BACKGROUND: Attached is copy of the City of Kalispell Building Options review dated June 6, 2001.
This document analyzes the cost of each of the four alternatives. The building options report was preceded
by a January 5, 2000 exhaustive review of the space needs within each department in our organization (the
two inch thick Space Needs Study is available upon request).
During a June 11, 2001 workshop, the Council concluded that Option #1 - B is the option of choice.
This option is believed to be the most efficient and cost effective option available. Also see the attached
Diagram of Departmental Relationships. This diagram is designed to provide a picture of which departments
are dependent on each other to maximize efficiencies in operations and management.
If you concur with the previous Council's selection of Option #1-B we will write a resolution to that
effect for an upcoming Council meeting. At that time the difficult part of this project begins. How do we
finance it?
RECOMMENDATION: Council give direction regarding which options, if any, provided in the Building
Options Rreport will be supported by the Council.
FISCAL EFFECTS: See attached Building Options.
ALTERNATIVES: As suggested by the Council.
Rey submitted,
A.
Chris A. Kukulski
City Manager
Report compiled February 7, 2002
+- z
Architects
Design
Group
Number One Sunset Plaza • Kalispell, MT 59901
406-257-7125 FAX: 406-756-3409
REVIEW OF PROPERTY
FOR THE CITY OF KALISPELL-PART 3
Kalispell, Montana
June 6, 2001
The City of Kalispell retained Architects Design Group in February of 2001 to assist with the evaluation of
purchase -lease -construct building options that may be required to fulfill department relationship goals and space
needs to the year 2010.
This portion of the study reviews four specific options. At the outset, it was hoped the options could be limited to an
expenditure of $2,000,000. The options include:
1. Build a new Fire Station to be located on currently owned City property.
2. Build a new Police Station to be located on currently owned City property.
3. Build an Office Building to be located on currently owned City property.
4. Purchase the Wyckman Building and proceed with the remodeling scenario described in the sales proposal.
I Q111 WI
Introduction
Page 1
Index
Page 1
Definitions
Page 2
Option - New Fire Station
. Page 2
Option - New Police Station & Court
Page 4
Option - New Office Building
Page 5
Option - Purchase the Wyckman Building
Page 6
Conclusion
Page 6
Attachments
John W. Peterson,A.I.A. Michael A.Absalonson,A.I.A. Glen D.Anacker,A.1.A. Frank J.di Stefano,A.I.A.
DEFINITIONS
The information presented in this study is accompanied with calculation data describing costs to complete the
various options under consideration. The following definitions apply to this data:
Pre -Design Construction Cost. This probable cost of construction is the estimation of a general contractors bid to
build the option under consideration, in a competitive marketplace. The line items provide the following
information, which may be reviewed on the first page of each estimate. In-depth information follows the first page,
and documents how the estimate was developed.
Cost of the Work
General Conditions of the Contract
• Overhead & Profit for the Contractor
Labor & Material Payment Bond
• Montana State Contractor's Tax
• Pre -Design Costing Allowance
Pre -Design Project Cost. This cost is the estimation of all of the costs associated with the project, including the
construction cost provided above. The line items provide the following information, which may be reviewed on the
first page of each estimate. In-depth information follows the first page, and documents how the estimate was
developed.
• Site Acquisition.
• Special Site Costs
Construction Contingency
• Probable Cost of Construction
Construction Alternates
• Furniture -Fixtures -Equipment
• A/E Design Services
• A/E Designated Services
• A/E Reimbursable Services
Building Activation
• Miscellaneous
OPTION -NEW FIRE STATION
The existing Fire Department at the City Hall Complex currently utilizes 11,833 S.F. The Space Study has
identified area needs for the Fire Department that equate to 13,252 S.F. by the year 2010.
In light of the space needs of the Fire Department, it has become a significant component of the overall space
review. The existing Fire Department at the City Hall complex has the potential to provide the City with significant
interior space for office use and meet future City needs if the Fire Department were to be relocated. Page F-A.1
describes the area specifics of such a move, and how each City Department might be re -located. In essence, the Fire
Department would be reconstructed on Lots 3-9 along 1st Avenue East between 4th and 5th Street. All other City
Departments, except Parks and Recreation would then locate to the City Hall Complex. A portion of this re -location
would be into remodeled space vacated by the Fire Department.
