Loading...
Meadows Edge Final Plat and AgreementPLANNMG FOR THE FUTURE j Welf i ,_ r REPORT TO: Doug Russell, City Manager FROM: Jarod Nygren, Senior Planner Planning Department 201 1" Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/plannine SUBJECT: Final plat request and Subdivision Improvement Agreement for Meadows Edge Phase IA MEETING DATE: July 1, 2019 BACKGROUND: WGM Group, INC. submitted a request, on behalf of Meadows Edge, LLC, for final plat approval of Meadow's Edge Phase IA, a 45-lot residential subdivision. The subdivision is located on Mountain Vista Way and can be legally described as Tract 3 of COS 18892 in the E2, Section 3, Township 28 North, Range 22 West, P.M.M., Flathead County, Montana. The City Council approved the preliminary plat for Meadows Edge with 33 conditions at their meeting on June 4, 2018, with Resolution No. 5874. All of the conditions have been met or adequately addressed. In addition, a Subdivision Improvement Agreement in the amount of $214,351.49 (125% of remaining cost) is included for City Council action. RECOMMENDATION: It is recommended that the City Council approve the final plat for Meadows Edge Phase IA. FISCAL EFFECTS: Positive impacts once developed. ALTERNATIVES: Deny the request. ATTACHMENTS: Final plat compliance letter and associated attachments. Report compiled: June 24, 2019 Aimee Brunckhorst, Kalispell City Clerk PLANNING FOR THE FUTURE June 24, 2019 Doug Russell, City Manager City of Kalispell 201 1" Ave E Kalispell, MT 59901 MONTANA Planning Department 201 1" Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 WWWAalispell.com/planning Re: Final plat request and Subdivision Improvement Agreement for Meadows Edge Phase IA Dear Doug: WGM Group, INC. submitted a request, on behalf of Meadows Edge, LLC, for final plat approval of Meadow's Edge Phase IA, a 45-lot residential subdivision. The subdivision is located on Mountain Vista Way and can be legally described as Tract 3 of COS 18892 in the E2, Section 3, Township 28 North, Range 22 West, P.M.M., Flathead County, Montana. The City Council approved the preliminary plat for Meadows Edge with 33 conditions at their meeting on June 4, 2018, with Resolution No. 5874. All of the conditions have been met or adequately addressed. The following report summarizes the applicant's compliance with the conditions of approval. In addition, a Subdivision Improvement Agreement in the amount of $214,351.49 (125% of remaining cost) is included for City Council action. COMPLIANCE WITH CONDITIONS OF APPROVAL The Planned Unit Development for Meadows Edge allows the following deviations from the Kalispell Zoning Ordinance: a) Kalispell Zoning Ordinance, Section 27.06.020 Permitted Uses — Allows up to four (4) attached townhomes as a permitted use. Staff Response: This condition has been met. The final plat is in compliance with the submitted preliminary plat application and materials. No additional deviations are requested. 2. That the development of the site will be in substantial conformance with the preliminary plat documents entitled Meadows Edge and associated submittal drawings which shall govern location of the lots, easements, roadways, phasing plan, covenants and declarations, landscaping, fencing, parkland, uses and pedestrian access facilities. Staff Response: This condition has been met. The final plat is in compliance with the approved preliminary plat. 3. The preliminary plat approval for the development shall be valid for a period of three years from the date of approval. Staff Response: This condition has been met. The City Council approved the preliminary plat at their meeting on June 4, 2018, giving the plat an expiration date of June 4, 2021. 4. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site that shall be completed and signed by the city and owner prior to the issuance of a building permit. Staff Response: This condition has been adequately addressed. All of the conditions of the preliminary plat have been met, or otherwise bonded; thereby a further agreement is unnecessary. 5. Architectural renderings for all commercial buildings are required to be submitted to the Kalispell Architectural Review Committee for review and approval prior to issuance of a building permit. Staff Response: This condition is not applicable. The condition is not applicable because there are no commercial buildings within Meadow's Edge Phase IA. 6. To ensure the traffic flow and access comply with Kalispell Design and Construction Standards, the development shall receive Site Review Committee approval prior to issuance of the building permit for development within the B-1 Zone. Staff Response: This condition is not applicable. The condition is not applicable because there are no commercial buildings within Meadow's Edge Phase IA. 7. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. Staff Response: This condition has been met. Public Works has issued a letter approving the subdivision on October 12, 2018. The letter is attached hereto for reference. In addition, the developer has entered into a subdivision improvement agreement with the City of Kalispell that can be used by the city as collateral to assure all remaining infrastructure required is installed to city standards for design and construction. 8. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and in compliance with the city's facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved. Staff Response: This condition has been met. Public Works has issued a letter approving the subdivision on October 12, 2018. The letter is attached hereto for reference. In addition, the developer has entered into a subdivision improvement agreement with the City of Kalispell that can be used by the city as collateral to assure all remaining infrastructure required is installed to city standards for design and construction. 9. The sewer for Phases 2-5 shall be designed to connect into the West Side Sewer Interceptor. Final design plans shall be reviewed and approved by the Kalispell Public Works Department prior to final plat of Phase 2. Staff Response: This condition is not applicable. The condition is not applicable because the applicant is only requesting final plat of Meadow's Edge Phase IA, not phases 2-5. 10. The developer shall submit to the Kalispell Public Works Department for review and approval a stormwater report and an engineered drainage plan that meets the requirements of the current City standards for design and construction. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the drainage plan for the subdivision has been installed as designed and approved. Staff Response: This condition has been met. Public Works has issued a letter approving the subdivision on October 12, 2018. The letter is attached hereto for reference. In addition, the developer has entered into a subdivision improvement agreement with the City of Kalispell that can be used by the city as collateral to assure all remaining infrastructure required is installed to city standards for design and construction. 11. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Stormwater Discharge Associated with Construction Activities. Staff Response: This condition has been met. Public Works issued a letter approving the stormwater plan on October 12, 2018 and subsequently issued a stormwater permit on October 24, 2018. DEQ issued a letter on October 24, 2018 for General Permit for Storm Water Discharge Associated with Construction Activities. 12. Prior to final plat a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. Staff Response: This condition has been met. Public Works issued a letter accepting the water and sewer on 6/26/2019 and the city has entered into a subdivision improvement agreement with the City of Kalispell that can be used by the city as collateral to assure all remaining infrastructure required is installed to city standards for design and construction. 13. The traffic impact study for the project site shall be reviewed and approved by the Public Works Department and where appropriate, the Montana Department of Transportation in order to determine the appropriate mitigation as the project develops. Staff Response: This condition has been met. Public Works issued a letter approving the street improvements on October 12, 2018 MDT issued an approach permit, which incorporated TIS mitigation, on June 24, 2019. The two approvals are attached hereto for reference. 14. The developer shall obtain an approach permit from the Montana Department of Transportation (MDT) for approaches onto Farm to Market Road. If any improvements are necessary at the intersection of the roadways, these improvements shall be completed to the satisfaction of the MDT prior to final plat and MDT shall so certify this in writing to the city. Staff Response: This condition has been met. MDT issued an approach permit on June 24, 2019. The approach permit is attached hereto for reference. 15. Prior to final plat all mitigation required as part of the approved traffic impact study shall be completed. All improvements shall be reviewed and approved by either the Public Works Department or Montana Department of Transportation. A letter from the Kalispell Public Works Department or Montana Department of Transportation shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or State of Montana. If infrastructure work has not been accepted, a letter stating that a proper bond has been accepted for the unfinished work by the appropriate agency is required. Staff Response: This condition has been met. Public Works has issued a letter approving the street improvements on October 12, 2018. MDT issued an approach permit, which incorporated TIS mitigation, on June 24, 2019. Both documents are attached hereto for reference. 16. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. Staff Response: This condition has been met. The Kalispell Fire Department issued a letter approving the subdivision on October 1, 2018. The letter is attached hereto for reference. 17. A letter shall be obtained from the Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the open space, landscape boulevards and streets serving the subdivision. Staff Response: This condition has been met. The Kalispell Parks Department issued a letter approving the landscaping on 6/26/2019. The letter is attached hereto for reference. 18. A park maintenance district shall be formed incorporating all the lots within the subdivision. The park maintenance district shall not be effective until such time as any open space or parks are accepted by the city. In this case an assessment would be levied within the maintenance district to be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. Staff Response: This condition has been met. The final plat note 95 indicated the property owners(s) shall waive their right to protest the creation of a parks maintenance district. 19. A park plan shall be created and approved by the Parks and Recreation Director prior to final plat of Phase 1. Staff Response: This condition has been met. The Kalispell Parks Department issued a letter approving the parks plan on 6/26/2019. The letter is attached hereto for reference. 20. All easements and/or right-of-ways shall be indicated on the face of the final plat. Utility easements for City water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. Staff Response: This condition has been met. Public Works issued a letter approving the easements on March 26, 2019. The letter is attached hereto for reference. 21. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Staff Response: This condition has been met. The notation is on the final plat. 22. That a minimum of two-thirds of the necessary public infrastructure for this subdivision shall be completed prior to final plat submittal of each phase. Staff Response: This condition has been met. More than 2/3 of the public infrastructure has been installed, and/or accepted by the city. The developer has entered into a subdivision improvement agreement with the City of Kalispell that can be used by the city as collateral to assure all remaining infrastructure required is installed to city standards for design and construction. 23. All utilities shall be placed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. Staff Response: This condition has been adequately addressed. Utilities have either been constructed underground, or will be constructed in the near future, at which time they will be verified via filed inspection by Public Works. 24. The following public right-of-way improvements shall be completed at each phase of the development: a. Phase 1 — West Spring Creek/Farm to Market shall be updated to city standards along the property boundary from Mountain Vista Way south to the intersection with Three Mile Drive. b. Phase 2 — Three Mile Drive shall be upgraded to city standards along the property boundary from the western terminus of the development to the eastern terminus of the development. c. Phase 3 — Farm to Market shall be upgraded to city standards from Mountain Vista Way north to the properties northern property boundary. Staff Response: This condition has been adequately addressed. The improvements to the roadways will be improved with each corresponding phase. 25. The paths located within Three Mile Drive and W. Spring Creek/Farm to Market shall be maintained by the Meadows Edge HOA. Staff Response: This condition has been adequately addressed. Provisions for path maintenance has been incorporated into the Meadows Edge CCNR's. 26. The alleyways within the development shall be designated as "private" at time of final plat. Staff Response: This condition has been met. The alleyways are indicated as private on the final plat. 27. Subdivision signage for the development shall comply with Section 27.22.050(6) of the Kalispell Zoning Ordinance. Staff Response: This condition has been adequately addressed. At the time a subdivision sign is installed planning staff will verify compliance with the sign regulations for subdivisions. 28. A homeowner's association (HOA) shall be formed and established for the common areas prior to final plat. Staff Response: This condition has been met. Articles of Incorporation for Meadows Edge have been filed with the Montana Secretary of State. See attached letter. 29. All properties along the western boundary of the subdivision shall install uniform rear yard fencing prior to certificate of occupancy of those residences. Staff Response: This condition is not applicable. Phase IA does not have any properties being platted along the western boundary of the approved preliminary plat. 30. A note shall be placed on the final plat that stating: "This subdivision is located in an agriculture area and potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. As such, the right to farm on adjoining properties shall not be restricted as a result of the development or occupancy of this subdivision." Staff Response: This condition has been met. Note #4 on the final plat has the right to farm language. 31. The developer shall work with Eagle Transit to establish bus stop location(s) within the Meadows Edge PUD. The approved bus stop location(s) shall be included on a revised PUD plan and submitted with the preliminary plat of phase 5. Bus stop location(s) shall be improved in accordance with Eagle Transit's requirements, which may include a bus shelter. This condition is waived if Eagle Transit provides a letter in writing that it will not serve the development. Staff Response: This is not applicable. The final plat is only for Phase IA and this condition pertains to Phase 5. 32. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat of Phase 1. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. Staff Response: This condition has been met. The US Postal Service sent an email on 9/5/2018 approving the proposed postal facilities for the subdivision. 33. Any water rights associated with the property shall be transferred to the City of Kalispell. The water rights shall be allocated proportionally for each phase of the development prior to final plat. Staff Response: This condition has been met. The developer has transferred all applicable water rights to the City of Kalispell. COMPLIANCE WITH APPROVED PRELIMINARY PLAT The final plat is in substantial compliance with the preliminary plat approved by the Kalispell City Council on June 4, 2018. COMPLIANCE WITH THE SUBDIVISION REGULATIONS: This subdivision plat has been found to be in compliance with the state and city Subdivision Regulations. COMPLIANCE WITH THE ZONING REGULATIONS This subdivision can be found to be in compliance with the Kalispell Zoning Ordinance and the R- 3/PUD zoning designation for the property which governs the dimensional requirements of the lots within the subdivision as well as the uses. RECOMMENDATION: It can be found that the conditions of preliminary plat approval have been met or are otherwise adequately addressed. The staff recommends that the Kalispell City Council approve the final plat for Meadows Edge — Phase IA. Attachments: - Two mylars of final plat - I I" x 17" copy of plat - Applicant responses and final plat application dated 4/24/2019 - Fidelity National Title guarantee FT1585-191570, dated 6/20/2019 - Subdivision Improvement Agreement and cashier's check - Engineer's cost estimate - Flathead County tax certification, dated 4/11/2019 - Letter from Kalispell Public Works (utility easements), dated 3/26/2019 - Letter from Kalispell Public Works (engineering approval), dated 10/12/2018 - Letter from Kalispell Public Works (stormwater permit), dated 10/24/2018 - Letter from Kalispell Public Works (acceptance), dated 6/26/2019 - Montana Department of Environmental Quality water and sewer approval letter, dated 10/16/2018 - Montana Department of Environmental Quality storm water permit, dated 10/24/2018 - Montana Department of Transportation approach permit, dated 6/24/2019 - Engineer's Certification letter dated 5/31/2019 - Kalispell Fire Department approval letter, dated 10/1/2018 - Kalispell Parks and Recreation letter, dated 6/26/2019 - Email from US Postal Service, dated 9/5/2018 c w/ Att: Aimee Brunckhorst, Kalispell City Clerk c w/o Att: W GM, Group 431 I't Avenue West Kalispell, MT 59901 Planning Department 201 1" Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 11,11v.lcalis Pell.con]/ )launin FINAL PLAT APPLICATION Project /Subdivision Name: Meadows Contact Person: Name: WGM Group, Inc. Address: 431 1st Avenue West Kalispell, MT 59901 Phone No.: (406) 756-4848 Subdivision Phase 1A Date of Preliminary Plat Approval: .tune 4th, 2018 Owner & Mailing Address: Meadows Edge, LLC P.O. Box 7184 Kalispell, MT 59904 320 221-0280 Type of Subdivision: Residential X Industrial Commercial PUD Other Total Number of Lots in Subdivision 45 Land in Project (acres) 16.1 Parkland (acres) 5.9 Cash -in -Lieu $ Exempt P No. of Lots by Type: Single Family 19 Townhouse 6 (20 d.u.) Mobile Home Park Duplex 3 (6 d.u.) Apartment Recreational Vehicle Park Commercial Industrial Planned Unit Development Yes Condominium Multi -Family Other Legal Description of the Property Tract 3 of COS 18892 in the East half of Section 3, Township 28 North, ___Range 22 West, P M M F ea CounMontana FILING FEE ATTACHED $__ 6.475 Minor Subdivision with approved preliminary plat $400 + $125/lot Major Subdivision with approved preliminary plat $800 + $125/lot Subdivisions with Waiver of Preliminary Plat $800 + $125/lot Subdivision Improvements Agreement $50 1 Attached Not Applicable (MUST CHECK ONE ✓ Health Department Certification (Original) ✓ Title Report (Original, not more than 90 days old) ✓ Tax Certification (Property taxes must be paid) ✓ Consent(s) to Plat (Originals and notarized) ✓ Subdivision Improvements Agreement (Attach collateral) ✓ Parkland Cash -in -Lieu (Check attached) ✓ Maintenance Agreement Plats: 2 mylars 1 11X17 Copy 1 full size copy 1 Electronic Copy **The plat must be signed by all owners of record, the surveyor and the examining land surveyor. Attach a letter, which lists each condition of preliminary plat approval, and individually state how each condition has specifically been met. In cases where documentation is required, such as an engineer's certification, State Department of Health certification, etc., original letters shall be submitted. Blanket statements stating, for example, "all improvements are in place" are not acceptable. A complete final plat application must be submitted no less than 60 days prior to expiration date - of the preliminary plat. When all application materials are submitted to the Kalispell Planning Department, and the staff finds the application is complete, the staff will submit a report to the governing body. The governing body must act within 30 days of receipt of the revised preliminary plat application and staff report. Incomplete submittals will not be accepted and will not be forwarded to the governing body for approval. Changes to the approved preliminary plat may necessitate reconsideration by the planning board. I certify that all information submitted is true, accurate and complete. I understand that incomplete information will not be accepted and that false information will delay the application and may invalidate any approval. The signing of this application signifies approval for Kalispell Planning staff to be present on the property for routine monitoring and inspection during the approval and development process. **NOTE: Please be advised that the County Clerk & Recorder requests that all subdivision final plat applications be accompanied with a digital copy. e/ Owner(s) Signature Date **A digital copy of the final plat in a Drawing Interchange File (DXF) format or an AutoCAD file format, consisting of the following layers: 1. Exterior boundary of subdivision 2. Lot or park boundaries 3. Easements 4. Roads or rights -of -way 5. A tie to either an existing subdivision corner or a corner of the public land survey system E 4W"AWGMGR0UP April 24, 2019 Tom Jentz, Director Kalispell Planning Department 201 15t Avenue East Kalispell, MT 59901 Re: Final Plat Application for Meadows Edge Phase 1A Subdivision Dear Tom: As engineer of record for Meadows Edge Phase 1A Subdivision, I hereby certify that all of the conditions stated in Resolution No. 5874 have been addressed to the best of my knowledge, except for the following conditions which are in the process of being addressed: Conditions #4, #8, #14, #17, #19, and #33. Enclosed is the Final Plat application for the Meadows Edge Phase 1A Subdivision. The conditions of approval are listed below along with how each has been addressed: 1. The Planned Unit Development for Meadows Edge allows the following deviation from the Kalispell Zoning Ordinance: a. Kalispell Zoning Ordinance, Section 27.06.020 Permitted Uses - Allows up to four (4) attached townhomes as a permitted use. The development of the site utilized the above deviation. Please see enclosed Meadows Edge Staff Report and Conditions of Approval, Section 11 Evaluation Based on Statutory -Criteria for Initial Zonj0_q_and Proposed PUD Overly, paragraph 1. 