Resolution 4265 - Change Order - Woodland Park DREAM Trail1308
IV
RESOLUTION NO. 4265
A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF
CONTRACT WITH PACK & COMPANY ON THE WOODLAND PARK DREAM TRAIL
PROJECT.
WHEREAS, the City did enter into a contract with Pack &
Company of 2335 Highway 93 North, Kalispell, Montana for
construction of the Woodland Park DREAM Trail project, and
WHEREAS, upon the advice and recommendation of Jeff Larson,
who is the City's consultant on said project, certain changes and
alterations of design and specifications have been found necessary
and advisable and in the best interests of the City; and said
changes and alterations could not have been necessarily foreseeable
when the original design and specifications were prepared on this
phase of the construction of the Woodland Park DREAM Trail, and
said changes are contained in Exhibit "A", attached hereto and are
by this reference made a part hereof; and
WHEREAS, it appears in the best interests of the City to
approve said changes and alterations,
NOW THEREFORE, pursuant to the provisions of Section 7-5-
4308(1) MCA be it hereby resolved:
1. The alterations and modifications of the specifications
and plans of the contract between the City of Kalispell and Pack &
Company, dated May 9, 1996, as set out in Exhibit "A", attached
hereto, are hereby approved, and
2. As soon as the price to be paid for said alterations and
modifications are agreed to in writing, signed by the contractor,
as hereby approved by the Council, this approval thereof shall be
in effect.
PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF
KALISPELL THIS 00`4' DAY OF 1'V\d , 1996.
ATTEST:
Debbie Gi CMC
Clerk of Cou cif
. '--"'.fi ::may y'y^+e f ... .a;, si`A¢`,,YS
F yTC
1
1
1
1309
05/09/96 10: 46 MDT M 15SOL1_A a 406 752 5767 NO. e24 POW
CTEp - CHANGE ORDER
STME OF iAOM'ANA CHANM ORDER M t
DWARnAM, T OF TRANSPORTATION mojBcr N0: � 67 9 9 � t
MUNWAYS DIVISION 1
DESI[iNATIOd�L �loodland Park-KAL
TO: Pack and Company DAZE:
C WTRACM
Ycuaobvibyduecadtoped=theLoRoa %wmk aaaamft&&qpisthesppmmdaoup rMbliftmrysDi m"
wM aot be tillWa work nDt for in the ad pugmd pdw oa dw tbaepL
I
Change the original project to include 405 linear feet of
engineering fabric typical section. In addition the work
will include installing 405 linear feet of french drain
trench with relief pipes every 25 feet on center. The work
will also include topsoiling and sodding to prepare the
typical section as shown on the typical section included.
Dimmed with Ed Hodkmd
� fist mmpamion fw &mshmg &U Ubm, soak. «tuip�m�co� materiels and mmdmto n=ty to
FSTUATE AMID COST
FBDMAL FUM i
UXAL AOMY3
COMM.
TM t7D�
UM NQ Sna QUAAFLM Umm DescmoN tJ1V17' N= i AUOM
CO-1-1. 01 90 C.Y. Pit Rua sub -base 20.84 1,875.60
CO-1-2 01 460 Sq.Yd En& Fabric 1.16 33
CO-1-3 01 405 LEFT French Drain 6.14 2,496.70
CO-14 01. 16 Each Relief Pipes 110.92 1,774.72
CO-1-5 01 1 LumSum Additional TopsoiBod 1,885 1,885.00
T'� 6 dqs ToW cou $ 8 555. 62
I hcmby undated and agm to the i --mm . Ptepund by 1 1
amd ooaditiooa m forth in this bstrumdpt p
By it
ApproW
owner
Ago f
Distda Coca mtioa Engineer
Affruved�
CTEP En&oedag coardi mw
1310
s
ORDER NO. z
DATE: 4
AGREEMENT DATE:
The CONTRACT PRICE due to this CHANGE ORDER will increase $ 14,429.12
The new CONTRACT PRICE including this CHANGE ORDER will be $295.2' 6-12 .
CHANGE of CONTRACT TIME:
The CONTRACT TIME will increase from 60 days to 63 days. Adjustment for paving will be made
when work is complete.
Requested By:
Recommended By:
Accepted By:
Fes- Jim Lyrich, Pack & Co.
Fre Phillips, P.E., Thomas, Dean & Hoskins, Inc.
Al Thelen, City Manager, City of Kalispell
11
r
Kalispell Development
Woodland Court Project
Schedule I & II
Contract: Pack 3 Co.
Exhibit 8
Change Order 2
Additional work for water main adjustment, Karen Drive
Description
Materials
1 Gate Valve & Box
2 Water main IrmAtlon
3 Fittings
W 45 bends
megalug
3/4' saddle
3/4' corp stop
4 6' water pipe
5 3/4' service pipe
8 Equipment
Trash Pump Rental
Pickup Truck
Air Comp w/ Jack Hammer
Vibratory Roller
621 B Loader
Case Excavator
590 Extendahoe
non-DBA
Dump Truck (waste haul)
Dump Truck (AC haul)
7 Labor/ Operators
Operator
Laborer
Laborer (AC pate
non--DBA
Dump Driver
6 Materials
Non Shrink Backlrll
Concrete
3/4' washed rock
Pit Run Gravel
1-1/4' Crushed Gravel
Asphalt
9 Resock - Famllian NW
coexhb.wkl
1
cost
19% markup
Amount
290.40
49M
333.96
87.20
10.08
77M
4 [a@ 32.45
129.00
19.47
149.27
10023.64
236.40
35.46
271.86
1024.50
24.56
5.69
28.27
1 0 33.00
33.00
4.95
37.95
25' @ 2.30
59.50
8.92
65.43
5' @ 0.26
1.30
0.20
1.50
28.00
4.20
32.20
5 H rs @ $5.00
25.00
3.75
28.75
2 Hrs @ $35
70.00
10.50
80.50
1.25 His @ 15.00
18.75
2.81
21.56
6 Hrs @ $24.00
144.00
21.60
165.60
10 Hrs @ $55.00
550.00
82.50
632.50
2.25 Hrs @ $20.00
45.00
6.75
51.73
18.75 Hrs @ $19.60
367.50
55.13
422,63
0.5 Hrs @ $14.50
7.25
1.09
8.34
13.75 Hrs @ $28.61
393.39
59.01
452.40
32.5 Hm @ $24.o3
780.98
117,15
898.13
6 Hrs @ $24.22
145.32
21.80
167.12
19 Hrs @ $19.60
372.40
55.86
428.26
50 CY @ $45.00
2250.00
$37.50
2557.50
1 CY @ $62.00
62.00
9.30
71.30
29.08 CY 0 $10.75
312.61
46.89
359.50
38.25 CY @ $5.70
218.03
32.70
250.73
19.77 CY @ $8.25
163.10
24.47
187.57
9.5 Ton @ moo
275.50
41.32
316.83
112.56
16.56
129.44
Total
8261.11
coexhb.wkl
K94-46-4
R
1312
Kalispell Development
Woodland Court Project
Schedule I & II
Contract: Pack & Co.
Exhibit A
Change Order 2
Addition for connecting 3 existing water
sry M an South Woodland Drive
Description
cost 15% markup
Amount
Materials
687.51
103.13
790.64
Equipment
Backhoe 3 Hrs @ $20.00
60.00
9.00
69.00
Compactor 3 Hrs @ $15
45.00
6.75
51.75
Operator 1.5 Hrs @ $28.61
42.92
6.44
49.36
Laborer 7.5 Hrs @ $24.03
180.23
27.03
207.26
Total
1166.01