Option A -New Fire Station
The following provides comparative information regarding this option:
Item
Gross Space Area Distribution
Probable Construction Cost for New Fire Department
Probable Construction Cost for City Hall Remodeling
Sub -Total
Total Project Cost
Item
Parking Available at New Fire Department
Issues
Cost Area S.F. Reference
Page F-A
$1,639,250 13,252 Page F-B
$663,272 11,706 Page F-C
$2,302,522
$2,867,319 Page F-D
Number
This option does not meet the budget parameters of $2,000,000.
• This option provides for high expansion potential.
44 Page F-B.2
• The parking number of 44 provides good flexibility for the City to augment existing off-street parking.
• The resulting area vacated by the Fire Department exceeds the space need at the City Hall Complex by
approximately 5,000 square feet, assuming the single story Fire Department space was utilized as two-story
office space, through remodeling. One might assume this additional space to be appropriate for "other" long
term expansion use.
It is possible to consider a reduced remodeling program under the New Fire Department option. Although the
vacated Fire Department apparatus room may provide up to 11,706 square feet, utilization of only the apparatus
room floor area [not build floor-2] would provide the City with 40,072 S.F. of space, just short of the projected 2010
need of 40,870 S.F.
Option B-New Fire Station
The following provides comparative information regarding a revision to the full remodeling option:
Item
Gross Space Area Distribution
Probable Construction Cost for New Fire Department
Probable Construction Cost for City Hall Remodeling
Sub -Total
Total Project Cost
Item
Parking Available at New Fire Department
Issues
Cost Area S.F. Reference
Page F-E
$1,639,250 13,252 Page F-B
$291,784 5,853 Page F-F
$1,931,034
$2,477256 Page F-G
Number
• This option does not meet the budget parameters of $2,000,000.
• This option provides for high expansion potential.
44 Page F-13.2
• The parking number of 44 provides good flexibility for the City to augment existing off-street parking.
• This Option alleviates a portion of, but not all of the "calculated' space pressure at the City Hall Complex. The
area provided by this option is approximately 800 S.F. short of the projected 2010 `total' needs.It does
eventually remove the City from lease of the PE & CD Building.
Although the full potential of the vacated apparatus room is not initially utilized, it is possible to consider the
remodeling of a second floor at some future time. The coordination of this remodeling would be significant
since the space below is occupied, and would require moving the occupants for the construction period.
OPTION -NEW POLICE STATION
The existing Police Department at the City Hall Complex currently utilizes 9,385 S.F. The Space Study has
identified area needs for the Police Department that equate to 13,272 S.F. by the year 2010.
This option also includes the consolidation of the staff located at the Planning Economic & Community
Development Building on Third Avenue East. The lease at this facility is currently scheduled to expire is
approximately one year and relocation of staff may be necessary. For the purpose of this study we believe
relocation should be to the City Hall Complex, and move Court offices to the new Police Station. This move would
make reasonable sense in light of the space adjacency requirements completed previously.
The following provides comparative information regarding this option:
Item
Cost Area S.F.
Reference
Gross Space Area Distribution
Page P-A
Probable Construction Cost for New Police Department
$2,428,468 13,272
Page P-B
Probable Construction Cost for City Hall Remodeling
$298,963 11,706
Page P-C
Sub -Total
$2,727,431
Total Project Cost
$3,505,215
Page P-D
Item Number
Parking Available at New Police Department 48 Page P-B.2
Issues
• This option does not meet the budget parameters of $2,000,000.
This option provides for moderate expansion potential.
• The parking number of 48 provides good flexibility for the City to augment existing off-street parking.
This Option alleviates a portion of, but not all of the `calculated' space pressure at the City Hall Complex. It
does eventually remove the City from lease of the PE & CD Building.
• Co -location of the Police Department and other City Departments is not in itself a significant issue. Prior parts
to this study have identified "space relationships", those adjacencies of space which seem to compliment one
another. For the purpose of this study, we have assumed the Court may be housed with Police, although this
relationship will tend to somewhat separate other department needs, such as the need for attorneys to serve the
Court as well as Administration.