2, That the development of the site will be in substantial compliance with the preliminary plat documents entitled Meadows Edge and associated submittal drawings which shall govern location of the lots, easements, roadways, phasing plan, covenants and declarations, landscaping, fencing, parkland uses, and pedestrian access facilities. The development of the site is in substantial compliance with the preliminary plat documents as approved by City Council, Please see enclosed Resolution No. 5874 - Preliminary Plat Conditions of Approval. 3. The preliminary plat approval for the development shall be valid for a period of three years from the date of approval. The preliminary plat was approved in June 2018 and is still valid. 4. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and 431 1" Avenue West, Kalispell, MT 59901 I OFFICE 406.756.4848 I EMAIL wgm@wgmgroup.com Kalispell Planning Department 4/24/19 Page 3 of 7 installed and tested in accordance with City of Kalispell and DEQ requirements will be provided upon completion. 9. The sewer for Phases 2-5 shall be designed to connect into the West Side Sewer Interceptor. Final design plans shall be reviewed and approved by the Kalispell Public Works Department prior to final plat of Phase 2. This will be addressed in future phases, 10. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. Refer to the design approval letters provided under Condition #8. A certification letter stating that the drainage plan for the subdivision has been installed as designed and approved is enclosed. 11. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. An erosion control plan was submitted with the construction documents to the Kalispell Public Works Department and the Montana Department of Environmental Quality. Prior to construction, the Contractor obtained a General Permit for Storm Water Discharge Associated with Construction Activities. Please see the enclosed Montana Department of Environmental Quality Notice of Intent Confirmation Letter and the City of Kalispell Stormwater Permit Approval Letter. 12. Prior to final plat a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. A Subdivision Improvements Agreement (SIA) including proper bonding has been generated for improvements not yet completed for Phase 1A. Over two-thirds of the infrastructure has been constructed to date. Please see the SIA enclosed with the final plat application form. A cashier's check for the bond amount has been provided to the City of Kalispell. 13. The traffic impact study for the project site shall be reviewed and approved by the Public Works Department and where appropriate, the Montana Department of Transportation in order to determine the appropriate mitigation as the project develops. Kalispell Planning Department 4/24/19 Page 5 of 7 The Homeowners Association will maintain the parks and open space areas through the dues collected. Please see enclosed email correspondence with the Kalispell Parks & Recreation Department. 19. A park plan shall be created and approved by the Parks and Recreation Director prior to final plat of Phase 1. A Park and Trail Master Plan was provided to Chad Fincher and was recently revised to address his initial comments. His approval letter is pending. 20.All easements and/or rights -of -way shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. All existing and proposed easements are shown on the face of the enclosed final plat, A letter from the Kalispell Public Works Department confirming this is enclosed. 21. The following statement shall appear on the final plat: " The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as " Utility Easement" to have and to hold forever." The above note is included on the final plat. 22. That a minimum of two-thirds of the necessary public infrastructure for the subdivision shall be completed prior to final plat submittal of each phase. Please reference the SIA Exhibit "B" enclosed with the final plat application, that states approximately 70% of necessary public infrastructure has been completed as of the bonding date. 23. All utilities shall be placed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. Please refer to the City's conditional approval letter enclosed under Condition #7. In addition, all dry utilities have been designed and constructed in underground conduits and vaults or pedestals. 24.The following public right-of-way improvements shall be completed at each phase of the development: Kalispell Planning Department 4/24/19 Page 7 of 7 Not applicable to Phase 1A and will be addressed in future phases. Currently, Eagle Transit is not ready to provide service to the development. 32. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. A letter of approval from the US Postal Service is enclosed. 33. Any water rights associated with the property shall be transferred to the City of Kalispell, The water rights shall be allocated proportionally for each phase of the development prior to final plat. For simplification of the water rights transfer process, we intend to transfer all water rights to the City pending a memorandum of understanding (MOU) from the City allowing the developer to continue using the north well for farming undeveloped land within the subdivision until the last phase gets developed, Enclosed is a Meadows Edge Water Rights Memorandum quantifying the water rights associated with this development. An MOU from the Public Works Department is pending. Sincerely, WGM Group, Inc. 645z� /1, j /J� Stephanie A. Reynolds, P.E. Senior Project Engineer Enclosures: Conditions of approval supporting documentation for Phase 1A SUBDIVISION Guarantee/Certificate Number: Issued By: 0 Fidelity National Title' FT1585-191570 Insurance Company FIDELITY NATIONAL TITLE INSURANCE COMPANY a corporation, herein called the Company GUARANTEES WGM Group, its successors and/or assigns as their respective interests may appear. herein called the Assured, against actual loss not exceeding the liability amount stated in Schedule A which the Assured shall sustain by reason of any incorrectness in the assurances set forth in Schedule A. LIABILITY EXCLUSIONS AND LIMITATIONS 1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A or with respect to the validity, legal effect or priority of any matter shown therein. 2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount set forth in Schedule A. Please note carefully the liability exclusions and limitations and the specific assurances afforded by this guarantee. If you wish additional liability, or assurances other than as contained herein, please contact the Company for further information as to the availability and cost. Fidelity National Title Company of Flathead Valley, LLC 1807 3rd Ave E Kalispell, MT 59901 Countersigned By: Authorized Officer or Agent -hhmd" ! SEAL Fidelity National Title Insurance Company By: Attest: President Secretary Subdivision Guarantee/Certificate Printed: 06.26.19 @ 01:35 PM Page 1 MT-FT-FLAT-01585.350200-SPS-1-19-FT1585-191570 GUARANTEEICERTIFICATE NO. FIDELITY NATIONAL TITLE INSURANCE COMPANY FT1585-191570 ISSUING OFFICE: Title Officer: Karla Kemm (LC) Fidelity National Title Company of Flathead Valley, LLC 1807 3rd Ave E Kalispell, MT 59901 Main Phone: (406)755-7004 Email Karla,Kemm@fnf.com SCHEDULE A Liability Premium Tax $10,000.00 $150.00 $0.00 Effective Date: June 20, 2019 at 08:00 AM The assurances referred to on the face page are: That, according to those public records which, under the recording laws, impart constructive notice of matter relative to the following described property: SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF Title to said real property is vested in: Meadows Edge, LLC, a Montana limited liability company subject to the matters shown below under Exceptions, which Exceptions are not necessarily shown in the order of their priority. END OF SCHEDULE A subdivision GuaranleelCertificate Printed: 06.26.19 @ 01-35 PM Page 2 MT-FT-FLAT-01585.350200-SPS-1-19-FT1585-191570 EXHIBIT "A" Legal Description A Tract of land being a portion of Tract 3 of Certificate of Survey No. 18892, on file and of record in Flathead County, Montana, located in the Southeast One Quarter of Section 3, Township 28 North, Range 22 West, Principal Meridian, Montana, City of Kalispell, County of Flathead, Montana; more particularly described as follows: Commencing at the Southeast corner of Section 3; thence N04°34'06"E, along the East line of Section 3, 1029.57 feet; thence N85°25'54"W, 76.88 feet to a point on the West right-of-way line of farm to market road and the point of beginning; thence N85007'36W, 147.97 feet; thence SO4°52'24"W, 57.34 feet; thence N85007'36W, 60.00 feet; thence N04°52'24"E, 4.90 feet; thence N86°38'57"W, 13.62 feet to the point of curve of a 438.00 foot radius tangent curve to the left; thence along said curve through a central angle of 17°52'26", an arc distance of 136.64 feet to a point of tangency; thence S75°28'37"W,59.44 feet to a point of curve on a 985.00 foot radius tangent curve to the right; thence along said curve through a central angle of 9'11'41", an arc distance of 158.07 feet; thence N00°00'00"E, 155.80 feet; thence along a 830.00 foot radius curve concave to the North, an arc distance of 47.37 feet (Chord Bears S85°18'28"W 47.37 feet); thence N00°00'00"E, 170.30 feet; thence along a 660.00 foot radius curve concave to the North, an arc distance of 60.03 feet (Chord Bears S88°45'37"W 60.01 feet); thence N00°00'00"E, 130.04 feet; thence along a 530.00 foot radius curve concave to the North, an arc distance of 15.90 feet (Chord Bears N87'26'22"W 15.90 feet); thence NO3°25'12"E, 173.75 feet; thence N79°33'35"E, 255.10 feet: thence N01059'06"E, 267.55 feet; thence N45055'35"E, 210.34 feet; thence N55°28'41"E, 293.87 feet; thence S87°33'50"E, 133.48 feet to a point on the West right-of-way line of farm to market road; thence along said West right -of way line the following courses: SO4°27'30"W 281.08 feet; N85°32'30"W, 10.00 feet and SO4°27'30"W, 879.97 feet to the point of beginning; The above parcel is to be known and designated as Meadows Edge Phase 1A. Subdivision Guarantee/Certificate Printed: 06.26,19 Q 01:35 PM Page 3 MT-FT-FLAT-01 585.350200-SPS-1-19-FT1585-191570 FIDELITY NATIONAL TITLE INSURANCE COMPANY SCHEDULE B GUARANTEEICERTIFICATE NO. FT1585-191570 a. Rights or claims of parties in possession not shown by the Public Records. b. Encroachments, overlaps, boundary line disputes, and any other matters which would be disclosed by an accurate survey and inspection of the Land including, but not limited to, insufficient or impaired access and matters contradictory to any survey plat shown by the Public Records. c. Easements, or claims of easements, not shown by the Public Records. d. Any lien, or right to a lien, for services, labor, or material heretofore or hereafter furnished, imposed by law and not shown by the Public Records. e. (a) unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters accepted under (a), (b), (c) are shown by the Public Records. f. Taxes to special assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records. Proceedings by a public agency which may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. g. County road rights -of -way, not recorded and indexed as a conveyance of record in the office of the Clerk and Recorder pursuant to Title 70, Chapter 21 MCA, including, but not limited to any right of the public to use and occupy those certain roads and trails. h. Mineral rights, claims or title to minerals in or under said land, including but not limited to metals, oil, gas, coal, or other hydrocarbons, sand, gravel, or stone, and geothermal energy rights, and easement or other rights or matters relating thereto, whether express or implied, recorded, or unrecorded. Paragraphs 1, a, b, c, d, and f will not appear as printed exceptions on extended coverage policies, except as to such parts thereof which may be typed as a Special Exception as shown below. SPECIAL EXCEPTIONS: 1, General Taxes for the year 2018 1 st Half: $809.40 PAID 2nd Half: $809.37 PAID Tax I D No.: 01-0013865 Affects: Premises and other property 2. General County Taxes for the year 2019 and subsequent years, which are a lien but not yet due or payable. 3. Any possible additional tax assessments because of construction and/or improvements to the property. 4. An existing county road, known as Farm To Market along the easterly boundary as disclosed by County Assessor's Map and surveys of record. Subdivision GuaranteeiCertificate Printed: 06.26,19 @ 01:36 PM Page 4 MT-FT-FLAT-01585.350200-SPS-1-19»FT1585-191570 FIDELITY NATIONAL TITLE INSURANCE COMPANY SCHEDULE B (continued) 5. Easement(s) and rights incidental thereto as set forth in a document: In favor of: Mountain States Power Company Recording Date: March 30, 1951 Recording No.: Book 317, Page 608 6. Easement(s) and rights incidental thereto as set forth in a document: In favor of: Pacific Power & Light Company Recording Date: September 29, 1994 Recording No.: 94-272-10340 GUARANTEE/CERTIFICATE NO. FT1585-191570 7. Recitals, notes, sanitary restrictions, ordinances, resolutions, easements, dedications and covenants as contained or referred to on Certificate of Survey No. 17323. Reference is hereby made to the survey for more particulars. Recording No.: 2006-158-10510 8. Recitals, notes, sanitary restrictions, ordinances, resolutions, easements, dedications and covenants as contained or referred to on Certificate of Survey No. 18892. Reference is hereby made to the survey for more particulars. Recording No.: 201000004200 9. Grant of Easement and Water Well Agreement Recording Date: June 18, 2010 Recording No.: 201000014008 10. This property lies within the boundaries of Resolution No. 5873 for The alteration of the boundaries of the City of Kalispell by including therein as an annexationto be known as Meadows Edge Additon No. 438, recorded June 14, 2018 at 201800011933 and will be subject to any levies and assessments thereof. 11, Ordinance No. 1810 Recording Date: September 21, 2018 Recording No.: 201800023321 12. Memorandum of Understanding between The City of Kalispell, Montana and Meadows Edge, LLC Recording Date: June 10, 2019 Recording No.: 201900011237 13. Recitals, notes, dedications, easements, certificates and covenants as contained on the plat of proposed plat of Meadows Edge Phase 1A. Reference is hereby made to the plat for more particulars. Subdivision Guarantee/Certificate Printed: 06.26.19 @ 01:36 PM Page 5 MT-FT-FLAT-01585.350200-SPS-1-19-FT1585-191570 GUARANTEE/CERTIFICATE NO. FIDELITY NATIONAL TITLE INSURANCE COMPANY FT1585-191570 SCHEDULE B (continued) 14. State of Montana Department of Environmental Quality Certificate of Subdivision Approval to be recorded with the proposed plat of Meadows Edge Phase 1A, if any. 15. Notice of Right to Claim a Lien Claimed by: Probuild Company, LLC dba Builders FirstSource 445 (KALIMTYD) Against: Meadows Edge LLC For: Building materials and professional services Recording Date: May 20, 2019 Recording No.: 201900009533 Affects: Premises and other property 16, A mortgage to secure an indebtedness as shown below Amount: $1,500,000.00 Dated: May 29, 2019 Mortgagor: Meadows Edge, LLC Mortgagee: First Interstate Bank Recording Date: June 6, 2019 Recording No.: 201900011064 Affects: Premises and other property The Mortgage set forth above is purported to be a "Credit Line" Mortgage. It is a requirement that the Trustor/Grantor of said Mortgage provide written authorization to close said credit line account to the Lender when the Mortgage is being paid off through the Company or other Settlement/Escrow Agent or provide a satisfactory subordination of this Mortgaget to the proposed Mortgage to be recorded at closing. 17. Notice of Right to Claim a Lien Claimed by: Northwest Drywall and Building Supply, Inc. Against: Meadow Edge LLC For: construction materials Recording Date: June 17, 2019 Recording No.: 201900012008 Affects: Premises and other property 18. Notice of Right to Claim a Lien Claimed by: Northwest Drywall and Building Supply, Inc. Against: Meadow Edge LLC For: construction materials Recording Date: June 17, 2019 Recording No.: 201900012009 Affects: Premises and other property Subdivision Guarantee/Certificate Printed_ 06,26.19 @ 01:36 PM Page 6 MT-FT-FLAT-01 585.350200-SPS-1-1 9-FT1 585-191570 GUARANTEEICERTIFICATE NO. FIDELITY NATIONAL TITLE INSURANCE COMPANY FT1585-191570 SCHEDULE B (continued) 19. The land described in the commitment/policy small not be deemed to include any home trailer or mobile home located on the property. 20. Exceptions and reservations contained in Patents of record. END OF SCHEDULE B Subdivision Guarantee/Certificate Printed, 06,26.19 @ 01:R PM Page 7 MT-FT-FLAT-01565.350200-SPS-1-19-FT1585-191570 Plat Room Flathead County, Montana 800 S. Main St. Kalispell, MT 59901 (406) 758-5510 This Form is for Subdivisions Only BY : WGM Group FOR, Meadows Edge LLC DATE: 3/29/2019 DESCP : Meadows Edge - Phase 1A located PURPOSE : Subdivision on a portion of TR 5 in 3-28-22 YEARS ASSESSOR # 2015 thru 2018 0013865 hereby certify that there are no outstanding taxes on the property assigned the assessor numbers listed above, fo the years indicated for each assessor number. 5 rJ APR 1 1 ,' 19 �p GOL+NTY 1. . allti� Deputy/Treasurer (seal) Return to: Aimee Brunckhorst Kalispell City Clerk 201 1"Avenue East Kalispell, MT 59901 APPENDIX E SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this 24th day of June , 2019 , by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and Meadows Edge, LLC (Name of Developer) a Corporation (Individual, Company or Corporation) located at _ P.O. Box 7184, Kalispell, Flathead County, Montana, 59904 (Street Address/P. O. