rau" ow FAX (4061759.7738 M ft* Me ear I"? Clarence W. Krepps zip SM3.1 "? City Manager red city council April 9, 1997 ors` Gary W. Nystul Robert Peccia and Associates Ward I 825 Custer Avenue Cliff Collins P.O. Box 5653 "aid I Helena, MT 59604 r4orhen F. Donahue Ward 11 Subject: North Meridian Road - Kalispell Dale Haarr STPU 6701(5) Ward It Control No. 2950 Jim Atkinson Ward III In accordance with Article IV, Section 6 of the original agreement between the City of Lauren Granrno Kalispell and Robert Peccia and Associates dated October 10, 1995, this letter and ward III attached request for additional compensation dated April 9,1997 will serve as Pamela 5. Ken Supplemental Agreement No. 2. Ward IV This supplement is to provide additional compensation for changes in the scope of work M. Duane 1.anso ward Iv the ro'ect cost and extra design and plan preparation necessary to to accommodat�.#he construction sg pl�areY=PPr'� �3'the Ci h'• This supplement provides for an additional actual cost of MS02 and an additional fixed fee of $2,498 for a total of $31,300. This will increase the fixed fee from S 19,913 to $21,691 and the maximum contract ceiling from $376,919 to 5408,219. Clarence Krepps City Manager l Approved Men d---- R,AcrtP is and Associates Date 46I%97 1.60 7 1 I ( fCOMrPtACT SUPPLEIAENT SCOPE Of SERVICES AND COST PROPOSAL *DWAT /ECC1A AND ASSOCIATES MORIN -11A OIAN ROAD - KALISPELL APRIL B. I "I. OLL iTEMS OF WORK PRINCIPAL PROJECTI ENCANEER ENGR4:E� 526 6S 1.14 TRANS EWA S23 7S TRANS "SIGNJ PLAWEN ENGtNEEF! -ASSIST 55 W i $10 S6 �I S1S.14 s1a 62 P R TWO $10.00 I. Ezra moA.. 4m. . au, I 24 I a t 1 1 120 70.6 Ra+ife nomw2ftTL �! 4 61 12 11,0 Rana@ Il f 2 6 161 a 22.1 iuyqw 2 4 6 14 11.4 Elm svwed S Pam ap 2 4 6 5.5 ><t m drain I 6 6 16 14.0 AOM ams 6 1s 24 22,0 Rarer aarorwmk 6 30 1 12 1 17 13.2 c4wmd �rdio[te I 2 12 14 13.5 10. Add awdm iom 3 Wo 4 2 26 26 62 $0.2 11. Eon PM i (OW 141 241 a 2 50 30.2 2. Nm wo go.. note "., aia 2 4 32 36 35.4 3. Ejj" final plan ray. i repo l E Rule of wwk MOM, 12 1 1s 4 5 3.2 16. Raw" am, doaarrt 1 6 2 11 5.2 Ftiarise Harr 4 it 12 11.0 7.1Aec.-mob admix 4 4 0.6 HOURS 0 65 6 6 221 152 1 q1 325.E L&SOMOW. COSTS p S0.a0 11.396.a5 514250 s143.76 s4,161.92 52.301.26 543,0 W00 0 13,t56.00 xrrr -- rr� .■1: j. no= IM eaom TOTAL PRMT (lasted on caber Ceala) SZ.1" WEAL PRCUECT COST $3%M 00 r.; . P$