OPTION -NEW OFFICE BUILDING
City area distribution is composed of departments with requirements difficult to group for efficiency and to meet
budget requirements of $2-million. The distribution of this option takes liberties with the 2010 area requirements in
order to achieve both interdepartmental efficiency and the budget constraints.
The Building Department and Community Development will require space in approximately one-year. These spaces
have been allocated to the Office Building. To compliment this move, Public Works is also scheduled to relocate.
The remaining department need areas have been reconfigured to expand, but not to the full study requirements, and
remain in place at the City Hall Complex. Please see Page O-A.1 for the specifics of the configuration.
The following provides comparative information regarding this option:
Item
Gross Space Area Distribution
Probable Construction Cost for New Office Building
Probable Construction Cost for City Hall Remodeling
Sub -Total
Total Project Cost
Item
Parking Available at New Fire Department
Issues
• This option meets the budget parameters of $2,000,000.
Cost Area S.F. Reference
Page O-A
$1,240,040 9,276 PageO-B
None None None
$1,240,040
$1,707,625 Page O-C
Number
61 Page O-B.2
• This option provides for significant expansion potential on this site.
The parking number of 61 provides substantial flexibility for the City to augment existing off-street parking.
' This Option alleviates a portion of, but not all of the `calculated" space pressure at the City Hall Complex. It
does eventually remove the City from lease of the PE & CD Building. This option may require review from
time to time to determine if an addition to the Office Building outlined in this study is necessary to fully meet
future space needs.
WYCKMAN OFFICE BUILDING
The distribution of space in this option allows for interdepartmental efficiency and approaches but does not quite
meet the budget constraints. In essence this option will allow the current City Hall Complex to become a "Public
Safety Building".
The following provides comparative information regarding this option:
Item
Gross Space Area Distribution
Cost of Acquisition & Improvement
Probable Construction Cost for City Hall Remodeling
Sub -Total
Total Project Cost
Item
Parking Available at Wyckman-Classical Gas Site
Issues
Cost Area S.F. Reference
Page W-A
$2,206,251 9,276 Page W-B
None None None
$2,206,251
$2,206,251 Page W-B
Number
• This option does not meet the budget parameters of $2,000,000.
12 None
• The Wyckman Building, in combination with the Classical Gas property, has significant expansion potential. It
provides approximately 5,600 S.F. per floor or 16,800 S.F. on two floors and a basement. Before expansion, it
will provide for minimal parking space, but can not provide for both expansion and parking.
• This Option will help to alleviate space pressure at the City Hall Complex and remove the City from lease of the
PE & CD Building.
Under the strict parameters of the proposed budget constraints, "what can we do for $2,000,000" only one option
meets this criteria, that of the New Office Building. Our concern from the study perspective involves the gray areas
of budget and interface with the City meeting or at least approaching real needs.
The New Office Building has been developed for this study to meet the budget constraints. It does not fully meet
the space needs issues, but does approach these need. The positive quality of this option is that it has a significant
amount of flexibility, i.e. it may expand and provide significant parking.
The Wyckman Option closely approaches the budget and at the same time meets the space needs. Under this option,
expansion is possible, but combining both expansion and some level of acceptable off-street parking is not possible
on the review site area.
The Fire Station Option `B" somewhat approaches the budget, provides for space need demands, allows for space
expansion at the City Hall Complex as well as at the new Fire Station and provides for significant parking.
The Police Option significantly exceeds the budget, and does not quite solve the space need demands in the City
Hall Complex.
In light of the above, it is my opinion that the Fire Station Option `B" best serves the overall needs of the City of
Kalispell.
Respectfully Submitted,
Michael A. Absalonson, A.I.A. Principal, Architect
Architects Design Group
The
City of Kalispell
Building Options
Iwe 6, 2001
ARCHITECTS DESIGN GROUP
KALSPELL MONTANA
KALISPELL MOWMA
511101
SUMMARY
Gross Space
New Fire Station
New Fire Station on City of
Kalispell Property
DEPARTMENT
CURRENT
REQUIRED
ALLOCATED
ALLOCATED
ALLOCATED
AI -LOCATED
EXISTING
2010
TO
TO
TO
TO
SPACE
SPACE NEED
CITY HALL
PE &CD
NEW PROJECT
OTHER
G.S.F.
