Resolution 4265 - Change Order - Woodland Park DREAM Trail1308
IV
RESOLUTION NO. 4265
A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF
CONTRACT WITH PACK & COMPANY ON THE WOODLAND PARK DREAM TRAIL
PROJECT.
WHEREAS, the City did enter into a contract with Pack &
Company of 2335 Highway 93 North, Kalispell, Montana for
construction of the Woodland Park DREAM Trail project, and
WHEREAS, upon the advice and recommendation of Jeff Larson,
who is the City's consultant on said project, certain changes and
alterations of design and specifications have been found necessary
and advisable and in the best interests of the City; and said
changes and alterations could not have been necessarily foreseeable
when the original design and specifications were prepared on this
phase of the construction of the Woodland Park DREAM Trail, and
said changes are contained in Exhibit "A", attached hereto and are
by this reference made a part hereof; and
WHEREAS, it appears in the best interests of the City to
approve said changes and alterations,
NOW THEREFORE, pursuant to the provisions of Section 7-5-
4308(l) MCA be it hereby resolved:
1. The alterations and modifications of the specifications
and plans of the contract between the City of Kalispell and Pack &
Company, dated May 9, 1996, as set out in Exhibit "A", attached
hereto, are hereby approved, and
2. As soon as the price to be paid for said alterations and
modifications are agreed to in writing, signed by the contractor,
as hereby approved by the Council, this approval thereof shall be
in effect.
PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF
KALISPELL THIS 00'4* DAY OF I'V\d 1996.
ATTEST:
Debbie Giqfir CMC
i
Clerk of Cou c il
wr frj 7-
si
I
I
I
1309
05/09/96 10:46 MDT MISSOLLA 4 406 752 5?ra7 NO. e24 POW
C -CHANGEORDER
TEP
STME OF)AMMA CHANM OMM M I
DWARnAM,rrCWTRANMRTAnON mojBcr W.—avxj�—
MUNWAYSEMMON MOMTM,_X,�o
�Iand �Park-�KAL
TO: Pack and Company DAM
CKWTRACM
Yommobvibydwecad taped=tb* *&m%wmk aaaamft&&qp mtg qpmmd, up rMbliftmoMm"
wM " be WWv w*Fk nDt EMj!Ldd for in the !2Mg, ad pugmd pdw fa dw
Mange the original project to include 405 linear feet of
engineering f abric typical section. In addition the work
will include installing 405 linear feet of french drain
trench with relief pipes every 25 feet on center. The work
will also include topsoiling and sodding to prepare the
typical section as shown on the typical section included.
Dimmed vA& Ed Hodkmd
The pqmcm shag W M mmpemmm fw &mshmg &U Ubm, =1i, cq,� mmenah and mmdmto m=my to
OMPIM to we&
ESTUATEANDCOST
FBDMALFUMS
UXALAOMYd���
COMM.
TM
UMNQ Sna QUAMM Umm DescmoN LMN= SAUOM
CO-1-1. 01 90 Cy. Pit Run sub -base 20.84 1,975.60
CO-1-2 61'7 460 Sq-Yd En& Fabric 1.16 533
CO-1-3 01 405 LEFr French Drain 2,496.70
CO-14 01. 16 Each RdWPipes 110.92 1,774.72
CO- 1-5 01 1 LumSum Additional TopsoiBod .1,895 1,885.00
dqs ToWCm $8,555.62
I hcmby undauend md agm to do --mm.
md om&kw m forth in this bstrmesit.
By ApproW owner
Approved
Digrict Cocamtka ign
Affruved
CTHPEn&oedagc4m&mw
1310
a
ORDER NO. —
DATE: 001%
AGREEMENT DATE:
The CONTRACT PRICE due to this CHANGE ORDER will increase $ 14,429.12 --
The new CONTRACT -PRICE Including this CHANGE ORDER will be $295.276-12 -
CHANGE of CONTRAC17 TIME:
'Me CONTRACT TIME will increase from 60 days to 63 days. Adjustment for paving will be made
when work is complete.
Requested BY:
Recommended By -
Accepted By-
FeeL Jim Lyrich, Pack & Co.
�- 12
Frep Phillips, P.E., Thomas, Dean & Hoskins, Inc. .........
Al Thelen, City Manager, City of Kalispell X..
11
L
k
Kalispell Development
Woodland Court Project
Schedule I & 11
Contract Pack & Go,
Exhibit 8
Change Order 2
Additional work for water main adjustment Haven Ortve
Description
materials
I Gate Valve & Box
2 Water mein IrmAtion
3 Fittings
W 45 bonds
megalug
3/40 saddle
3/40 corp stop
4 60 water pipe
5 3/4' service pipe
a Equipment
Trash Pump Rentai
Pickup Truck
Air Comp w/ Jack Hammer
Vibratory Roller
621 B Loader
Case Excavator
590 Extendahoe,
non-DBA
Dump Truck (waste haul)
Dump Truck (AC hau!)
7 Labor/ Operators
Operator
Laborer
Laborer (AC patcM
non-DBA
Dump Driver
6 Materials
Non Shrink Backfill
Concrete
3/40 washed rock
Pit Run Gravel
I - 1/40 Crushed Gravel
Asphalt
9 Resock - Familian NW
coexhb.wki
. I
cost
19% markup
Amount
290.40
49M
M3.96
87.20
10.08
77M
4 @ 32.45
129.00
19.47
149.27
10023.64
236.40
35-46
271.86
1024.50
24.56
&69
28.27
1 0 33.00
33.00
4.95
37.95
25' @ 2.30
59.50
S.92
65.43
5- @ 0.26
1.30
0.20
1.50
2a.00
4.20
32.20
5 Hre @ $5.00
25.00
3.75
28.75
2 Hrs @ $35
70.00
10.50
80.50
1.25 His @ 15.00
1a.75
2.81
21.56
6 HfS @ $24.00
144.00
21.6D
165.60
10 HM @ $55.00
550-00
82.50
632.50
2.25 Hrs @ $20.0o
45.00
6.75
51.73
18.75 Hrs @ $19.60
367.50
55.13
422.ss
0.5 Hrs 0 $14.50
7.25
1.09
8.34
13.75 Hrs @ $2a.el
393.39
59.01
452.40
32.5 Hm Q $24.os
780.ge
1117,15
898.1s
6 I-Irs @ $24,22
145.32
21.80
167.12
19 Hrs @ $1 9.6o
372.4o
55.86
428.26
50 CY @ $4&00
2250.00
$37.50
2557.50
1 CY @ $62.00
62.00
9.30
71.30
29.08 CY 0 $10.75
312.61
46.eg
359.50
38.25 CY @ $5.70
218.03
32.7o
250.73
19.77 CY @ $8,25
163.10
24.47
187.57
9,5 Ton @ moo
275.50
41.32
316.83
112.56
16.56
129.44
Total
8261.11
coexhb.wki
K94-46-4
-4
1312
Kalispell Development
Woodland Court Project
Schedule I & 11
contract: Pack & Co.
Exhibit A
Change Order 2
Addition for connecting 3 exilsfing water
sMM On South Woodland Dim
Descriptloon
cost 15% markup
Amount
Materials
687.51
103.13
790.64
Equipment
Backhoe 3 Hrs Q $20.00
60.00
9.00
69.00
compactor a Hrs @ $15
45.00
6.75
51.75
Operator 1.5 Hrs @ $28.61
42.92
6.44
49.36
Laborer 7.5 Hrs @ $24-03
180.23
27.03
207.26
Total
1166.01
coexheLwk1
K94-46-4
� r5l,
-.7. 7- "I'T
:z -,i�
I I
I
I