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as Meadows Edge Phase lA (Name of Subdivision) located at Tract 3, E 1/2 Section 3, T28N, R22W, P.M.M., Flathead County, Montana (Location of Subdivision) and, WHEREAS, the City has conditioned it's approval of the final plat of Meadows Edge Phase 1A upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A'; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B'; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $ 171,481.19 NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $ 214,351.49 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in he sum Of $ 214,351.49 completing the required improvements in Meadows Edge Phase I (Name of Subdivision) the estimated cost of b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by July 01 320 20 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of two (2) years from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before tten. Meadows Edge, LLC by (Name) (Title) STATE OF MONTANA COUNTY OF�� On this '-Lj*` day of `Sv�.rti� , 20 11 , before me, a Notary Public for the State of Montana, personally appeared C IXAe-M e4J.-.eL , known to me to be the ro of M -g- G.L., , whose name is subscribed to the foregoing instrumed and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year first above written. Notary Public fort State of Montana Printed Name M Co Residing at -MT— My Commission Expires Z' MAYOR, CITY OF KALISPELL ATTEST: MAYOR CITY CLERK COpyy MINCY COCHRAN NOTARY PUBLIC for the SFAL �z` State of Montane Residing at Kalispell, MT p� V My Commission Expires May 17, 2m. Project Name: MEADOWS EDGE SUBDIVISION, PHASE 1A WGM Project Number: 171034.4 Owner: MEADOWS EDGE, LLC Bonding Date: July 1, 2019 EXHIBIT "B" CERTIFICATION OF WORK TO BE � � 1 COMPLETED f WG M Completed as of Bonding Date Final Construction Construction Quantity Costs Total Quantities and Costs Line Item Item Description Unit Quantity Unit Price Total Quantity Current Total Schedule 1-Site Work 1.1 Mobilization, Submittals & Permits LS 1 $25,000.00 $2S,000.00 1.ODDO $25,000-00 1.2 Erosion Control Measures LS 1 $10,017,50 $10,017.50 0.5543 $5,552-70 1.3 Traffic Control LS 1 $4,700.00 $4,7oo.00 1.0000 $4,700.00 2.4 Construction Survey LS 1 $1c,500.0o $10-600. 1.0000 $10.500.00 1.5 Clearing Topsoil & Stockpile LS 1 $25,000.DO $2S,owm 1.0000 $25,000.D0 1.6 Embankment LS 1 $30,000.00 $30,13DCLOD 1.0000 $30,000.00 1.7 Seeding & Restoration LS 1 $15,000.Cc $15,000.00 0.1702 $2,553.00 1.8 Material Testing LS 1 $18,coo.0o $11L,00n.00 1.0D00 $18,DDo.00 SCHEDULE 1 TOTAL $138,217.50 $121,30530 Schedule 2 - Reads & Sidewalks 2.1 3" Minus Select Subbase MaterW CY 1930 $33.00 $63,690.00 1,930 $63,690.00 2.2 3/4" Minus Base Course Material CY 1292 $36.00 $46,152.DO 1,282 $46,152.o0 2.3 Asphalt Pavement (4" Thickness) SY 6401 $19.50 S124,11IStSD 6,200 $120,900.0c 2.4 Concrete Curb &Gutter LF 3252 $1fi.00 $52,032.00 3,187 $50,992.00 2.5 Temporary Road CY 273 $35.00 $9,555.00 273 $9,555.DO 2.6 Alley Approach EA 3 $1,15O.00 S3,450.00 3 $3,450.00 2.7 Sidewalk (4" Concrete, 5' Width, 6" Base) SF 15325 $5.00 $76,625.00 4,430 $22,150.00 2.8 ADA Ramp {Truncated Domes} EA 10 $450.00 $4,500.00 0 $0-00 2.9 Mailbox Facility EA 1 $2,500.00 $2,500.00 0 $o. 2.10 Drive Over Curb and Gutter LS 1 $1,417.50 $1,417.50 1 $1,417,50 2.11 Sidewalk 15" Concrete, 5' Wdith, G" Base) LS 1 $4,075.00 $4,1375.00 1 $4,075.00 2.12 Casting Change to Drive Over LS 1 $110.00 $110.00 1 $110,00 2.13 Approach Aprons To Townhouses 5F 2683.5 $7.50 $20,126.25 2,694 $20,126.25 SCHEDULE 2 TOTAL $409,052.25 $342,617.75 Schedule 3 - Water System 3.1 8" PVC Water Main LF 16G5 $57.00 $94,90S.00 1,750 $59,750.00 3,2 6" Dia. 90' A.I. Elbow FA 1 $600,00 $600.00 1 $600.00 3.3 8" Dia. 11.25' D.I. Elbow EA 0 $0.00 $0.00 D $D.00 3A 8" Dia. 22.5' D.I. Elbow EA 4 $650.00 $2,600.00 4 $2,600.Ug 3.5 Connect to Existing Water Main EA 1 $1,200.00 $1,200.00 1 $1,200.00 3.5 8"W' MJxMJ O.I. Cross EA 1 $875.00 $875.00 1 $875.00 3.7 G" Fire Hydrant Assembly EA 5 $5,100.c0 $25,500.00 5 $25,500.00 3.8 8" MJxMJ Gate Valves, Boxes, & Apron EA 11 $1,900.00 $20,900.00 11 $20,900,D0 3.9 3/4" Domestic Water Service EA 44 $1,650.00 $72,600.00 45 $74,250.00 3.10 8" MI End Cap w/ Thrust Blacking EA 2 $600.00 $1,200.00 2 $1,200.ac 3.11 8"x6" MJxMJ D.I. Reducer EA 1 $650.00 $650,00 1 $650.00 3.12 18" PVC Water Main LF 63 $140.00 $8,820.00 65 $9,100.00 3.13 IS" Butterfly Valve, Box, & Apron EA 2 $G,350.00 $12,700.00 2 $12,70C.U0 3.14 18" MI End Cap EA 2 $2,100.00 $4,200.00 2 $4,200.[10 3.15 8"XIO" Transition Fittings (PVC to HDPEI and Appurtenances EA 2 $1,745.00 $3,490.00 2 $9,490.- 3.16 12"XB" MJxMJ D,I, Reducer EA 1 $900.00 $900.00 1 $91Do,00 3.1/ 3.18 3.19 3.20 3.21 3.22 18"X8" MJxMJ D.I. Cross 10" HOPE DR11 Directional Drill Flowable Fib Valve Box Extension (for depths exceeding 7 ft.) Meter Pits (Materials Only( 2" Irrigation to the Pond Area EA LF - LS EA EA LS 1 86 1 4 4A 1 $4,000.00 $185.00 $2,850.00 $375.00 $559.00 $6,063.02 $4,000.00 $15.910.00 $2,850,00 $1,500m $24,596.00 $6,063.02 1 86 1 4 45 1 $4,000.00 $15,910.Ou $2,850.00 $1,500.00 $25,155.00 $6,063.02 SCHEDULE 3 TOTAL $299,996.00 $313,393.02 Schedule 4 -Sewer System 4.1 Connect to Existing EA 1 $S,7tl0AD $1,700.00 1 $1,700.ap 4.2 Install 48" Dia. Manhole w/Cover & Apron EA 10 $3,500.00 $35,000.00 10 $35,DD0.00 4.3 4" Sanitary Sewer Service EA 44 $1,5D0.00 $66,000.00 45 $67,SM.00 4.4 8" PVC Sewer Main LF 1595 $50.00 $79,800.00 1,596 $79.800.00 4.5 Jack and Bore w/16" casing, spacers, restraints, end seals LS 86 - $1,162.79 $100,ao0.a0 86 $100,OM.00 4.6 Upsize Casing to 36" LS 1 $8,659.51 $8,659.51 1 $8,65951 SCHEDULE 4 TOTAL $291,159.51 $292,65951 Schedule 5 - Stvrmwater Management 5.1 30" LD. Storm Basin (wl donee grate W,sing. ap_. & angsl EA 2 $2,200.00 $4,400.O0 2 $4,400.00 5.2 30"I.D. Storm Basin f«r/"ranapp turn.,n& apron,& ringq EA 5 $2,20D.00 $31,000.00 5 $11,000.00 5.3 48"I.D. Storm Basin fw/napd-gp.,6..wg.apron,&ansrl EA 1 $3,100.00 $3,100.p0 1 $3,100.00 5.4 48" I.D. Storm Basin lw/wgd wr6caftn p,on,&r[ngsl EA 11 $4,400.00 $48,400.00 11 $48,400,00 5.5 Water Quality Unit (48" DIAMETERI EA D $0.00 $0.00 a $0.00 5.6 12" PVC, SDR 35 Storm Main LF 690 $52A0 $35,880,00 714 $37,128.00 5.7 15" PVC, SDR 35 Storm Main LF 368 $56.00 $20,60&00 341 $19,096.00 5.8 18" PVC, SOR 35 Storm Main LF 328 $45.00 $14,760.00 328 $14,76D.00 5.9 24" PVC, SDR 35 Storm Main LF 596 $100.00 $59,600.00 605 $60,500.00 5.10 19" Flared End Section EA 2 $375.00 $750.00 2 $750.00 5.11 24" Flared End Section EA 1 $415.00 $415.00 1 $475.Op 5.12 Detention Pondtgrading. ,hzpmg,aae„rowe,sr�p-raps LS 1 $36,400.00 $36,400.00 0,9 $33,113.Og 5.13 Pond Outlet Structure EA 1 $4,500.00 54,500.0a 1 $4,500. 00 5.14 water Quality Unit (72" DIAMETER) EA 1 $25,000.00 $25,000.00 1 $25,O00.00 SAS Detention Pond Adjustments tacassr-wench plug,emnankmenq LS 1 $19,000.00 $19,000.00 1 $19,W0.00 5.16 Water Quality Unit Access Road SF 1200 $1.60 $1,920.00 1,2Do $1,920, 00 5.17 Critter Guards LS 1 $889.49 $889.49 0 $000 SCHEDULE 5 TOTAL $286,622-49 $283,982.08 Schedule 6 - Dry Utilities, Street Lighting, and Signage 6.1 Utility Trench with Bedding LF 2850 $7,50 $21,450.0p 3,221 $24,157.50 6.2 6" conduit w/ Pull Rope LF 975 $5.50 $5,362.50 975 $5,362. 50 6.3 4" Conduit w/ Pull Rope LF 140 $3.50 $490,00 255 $892.50 6.4 3" Conduit w/ Pull Rope LF 3000 $3.00 $9,000.00 3.178 $9,534.00 6.5 2" Conduit w/ Pull Rape LF 6344 $2.50 $15,960.00 5,756 $14,394).po 6.6 1" Conduit w/ Pull Rope LF 553 $2.O0 $1,106.00 503 $1,D06.00 6.7 Single Phase Utility Vault LA g $850.ap $7,650.00 9 $7,65O.OD 6.8 Three Phase Utility Vault EA 2 $1,200.00 $2A130. 2 52,400.00 6.9 Secondary Electrical Pedestal EA 20 $65.D0 $1,3011 18 $1,170.00 6.10 i Street Light Concrete Base EA 6 $900.00 $5,400.00 7 $6,300.00 6.11 Street Signs (2-Stop w/road names, 2-Private Alley) LS 1 $1,500.00 "'SO .00 0 $0.00 6.12 Additional Street Signs and Painted Curb L5 1 52,075.DD $2,075.00 p $0.00 6.13 Dlredlonal Drilling (6" HOPE) for FEC (Farm to Market) LF 86 $96.00 $8,256.00 94 $9,024,00 6.14 Direction# Drilling (2" HDPE) for Phone/Fiber (Farm to Market) LF 172 $44.50 57,654.00 25B $11,4R1.Do 6.15 6" Lang Radius Sweep EA 5 5200.00 $1,000.0o 2 $400.00 6.16 3" Long Radius Sweep EA 63 $52.00 $3,276.0❑ 25 $1,300,OD 6,17 2" Long Radius Sweep EA 126 $48.00 $6,048,00 129 $6,192.00 6.19 1" Long Radius Sweep EA 19 $42.00 $798,00 1❑ $a2a.o❑ 6.19 Installation of Charter -Supplied Roll Pipe for Fiber LF 1000 $1.8D $1,800.00 700 $1,260.00 6.20 FEC Revisions due to Driveway Updates LS 1 $4,739.61 $4,739.61 1 $4,739.61 SCHE0ULE6 TOTAL $107,165.11 $107,679.11 CIVIL CONSTRUCTION BASE BID TOTAL $1,532,212.86 $1,460,737-17 Landscape Plan Cost Estimate L.1 Mobilization, Demobilization, Insurance, Permits LS 1 $2,500.00 $2,500.00 0 $0.00 L.2 Park/Open Space Grass Seed Mix LS 1 $14,148.00 $14,148.00 0.5 $7,074.D0 L.3 Deciduous Tree: 2.25" cal sized EA 60 $27S.00 $16,500 00 0 $0.00 LA Deciduous Tree: 2.0" cal sized EA 13 $250.00 $3,250,00 0 $0.00 L5 Coniferous Tree: 5-6' height EA 20 $280.00 $5,60D.IX3 0 $0-00 L.6 Flowering Tree: 2.0" cal sized EA 4 $zs❑.❑a S1,❑❑a.00 D $❑.❑a L7 2" City Water Meter for Park and Open Space EA 1 $2❑,536.00 $20,536.00 1 $20,536.00 L.8 Automatic Controller EA 1 $2,50D.00 $2,500.00 ❑ 50.00 L.9 2.5" Irrigation Backflow Preventer EA 1 $50❑.00 $51)0.00 0 $11.00 L10 Auto Spray Irrigation Valve & Box EA 22 $150.00 $3,300.00 0 $0.00 L.11 Misc. Wiring LS 1 $2,000.W $2,0W.D0 ❑ $0,01) L.12 Quick Coupler EA 1 $149.00 $149.00 0 $0.00 L.13 4" Sch. 40Irrigation S€eeving LF 100 $4,00 $400.❑0 0 $0.00 L14 6" Sch.40 Irrigation Sleeving LF 90 $2,00 $180.00 0 50,00 L.15 Hunter Short Radius MP800, Matched Precipitation Rotator head EA 70 $18.00 $1,26❑.00 0 $0-00 L.16 Hunter MP1000, Matched Precipitation Rotator Head EA 52 $10.00 $936.00 0 $❑.0❑ L.17 Hunter MP2000, Matched Precipitation Rotator Head EA 24 $18.00 $432.00 0 $0.00 L.18 Hunter 1-25 Nozzle 07 Rotary Head., Matched Precipitation EA 8 $50.00 $400.00 0 $D,00 L.19 Hunter 1-25 Nozzle 15 Rotary Head, Matched Precipitation EA 54 $50.0❑ $2,700.00 0 $0,00 L.20 2,5" PVC Irrigation Main LF 819 $3.50 $2,866.50 0 $0.00 L.21 2" PVC Irrigation Main LF 412 $3.00 $1,236.00 ❑ $0.00 L22 2" Poly Irrigation Lateral LF 706 $z.❑❑ $1,412.00 a $D.❑o L.23 11/2" Poly Irrigation Lateral LF 648 $1.75 $1,134,00 ❑ $0.00 L.24 1" PVC Irrigation Main LF 100 $1.30 $130.00 0 $p.❑❑ L.25 V Poly Irrigation Lateral LF 3520 $0.80 $2,816.00 0 $0.❑❑ L.26 6' wide Gravel Trail LF 1010 $12.00 $12,129.00 a $0.01) LANDSCAPING TOTAL $100,005.50 $27,610.00 TOTAL PROJECT BUDGET (INCLUDES LANDSCAPING) $1,632,218.36 $1,460,737.17 TOTAL ESTIMATED COST OF CONSTRUCTION $1,632,218.36 approx. % of completed work as of bonding dot AMOUNT COMPLETED PRIOR TO BONDING $1,460,737.17 AMOUNT OF REMAINING WORK PRIOR TO BONDING $171,481.19 AMOUNTOF BOND {125%OF REMAINING WORK] IF$21M,3Sy.4B AS PROJECT ENGINEER FOR MEADOWS EDGE SUBDIVISION PHASE IA, I CERTIFY THAT THE WORK LISTED HEREIN IS CORRECT. IN ADDITION, I CERTIFY THAT THE ASSOCIATED COSTS ARE REASONABLY ACCURATE ESTIMATES OF THE RESPECTIVE COSTS OF THE WORK. THE VALUE OF CONSTRUCTION AND OTHER WORK COMPLETED TO DATE 15 ESTIMATED TO BE: THE TOTAL VALUE OF REMAINING WORK, SERVICES AND FEES IS ESTIMATED TO BE: SECURITY HELD AT 125% OF THE REMAINING COSTS SHOULD BE IN THE AMOUNT OF: STEPHANIE REYNOLDS, P.E. *ALL IMPROVEMENTS SHALL BE COMPLETED BY: $1,460,737.17 $171,481.19 $214,351.49 July 1, 2020 STEP'A" E A. R2857�PE5 APPENDIX H3 Maintenance Agreement Responsible Party List the party that shall be permanently responsible for the maintenance of structural or non-structural measures required by the Operation Manual. (e,g. owner, governmental agency, or other legal established entity) ed G Designate personnel for inspection and maintenance: Name: 0, Address: ?_ n, 1&, 71 A4- h. Contact Phone: Property Descril)tion List legal description of property — 1 :2rq a bn o'(� r 3 titT�8, ��-Z v.i ? p M , H , F L6+- ,r.A.d COux+,L,� 14T O eration said Maintenance Has the Operation and Maintenance Manual been created? xYes ❑No Responsible Party shall ensure the continued performance of the maintenance obligation in accordance with the Operation and Maintenance Manual. Failure to Maintain Stormwater Systems If the required maintenance and repairs are not being performed and inhibit the intended function of the stormwater system the City may hire a contractor to perform the required maintenance and bill the HOA, POA, or responsible property owner. In the event the HOA, POA, or responsible property owner fail to perform the required maintenance and repairs to the stormwater facility and inhibit the intended function of the stormwater system, a stormwater maintenance district program may be formed in accordance with §7-12-4IO2 MCA incorporating all the lots within a development. The taxes levied within the maintenance district shall be determined by the Public Works Department with approval by the Kalispell City Council. By signing the Maintenance Agreement the Responsible Party shall assume full responsibility for the maintenance f the stormwater system. Si nature of Responsible Party Date 206 MEADOWS EDGE REQEST FOR ANNEXATION AND INITIAL ZONING OF R-3 AND B-1 STAFF REPORT #KA-18-04 REQUEST FOR A PLANNED UNIT DEVELOPMENT STAFF REPORT #KPUD-18-02 REQUEST FOR MAJOR SUBDIVISION PRELIMINARY PLAT STAFF REPORT KPP-18-05 KALISPELL PLANNING DEPARTMENT APRIL 27, 2018 This is a report to the Kalispell City Planning Board and the Kalispell City Council regarding the request from Meadows Edge, LLC to annex a 112-acre property into the city. Upon annexation the applicant is requesting R-3 and B-1 Zones with a Residential Mixed Use Planned Unit Development (PUD) zoning overlay and major subdivision approval for a 92-lot residential subdivision. The property is undeveloped tract land located at the northwest corner of the intersection of Three Mile Drive and W. Springcreek/Farm to Market, west of the Mountain Vista Estates Subdivision. A public hearing has been scheduled before the planning board for May 8, 2018, beginning at 6:00 PM in the Kalispell City Council Chambers. The planning board will forward a recommendation to the Kalispell City Council for final action. A. Petitioner and Owners: Meadows Edge, LLC (Jason McDonald) P.O. Box 7184 Kalispell, MT 59901 (320) 221-0280 Technical Assistance: WGM Group 431 1st Avenue East Kalispell, MT 59901 B. Background Information Meadows Edge, LLC is requesting permission to annex a 112-acre property into the city. Upon annexation the applicant is requesting R-3 and B-1 Zones with a Residential Mixed Use Planned Unit Development (PUD) zoning overlay and major subdivision approval. The development will consist of 218 residential. lots (322 units), 5.7-acres of neighborhood commercial, parkland, open space/wetland conservation, storm water and city streets. This is a multi -application process and the applicant has submitted the following applications: • Annexation and Initial Zoning - The subject property will be annexed under the provisions of Sections 7-2-4601 through 7-2-4610, M.C.A., Annexation by Petition. Upon annexation by the city, the property will be served by city police, fire and have access to city sewer and water services. The applicant is requesting that the zoning for the property be R-3 and B-1. The initial city zoning classification will be reviewed in accordance with Section 27.03.010(4) of the Kalispell Zoning Ordinance and the itemized criteria described by 76-2- 304, M. C.A. West: County AG-80 WVO H. Proposed Zoning: The proposed zoning of the subject property is City R-3 and City B-1 with a Residential Mixed Use PUD zoning overlay. The PUD functions in concert with the R-3 and B-1 Zone to provide a comprehensive, integrated development plan. In this case the development is seeking 5.7-acres of neighborhood commercial use at the intersection of Three Mile Drive and W. Springcreek, 171 single-family units, 50 two-family units, 21 three-family units and 80 four -family units. The zoning will be further outlined in this report. I. General Land Use Character: The area can be described as a transitional area with city residential development to the east of the project site. The residential densities vary greatly in the area as it continues to develop from rural residential and agriculture uses to urban residential uses. To the south, north and west of the project site lies areas within the county that are still either large lot residential tracts or unimproved agriculture lands. City annexations and subsequent residential development along Three Mile Drive has transitioned that corridor into a more urban land use. City subdivisions along Three Mile Drive include Mountain Vista, Spring Creek Estates, Cottonwood Park, Blue Heron, Empire Estates and Aspen Creek, which have all developed in close proximity of the proposed development. Aspen Knoll, Two Mile Tracts, Big Sky Homesites and Hillcrest Terrace are larger lot county residential subdivisions that have developed along Two Mile in close proximity to the proposed development to the south. The area clearly has a residential demand based off of the land use pattern in the area and the proposed use would be considered a continuation of that pattern which has taken advantage of the increased services in the area, including water, sewer and the bypass. J. Utilities and Public Services: Existing city infrastructure in this area includes city water and sewer Iines within Spring Creek Estates and Mountain Vista. Additionally, the West Side Sewer Interceptor will be constructed through the Rockwood Ranch property to the southeast in the coming months. The West Side Sewer Interceptor will provide adequate sewer capacity for this development and for development on the north end of town. Sewer: City of Kalispell Water: City of Kalispell Refuse: City of Kalispell Electricity: Flathead Electric Cooperative Gas: NorthWestern Energy Telephone: CenturyTel Schools: School District #1, West Valley Elementary Fire: City of Kalispell Fire Department Police: City of Kalispell Police Department I. ANNEXATION EVALUATION Compliance with the growth policy: Two primary mechanisms for managing growth in the City of Kalispell exist which are to rely on redevelopment and inf ll within the current city limits or annexation the Rural Fire District. At the time of annexation, the property will be served by the Kalispell Fire Department and Kalispell Police Department. The site lies within 3.4 miles of fire station 62 and is readily serviceable by the city fire, police and ambulance services all of which now respond to the immediately adjacent neighborhoods within the city. Given the level of existing services available to and in place, annexation of the property will not overburden the municipal services in place. 3. Distance from current city limits: The subject property is bordering city limits on its eastern property boundary, thus annexation will serve to be a logical expansion of the existing city limits. 