Resolution 4265 - Change Order - Woodland Park DREAM Trail1308 IV RESOLUTION NO. 4265 A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH PACK & COMPANY ON THE WOODLAND PARK DREAM TRAIL PROJECT. WHEREAS, the City did enter into a contract with Pack & Company of 2335 Highway 93 North, Kalispell, Montana for construction of the Woodland Park DREAM Trail project, and WHEREAS, upon the advice and recommendation of Jeff Larson, who is the City's consultant on said project, certain changes and alterations of design and specifications have been found necessary and advisable and in the best interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of the construction of the Woodland Park DREAM Trail, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations, NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(l) MCA be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Pack & Company, dated May 9, 1996, as set out in Exhibit "A", attached hereto, are hereby approved, and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the contractor, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS 00'4* DAY OF I'V\d 1996. ATTEST: Debbie Giqfir CMC i Clerk of Cou c il wr frj 7- si I I I 1309 05/09/96 10:46 MDT MISSOLLA 4 406 752 5?ra7 NO. e24 POW C -CHANGEORDER TEP STME OF)AMMA CHANM OMM M I DWARnAM,rrCWTRANMRTAnON mojBcr W.—avxj�— MUNWAYSEMMON MOMTM,_X,�o �Iand �Park-�KAL TO: Pack and Company DAM CKWTRACM Yommobvibydwecad taped=tb* *&m%wmk aaaamft&&qp mtg qpmmd, up rMbliftmoMm" wM " be WWv w*Fk nDt EMj!Ldd for in the !2Mg, ad pugmd pdw fa dw Mange the original project to include 405 linear feet of engineering f abric typical section. In addition the work will include installing 405 linear feet of french drain trench with relief pipes every 25 feet on center. The work will also include topsoiling and sodding to prepare the typical section as shown on the typical section included. Dimmed vA& Ed Hodkmd The pqmcm shag W M mmpemmm fw &mshmg &U Ubm, =1i, cq,� mmenah and mmdmto m=my to OMPIM to we& ESTUATEANDCOST FBDMALFUMS UXALAOMYd��� COMM. TM UMNQ Sna QUAMM Umm DescmoN LMN= SAUOM CO-1-1. 01 90 Cy. Pit Run sub -base 20.84 1,975.60 CO-1-2 61'7 460 Sq-Yd En& Fabric 1.16 533 CO-1-3 01 405 LEFr French Drain 2,496.70 CO-14 01. 16 Each RdWPipes 110.92 1,774.72 CO- 1-5 01 1 LumSum Additional TopsoiBod .1,895 1,885.00 dqs ToWCm $8,555.62 I hcmby undauend md agm to do --mm. md om&kw m forth in this bstrmesit. By ApproW owner Approved Digrict Cocamtka ign Affruved CTHPEn&oedagc4m&mw 1310 a ORDER NO. — DATE: 001% AGREEMENT DATE: The CONTRACT PRICE due to this CHANGE ORDER will increase $ 14,429.12 -- The new CONTRACT -PRICE Including this CHANGE ORDER will be $295.276-12 - CHANGE of CONTRAC17 TIME: 'Me CONTRACT TIME will increase from 60 days to 63 days. Adjustment for paving will be made when work is complete. Requested BY: Recommended By - Accepted By- FeeL Jim Lyrich, Pack & Co. �- 12 Frep Phillips, P.E., Thomas, Dean & Hoskins, Inc. ......... Al Thelen, City Manager, City of Kalispell X.. 11 L k Kalispell Development Woodland Court Project Schedule I & 11 Contract Pack & Go, Exhibit 8 Change Order 2 Additional work for water main adjustment Haven Ortve Description materials I Gate Valve & Box 2 Water mein IrmAtion 3 Fittings W 45 bonds megalug 3/40 saddle 3/40 corp stop 4 60 water pipe 5 3/4' service pipe a Equipment Trash Pump Rentai Pickup Truck Air Comp w/ Jack Hammer Vibratory Roller 621 B Loader Case Excavator 590 Extendahoe, non-DBA Dump Truck (waste haul) Dump Truck (AC hau!) 7 Labor/ Operators Operator Laborer Laborer (AC patcM non-DBA Dump Driver 6 Materials Non Shrink Backfill Concrete 3/40 washed rock Pit Run Gravel I - 1/40 Crushed Gravel Asphalt 9 Resock - Familian NW coexhb.wki . I cost 19% markup Amount 290.40 49M M3.96 87.20 10.08 77M 4 @ 32.45 129.00 19.47 149.27 10023.64 236.40 35-46 271.86 1024.50 24.56 &69 28.27 1 0 33.00 33.00 4.95 37.95 25' @ 2.30 59.50 S.92 65.43 5- @ 0.26 1.30 0.20 1.50 2a.00 4.20 32.20 5 Hre @ $5.00 25.00 3.75 28.75 2 Hrs @ $35 70.00 10.50 80.50 1.25 His @ 15.00 1a.75 2.81 21.56 6 HfS @ $24.00 144.00 21.6D 165.60 10 HM @ $55.00 550-00 82.50 632.50 2.25 Hrs @ $20.0o 45.00 6.75 51.73 18.75 Hrs @ $19.60 367.50 55.13 422.ss 0.5 Hrs 0 $14.50 7.25 1.09 8.34 13.75 Hrs @ $2a.el 393.39 59.01 452.40 32.5 Hm Q $24.os 780.ge 1117,15 898.1s 6 I-Irs @ $24,22 145.32 21.80 167.12 19 Hrs @ $1 9.6o 372.4o 55.86 428.26 50 CY @ $4&00 2250.00 $37.50 2557.50 1 CY @ $62.00 62.00 9.30 71.30 29.08 CY 0 $10.75 312.61 46.eg 359.50 38.25 CY @ $5.70 218.03 32.7o 250.73 19.77 CY @ $8,25 163.10 24.47 187.57 9,5 Ton @ moo 275.50 41.32 316.83 112.56 16.56 129.44 Total 8261.11 coexhb.wki K94-46-4 -4 1312 Kalispell Development Woodland Court Project Schedule I & 11 contract: Pack & Co. Exhibit A Change Order 2 Addition for connecting 3 exilsfing water sMM On South Woodland Dim Descriptloon cost 15% markup Amount Materials 687.51 103.13 790.64 Equipment Backhoe 3 Hrs Q $20.00 60.00 9.00 69.00 compactor a Hrs @ $15 45.00 6.75 51.75 Operator 1.5 Hrs @ $28.61 42.92 6.44 49.36 Laborer 7.5 Hrs @ $24-03 180.23 27.03 207.26 Total 1166.01 coexheLwk1 K94-46-4 � r5l, -.7. 7- "I'T :z -,i� I I I I