Loading...
Sidewalk and Curbing Construction year ending Dec. 31, 2019 Bid TabulationSidewalk and Curbing Construction for the Year Ending December 31, 2019 (#6160364) Owner: Kalispell MT, City of Solicitor: Kalispell MT, City of 03/07/2019 02:00 PM MST sandon construction co inc Knife River Corporation - Kalispell Section Tit Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Base Bid $4,503.75 $10,540.75 1 1 Project Mobilization LS 1 $2,800.00 $2,800.00 $8,850.00 $8,850.00 2.A 2.A 4" Concrete Pavement, 100 SF or Less SF 1 $10.85 $10.85 $13.00 $13.00 2.B 2.B 4" Concrete Pavement, 101 to 240 SF SF 1 $6.05 $6.05 $9.00 $9.00 2.0 2.0 4" Concrete Pavement, 241 SF or More SF 1 $5.85 $5.85 $7.50 $7.50 3 3 6" Concrete Pavement SF 1 $9.00 $9.00 $14.00 $14.00 4 4 8" Concrete Pavement SF 1 $17.95 $17.95 $15.00 $15.00 5.A 5.A Concrete Curb & Gutter, 50 LF or Less LF 1 $23.50 $23.50 $37.00 $37.00 5.B 5.B Concrete Curb & Gutter, 51 LF or More LF 1 $20.50 $20.50 $28.00 $28.00 6.A 6.A Concrete Standup Curb, 50 LF or Less LF 1 $21.50 $21.50 $34.00 $34.00 6.B 6.B Concrete Standup Curb, 51 LF or More LF 1 $20.50 $20.50 $26.00 $26.00 7 7 Concrete Valve Collar EA 1 $525.00 $525.00 $350.00 $350.00 8 8 Concrete Manhole Collar EA 1 $575.00 $575.00 $600.00 $600.00 9.A 9.A Concrete Removal, 4 Inches and Less SF 1 $1.75 $1.75 $1.80 $1.80 9.B 9.B Concrete Removal, More Than 4 Inches SF 1 $2.30 $2.30 $3.05 $3.05 10 10 Concrete Curb Removal LF 1 $3.50 $3.50 $4.50 $4.50 11 11 4" Irrigation Sidewalk Sleeve EA 1 $30.00 $30.00 $80.00 $80.00 12.A 12.A Landscape - Reseed SF 1 $2.00 $2.00 $3.40 $3.40 12.13 12.13 Landscape - Resod SF 1 $3.50 $3.50 $4.50 $4.50 13 13 Truncated Dome Panel EA 1 $285.00 $285.00 $300.00 $300.00 14 14 3/4" Crush Gravel CY 1 $75.00 $75.00 $90.00 $90.00 15 15 Laborer HR 1 $65.00 $65.00 $70.00 $70.00 Base Bid Total: I I I 1 1 1$41503.75 1 1$10,540.75