4. Cost of services: Once annexed to the city, full city services will be made available to the property owner. Any necessary infrastructure associated with this development will be required to be constructed in accordance with the City of Kalispell's Design and Construction standards and any other development policies, regulations or ordinances that may apply. If annexed, the property owner will be extending and connecting to city sewer and water at the time of development. The analysis is only an estimate based on a variety of assumptions. The analysis does not take into consideration changes in methods of assessment and estimated costs associated with services. The information can only be used as a general estimate of the anticipated cost of services and revenue. The cost to serve the land proposed for annexation is shown in the attached cost of service analysis - Initial Annexation. Currently, the subject property is vacant land and there will be no services provided to the property. Based on the city's taxation and assessment policies, the property will generate approximately $14,737.41 in taxes and $2,288.27 in assessments. Based on this analysis, the annexation will be net gain to the city of $17,025.68. The cost to serve the development of the project is shown in the attached cost of service analysis - 100% buildout of 322 residential units. Based on the city's taxation and assessment policies, the property will generate approximately $259,517 in taxes and $79,616 in assessments. Cost of services for the property is approximately $337,120. Based on this analysis, the project will be a net gain to the city of $2,013. In addition the city will collect $3,007,480 in one time impact fees. It should be noted that the commercial component to the subdivision was not included in the full-buildout, as we don't know how that property will develop. It is likely that once the commercial component to the property is developed there will be additional gain to the city, as the commercial component will require less services and generates more tax revenue. W constraints. The proposed B-1 Zone is in keeping with the Growth Policy map which designates the entire intersection of Three Mile Drive and West Spring Creek/ Farm to Market as a Neighborhood Commercial zone at the scale proposed and anticipates that. area serving the full buildout of residential uses surrounding that area. The B-1 Zoning will provide for an area that the neighboring residential developments can have access to services that address their daily needs without having to make prolonged trips into other areas of the city. The B-1 Zoning will be in close enough proximity that it will be accessible for pedestrians and cyclists, reducing overall vehicle trips throughout the community. Lastly, the B-1 Zone meets the city's goal of providing adequate areas in the community for commercial development that meets the needs of present and future business in terms of cost, type, design and location. A Residential Mixed Use PUD will function in concert with the R-3 and B-1 Zones to provide a comprehensive, integrated development plan providing flexibility of architectural design, density as well as the option to mix land uses. In this case, the development is seeking 5.7-acres of neighborhood commercial use at the intersection of Three Mile Drive and W. Springcreek/Farm to Market, 171 single- family units, 50 two-family units, 21 three-family units and 80 four -family units. The Growth Policy states that a variety of housing types and compatible land uses are encouraged in residential areas and should be designed to fit the scale and character of the neighborhood. Where necessary developers should utilize the Planned Unit Development process to craft development proposals that are both innovative and creative, while maintaining the values of the community. The requested Residential Mixed Use PUD request is further outlined in Section 3 below. Based on the above discussion, the requested zoning districts can be found to comply with the Suburban Residential and Neighborhood Commercial land use designations. The proposed zoning implements the policies regarding housing and commercial development as found in Chapter 4 of the Kalispell Growth Policy Plan -It 2035. Further growth policy compliance is outlined in this report for specific aspects of the project. 2. Is the requested zone designed to lessen congestion in the streets? The B-1 Zoning will provide for an area that the neighboring residential developments can have access to services that address their daily needs without having to make prolonged trips into other areas of the city. The B-1 Zoning will be in close enough proximity that it will be accessible for pedestrians and cyclists, reducing overall vehicle trips throughout the community. Additionally, a traffic impact study for the development was completed by WGM Group. The traffic study was prepared using standard techniques to forecast traffic volumes and operations at the proposed site access points and 10 nearby study intersections. Capacity analysis was presented with both with and without the traffic generated by the proposed subdivision to determine what impact the proposal will have on traffic operations. The analysis concluded that the road network will continue to operate with good level of service and the study did not identify any unusual safety issues. The study concluded that no changes to the roadway network are required as a result of the proposed development. Upon submitting the project to Public Works for review, the traffic study will be further evaluated by staff to 7 8. Will the requested zone facilitate the adequate provision of transportation, water, sewerage, schools, parks, and other public requirements? Municipal water and sewer can be extended to the property from the Mountain Vista Estates subdivision for the first phase of the development. Additionally, the West Side Interceptor is being constructed through the Rockwood Ranch property to the southeast which will to provide for further development on the west and north sides of the Kalispell planning area. Subsequent phases of the development (2-5) will likely require the developer to hook into the West Side Sewer Interceptor, as there is limited sewer capacity available within the infrastructure in place through Mountain Vista. Once the development ties into the West Side Interceptor there will not be any sewer capacity issues for the entire buildout of the development. The developer would need to extend the needed city services that are not currently in place at the developers' expense in accordance with the city's policies and standards. New improvements to the property such as roads, water, sewer and drainage would be installed in accordance with city policies and standards at the developers' expense prior to subdivision approval thereby insuring that there is adequate provision of services at the site prior to development. Fire, police, ambulance and public access are adequate to accommodate potential impacts associated with the development of this site. There will be impacts to services that can be anticipated as a result of this proposal which can be met by the city. All public services and facilities are currently available or can be provided to the property. 9. Does the requested zone give consideration to the particular suitability of the property for particular uses? As outlined earlier, the requested zones of R-3 and B-1 with a PUD overlay are the appropriate designations for the growth policy land uses assigned to the property on the Kalispell Growth Policy Future Land Use Map. The growth policy map is a long- range planning document providing guidance to the city on how specific areas of the city should develop over time. The requested zones are in compliance with the growth policy and the city anticipated the property would develop in the requested manner. Based on the proposed uses and densities of the PUD, the requested zoning does give consideration to the particular suitability of the property for the particular uses. 10, Does the requested zone give reasonable consideration to the character of the district? The neighborhood immediately to the east of the subject property has developed very similarly to the requested development. The proposed zoning allows this development to address needs within the community for a variety of housing types in reasonable proximity to the city core and future commercial and residential development. Availability of public water and sewer to the area indicate that this type of development will continue to occur on the urban fringes of the community. The proposed zoning and PUD master plan of the property gives reasonable consideration to the character of the district, as it is similar to existing developments in the area. 7 Section 27.19.030(2)(4) states that the R-3 PUD can be developed at a maximum density of 4 dwelling units per developable acre. The property is being developed at 3.45 dwelling units per acre. e) Commercial uses appropriate to a mixed use PUD are the same as those permitted in a commercial PUD. Commercial PUD's must be a minimum of 2-acres in size and established in the B-1- B-5, P-1 and H-1 Zones. The commercial component to the project is 5.7-acres in size and within the B-1 Zone. f) Incompatible industrial and commercial uses are not permitted. The B-1 Zone is a Neighborhood Commercial Zone and has use limitations and standards appropriate for neighboring residential uses. g) The combined area of all commercial/industrial lots cannot exceed 35% of the developable area. The B-1 Zone encompasses 5.5% of the developable area. The PUD overlay would allow for one deviation from the Kalispell Zoning Ordinance in regards to allowable uses for Meadows Edge to implement its master site plan. The PUD would serve as a zoning overlay district for the entire 112-acre site. It will function in concert with the underlying zones of R-3 and B-1. In order to allow the design of the future development shown as part of the application, the proposed PUD seeks A deviation from the underlying R-3 zoning designation in the following ways: Section 27.06.020 Permitted Uses - Townhouse development within the R-3 Zone requires a conditional use permit. This deviation would allow for construction of townhomes (up to four attached units) within the development as a "permitted use." The result of this request would mean that ultimate approval of all the townhomes would not require public review, i.e. - Planning Board and Council approval. The development has 52 townhouse lots configured in two unit, three unit and four unit configurations. The lots will be developed as 50 two-family units, 21 three-family units and 80 four -family units for a total of 151 townhouse units. Townhouse development is not out of character for city development within the area as Mountain Vista immediately east of the subject property has townhomes. To clarify, this deviation would allow for townhouse densities of one dwelling unit per 3,000 square feet, as the minimum lot size in the R-3 Zone is 6,000 square feet. It should be noted that the developer is not proposing densities less than 4,000 square feet per dwelling unit. The developer has submitted site plans and elevations of the proposed townhouse units. The townhouse units will have a single - shared driveway approach that fans out providing access into the units. The sinlge driveway approach is a better design for snow storage, as multiple curb cuts along a street profile do not allow for adequate snow storage. Additionally, the single driveway approach provides for a larger area within the boulevard to install services, utilities, etc. IV. Criteria for the Creation of a Planned Unit Development (PUD1 District The intent of the PUD district is to serve as an overlay zoning district. The Kalispell Zoning Ordinance describes the intent of a PUD district as follows: "The district shall 11 Chapter 5, Natural Environment: Goal: Protect wetland and riparian areas since they are important in flood protection, maintaining water quality, and providing habitat. Policy: Protection of wildlife and wildlife habitat should be encouraged and wildlife corridors should be conserved and maintained. The project conserves 13.8-acres of wetland area which provides important habitat for wildlife in the area. Additionally, an unnamed seasonal stream traverses the property in the middle from east to west that will be maintained as open space. This area will remain unfenced providing an additional corridor for habitat. B. The extent to which the PUD departs from the underlying zoning and the reasons why such departures are or are not deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations; In order to allow the design of the future development shown as part of the application, the proposed PUD seeks deviations from the underlying R-3 zoning designation in the following way: Section 27.06,020 Permitted Uses -- Townhouse development within the R-3 Zone requires a conditional use permit. This deviation would allow for construction of townhomes within the development as a "permitted use." The result of this request would mean that ultimate approval of all the townhomes would not require public review, i.e. - Planning Board and Council approval. The development has 52 townhouse lots that will total 151 units once developed. Townhouse development is not out of character for city development within the area as Mountain Vista immediately cast of the subject property has townhomes. This would allow townhouses on a 6,000 square foot lot (1 unit per 3,000 square feet). Additionally, the townhouse residences will have to have approval from the "Architectural Control Committee" as outlined in the HOA bylaws assuring that development is compatible with the rest of the development. C. The extent to which the PUD departs from the subdivision regulations (if subdivision is anticipated) and the public works standards for design and construction applicable to the subject property, the reasons why such departures are deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations; The project does not have any deviations from the subdivision regulations. D. The overall internal integrity of the PUD including the appropriate use of internal design elements, the use of buffers between different land uses, the use of transitions between uses of greater and lesser intensity, the use of enhanced design features to provide connectedness for both vehicle and pedestrian traffic throughout the PUD and the use of innovative and traditional design to foster more livable neighborhoods; As stated previously, the Residential Mixed Use PUD proposes 5.7-acres of 3-1 Zone along with the R-3 Zone. The B-1 Zoning will provide for an area that the neighboring residential R-3 Zone can have access to services that address their daily needs without 13 I. Public Services Police and Fire Services The property will be served by the Kalispell Fire Department and Kalispell Police Department. The site lies within 3.4 miles of fire station 62 and is readily serviceable by the city fire, police and ambulance services all of which now respond to the immediately adjacent neighborhood. Water and Sewer Municipal water, sewer and city streets will be extended to the property from the Mountain Vista Estates subdivision to the east. Additionally, the West Side Sewer Interceptor is being constructed through the property to the southeast this coming year. The West Side Sewer Interceptor is a large sewer main 24"-30" in size that is being constructed in order to provide for new growth in the city. The sewer flows will be conveyed via the West Side Interceptor to the wastewater plant located near the Kalispell Airport, which has the capacity for this and further developments. The water and sewer lines located within Mountain Vista Estates are sized to accommodate Phase 1 of this development. The remaining phases will require the developer to tie into the West Side Sewer Interceptor prior to development. Final design and engineering plans will be reviewed in accordance with the city's policies and standards at the time of future phases, including city facilities plans. The developer is responsible for extending the needed city services in accordance with the city's policies and standards at their expense. The City of Kalispell requires developments to complete a minimum of two-thirds of the necessary public infrastructure (water, sewer, roads, etc.) prior to filing the final plat for subsequent subdivisions. This condition has been included in the list of conditions to insure that prior to issuing a building permit on a new lot, there is access which meets the fire department's minimum standards as well as adequate water and sewer services are available for each phase. Storm Water A preliminary storm water report has been prepared showing that storm water will be conveyed from the new development via impervious surfaces to cubs where it will be conveyed into retention/detention ponds within an open space area near Farm to Market Road. Each of the ponds will hold storm water for that immediate area and allow it to slowly percolate into the ground. Storm water runoff from the site shall be managed and constructed per the City of Kalispell Construction and Design Guidelines. Final design will be approved by Kalispell Public Works Department prior to building permit issuance. Additionally, prior to receiving a building permit the developer will need to submit a construction storm water management plan to the Public Works Department. This plan will need to show how storm water will be treated and where it will be directed during construction activities. 2. Control over vehicular traffic A traffic impact study for the development was completed by WGM Group. The traffic study was prepared using standard techniques to forecast traffic volumes and operations 15 The development has provided for individual automobiles, pedestrian and bicycle traffic in the PUD proposal. To provide for a greater diversity of transportation options planning staff would recommend that the developer work with Eagle Transit to establish at least one bus stop location in the project site, preferably within the Neighborhood Commercial area. Eagle Transit provides transportation in a safe manner for the transportation - disadvantaged and the general public of Flathead County and has a fixed route within the county and has several bus stops within the City of Kalispell. Currently, there is not a bus stop in this area of the city. With this development and Rockwood Ranch it may be time for Eagle Transit to consider a stop in the project area to serve the residents on this end of town, as upon completion of these development there will be a significant number of residents along Three Mile Drive. C. Visual enjoyment The project accomplishes this by including the following in the PUD plan: The Meadows Edge HOA establishes an Architectural Control Committee that will be responsible for reviewing building plans, landscaping and fencing plan prepared by a licensed architect or designer, showing the design, location, material, color and exterior finish of proposed improvements. Additionally, the developer is constructing alleys in order to build housing units more similar to the historic area of Kalispell and Spring Creek Estates where the garages are accessed in the back of the property. The design guidelines provide housing standards to maintain the visual quality of the entire project. • The developer has submitted site plans and elevations of the proposed townhouse units. The townhouse units will have a single -shared driveway approach that fans out providing access into the units. The single driveway approach will be more visually appealing from the street since there will be limited curb cuts for driveways which will allow for more landscaped boulevard area and street trees. • The 4-acre developed park is central to the site and can be accessed via the contiguous sidewalk system with multiple access points. • There is also a 20 foot landscaped buffer strip along the properties western property boundary in order to provided for additional separation from the agriculture operations on the neighboring properties to the west. • The project conserves 13.8-acres of wetland area, which provides important habitat for wildlife in the area. Additionally, an unnamed seasonal stream traverses the property in the middle from west to east that will be maintained as open space. This area will remain unfenced providing an additional corridor for habitat and passive recreational opportunities. • All of the arterials surrounding the development will be upgraded to city standards, which will include landscaped boulevards, street trees and a trail system. Additionally, all of the city streets within the development will be built to city standards including landscape boulevards and street trees. 