Resolution 4300 - 14th Street East Roadway and Utility Project - Change Order #11490 s RESOLUTION NO. 4300 A RESOLUTION TO ALTER AND AMEND THE CONTRACT WITH NUPAC ON 14TH STREET EAST ROADWAY AND UTILITY PROJECT. WHEREAS, the City on July 9,1996 did enter into a contract with NUPAC, Kalispell, MT for the construction of certain roadway and utility improvements on 14th Street East, and WHEREAS, certain elements in the project required addition time to complete ; and said additional time requirements could not have been necessarily foreseeable when the original construction contract into, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, upon the advise and recommendation of Fred Zavodny, PWD, it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the contract between the City of Kalispell and NUPAC, dated July 9, 1996, as set out in Exhibit "A" attached hereto are hereby approved, and 2. As soon as the alterations and modifications are agreed to in writing, signed by the Public Works Department, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROV BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS DAY OF ri ovg,i'Y1 be}- , 1996. ATTEST: r Cm c Debbie Giffor , Clerk of Coun it .. j;DRauthe, Mayor i I EXHIBIT "A" To: Robert H. Babb, City Engineer From: Fred Zavodny, Project Managerliy:�� Date: October 3, 1996 Re: 14"' Street East Roadway and Utility Project - Request For Change Order 1 The date of substantial completion for the 14"' St. East Project was September 20t". Contractually the project completion date was September 1 11. A time extension of 19 calendar days or 14 work days is requested. Justification is as follows: 1. The Contract was bid with Schedule IV, additional storm drain construction, as optional depending on bid prices and budget limitations. Schedule IV was awarded but no additional time was granted within the contract. A seven (7) day extension is requested for this item. 2. Acceptable water main disinfection tests were difficult to achieve. No specific reason for the test failures were determined. The logistics of the project prohibited other significant construction operations from being accomplished while water testing operations were being conducted. A seven (7) day extension is requested for this item. 3. The storm drain outfall structure required additional piping components to achieve design parameters. An additional three days were required to obtain the components and install them. A three (3) day extension is requested for this item. 4. A number of unanticipated conflicts with existing gas mains were encountered. Two lost days can be attributed to the gas main conflicts and investigations. A two (2) day extension is requested for this item. The contractor performed in a workmanlike manner throughout the project and the request for additional time is reasonable and prudent. I recommend approval of this change order.