Loading...
Resolution 4265 - Change Order - Woodland Park DREAM Trail1308 IV RESOLUTION NO. 4265 A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH PACK & COMPANY ON THE WOODLAND PARK DREAM TRAIL PROJECT. WHEREAS, the City did enter into a contract with Pack & Company of 2335 Highway 93 North, Kalispell, Montana for construction of the Woodland Park DREAM Trail project, and WHEREAS, upon the advice and recommendation of Jeff Larson, who is the City's consultant on said project, certain changes and alterations of design and specifications have been found necessary and advisable and in the best interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of the construction of the Woodland Park DREAM Trail, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations, NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Pack & Company, dated May 9, 1996, as set out in Exhibit "A", attached hereto, are hereby approved, and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the contractor, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS 00`4' DAY OF 1'V\d , 1996. ATTEST: Debbie Gi CMC Clerk of Cou cif . '--"'.fi ::may y'y^+e f ... .a;, si`A¢`,,YS F yTC 1 1 1 1309 05/09/96 10: 46 MDT M 15SOL1_A a 406 752 5767 NO. e24 POW CTEp - CHANGE ORDER STME OF iAOM'ANA CHANM ORDER M t DWARnAM, T OF TRANSPORTATION mojBcr N0: � 67 9 9 � t MUNWAYS DIVISION 1 DESI[iNATIOd�L �loodland Park-KAL TO: Pack and Company DAZE: C WTRACM Ycuaobvibyduecadtoped=theLoRoa %wmk aaaamft&&qpisthesppmmdaoup rMbliftmrysDi m" wM aot be tillWa work nDt for in the ad pugmd pdw oa dw tbaepL I Change the original project to include 405 linear feet of engineering fabric typical section. In addition the work will include installing 405 linear feet of french drain trench with relief pipes every 25 feet on center. The work will also include topsoiling and sodding to prepare the typical section as shown on the typical section included. Dimmed with Ed Hodkmd � fist mmpamion fw &mshmg &U Ubm, soak. «tuip�m�co� materiels and mmdmto n=ty to FSTUATE AMID COST FBDMAL FUM i UXAL AOMY3 COMM. TM t7D� UM NQ Sna QUAAFLM Umm DescmoN tJ1V17' N= i AUOM CO-1-1. 01 90 C.Y. Pit Rua sub -base 20.84 1,875.60 CO-1-2 01 460 Sq.Yd En& Fabric 1.16 33 CO-1-3 01 405 LEFT French Drain 6.14 2,496.70 CO-14 01. 16 Each Relief Pipes 110.92 1,774.72 CO-1-5 01 1 LumSum Additional TopsoiBod 1,885 1,885.00 T'� 6 dqs ToW cou $ 8 555. 62 I hcmby undated and agm to the i --mm . Ptepund by 1 1 amd ooaditiooa m forth in this bstrumdpt p By it ApproW owner Ago f Distda Coca mtioa Engineer Affruved� CTEP En&oedag coardi mw 1310 s ORDER NO. z DATE: 4 AGREEMENT DATE: The CONTRACT PRICE due to this CHANGE ORDER will increase $ 14,429.12 The new CONTRACT PRICE including this CHANGE ORDER will be $295.2' 6-12 . CHANGE of CONTRACT TIME: The CONTRACT TIME will increase from 60 days to 63 days. Adjustment for paving will be made when work is complete. Requested By: Recommended By: Accepted By: Fes- Jim Lyrich, Pack & Co. Fre Phillips, P.E., Thomas, Dean & Hoskins, Inc. Al Thelen, City Manager, City of Kalispell 11 r Kalispell Development Woodland Court Project Schedule I & II Contract: Pack 3 Co. Exhibit 8 Change Order 2 Additional work for water main adjustment, Karen Drive Description Materials 1 Gate Valve & Box 2 Water main IrmAtlon 3 Fittings W 45 bends megalug 3/4' saddle 3/4' corp stop 4 6' water pipe 5 3/4' service pipe 8 Equipment Trash Pump Rental Pickup Truck Air Comp w/ Jack Hammer Vibratory Roller 621 B Loader Case Excavator 590 Extendahoe non-DBA Dump Truck (waste haul) Dump Truck (AC haul) 7 Labor/ Operators Operator Laborer Laborer (AC pate non--DBA Dump Driver 6 Materials Non Shrink Backlrll Concrete 3/4' washed rock Pit Run Gravel 1-1/4' Crushed Gravel Asphalt 9 Resock - Famllian NW coexhb.wkl 1 cost 19% markup Amount 290.40 49M 333.96 87.20 10.08 77M 4 [a@ 32.45 129.00 19.47 149.27 10023.64 236.40 35.46 271.86 1024.50 24.56 5.69 28.27 1 0 33.00 33.00 4.95 37.95 25' @ 2.30 59.50 8.92 65.43 5' @ 0.26 1.30 0.20 1.50 28.00 4.20 32.20 5 H rs @ $5.00 25.00 3.75 28.75 2 Hrs @ $35 70.00 10.50 80.50 1.25 His @ 15.00 18.75 2.81 21.56 6 Hrs @ $24.00 144.00 21.60 165.60 10 Hrs @ $55.00 550.00 82.50 632.50 2.25 Hrs @ $20.00 45.00 6.75 51.73 18.75 Hrs @ $19.60 367.50 55.13 422,63 0.5 Hrs @ $14.50 7.25 1.09 8.34 13.75 Hrs @ $28.61 393.39 59.01 452.40 32.5 Hm @ $24.o3 780.98 117,15 898.13 6 Hrs @ $24.22 145.32 21.80 167.12 19 Hrs @ $19.60 372.40 55.86 428.26 50 CY @ $45.00 2250.00 $37.50 2557.50 1 CY @ $62.00 62.00 9.30 71.30 29.08 CY 0 $10.75 312.61 46.89 359.50 38.25 CY @ $5.70 218.03 32.70 250.73 19.77 CY @ $8.25 163.10 24.47 187.57 9.5 Ton @ moo 275.50 41.32 316.83 112.56 16.56 129.44 Total 8261.11 coexhb.wkl K94-46-4 R 1312 Kalispell Development Woodland Court Project Schedule I & II Contract: Pack & Co. Exhibit A Change Order 2 Addition for connecting 3 existing water sry M an South Woodland Drive Description cost 15% markup Amount Materials 687.51 103.13 790.64 Equipment Backhoe 3 Hrs @ $20.00 60.00 9.00 69.00 Compactor 3 Hrs @ $15 45.00 6.75 51.75 Operator 1.5 Hrs @ $28.61 42.92 6.44 49.36 Laborer 7.5 Hrs @ $24.03 180.23 27.03 207.26 Total 1166.01 coexha.wk1 K94-46-4 t :df r 1 1