17 following the completion of Phase 1 and so on through Phase 5, which is the commercial component to the subdivision. Maintaining the integrity of the subdivision would include the staff discussion, outlined earlier, highlighting the necessary street improvements that should be completed with each phase. As long as those improvements are installed with each corresponding phase the development will be able to stand on its own if for some reason development of the subdivision lapses for a period of time. Section 27.19.020(10), Abandonment and Expiration, outlines procedures to be followed when the PUD fails to comply with a completion schedule. Part of the requirements of the PUD is that the developer would enter into an agreement with the City of Kalispell to adequately insure that the overall integrity of the development, the installation of required infrastructure, architectural integrity and proposed amenities, are accomplished as proposed. A recommended condition of approval for the PUD would require this agreement be in place prior to filing the final plat for the first phase of the project. b. Conformity with all applicable provisions of this chapter. No other specific deviations from the Kalispell Zoning Ordinance or Subdivision regulations can be identified based upon the information submitted with the application other than those addressed in this report. V. REVIEW AND FINDINGS OF FACT FOR THE PRELIMINARY PLAT The applicant is requesting a major subdivision on 39-acres of the 112-acre property into 92 residential lots. The subdivision will include 22-acres in lots, 9-acres in city streets and 8-acres in open space. The proposed subdivision is the first phase of five (5) subdivision phases. The application will be reviewed in accordance with Section 28.2.06 of the Kalispell Subdivision Regulations. A. Effects on Health and Safety: Fire: The property is considered to be at low risk of fire because the subdivision will be constructed in accordance with the International Fire Code and have access which meets city standards. The site is within the immediate service area of the north Kalispell fire station, as they currently respond to the city developments adjacent the subject property. Flooding: According to Flood Insurance Rate Map, panel 30029C1805J, dated November 4, 2015, none of the property proposed for development is within a mapped flood area. Access: There are two accesses to serve Phase 1 coming from Farm to Market and Three Mile Drive. Farm to Market and Three Mile Drive are improved roadways that provide access into the greater transportation network. B. Effects on Wildlife and Wildlife Habitat: There are no known big game wintering ranges, migration routes, nesting areas, wetlands, or important habitat for rare or endangered species per the Kalispell Growth Policy environmental considerations maps. There will be a 13.8-acre wetland conservation area at the northern boundary of the subject property that will remain undeveloped. The 19 the road network to the subdivision provides adequate access for fire protection. Solid Waste: Solid waste will be handled by the city. There is sufficient capacity within the landfill to accommodate this additional solid waste generated from this subdivision. Medical Services: Ambulance service is available from the fire department and ALERT helicopter service. Kalispell Regional Medical Center is approximately 2.5 mile from the site. E. Effects on Agriculture and agricultural water user facilities: The site has been traditionally used for agricultural uses including crop production. According to the Kalispell Growth Policy Resources and Analysis Section, "Important Farmlands" map, the project generally has a farmland classification of "prime farmland' when irrigated. Lands to the west are still primarily used for agricultural purposes. With the approval of this subdivision water and sewer service will be extended to the site. This extension of services will impact the agricultural land use in the area. The effect this subdivision would have on adjacent agricultural land would be the potential for more land currently in agricultural production to convert to relatively higher density residential subdivisions due to the close proximity of water and sewer mains. Current policies in the Kalispell Growth Policy Plan -It 2035, Chapter 5, Land Use: Natural Environment, state the following: Policy - Encourage urban growth only on agriculture lands entirely within the city's annexation policy boundary. By providing a growth area boundary, the city can entertain requests for annexation, which in turn lead to the extension of water and sewer services. This enables more of the growth to come into the City of Kalispell and connect to city water and sewer, and have police and fire protection that the City offers its residents. Allowing higher density development within the city's growth policy area, it could reasonably be expected that more farmland could be conserved because the availability of residential and commercial lots within the Kalispell Growth Policy boundary, limiting sprawl/leapfrog development. F. Relation to the Kalispell Growth Policy: The Kalispell Growth Policy Future Land Use map for the area anticipates this area to be developed as Suburban Residential. The development of Phase 1 as 92 residential lots is consistent with the Kalispell Growth Policy land use designation. G. Compliance with Zoning: The property being subdivide is located within an R- 3/PUD Zoning District, provided the property is annexed and is given the zoning designation as outlined in the report. The submitted preliminary plat application is in compliance with all applicable zoning regulations outlined herein. 21 5. Architectural renderings for all commercial buildings are required to be submitted to the Kalispell Architectural Review Committee for review and approval prior to issuance of a building permit. 6. To ensure the traffic flow and access comply with Kalispell Design and Construction Standards, the development shall receive Site Review Committee approval prior to issuance of the building permit for development within the B-1 Zone. 7. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. 8. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and in compliance with the city's facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved. 9. The sewer for Phases 2-5 shall be designed to connect into the West Side Sewer Interceptor. Final design plans shall be reviewed and approved by the Kalispell Public Works Department prior to final plat of Phase 2. 10. The developer shall submit to the Kalispell Public Works Department for review and approval a stormwater report and an engineered drainage plan that meets the requirements of the current City standards for design and construction. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the drainage plan for the subdivision has been installed as designed and approved. 11. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Stormwater Discharge Associated with Construction Activities. 12. Prior to final plat a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. 13. The traffic impact study for the project site shall be reviewed and approved by the Public Works Department and where appropriate, the Montana Department of Transportation in order to determine the appropriate mitigation as the project develops. 23 23. All utilities shall be placed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. 24. The following public right-of-way improvements shall be completed at each phase of the development: a. Phase 1 - West Spring Creek/Farm to Market shall be updated to city standards along the property boundary from Mountain Vista Way south to the intersection with Three Mile Drive. b. Phase 2 -- Three Mile Drive shall be upgraded to city standards along the property boundary from the western terminus of the development to the eastern terminus of the development. c. Phase 3 - Farm to Market shall be upgraded to city standards from Mountain Vista Way north to the properties northern property boundary. 25. The paths located within Three Mile Drive and W. Spring Creek/Farm to Market shall be maintained by the Meadows Edge HOA. 26. The alleyways within the development shall be designated as "private" at time of final plat. 27. Subdivision signage for the development shall comply with Section 27.22.050(6) of the Kalispell Zoning Ordinance. 28. A homeowner's association (HOA) shall be formed and established for the common areas prior to final plat. 29. All properties along the western boundary of the subdivision shall install uniform rear yard fencing prior to certificate of occupancy of those residences. 30. A note shall be placed on the final plat that stating: "This subdivision is located in an agriculture area and potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. As such, the right to farm on adjoining properties shall not be restricted as a result of the development or occupancy of this subdivision." 31. The developer shall work with Eagle Transit to establish bus stop location(s) within the Meadows Edge PUD. The approved bus stop location(s) shall be included on a revised PUD plan and submitted with the preliminary plat of phase 5. Bus stop location(s) shall be improved in accordance with Eagle Transit's requirements, which may include a bus shelter. This condition is waived if Eagle Transit provides a letter in writing that it will not serve the development. 32. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat of Phase 1. In addition, the mail delivery site and 25 RESOLUTION NO.5874 A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF PHASE 1 OF MEADOWS EDGE, DESCRIBED AS TRACT 3 OF COS 18892 IN THE EAST HALF OF SECTION 3, TOWNSHIP 28 NORTH, RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA. NITTEREAS, Meadows Edge, LLC, the owner of the certain real property described above, has petitioned for approval of Phase 1 of the Subdivision Plat of said property; and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on May 8, 2018 on the proposal and reviewed Subdivision Report #KPP-18-05 issued by the Kalispell Planning Department; and WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval of the Preliminary Plat of Phase 1 of Meadows Edge, subject to certain conditions and recommendations; and WHEREAS, the city council of the City of Kalispell at its regular council meeting of .tune 4, 2018, reviewed the Kalispell Planning Department Report ##KPP-18-05, reviewed the recommendations of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-18-05 are hereby adopted as the Findings of Fact of the city council. SECTION 2. That the application of Meadows Edge, LLC for approval of the Preliminary Plat of Phase I of Meadows Edge, Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: The Planned Unit Development for Meadows Edge allows the following deviations from. the Kalispell Zoning Ordinance: a) Kalispell Zoning Ordinance, Section 27.06.020 Permitted Uses — Allows up to four (4) attached townhoines as a permitted use. That the development of the site will be in substantial conformance with the preliminary plat documents entitled Meadows Edge and associated submittal drawings which shall govern location of the lots, easements, roadways, phasing plan, covenants and declarations, landscaping, fencing, parkland, uses and pedestrian access facilities. The preliminary plat approval for the development shall be valid for a period of three years from the date of approval. 13. The traffic impact study for the project site shall be reviewed and approved by the Public Works Department and where appropriate, the Montana Department of Transportation in order to determine the appropriate mitigation as the project develops. 14. The developer shall obtain an approach permit from the Montana Department of Transportation (MDT) for approaches onto Farm to Market Road. If any improvements are necessary at the intersection of the roadways, these improvements shall be completed to the satisfaction of the NOT prior to final plat and MDT shall so certify this in writing to the city. 15. Prior to final plat all mitigation required as part of the approved traffic impact study shall be completed. All improvements shall be reviewed and approved by either the Public Works Department or Montana Department of Transportation. A letter from the Kalispell Public Works Department or Montana Department of Transportation shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or State of Montana. If infrastructure work has not been accepted, a letter stating that a proper bond has been accepted for the unfinished work by the appropriate agency is required. 16. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 17. A letter shall be obtained from the Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the open space, landscape boulevards and streets serving the subdivision. 18. A park maintenance district steal I be formed incorporating all the lots within the subdivision. The park maintenance district shall not be effective until such time as any open space or Parks are accepted by the city. In this case an assessment would be levied within the maintenance district to be determined by the Parks and Recreation Department- with approvals by the Kalispell City Council, 19. A park plan steal l be created and approved by the Parks and Recreation Director prior to final plat of Phase 1. 20. All easements and/or right-of-ways shall be indicated on the face of the final plat. Utility easements for City water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 21. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether pub[ic or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the consttiiction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated an this plat as "Utility Easement" to have and to hold forever'." 32. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shalt be installed or bonded for prior to final plat of Phase I. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department, The mail delivery site shall not impact a sidewalk or proposed boulevard area. 33. Any water rights associated with the property shall be transferred to the City of Kalispell. The water rights shall be allocated proportionally for each phase of the development prior to final plat. SECTION 3. Upon proper review and filing of the Final Plat of said subdivision in the office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL THIS 4TH DAY OF JUNE, 2019. ATTEST: 4,Akice Brunckhorst, CMC City Clerk Mark John nj Mayor October 12, 2018 Stephanie Reynolds, PE Project Engineer WGM Group, Inc. 431 1 st Ave West Kalispell, MT 59901 RE: Meadows Edge Subdivision — Phase 1 A — Engineering Conditional Approval Dear Ms. Reynolds, The construction drawings dated October 11 and 12, 2018 for the above project are hereby approved contingent on the following items: I . PIease provide the geotechnical recommendations for the construction of the detention pond embankments when available and modify the plans as necessary. 2. Prior to the approval of the remaining portion of Phase 1, the north/south pedestrian ramps at the intersection of Mountain Vista way and Farm to Market Road shall be installed. Please provide the City with electronic set of the plans when these contingent modifications have been addressed. Final acceptance of public improvements will not be approved by the Public Works Department until contingent items have been completed. Two reviews were completed during this process at a cost of $180 each. Please send a check to the Building Department for $360. Approval does not relieve you, nor the contractor from designing or constructing this project in accordance with the City Standards currently in effect. If more than 18 months lapse before completing construction, plans and specifications must be resubmitted and approved before construction continues. Any modifications made to these approved plans shall be submitted for review prior to construction. 2011'Avenue East, P.O. Box 1997, Kalispell, MT 59903 —Phone (406)758-7720 — Fax (406)758-7831 www.kalispell.com MUNICIPAL FACILITIES EXCLUSION CHECKLIST Required under § 76-4-127 MCA (formerly called master plan exclusion) t . Does this subdivision affect property with an existing Title 76-4 Approval? Yes No X If yes, then you may not use the Municipal Facilities Exclusion for this subdivision 2. Name of Subdivision: uEADOWS EDGE SUBDIVISION. PHASE 1A Name and address of the applicant: EDGE, LLC BOX 7148, KALISPELL, MT 59904 4. Name and address of engineer: WGN1 GROUP, INC. (STEPHANIE A. REYNOLDS, P.E.) 431 1 STAVE W, KALISPELL, MT 59901 5. Location of the subdivision to the city or town, vicinity map attached: Yes X No 6. Copy of the Plat or Certificate of Survey or Unit Declaration and floor plan with exemption citation. Attached X 7. Number of parcels or units in the subdivision: as S. A copy of any applicable zoning ordinances in effect: SEEATTACHED 9. Copy of Growth Policy, if applicable: On file X Attached: 10. Will an extension of the existing sewer main(s) be necessary to serve this subdivision? Yes X No 1 1. Will an extension of the existing water main(s) be necessary to serve this subdivision? Yes X No 12. How construction of the sewage disposal and water supply systems or extensions will be financed. : BY APPLICANT 13. Has the governing body reviewed and approved plans to ensure adequate storm water drainage Yes x No 14. Exclusion Checklist review fee, ($100) included: Yes X No I certify that the subdivision or division is within an area covered by a growth policy pursuant to Title 76, chapter 1, MCA, or within a first-class or second-class municipality, as described in Section 7-1-4111, MCA. I certify that adequate storm water drainage and adequate municipal facilities will be provided for the subdivision. I further certify that the governing body has reviewed and approved plans to ensure adequate storm water drainage. For subdivisions subject to the Montana Subdivision and Platting Act, I certify that adequate municipal facilities for the supply of water and disposal of sewage and solid waste are available or will be provided within the time provided in Section 76-3-507, MCA. I further certify that I am authorized to sign this form on behalf of the governing body. Name d HI Houski, A t� Signature Dept t oQ k's Title J r City kCrc,, i f Zip Phone ,�j15 — '777 20 Please sign and send with the $100.00 review fee to: MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY SUBDIVISION REVIEW SECTION, PERMITTING AND COMPLIANCE DIVISION PO BOX 200901 HELENA, MT 59620 Revised 06/I7 Q,4m,Montana [department of Environmental Quality October 16, 2018 Stephanie A Reynolds PE WGM Group 151 Buisness Center Loop Suite A Kalispell MT 59901 RE: Phase One Priliminary Plat Meadows Edge Municipal Facilities Exclusion EQ# 19-1188 City of Kalispell Flathead County Dear Ms. Reynolds; This is to certify that the information and fees received by the Department of Environmental Quality relating to this subdivision are in compliance with 76-4-127, MCA. Under 76-4-125(2)(d), MCA, this subdivision is not subject to review, and the plat can be filed with the county cleric and recorder. Plans and specifications must be submitted when extensions of municipal facilities for the supply of water or disposal of sewage are proposed 76-4-131. Construction of water or sewer extensions prior to DEQ, Public Water Supply Section's approval is prohibited, and is subject to penalty as prescribed in Title 75, Chapter 6 and Title 76, Chapter 4. Sincerely, Rachel Clark Department of Eriviromnental Quality Engineering Bureau Public Water & Subdivision Review (406) 4-44-6722 email rclark c�mt. og_v cc: City Engineer County Sanitarian Owner file Steve Bullock, Governor i Tom Livers. Director I P.O. Box 200901 1 Helena, NET 59620-0901 1 (406) 444-2544 1 www.decl.mt.gov D E.Ag QM,- q N Montana Department or Environmental Quality October 16, 2018 Stephanie Reynolds, PE WGM Group 151 Business Center Loop, Suite A Kalispell, MT 59901 Re: City of Kalispell — PWSID#MT000259 Meadows Edge Subdivision Phase 1A — Water & Sanitary Sewer Main Extensions EQ#19-1189 Approval Dear Ms. Reynolds: Thank you for the plans and specifications, engineering report and geotechnical report for the proposed water and sewer main extensions associated with the Meadows Edge Phase 1A subdivision in Kalispell, received August 16, 2018 through October 15, 2018, under the Professional Engineer's seal of Stephanie A. Reynolds, #28574PE. The proposed water and sewer extension was reviewed in accordance with Circular DEQ-1 design standards, 2014 Edition and Circular DEQ-2 design standards, 2016 Edition. City of Kalispell approval was received on October 15, 2018. The Meadows Edge Phase 1A development received approval of the Municipal Facility Exclusion on October 16, 2018. As such, the City of Kalispell is responsible for the on -site storm water runoff review within this development. The plans and specifications for the water and sanitary sewer mains proposed in Meadows Ede Phase 1A received October 15 201$ are hereby approved. One copy of the plans