G.S.F.
G.S.F.
G.S.F
G.S.F.
G.S.F.
A
B
C
D
E
F
-
2,024
-
-
1,024
2,024
BUILDING
COMMUNITY DEVELOPMENT
919
1,090
1,090
-
-
-
COMMON SPACES BD & CD
1,825
2,472
2,472
-
-
-
SUB -TOTAL
3,768
5,586
PUBLIC WORKS
1,707
3,691
3,691
-
-
-
PARKS & RECREATION
426
2,345
-
-
-
2,345
FINANCE & WATER
5,121
7,849
7,849
-
-
-
CITY ADMINISTRATION
4,892
6,322
6,322
-
-
-
COURTS
855
4,150
4,150
-
-
-
POLICE
9,385
13,272
13,272
-
-
-
FIRE
11,833
13,252
-
-
13,252
-
APPARATUS ROOM -FLOOR 1 -
5,853
APPARATUS ROOM -FLOOR 2 Note[5]
5,853
SUB -TOTAL
40,870
-
13,252
2,345
45,925
50,881
Ill
[2]
[31
[4]
151
151
TOTAL
49,693
56,467
56,467
A
B
C+D+E+F
NOTES
[1]
Current Existing City Hall Complex Space Available
[21
Departments Scheduled to Move to City Hall
[31
New Fire Station
[4]
Parks & Recreation Remains at Present Site
[5]
Existing Area Exceeds City Hall Need Allocation
New Fire Station
F-A.1
i
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
NEW FIRE STATION
KAUSPEU-MONTANA
ARCHITECTS DESIGN GROUP
ADG: 01-111-3
May • 01
PRE -DESIGN
COSTING
Summary of Project Area Area Adjusted
Site Area
23,100
23,100 New Site
Basement
0
0
Main Floor
8,100
8,100
Second Floor
5,152
5,152
Cost Attributable Area G.S.F.
13,252
13,252
Summary of Cost Cost Cost Percent
Sub -Total Per S.F. Total
1. General Requirements
$15,000
$1.13
0,92%
2. Sitework
$78,593
$5.93
4.79%
3. Foundations
$76,707
$5.79
4.68%
4. Substructure
$33,858
$2.55
2.07%
5. Superstructure
$122,881
$9.27
7.50%
6. Exterior Closure
$191,094
$14.42
11.66%
7. Roofing
$93,789
$7.08
5.72%
8. Interior Construction
$189,371
$14.29
11.55%
9. Conveying
$55,000
$4.15
3.36%
IO.Mechanical
$269,470
$20.33
16.44%
11.Electrical
$119,798
$9.04
7.31%
12.Special Construction
$25,175
$1.90
1.54%
Sub -Total $1,270,736 $95.89 77.52%
F-B
New
Fire Station on
City of Kalispell Property
General Conditions
5.0%
$63,537
$4.79
3.88%
Overhead & Profit
7.0%
$88,952
$6.71
5.43%
Bond
1.0%
$12,707
$0.96
0.78%
Montana State Contractor's Tax
1.0%
$12,707
$0.96
0.78%
Pre -Design Costing Allowance
15.0%
$190,610
$14.38
11.63%
Construction Inflation 12-Months
0.0%
$0
$0.00
0.00% N.I.