and specifications bearing the approval stamp of the Department of Environmental Quality is enclosed. A second set will be retained as Department Record. As a part of this project, a deviation was requested and granted from DEQ-1 Section 8-8.3(b), with City input, allowing the water and sewer main crossing to be installed with less than 18-inches of clearance, in accordance with the approved plan detail, requiring Plowable fill. The water main extension includes installation of: approximately 1800 feet of 8-inch diameter water main (C900 PVC Ct_.150), 90 feet of 8-inch diameter water main (HDPE DR11), 8 gate valves, four fire hydrant assemblies, one connection to the existing water main near the intersection of Farm to Market Road and Mountain Vista Way, and three dead end caps. 44 residential service connections will be installed as a part of this phase. Fire hydrant flow testing and water modeling illustrate that fire flow capacity of approximately 3000 gpm at 20 psi can be provided. Steve Bullock, Governor I Tom Livers, Director 1 655 Timberwolf Parkway Suite 3 1 Kalispell, MT 59901-1215 1 (406) 755-8986 1 www deq,mt,gov e _ro r LL mi 3 �ro a3noO V.s�Ma z O Z F- Z C/) ¢ 0 LLJ LLI ❑ Q J LU 2 LU (n OL 0- 3 J o Q LLU C a �o boa 7a� + i i o a t 0 0 o i¢ a� k` ' ff U w��;} a� o o o rc o a i s o nV e r r e r r Y N a- u q'¢u`."c J< agg' ��9kc��4F N05 .! fig` =g �F--I I V� ��� f✓�-f -t wT,ur� � � J J 41 I � ix —+ U 7 Li �,` Ll ILJL-.1� W 4 ¢ IJ z � w a Z ¢ g = IL H J W uj w � p C) W U fY r L, w rAT 4 WG M 1 , �__', I ", �A- March 28, 2019 City of Kalispell Public Works Department Attn: Mark Crowley 201 V Avenue East Kalispell, MT 59901 Re: Meadows Edge Subdivision Phase 1A Certification Letter for Completion of the Storm Sewer System Dear Mark: WGM Group, Inc. certifies the stormwater conveyance and management improvements have been completed in substantial conformity with the approved construction plans and specifications dated 10/11/18. These improvements consist of storm sewer mains, stormwater catch basins and manholes, a water quality unit, and stormwater detention pond. Since the roads are currently being bonded for through a Subdivision Improvement Agreement, the catch basin drainage grates within the right-of-way have not yet been installed. However, these grates are on -site and will be installed prior to paving later this year. Upon City acceptance of the project, the stormwater infrastructure within public right-of- way will be maintained by the City and the stormwater infrastructure within the open space areas will be maintained by the Meadows Edge HOA. If you have any questions, please feel free to give me a call at (406) 756-4848 or email me at sre nolds w m rou .com. Sincerely, WGM Group, Inc. Stephanie A. Reynolds, P.E. Senior Project Engineer 431 1" Avenue West, Kalispell, MT 59901 1 OFFICE 406,756.4848 1 EMAIL sreynolds@wgrngroup.com D E.Qt`70ntdna Department Of Environmental Quality October 24, 2018 Charles Pisk MEADOWS EDGE SUBDIVISION PHASE I SANDRY CONSTRUCTION CO INC Po Box 507 Big Fork, MT 59911 RE: Confirmation Letter, Notice of Intent (NOI) MTRI07600 MEADOWS EDGE SUBDIVISION PHASE lA Dear Charles Pisk: The Department of Environmental Quality (DEQ) acknowledges the receipt of your complete application package (NOI and SWPPP) to discharge under the January 01, 2018, General Permit for Storm Water Discharges Associated with Construction Activity (SWC-GP) on 10/25/2018. Your authorization number under the SWC-GP is MTR107600. Please include this number on any correspondence with DEQ regarding this site. This letter confirms only that a complete NOI has been received. DEQ does not assess the validity of the information you provided other than project location as it relates to sage grouse habitat. Your signature on the NOI certifies that you have read, understand, and are implementing all applicable requirements. Specifically, the SWC-GP: Requires implementation of a Storm Water Pollution Prevention Plan (SWPPP), Defines the inspection process, and Defines record keeping requirements (refer to Part 2.5 of the General Permit). The SWC-GP and additional guidance materials can be viewed and downloaded at http://deq.mt.goviWater/W PB/mpdes/stormwaterconstr-uction. Authorization under the SWC-GP remains in effect until you submit a complete Notice of Termination (NOT). Your signature on the NOT certifies that you have achieved final stabilization, removed your temporary Best Management Practices, and have paid all applicable fees. All effective authorizations are assessed annual fees each calendar year until a complete NOT is received. Coverage under the SWC-GP does not waive your obligation to obtain coverage under other applicable permits. If you have questions regarding SWC-GP requirements, please contact the Water Protection Bureau at (406) 444-3080. Sincerely, Deanna Tarum Data Control Specialist October 24, 2018 Meadows Edge LLC Layne Massie 460 N. Somers Rd Kalispell, Mt 59901 Re: Approval letter for City 5tormwater Management Permit Number SW18-0049 for project site: intersecton of Three Mile Drive and Farm to Market Road, Kalispell, Mt 59901 Dear Permittee: As of July 17th, 2017, all stormwater permits must be reviewed and approved before the commencement of any land disturbing activity. This letter serves as an approval letter to begin land disturbance for the above -referenced project site. You are required to: (1) Implement the City Stormwater Management Plan prior to any land disturbance (2) Develop and maintain best management practices (3) Terminate the permit once the site is properly stabilized To keep track of current projects, yearly renewal is required. If your project will continue past December 31st of the current year, permit renewal is required. Failure to renew your permit before January 1st of next year may incur a late fee. Please review and follow the City 5tormwater Management Ordinance 1600 (www.kalispell.com) and the Erosion and Sediment Control Best Management Practices Reference Manual (www.mdt,mt.gov/re.search/projects/env/erosion.shtml). Note: This permit is separate from any permit required by other governmental agencies and does not waive any obligation by you to obtain other permits or approvals that may be required. If you have any questions, please call 406-758-5705 or email clewis@kalis efl.com. Sincerely, i 3- Casey Lewis Environmental Speciolist Public Works Department City of Kalispell 2011st Avenue East, P.O. Bmc 1997, Kalispell, MT 59903 -Phone (406) 758-7720 -Fax (4061 758-7831, wwwAalispell.com 2701 Prospect Avenue State of Montana PO Box201001 1"WTX Helena, MT S962.0-1001 Montana Department of Transportation Phone: (406) 444-7237 MDT-MA#-006 1 1/13 Fax (406) 444-0807 Driveway Approach Application and Permit Page 1 of 2 Y h p p p TTY:(406)444-7696 www.mdt.mt.aov 'o'be filled in by Department of Transportation Personnel Print Form F.A. Route No: Milepost: Project: Approach Station: C-424 (S 424) 2.11 FAS S 157(1) 149+00 LT District: County: Maint Section No: Missoula I Flathead 1201 Drainage as determined by Department of Transportation Type: as per plans Size: Length: Sight Distance (feet): flight: 925 Left: 1,200 Approach Recorrimend,406 by DistrictTraffic Date Appr,-AppicationApproved by Date! Engineer or Traffic & Safety Bureau District=Administrator or Ddsignee Access Control: {' Yes (a No I Access Contra is Yes: Date Approach Recommended by Access Manager, R/W Bureau (PROPERTYAPPLICANT OWNER) Name Phone\Fax Number Edge, LLC (Attn: Layne Massie) (406) 407-1309 Address City State Zip Code E-mail P.O. Box 7184 Kalispell IMT 59904 laynemassie@gmail.com herein termed the applicant, requests permission to construct approach(es) described and shown on attached site plan or plan and profile and hereby made a part of this application Use of Property or Facility: Mulit-family Residence Meadows Edge Development- Phase 1 A An environmental checklist must be filled out, signed and attached in order for this application to be considered complete. City or Town: (If rural, direction & approx, distance from nearest city or to, Ka[ispe[[ Street Name, if any: Farm to Market Road (50 mph) Surfacing lAsphalt Width 124 ft. (fog line to fog line) Estimated number of trips per day: see TIS Side of Roadway W Width: as per plans Flare: as per plans OtherCornments This permit is only for Phase 1 A of the Meadows Edge development. The Developer agrees to complete MDT's review process for future phases of the development. 2701 Prospect Avenue State of Montana PO Box201001 Helena, MT59620-1001 MD7* Montana Department of Transportation Phone: (406) 444-7237 MDT-MAI-006 11/13 Fax (406) 444-0807 Page 2 of 2 Driveway Approach Application and Permit Try: (406) 444-7696 www.mdt.mt.gov (INSTRUCTIONS CONCERNING USE OF THIS FORM( Applicant will complete and deliver this form in duplicate to the DistrictAdministrator serving the area in which the Approach Permit is requested. The District Administrator, in conjunction with the District Traffic Engineer, is delegated authority to approve curb cuts, public and private approaches serving businesses, residences and agricultural uses in rural or urban areas without further consultation if the traffic conditions are not congested. In congested areas, usually urban situations, the District Administrator and District Traffic Engineer can request the Traffic and Safety Engineer in Helena for additional technical assistance. If this is necessary, the approach should be scaled onto existing plan and profile sheets showing the highway right-of-way and sent to Helena, - APPROACH PERMIT - Subject to the following terms and conditions, the permit applied for upon the reverse side hereof, Is hereby granted: 1) TERM. This permit shall be in full force and effect from the date hereof until revoked as herein provided. 2) REVOCATION. This permit may be revoked by State upon giving thin ty (301 days notice to Permittee by ordinary mail, directed to the address shown in the application hereto attached, but the State reserves the right to revoke this permit without giving said notice in the event Permittee breaks any of the conditions or terms set forth herein. 3) COMMENCEMENT OF WORK No work shall be commenced until Permittee notifies the Department of Transportation when work is proposed to commence. 4) CHANGES IN HIGHWAY. If the State changes the highway, or there are other changes to adjoining streets, alleys, etc., which necessitate alterations in structures or installations installed under this permit, Permittee shall make the necessary alterations at Permittee's sole expense or in accordance with a separate agreement. 5) STATE SAVED HARMLESS FROM CLAIMS. In accepting this permit the Permittee, its/his successors or assigns, agree to protect the State and save it harmless from all claims, actions or damage of every kind and description which may accrue to, or be suffered by, any person or persons, corporations or property by reason of the performance of any such work, character of materials used, or manner of installations, maintenance and operation, or by the improper occupancy of said highway right of way, and in case any suit or action is brought against the State and arising out of, or by reason of, any of the above causes, the Permittee, its/his successors or assigns, will upon notice to it/him of the commencement of such action, defend the same at its/his sole cost and expense and satisfy anyjudgment which may be rendered against the State in any such suit or action. 6) PROTECTION OF TRAFFIC. Submit a traffic control plan for review and approval prior to any work being performed in MDT Right -of -Way. Traffic control must meet current MUTCD and MDT standards and guidance. The approval shall in no way operate to relieve or discharge the Permittee from any of the obligations assumed by acceptance of this permit, and especially those set forth under Section 6 thereof. 7) HIGHWAY DRAINAGE. If the work done under this permit interferes in any way with the drainage of the State Highway affected, Permittee shall, at its/his own expense, make such provisions as the State may direct to take care of said drainage. 8) RUBBI5H AND DEBRIS. Permittee is responsible for debris that is carried onto the roadway by this construction with sweeping and cleaning done daily at permittee's expense. Upon completion of work contemplated under this permit, all rubbish and debris shall be immediately removed and the roadway and the roadside left in a neat and presentable condition satisfactory to the State. 9) WORK TO BE SUPERVISED BY STATE. All work contemplated under this permit shall be done under the supervision of and to the satisfaction of the authorized representative of the State, and the State hereby reserves the right to order the change of location or removal of any structure or installation authorized by this permit at any time, said changes or removal to be made at the sole expense of the permittee. 10) STATES RIGHT NOT TO BE INTERFERED WITH. All such changes, reconstructing or relocation shall be done by Permittee, in such a manner as will cause the least interference with any of the State's work, and the State shall in noway be liable for any damage to the Permittee by reason of any such work by the State, its agents, contractors or representatives, or by the exercise of any rights by the State upon the highways by the installations or structures placed under this permit. 71) REMOVAL OF INSTALLATIONS OR STRUCTURES. Unless waived by the State, upon termination of this permit, the Permittee shall remove the installations or structures contemplated by this permit and restore the premises to the condition existing at the time of entering upon the same under this permit reasonable and ordinary wear and tear and damage by the elements, or by circumstances over which the Permittee has no control, excepted. 12) MAINTENANCE AT EXPENSE OF PERMITTEE Permittee shall maintain, at its/his sole expense the installations and structures for which this permit is granted, in a condition satisfactory to the State. 13) STATE NOT LIABLE FOR DAMAGE TO INSTALLATIONS. in accepting this permit the Permittee agrees that any damage or injury done to said installations or structures by a contractor working for the State, or by any State employee engaged in construction, alteration, repair, maintenance or improvement of the State Highway, shall be at the sole expense of the Permittee. 14) STATE TO BE REIMBURSED FOR REPAIRING ROADWAY. Upon being billed therefor Permittee agrees to promptly reimburse State for any expense incurred in repairing surface or roadway due to Settlement at installation, or for any other damage to roadway as a result of the work performed under this permit. 15) OTHER CONDITIONS AND/OR REMARKS. a. All approach side slopes will preferably be constructed on 10 to 1 slope but not less than 6 to 1 slope, unless otherwise approved. b. No private signs or devices etc., will be constructed or installed within the highway right-of-way limits. C. This permit is valid only if approach construction is completed within specified months from date of issue. 6 Months d. Prior to Starting work, for construction inspection and approval of completed approach contact Dennis Oliver 406-751-2012 e. ® See attached addendum - - Dated at: Kalispell, MT Agreement Date The undersigned, the "Permittee" mentioned in the Waregoing instrument, hereby accepts this permit, together with all of the terms To be filled in by Department of Transportation Personnel and conditions set forth therein. l Completed Approach Inspection By: Date Signed by Permittee Title: W 6/2019 Attachment for Meadows Edge Phase lA approach: Secondary 424 (Farm To Market) MP 2.11 Sta. 149+00 LT This attachment includes terms and conditions in addition to those listed on the back (page 2) of the permitforin. A. This permit is for Phase I A of the Meadows Edge development. The improvements have been reviewed and approved through MDT's System Impact Analysis Process. The approach and associated improvements shall be as per the plans which were submitted and approved by MDT. B. The permittee agrees to complete MDT's review process for future phases of the development. C. Parking is not allowed on MDT right of way. Landscaping or beautification on right of way requires a separate encroachment permit. D. Any work performed prior to MDT review and approval is subject to removal if MDT design standards and/or guidelines are not met. E. If any change from the MDT approved plans is determined necessary at the time of construction the change must be approved by MDT in writing prior to installation. F. MDT design reviews are made to insure compatibility with existing facilities and design standards and guidelines. The permittee is responsible for all survey and plan errors and/or omissions that impact the constructability or intended design function of the project. G. The permittee must obtain approvals from downstream landowners if their proposed facility impacts downstream properties (easements, etc.) and provide documentation of appropriate coordination with affected landowners. If any aquatic resources, such as streams, canals, wetlands, etc. will be impacted as a result of this project, the appropriate water quality permits must be obtained from state, federal, tribal, anal/or local agencies. H. The permittee is solely responsible for any environmental impacts incurred as a result of this project and is solely responsible for obtaining any necessary environmental permits, notifications, and /or any other necessary environmental clearances. r- Permittee Initials: - MD7*Montana Department of Transportation Michael T. 7ooley, Director M Steve Bullock, Governor Kalispell Area Office 85 Fifth Avenue East North PO Box 7308 Kalispell, MT59904-0308 October 12, 2018 Stephanie Reynolds WGM Group 431 lot Avenue West Kalispell, MT 59901 Subject: Meadows Edge Temporary Construction Approach Permit Please find enclosed the approach permit application with attachments for the temporary construction access located on Secondary 424 (Farm To Market Road) at reference post 2.11. Please have the owner sign and date the permit application on the back at the bottom as indicated for permittee and initial the bottom of the supplemental attachment. (Note all the locations to fill in/sign are highlighted.) Please make a copy of the signed permit and the initialed supplemental attachment for your files and return the originals to me. You can keep the copy of the signed environmental checklist for your records, you do not have to return it. If you have any questions please feel free to contact me. Sincerely, James M. Freyholtz, P.E. Kalispell Area Traffic Engineer (406) 751-2066 Enclosures: copies: An Equal Opportunity Employer Phone: (4067T1Y: (800) 335-7592 Fax: (406) 7.552 -5767 767 Web Page: www mdt.mt.gov 2701 Prospect Avenue State of Montana PO Box201001 Helena, MT 59620-1001 ffifi"* Montana Department of Transportation Phone: (406) 44-4-7237 MDT-MAI-006 1 1/13 Fax (406) 444-0807 Page Z of 2 Driveway Approach Application and Permit TTY: (406) 444-7696 www.mdt.mt.(.Iov (INSTRUCTIONS CONCERNING USE OF THIS FORM) Applicant will complete and deliver this form In duplicate to the District Administrator serving the area In which the Approach Permitis requested. The District Administrator, in conjunction with the District Traffic Engineer, is delegated authority to approve curb cuts, public and private approaches serving businesses, residences and agricultural uses in rural or urban areas without further consultation if the traffic conditions are not congested. In congested areas, usually urban situations, the District Administrator and District Traffic Engineer can request the Traffic and Safety Engineer in Helena for additional technical assistance. If this is necessary, the approach should be scaled onto existing plan and profile sheets showing the highway right-of-way and sent to Helena. -APPROACH PERMIT - Subject to the following terms and conditions, the permit applied for upon the reverse side hereof, is hereby granted: 1) TERM. This permit shall be in full force and effect from the date hereof until revoked as herein provided. Z) REVOCATION. This permit may be revoked by State upon giving thirty 30 days notice to Perm€ttee by ordinary mail, directed to the address shown in the application hereto attached, but the State reserves the right to revoke this permit without giving said notice in the event Permittee breaks any of the conditions Of terms set forth herein. 3) COMMENCEMENT OF WORK. No work shall be commenced until Permittee notifies the Department of Transportation when work is proposed to commence. 4) CHANGES IN HIGHWAY. If the State changes the highway, of there are other changes to adjoining streets, alleys, etc., which necessitate alterations in structures or installations installed under this permit, Permittee shall make the necessary alterations at Permittee's sole expense or in accordance with a separate agreement. 5) STATL SAVED HARMLESS FROM CLAIMS. In accepting this permit the Permittee, Itsthis successors or assigns, agree to protect the State and save it harmless from all daims, actions or damage of every kind and description which may accrue to, or be suffered by, any person or persons, corporations or property by reason of the performance of any such work, character of materials used, or manner of installations, maintenance and operation, or by the Improper occupancy of said highway right of way, and in case any suit or action is brought against the State and arising out of, or by reason of, any of the above causes, the Permittee, its/his successors or assigns, will upon notice to Whim of the commencement of such action, defend the same at its/his sole cost and expense and satisfy any judgment which may be rendered against the State in any such suit or action. 6) PROTECTION OF TRAFFIC. Submit a traffic control plan for review and approval prior to any work being performed in MDT Right -of --Way. Traffic control must meet current MUTCD and MDT standards and guidance. The approval shall in no way operate to relieve or discharge the Permittee from any of the obligations assumed by acceptance of this permit, and especially those set forth under Section 6 thereof. 7) HIGHWAY DRAINAGE. If the work done under this permit interferes in any way with the drainage of the State Highway affected, Permittee shall, at its/his own expense, make such provisions as the State may direct to take care of said drainage. 8) RUBBISH AND DEBRIS. Permittee is responsible for debris that is carried onto the roadway by this construction with sweeping and cleaning done daily at permittee's expense. Upon completion of work contemplated under this permit, all rubbish and debris shall be immediately removed and the roadway and the roadside left in a neat and presentable condition satisfactory to the State. 9) WORK TO BE SUPERVISED BY STATE. All work contemplated under this permit shall be done under the supervision of and to the satisfaction of the authorized repfewntative of the State, and the State hereby reserves the right to order the change of location or removal of any structure or installation authorized by this permit at any time, said changes or removal to be made at the sole expense of the permittee, 10) STATE'S RIGHT NOT TO BE INTERFERED WITH. All such changes, reconstructing or relocation shall be done by Permittee, in such a manner as will cause the least interference with any of the State's work, and the State shall in no way be liable for any damage to the Permittee by reason of any such work by the State, its agents, contractors or representatives, or by the exercise of any rights by the State upon the highways by the installations or structures placed under this permit. 11) REMOVAL OF INSTALLATIONS OR STRUCTURES. Unless waived by the State, upon termination of this permit, the Permittee shall remove the installations or structures contemplated by this permit and restore the premises to the condition existing at the time of entering upon the same under this permit, reasonable and ordinary wear and tear and damage by the elements, or by circumstances over which the Permittee has no control, excepted. 12) MAINTENANCE AT EXPENSE OF PERMITTEE. Permittee shall maintain, at its/his sole expense the installations and structures fur which this permit is granted, in a condition satisfactory to the State. 13) STATE NOT LIABLE FOR DAMAGE TO INSTALLATIONS. In accepting this permit the Permittee agrees that any damage or injury done to said installations or structures by a contractor working for the State, or by any State employee engaged In construction, alteration, repair, maintenance or improvement of the State Highway, shall be at the sole expense of the Permittee. 14) STATE TO BE REIMBURSED FOR REPAIRING ROADWAY. Upon being billed therefor Permittee agrees to promptly reimburse State for any expense incurred in repairing surface or roadway due to settlement at installation, or for any other damage to roadway as a result of the work performed under this permit. 15) OTHER CONDITIONS AND/OR REMARKS. a. All approach side slopes will preferably be constructed on 10 to 1 slope but not less than 6 to 1 slope, unless otherwise approved. b. No private signs or devices etc., will be constructed or installed within the highway right -of way limits. C. This permit is valid only if approach construction is completed within specified months from date of issue. 6 Months d. Prior to Starting work, fur construction inspection and approval of completed approach contact Dennis Oliver 406-751-2012 e. ® See attached addendum Dated at: Kalispell, MT Agreement Date () rl(6 - The undersigned, the "Permittee" mentioned in the aforegoing instrument, hereby accepts this permit, together with aft of the terms and conditions set forth therein, _Z " 4", e by Permittee To be filled in by Department of Transportation Personnel Completed Approach Inspection By: Date tit e: 2701 Prospect Avenue Pa, Box 962 01 PWFN Montana Department of Transportation Helena, MT59620-1001 Phone: (406) 444-7228 MDT-ENV-006 04/17 Environmental Checklist Fax (406) 444-7245 Page 1 of 2 TTY: (406) 444-7696 Date Choose type of Environmental Checklist: Encroachment/Occupancy (including utility) Location Applicant Information: Highway or Route: Mifepost(s): Name: Title Farm to Market Road City of Kalispell Physical Address: City: Company/Utility: 1120 Farm to Market Road Kalispell Public Works Legal Description: County: Mailing Address: Phone: Three tracts of land in the East half Flathead 201 1st Ave. E. Township: Range: Section(s): City: State: Zip: Business Phone: 28N 3 Kalispell (406) 758-7720 Montana Environmental Checklist Help Guide (click button to view) Guide Impact Questions Comment, Expl, and/or Actions that qualify for Categorical Exclusion under MEPA and/or NEPA (See ARM 18.2.261 and 23 CFR 771,117) Information Source (Attach (See ARM 18.2.261 and 23 CFR 771.117) supporting information, as necessary.) 1 Will the proposed action impact any known historical or archaeological site(s)? C' Yes G No 2 Will the proposed action impact any publicly owned parkland(s), recreation area(s), wildlife or waterfowl refuge(s)? C- Yes 6- No 3 Will the proposed action impact prime farmlands? (If yes, attach a completed Farmland Conversion Impact (- Yes re No Rating Ad-1006.) a. Will the proposed action have an impact on the human environment that may result from relocations of C, Yes re No persons or businesses, changes in traffic patterns, changes in grade, or other types of changes? b. Has the proposed action received any preliminary or final approval from the local land use authority? a Yes r No Preliminary Plat approval was 5 For the proposed action, is there documented controversy on environmental grounds? (For example, has granted for the project on 614118. C Yes (: No the applicant received a letter of petition from an environmental organization?) 6 Will the proposed action require work in, across or adjacent to a listed or proposed Wild or Scenic River? r Yes t+ No 7 Will the proposed action require work in a Class f Air Shed or nonattainment area? 6' Yes C No 8 Will the proposed action impact air quality or increase noise, even temporarily? f• Yes C'' No 9 a. Is the proposed action located within an M84 Area? C' Yes C No b. Will the proposed action have potential to affect water quality, wetlands, streams or other water bodies? (- Yes 6- No A SWPPP will he implemented If YES, an environment -related permit or authorization may be required_ during construction. 10 Are solid or hazardous wastes or petroleum products likely to be encountered? (For example, project C Yes C: No occurs in or adjacent to 5uperfund sites, known spill areas, understorage tanks, or abandoned mines.) 11 a. Are there any listed or candidate threatened or endangered species, or critical habitat in the vicinity of C: Yes (' No the proposed action? gull Trout b. Will the proposed action adversely affect listed or candidate threatened or endangered species, or C, Yes (: No adversely modify critical habitat? 12 Will the proposed action require an environmental -related permit or authorization? (: Yes C No "yes," A SWPPP will be required for If the answer is please list the specific permits or authorizations. construction. 13 is the proposed action within designated sage grouse habitat(https:/Isagegrouse.mi.gov/projecis). (If yes, f- Yes (: No a consultation letter issued from the Montana Sage Grouse Habitat Conservation Program is required.) 14 a. Is the proposed action on or within approximately 1 mile of an Indian Reservation? C" Yes to No b. If "Yes", will a Tribaf Water Permit be required? C' Yes r No (a N/A 15 Will the proposed action result in increased traffic volurnes, increased wail or delays on state highways, or C Yes Co No have adverse impacts on other forms of transportation (rail, transit or air movements)? PUBLIC R GHT-OF-WAY PERMIT CITY OF KALISPELL PUBLIC WORKS DEPARTMENT 201 FIRST AVENUE EAST KALISPELL, MT 59901 Phone: 406-758-7720 Permit Fee $10.00 Date Submitted: d okay-h Date Issued: �8 �� � Permit Number: PERMIT LOCATION / OWNER AND CONTRACTOR INFORMATION Owner's Name: S-�� L�.. Job Address: Contractor's Name: • Contractor's Address: - Contractor's Business Phone: Cell: lq3 TYPE AND PURPOSE OF PERMIT EXCavatIon Temporary Use Utility Construction s Landscaping Driveway Temporary Obstruction �idewalk Curbing BID Business Sidewalk Use Sidewalk Sign Other Description of Work or other use of the Right-of-Way:_�� f Date Work/Use will Begin: WtTDate Work/Use will End: REQUIRED SUBM1TTALS• Permit will not be issued same day as applied for. Three (3) Work Days Review Time May Be Required. Insurance Bonding �Traffic/Pedestrian Control Plan Parks Department ,--'- Site Plan Kalispell Parking Commission Temporary Contractor Permit The City shall be included or named as an additional or named insured on the landowner's Prcmises Liability policies which shall insure that portion of public right-of-way under permit. The insurance must be in a form suitable to City. CONTI CTO-R. C'ERTI FI CATIOI'e7 I am familiar with the current Standards for Design and Construction for the City of Kalispell that apply to the w rk I have described above. I understand that all construction work within the public right-of-way's object to inspectio by e Public Works Department. A minimum of twenty four (24) hours a a notificat n is �q jircd f der to schedule and perform the inspection. Signaturef Contractor Providing Liability Insurance and Bonding I understand that, if necessitated by future changes to City Streets or Utilities, all private utilities, excluding service laterals, placed within City of Kalispell Right of Way may be required to be relocated by Utility Owner at no expense to the City of Kalispell. Signature of Utility Owner if New Occupying Utility Installed City of Kalispell Publicrks Department Comments: This approved Permit must be Dept on the job site at all times and must be available upon request for inspection by representatives of the City of Kalispell. NOTE: CALL TWO BUSINESS HAYS BEFORE YOU DIG - 755-UDIG (755-8344) March 2014 Revision KALISPELL FIRE DEPARTMENT Dave Dedman — Fire Chief PO Box 1997 Jon Campbell —Assistant Fire Chief 312 First Avenue East Cee Lee— Executive Secretary Kalispell, Montana 59901 Phone: (406) 758-7760 FAX: (406) 758-7777 10C1/2018 Stephanie Reynolds, P.E. WGM Group 43I lst Ave West Kalispell MT, 59901 Re: Meadows Edge Phase IA Dear Stephanie, After reviewing the phase exhibit and Meadows Edge Phase 1 A Plan set from your 9/20/2018 correspondence I find that the fire flows, hydrant locations and vehicle standards to be acceptable. If you have any further questions please feel free to contact me. Dave Dedman, Fire Chief City of Kalispell "Protecting our coniniunity with the highest level of professionalism 11 March 26, 2019 Kristine McMahon, PLS Land Surveyor WGM Group 431 1"Ave West Kalispell, MT 59901 Re: Meadows Edge, Phase 1 A Dear Ms. McMahon: The Final Plat for Phase 1 A of the Meadows Edge, dated March 18, 2019, has been reviewed by this office to ensure conformance the City of Kalispell Design and Construction Standards for required easements and right-of-ways. All required easements and right-of-ways have been determined to be acceptable. Sincerely, Keith Haskins, PE City Engineer cc: Jarod Nygren — Senior Planner 201 1" Avenue East, P.O. Box 1997, Kalispell, MT 59903 —Phone (406) 758- 7720 — Fax (406) 758-7831 www.kalispell.com Tforks Department moyvT 2011' Avenue East, P.O. Box 1997, Kalispell, MT 59903 —Phone (406) 758-7720 — Fax (406) 758-7831 r RIV.klispell.coto June 26, 2019 Stephanie Reynolds, PE Project Engineer WGM Group, Inc. 431 1 st Ave West Kalispell, MT 59901 Re: Meadows Edge Subdivision— Phase I Dear Stephanie, Our office is in receipt of your water and sewer certification letter dated May 31, 2019 regarding required infrastructure. Thank you for your help in bringing this project to completion. Professionally, Matt Bean Construction Manager CC: Jarod Nygren ARTICLES OF INCORPORATION OF MEADOWS EDGE HOMEOWNERS ASSOCIATION INC. The undersigned, acting as Incorporator of a corporation under the Montana Non -Profit Corporation Act, adopts the following Articles of Incorporation for such corporation: FIRST: The name of the non-profit corporation is MEADOWS EDGE HOMEOWNERS ASSOCIATION, INC. SECOND: The address of the initial registered office of the corporation is: 55 Hunter Circle, Kalispell, Montana 59901, and the name of the initial registered agent at such address is Wade Rademacher, THIRD: The name of the Incorporator is Wade Rademacher, and his address is 55 Hunter Circle, Kalispell, Montana 59901, FOURTH: The period of its duration is perpetual, FIFTH: The corporation is a Mutual Benefit Corporation. SIXTH: The corporation shall have members consisting of owners of property in the Meadows Edge Subdivision in Kalispell, Montana, according to the plat of Meadows Edge Subdivision on file and of record in Flathead County, Montana. Provisions for the regulation of the internal affairs of the corporation, including provisions for the distributions of assets or dissolution or final liquidation, are: a. No part of the net earnings of the corporation shall inure to the benefit of or be distributable to its Members, Directors, Officers, or other private persons, except that the corporation shall be authorized and empowered to pay reasonable compensation for services rendered and to make payments and distributions in furtherance of the purposes set forth herein. Upon dissolution of the corporation, the Board of Directors shall, after paying or making provisions for the payment of all of the liabilities of the corporation, dispose of all of the assets of the corporation, pursuant to §35-2-720, M.C.A., et seq. SEVENTH: The purposes for which this corporation is formed are: a. The primary and specific purpose is to further and promote the interests and welfare of owners of property in the Meadows Edge Subdivision, in the City of Kalispell, County of Flathead, State of Montana, and to operate, maintain, ARTICLES OF INCORPORATION —Page 1 BYLAWS OF MEADOWS EDGE HOMEOWNERS ASSOCIATION INC. ARTICLE I 12363737 NA11IE OF CORPORATintana Secretary of State Filed: February 26, 2019 12:49 PM The name of the Corporation shall N the Meadows Edge P9"4 'g20sociation, Inc, hereinafter referred to as the "Corporation", ARTICLE H PURPOSE OF THE ORGANIZATION The purposes of the Corporation are: A. To conduct and establish a non-profit corporation devoted to further and promote the interest and welfare of the owners of property in the Meadows Edge Subdivision in Kalispell, Flathead County, Montana; to operate, maintain, improve and insure the roads and association areas in the Meadows Edge Subdivision for the benefit of said owners, and to enforce the Covenants, Conditions and Restrictions of Meadows Edge, B. The Corporation is organized exclusively for charitable purposes, it shall not have authority to effectuate a pecuniary gain, profit or dividend to the membors, directors or officers of the Corporation. No part of the net earnings of the Corporation shall inure to the benefit of or be distributed to its members, directors or officers, except that the Corporation shall be authorized and empowered to pay reasonable compensation for services to, or assistance to the Corporation in accomplishing its purposes, including a salary paid to its legally employed personnel, The Corporation shall not have the authority to carry on propaganda or otherwise attempt to influence legislation, and it shall not participate in or intervene in any political campaign for or against any candidate for public office. C. To have such other general powers as are granted by the Montana Non -Profit Corporation Act, as amended, or any corresponding provisions of any future laws of Montana issued to non-profit corporations but, notwithstanding any of the provisions of these Bylaws, this non-profit Corporation is without the power and shall not carry on any other activities prohibited to be carried on by the following: 1. By a non-profit corporation exempt from Federal Income Tax under Section 501 (e). (3) of the Internal Revenue Code of the United States Treasury Department, or 2, By a non-profit corporation contribution to which are deductible under Section 170 (c) (2) of the Internal Revenue Code of 1954 of the United States Treasury Department. Generated on February 26, 2019 12:49 PM 12363737 F, Proxies. At all member meetings, a member may vote in person, or by proxy, The member or the member's attorney shall make the proxy vote in writing and file it with the Secretary of the Corporation before or at the time of the meeting, No proxy shall be valid after 11 months from the date it was made, unless otherwise provided in the proxy, G, Member's Rights to Inspect Corporate Records. (a) Minutes and Accounting Records. The Corporation shall keep a permanent record of the minutes of all meetings of its members and Board of Directors, a record of all actions i taken by the members or Board of Directors without a meeting, and a record of all actions taken by a committee of the Board of Directors acting in place of the Board and on behalf of the Corporation, The Corporation shall maintain appropriate accounting records. (b) Absolute Inspection Rights of Records Required al Principal Once. At least five _ business days before the date . on which the member wishes to inspect and copy records, the member must give the Corporation written notice of the member's demand to inspect, If the member gives proper Notice (as required by this section), the member (or the member's agent or { attorney) has the right 10 inspect and copy, during regular business hours, any of the following { records, all of which the Corporation is required to keep at its principal office: (1) its articles or restated articles of incorporation and all amendments to them currently in effect; (2) its bylaws or restated bylaws and all amendments to them currently in effect; (3) resolutions adopted by its Board of Directors; (d) the minutes of all member's meetings, and records of all action taken by members without a meeting, for the past three years; (5) a list of the names and business addresses of its current directors and officers; and, (6) its most recent annual report delivered to the Secretary of State. (c) Copy Costs. The right to copy includes, if reasonable, the right to photocopy, or copy by other reasonable means. The Corporation may impose a reasonable charge, coveting the costs of labor and material, for copies of any documents provided to the member, The charge may not exceed the estimated cost of production or reproduction of the records, 3 Generated on February 26, 2019 12:49 PM 12363737 Section 4, Compensation for Directors. No director shall receive compensation for serving on the Board of Directors, Board members may, however, be reimbursed for mileage and out-of-pocket expenses incurred while on the business of the Corporation when such reimbursement is approved by the Board of Directors, Section 5. Meetings of the Board of Directors. A. Regglor Meetings. A regular annual meeting of the Board of Directors shall be held without notice other than this Bylaw immediately after, and at the same place as, the annual meeting of the members. The Board of Directors may provide by resolution for the holding of additional regular meetings, at a time and place fixed by the Board of Directors, without further notice other than this Bylaw, B. Special Meetings. Special meetings of the Board of Directors may be called by the President or by any two (2) directors and it shall thereupon be the duty of the Secretary to cause a notice of such meeting to be given as hereafter provided, The President or directors calling such meeting shall fix the time and place of the meeting, C, Tele-Conference Board Meeting. A Board meeting may be conducted by any means of communication through which all directors participating and all directors physically present at the meeting may simultaneously hear each other during the meeting. Participation in a meeting by such means constitutes presence in person at the meeting, D. Notice of Director's Meeting, Written notice of the time and place of special meetings of the Board of Directors shall be delivered to members of the Board not less than five days prior to the meeting, either personally, by mail, by facsimile or by electronic notification and in the event of delivery by mail, the effective date of the notice shall be the date it is mailed. E. Waiver of Notice, Notice of any regular or special meeting may be waived either before, at, or after such meeting in writing signed by the director, The attendance by a director at any regular or special meeting shall be considered a waiver of any required notice, unless the director is in attendance to object to ,the adequacy of the notice. F. Quorum. A majority of the Board of Directors shall constitute a quorum for the transaction of business, except that when a vacancy or vacancies exist, a majority of the remaining directors shall constitute a quorum. In the event that less than a majority of the Board of Directors is present at any meeting, the majority of those Directors present may adjourn the meeting and designate a place and time for the next meeting, under which circumstances the Secretary shall notify the absent members of the place and time of the next meeting, An act of the majority of the Board of Directors present at any meeting at which a quorum is present at the outset of the meeting shall be the act of the Board of Directors, Generated on February 26, 2019 12:49 PM 12363737 C. Secretary, The Secretary shall be responsible for keeping of the. minutes of the meetings of the members and the Board of Directors in one or more books provided for that purpose; be responsible for seeing that all notices are duly given in accordance with these Bylaws or as required by law; be custodian of the corporate records, have general charge of the books of the Corporation; be responsible for keeping on file at all tirnes a complete copy of the Articles of Incorporation and Bylaws of the Corporation containing all amendments thereto; and, in general, perform all duties incidental to the office of the Secretary and such other duties as from time to time may be assigned to the Secretary by the Board of Directors, D. Trtasurer, The Treasurer shall have charge and custody of and be responsible for all funds and securities of the Corporation; be responsible for the receipt of and the issuance of receipts for monies due and payable to the Corporation from any source whatsoever, and for the deposit of all such monies in the name of the Corporation in such bank or banks as shall be selected in accordance with the provisions of the Bylaws; and in general perform all the duties _ incidental to the office Treasurer and such other duties as from time to time may be assigned by the Board of Directors. ARTICLE VI INDEMNIFICATION OF DIRECTORS OFFICERS AGENTS, AND EMPLOYEES Sectioh 53 Indemnification of Directors. The Corporation shall indemnify any individual made a party to a proceeding because he or she is or was a director of the Corporation, against liability incurred in the proceeding, but only if such indemnification is both (i) determined permissible and (ii) authorized, as defined in subsection (a) of this § 5.1. (a) Determination and Authorization. The Corporation shall not indemnify a director under the § S,1 of Article V unless; (1) Determination. A determination has been made that the director met the standard of conduct set forth in subsection (b) below, and (2) Authorization. Payment has been 'authorized based on a conclusion that the expenses arc reasonable, the Corporation has the financial ability to make the payment, and the financial resources of the Corporation should be devoted to this use rather than some other use by the Corporation. 7 Generated on February 26. 2019 12:49 PM 12363737 ARTICLE IX Fiscal Year The fiscal year of the Corporation shall commence on the 1st day of January of each calendar year and end on the 31st day of December of each calendar year. The foregoing Bylaws were originally adopted at the meeting of the directors of Meadows Edge Homeowners Association, Inc, held in Kalispell, Montana on the day of March, 2019, Secretary �� 4 Generated on February 26, 2019 12,49 PM MONTANA SECRETARY OF STATE Retum Method: Email RANDALL S. OGLE PO BOX 899 KALISPELL MT 59903 CERTIFICATION LETTER February 26, 2019 I, COREY STAPLETON, Secretary of State for the State of Montana, do hereby certify that Meadows Edge Homeowners Association, Inc. filed its Articles of Incorporation with this office and has fulfilled the applicable requirements set forth in law. By virtue of the authority vested in this office, I hereby issue this certificate evidencing the filing is effective on the date shown below. Certified File Number: D1110529 - 12362952 Effective Date: February 27, 2019 Your company's annual report is due by April 15th of next year and each consecutive year thereafter, Thant; you for being a valued member of the Montana business community, I wish you continued success in your future endeavors. Corey Stapleton Montana Secretary of State Montana State Capitol . PO Box 202801 . HOCild, MoUtana 59620-280I tel: (406) 4 44-3665 . fax: (406) 444-3976 . TTY: (406) 444-9068 . sos.Mt.p,csv STATE OF i u::a.9r.�nes� � T•• y Articles of Incorporation Meadows Edge Homeowners Association, Inc, (D1110529) General Details Handling Option Delayed Effective Date Corporate Type Business Entity Name Registered Agent in Montana Name Street Address Mailing Address Registered Agent Type 12362952 Montana Secretary of State Filed: February 26, 2019 11:13 AM Delayed Effective Date: February 27, 2019 BID:D1110529 24 Hour priority Handling 02/27/2019 Mutual Benefit Corporation with members Meadows Edge Homeowners Association, Inc. Wade Rademacher 55 Hunter Circle, Kalispell, Montana, 59901, United States Same as Street Address Non -Commercial The appointment of the registered agent listed above is an affirmation by the represented entity that the agent has consented to serve as a registered agent, Yes Term Perpetual Purpose The primary and specific purpose is to further and promote the interests and welfare of owners of property in the Meadows Edge Subdivision, in the City of Kalispell, County of Flathead, State of Montana, and to operate, maintain, improve and insure the roads, alleys, parks, open spaces and common areas in the Meadows Edge Subdivision for the benefit of said owners. This Nonprofit Corporation a) Is not applying through the IRS for 501(c)(3) status and upon dissolution, the assets shall be distributed in the following manner: Manner of asset distribution on Generated on February 26, 2019 12:49 PM 1 of 2 M WGMGROUR Communivv Val�eg Futures May 31, 2019 City of Kalispell Public Works Department Attn: Matt Bean 201 Is' Avenue East Kalispell, MT 59901 Re: Meadows Edge Subdivision Phase 1A EQ#: 19-1189 Water and Sanitary Sewer Main Extensions Water and Sanitary Sewer System Certification Dear Matt: WGM Group, Inc, certifies that the water and sanitary sewer system improvements serving the Meadows Edge Phase 1A subdivision have been completed and tested in substantial conformity with the approved WGM Group, Inc. construction plans and specifications dated 10/11/18 and approved construction modifications. There are no deviations from the design standards other than those previously approved by the department. Please note that the 18" water transmission main segments placed at the request of the Public Works Department for a future City project are to remain isolated from the operational system currently serving the Meadows Edge Phase 1A Subdivision via closed butterfly valves. These valves will be noted as "normally closed" on the record drawings we will submit at project closeout. The 30 ft. long northern segment is a dry laid main that has been swab chlorinated. These segments will be certified and tested during the future water transmission main project scheduled for construction later this year as confirmed by the City. If you have any questions or would like additional information, please feel free to give me a call at 756-4848 or email me at sreynoldsCawgmgroup.com. Sincerely, WGM Group, Inc. 3�� �q, 12,7,,w ao-, Stephanie A. Reynolds SENIOR PROJECT ENGINEER cc: MDEQ / EQ#19-1189 - Emily L. Gillespie Edge, LLC - Wade Rademacher City of Kalispell Planning Department - Jarod Nygren City of Kalispell Public Works Department - Keith Haskins File 431 1" Avenue West, Kalispell. NIT 59901 1 OFFICE 406.756.4848 1 EMAIL wgm@wgmgroup.com 71 PY MT" S91 o `1 IIll�lllll� �Illllillll llllllll l lllllEll lllllllfl l llllll l llil lllff 111 J1l1111111 Jill Aage°i E13 7 Debbie Pierson, Flathead Cpunty MT 6y SC 6/1012FC19 10324 AM MEMORANDUM OF UN DERS1!ANDrNG between THE CITY OF KALISPELL, MONTANA and MEADOWS EDGE, LLC FOR THE TRANSFER OF WATER RIGHTS AND WATER USAGE ,This agreement ("MOU") is made and entered into by and between the City of Kalispell, a municipal corporation incorporated and organized under the laws of the State of Montana, ("City") with its business office at 201 1" Ave E, Kalispell, MT 5990land Meadows Edge, LLC ("Meadows Edge") a limited liability company organized under the laws of the State of Montana with its business office at P.O. Box 2190, Woodland, WA 98674-0021 for the purposes set forth below. RECITALS C� 1. Upon the petition of Meadows Edge, the City annexed property owned by Meadows mEdge into the City by Resolution No. 5873 and particularly described as follows: Tract 3 of COS 18892 in the East Half of Section 3 and Parcel A of COS 15268 in the Southwest Quarter of Section 2, Township 28 North, Range 22 West, P.M.M., Flathead County, Montana. 2. 'Thereafter the City adopted a zoning designation for the property as a Planned Unit Development by Ordinance No. 1810 and approved the preliminary plat for the property by Resolution No. 5874. 3. The City serves as the owner and operator/manager of a municipal water system known as the Kalispell Water Utility System, which provides potable water services to the City of Kalispell including the subdivision of Meadows Edge. 4. The City water service regulations require all properties annexing into the City and receiving water service from the City water utility to transfer all water rights benefitting the property being served to the City. 5. Meadows Edge seeks to develop the annexed property in phases and to utilize its water Tights in such a fashion as to allow for the irrigation of the yet to be developed agricultural land from the surface water right it holds under the Statement of Claim 76L.1148685. 6. The City regulations do not allow the use of surface waters for purposes of potable water or irrigation of property that has been developed for residential use. Water Rights MOU — City of Ka lisp ell/Head ows Edge, LLC - Page 1 I�III IIEliI�1� �I1I�I�IH�II�ilill��p�IlN�llll������llll�ll�l{Illi�ilI�II Page'. . Fees: $31 00 6/10/2019 10:24 AN NOW, THEREFORE the City and Meadows Edge agree as follows: 1. The foregoing recitals are true and correct and by this reference are incorporated into the terms of this MOU. 2. Meadows Edge shall transfer all water rights it holds on the property (Statements of Claim 76LJ148685, 148695, 148679, and Provisional Permit 76LJ2318) to the City prior to final plat of Phase lA of the subdivision. 3. , The City shall allow continued use bf the water right described in Statement of Claim 76LJ148679 for the sole purpose of irrigation of unimproved portions of the development which have not received final plat approval for a maximum] period of 10 years or at the time of approval of the final plat of the last phase of the development, whichever occurs first. 4. As the common areas, parks and,boulevard areas are developed in each phase of the subdivision and prior to the final plat of each phase, all irrigation shall be conducted to utilize only the City potable water services, which have been setup, established and metered for such purposes, meeting the requirements of the regulations for water service as well as the Design and Construction Standards. IN WITNESS WHEREOF the parties have subscribed their names on the dates hereinafter written. �t 9 Date Date FOR. ME , OWS EDGE, LLC Wade Rademacher, Project Mana FOR THE CITY OF KALISPELL r Doug Russe City Manager Water. Rights MOLT — City of Kalispell/Meado►vs Edge, LLC - Page 2 I I�IUIIIIIiIIIiIII�IIIII mill III 11111IIIIIDI111111111 P20190001 age: 3of337 Fees: $31.00 6/10/2019 10:24 AM STATE OF MONTANA } ) ss. County of Flathead } On this f day of n�iC� , 2019, before me, a Notary Public for the State of Montana, personally appeared Te, r�cc,( proved to me to be the person whose name is subscribed to the within instrument, and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year hereinabove first written. aauxckgQ AIMEE BRUNCKHORST w�: 9 NOTARY PUBLIC for IN N TARP PUBLIC for the State of Montana State of Montana Printed Name: �EP►L'Q Re �g�I Lakeside, Monlaet0 Residing at: `�yt•.......••:tra ' mission Expires FO��►0`' Recember 4, 2020 My Commission expires: STATE OF MONTANA ) ) 5S. County of Flathead ) On this s�.day of i� , 2019, before me, a Notary Public for the State of Montana, personally appeared '-DoLk{ Q-kj,'�ct1 , proved to me to be the person whose name is subscribed to the within instrument, and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year hereinabove first written. JUDI A. FUNK- N NOTARY PUBLIC fa�-p State of Montana Padding at Kallspell, Monte rely Commission ExpirekN, ARY PUBLIC for the State of Montana expires: Water Rights IVIOU — City of Kalispell/Meadoivs Edge, L LC - Page 3 J W C) z F_ O saa x •m a � o � n F OOQ 4� a 3 Z p Y uma fA W ¢ K N w W V Zw# � r Z o u o f o O N r U a o aW �S� z of o z . u �QOLLJ ��UN O oa Y� O 4❑ � oaf U ¢ as = Q o3 w w� wm sN w� a z a 4 aw � o mc°i w x w � LL EE F �cn N w y or z zu k xuF� z oz w o LLY z z u o mwo ¢ wz� �a a as z= �o o c a u z z = °� ° x to m u m sgo a iWLLo w w�a ao Y a wSa- �z F2 as E� o� a o u ¢ u ZF w iw a u Inw w Q U m m a Soot m Da�mao z e m9io �o � am ia� F$'J`w F �zrz?u�wzz 1 �r� z z gwSa k'�o xruvionoo#o� z a p on a+°u ro z Z F waa o siva rSr w mw or❑aU;Z oFao m?ww?zrao a zF ¢ o e0. go"Fz a000 zLLou `azo�w�xwxazaz ° Z WSz Q l4i Zr �rpww W V o xo�. 2Po , w 2 P IO7W CFl w �8w FC°off u r r z Q 2 w J q z a NUO � oaaS�z� °woo ,'o� ti ozio����� a nLLw n � zw wo tnwooQ�zx�z J w z O f N u 6 O- J W zoaoN¢m a 2 V 0 W y��wF¢w Z? 2 W Z a p~c�o�zr� Z�Wrr° u FQ� w mw#��ao WwW$=g=j W l�iwOz 81 zF ` z a O or�j° awl U xx PmzWoy�WjgQ O`~ W"off NZF oo F-4Z�rw 2xLLroUywr aZZ��0�42W w1-ti1W F- O nX� i • Wwpj Zy m, F'z 04 W <WW N �YZ7�°4 Fez �Fo�zFC'r 04U4 4_r�P I� m ¢mom UcQ�N�a w#-WW�Z °�D �`= W F3 Fg40Uw ¢in WN1� r1 ZWFWWd0[e�0 ?¢zDO>LL �¢2 Ff=4KN rcen 6 w z=PU wa oZ 2w2 Wm WOW o r aoN Q �V 2�_ Vtn f/ZV�ZZO Vi U�QZNO OI�U�r ZW ZIQ-ZK~ o VI N �ZZQa P SWV aW2 �Jw==m a z8- or m �Fm.�]9VG¢ oWOZa�wWOY �OW C [KaZWO 0 jb��wV of/ N�NN OOz�4KWJY pW= p4�maV�O�Z a�ila�UZZoOa mw U �jmQa wN wNNE qom �4owQ¢ W2z00}' Us O�U�z3U oW L� wwKOU SQ �+I �n 4 Q40 w� .. olmgx.� �pZa�a�W �$�$13UW 2s �W�U�T zQ w� ma r 5z ¢ZQ?C a��i.i m r0 L] u I'J' z z > w Y oa3ti P° °Z�iQ I�UOO�OWj� wv¢¢ o WrZWwaZ�Wo w Zoo ;riaw rr w woz ZOO�VXo Oa r 2 Z22 °2� 3 C rW O xx ZoZwFw�V21 WmW z4x�V 4F~OaVZ°U il/�W WQLLp�Zj��� tiN..S p[Sil Zw ww w4 a O aJw w WNw�¢Q� N WOYwI� VZw�F �Wx$Z� rPj� xw -�F?. vxiw w¢ r w y�jN~6C N a J[+I ZwwZ zoa OVm 41< w� F#Iuri <-Z VFZS wZ�- UF�W0 ��a ° P3pLL oV29W `i wr�rz❑O 3O mul aWz�aU xw�oaQ °P �Z �N D2ali Q 50a5 �o°a04-4 QwDOw P^=W� 6�0¢ Ozw Wwo 3�F4fpUZ24 U ZT Q}OZZw4 Z w O m Q U m }4} r } U Z O 4¢ §.ZWR W r V_ Z z Wxx� w r W y w SKu�iF r F F g o m K T w u W a Z o P z 0 U 2w pD2y �� �uj fr.. 4F �$ �Pm�VIZH2 #O W a �7U W o v^i w ly i a U O Z °} a W F >> Q Z g O w m P W tl H m a N rj < ul 7 �Z�4Z01 W wZo4 UOmY4m V QW$wap 4[a.� Ijo Yt�t2i�34 wrK N ❑Q¢WSxlnz �7oWz �swm�&avwi �rcWaoo�LL#W z (J1 -212/I000SI ZO Y�� Row- w z Spw Q Wa nr °iao=QWo-awe ��"' wQ� Iz °FZwNWWVIF y Rwo zNq PzQZw WSw 0 Ni F� z V ¢WW V1Q0¢O aUmP vwloF pJ O�O o gw4�r. ZU' p3 1y..,2 xU OIFIIF o N� ZF 44w4 W4o�M UI-w°u�Om�i zPZ w�OQ.- Do m34WQ OZ _m W����°Om D �O�O�r U4 oo�d4. Qw ZW -yi OV WOVwQ r/��IawmU �y P JJ aK <r J �o Fa ao 4 4011 o� yY 30 w F 1-O�i�V �sooao'noUwi am hO Qa wq❑Nm d4 ot ❑a=SZF Z to o� �z� zm ao. �i4Oz�aWo wrmodao�4orwr f�" a wa �a �`..rzo Waaa3 Soz � O O � a i�<ma Z W O INK V Z�QPU CHLLZrwj l�0 a�a Q� W�azm PTP ¢2 W �U-ZZ �viUU - oar ono Z ZF_=�N <P4 N�LLN <W �QOP 2 � U wQ Ln zw �o I dew wF? �Otio •"'^=ao¢4�aoNmz zr a waU�¢ w#z EETv z x�0 V y �^Y4w7Zu wc¢noa c'Somx Z�p 0 oz uma ?aN a°mUaw ova w�O�OOKnmZnliw�� Qo ¢ ti ED 0 �40 o MirnWzz�xaaw QQ oQZza 1 Ka`w"a 1 aQz ?•I�w4 w PZW Ox=wUd ¢InOO�Zr'i w 47 �rZ h-"z aF<}o zFa W N _ ¢ O 2� o° � h > ~ FFWN4Q SOSo W Z x�O p_ U r W N,. P w O F r� S P Q¢ P .Fir P. L�Zi��¢ ¢� 2 O f5 X z o O Q O 2 W „i¢�n OUp Z wRV iF G z Z t-°� vi a U J � i r m 4 001' !y ry '\ UU^d j n 1w '�h' n 1 # 3f1 .0o,oLOL 4 6 z WaS. NO 2 Al \ �,D n� •�i^` \ i� N !] I I!n !� I in { m� „��� O h mww ry / c m 2 m IIm m I m { d n and �i4n ic3` 1..56 —` — 3f1 ,00,0E I y o -�� 's �g \s4s \icape �• .6!'E ! 3,4Z,Z5. N .Dots y— — 1 8d� 1'l Obi R .¢i \}S G y+`arc <s ,�\ \ O y�gj 4Z,ZS.4N N fl n .p�\ \ G7 �$ .6y brL d 1;/�s 0 iow • _ ^rye �r cp�'Y�b�v �I V Y s Y w�`� I..I P d f �s£ o= 66S 1 .nos z1 C Ir S4 Ott ^a O i ory // e o f `O +I O a a m a ry w N F.6y 6LS15 �i� 3LI 0p //O nr u.60'90L 3„00,00.05 "� a NN e^ a •" mr a 10.00' LIE (I.94'SZl 3„ZZ.MZN IN V 3OVd5 N3d0 - I' i] I ,L5'60L 3„OO,Oa05 d I i~ 4 ,Z9,921 3,00,Oa0N a ap . LE"LO L 3„OO,O0.05 w A O N U s I N N DAq q O N z mod Ol.g } J S d t $ Y Apo I } $ g I vi u n ,lB'B[L 3,00,00.ON ,OG40L 3„00,00.05 ,BL'OL[ 3„OO,OO.oS 3,.EL,8Z.95�- Y Z L I q2L M.SZ 9Z.OtN 1 m N 4 a a ly d ,E4'SOI 3,00,00.OS ,Z9'SLL ],0o,00.OS y5 7 O N-c I s£'KL 3„00.00.UN >Y ran c n 9 9Z.Ols 1 '� £LyZt �• � g00 L1E t u O1rv7- f mo r n m ,mm' 3.00,00.03 n u' u,J40'£LL 3„00,00A5 r£{4ZL M.4Z 9Z•p LN }} 4 LO y4 . ,� I 3„OO,OaON rnQ o � 0}� ^} a a r U } •� y m o I r m= } o I O �� m' 4� ,oK O Y¢ n I ci �7 ,ten a UE fP } .� 7 u e oa 0 _< ma n Q' 1 N r 50.0o I a ♦X wQ Z9Z.Ot5 0, d } £L-VZl 3„9 OII n y ,bz'L LL 3.uc.uaos ,OZ'I Ll 3„00,00A5 } o aa, } in � m^ n N u ,Li'9YI .eo'oa 4 '" i ' CS II .09'SSL 3„00,00.05 a M SZ 9Z.OlN �_ wdd K _ R m { liaci a M o I It o u Y ,6009 N I " �,ts'£Zt �gMsz•9z. O $ I Z£'ou 3.00,oaos a sau _so'oc_ _ R ,X*OLL 3„00, as I 8 `M.SZ 9Z:OLN , o I �L9izL ¢, �K otl aq i S------------- ch r �' r h i d J it J J _Le'ZZL 3„00,Oo.ON I ,0009 ,SO'0£L 3.00.. 0.u5 .9L'f I! 'Or� MON 333 N of I a N N CL ,SCL 3,ZL,5 .£N 1N3W3SV3 8S30C, uy o I a K ANMO&Gl ,O'OZ m Z 310N 33S w z I LN3R3SY3 55300V E wa a e ANV}IOdIN31 ,0'OZ c oil I I wI w I 1 rvla uwi y F z°cam I r/ ,00'00Z 3.A -- — F� a wm 0 r� V m _ W W Sr Z 4 C� o a� w a n u N z ^ Fz cu a a vwi I-) C7) o a m� rem a } H 00 o z {� ` w K z a r o 4 c K I-� aY sn o o r W I m 0 xo =� N m z o� a W zz z w m m vl xz F w 3 O v4'i v y N y w OF h xKY 4 U LV] q