Sub -Total
$368,514
$27.81
2248%
TOTAL $1,639,250
TOTAL DOLLARS PER SQUARE FOOT $123.70 $123.70 100.0%
Pre -Design Construction Cost F-B .1
DESCRIPTION
REF
QUANTITY
QUANTITY
UNITS
COST
SUB -TOTAL SYSTEM
CONVERTED
IN
TOTAL
1: General Requirements
Temporary Office, Communications, Utilities
M
1
1
1
$4,000
$4,000
Permits
M
1
1
1
$5,000
$5,000
Contractor Testing Program
M
1
1
1
$5,000
$5,000
Scheduling
M
1
1
1
$1,000
$1,000
Selective Demolition & Cutting -Patching
Demolition
M
0
0
Sf
$0.00
$0
Lead Paint Encapsulation
M
0
0
Sf
$0.00
$0
Asbestos Abatement
M
0
0
Sf
$0.00
$0
2: Sitework
Building Excavation & Structural Pad
Utilities
Parking
Site Landscaping
Site Lighting
P
8,100
1,500
Cy
$17.41
$26,115
ADG
1
1
Unit
$10,000
$10,000
M
13,252
44
Ea
$615.00
$27,060
P
1,748
1748
Sf
$3.50
$6,118
M
1
6
Ea
$1,550
$9,300
3: Foundations
Backfill for Foundations M 1
Footings and Foundations M 1
4: Substructure
Concrete Slab -on -Grade M 1
8100 Sf-G $1.28 $10,368
8100 Sf-G $8.19 $66,339
8100 Sf-G $4.18 $33,858
$15,000
$78,593
$76,707
$33,858
Pre -Design Construction Cost F-B .2
DESCRIPTION
REF
QUANTITY
QUANTITY
UNITS
COST
SUB -TOTAL
SYSTEM
_
CONVERTED
IN
TOTAL,
5: Superstructure
Elevated Floors M
Roof M
Steel Stairs
6: Exterior Closure
Walls: CMU
Doors
Windows
7: Roofing
Roof Covering: CSPE A
Insulation A
Openings & Specialties A
8: Interior Construction
Partitions
Interior Doors
Wall Finishes
Floor Finishes
Ceiling Finishes
Interior Surface of Exterior Wall
1 5152
Sf-F
$8.53
1 13252
Sf-R
$4.90
I 2
Ea
$7,000
$43,947
$64,935
$14,000
$122,881
75%Wall 13252 Sf-F $10.46 $138,616
15% Wall 13252 Sf-F $1.73 $22,926
10% Wall 13252 Sf-F $2.23 $29,552
$191,094
1 13252 Sf-F $6.86
0 0 Inc
1 450 Lf-P $6.40
M
10 SF F / LF
13252
Sf-F
$5.12
M
500 SF-F/D
13252
Sf-F
$1.75
M
13252
Sf-F
$2.31
P
13252
Sf-F
$2.06
M
50%Area
13252
Sf-F
$2.69
M
75% Wall
13252
Sf-F
$0.36
$90,909
$2,880
$93,789
$67,850
$23,191
$30,612
$27,299
$35,648
$4,771
$189,371
Pre -Design Construction Cost F-D .3
DESCRIPTION
REF QUANTITY QUANTITY UNITS
CONVERTED IN
COST
SUBTOTAL SYSTEM
TOTAL
9: Coveying
Elevator
M 1 1 Ea
$55,000
$55,000
Conveyors
M 0 0
$0.00
$0
$55,000
10: Mechanical
Plumbing
Fire Protection
Heating
Heating & Cooling
Special Systems
11: Electrical
Service & Distribution
Lighting & Power
Special Electrical
12: Special Construction
Equip Kitchen Area
Lockers
Flagpoles
Miscellaneous Specialties
NOTES
M
1/400Sf
33 Ea
$1,600
$52,800
M
1
13252 Sf-F
$1.88
$24,914
M
1
13252 Sf-F
$14.47
$191,756
M
0
0
$0.00
$0.00
$269,470
1 13252 Sf-F $2.38 $31,540
1 13252 Sf-F $6.02 $79,777
1 13252 Sf-F $0.64 $8,481
$119,798
1 1
Unit
$5,900
$5,900
1 30
Ea
$220
$6,600
M 1 1
Ea
$2,675
$2,675
1 1
Unit
$10,000
$10,000
$25,175
Pre -Design Construction Cost F-B .4
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
NEW FIRE STATION -RELATED COSTS
KALISPELL•MONTANA
ARCHITECTS DESIGN GROUP F-C
ADG: 01-111-3 Remodeling City Hall
May • Ol Vacated Fire Department
PRE -DESIGN CONSTRUCTION COSTING Space for Office Use
Summary of Project Area Area Adjusted
Site Area
0
0
Basement
0
0
Main Floor
5,853
5,853 New Office
Second Floor
5,853
5,853 New Office
Cost Attributable Area G.S.F.
11,706
11,706
Summary of Cost
Cost Cost Percent
Sub -Total Per S.F. Total
1. General Requirements
$7,000
$0.60
1.06%
2. Sitework
$0
$0.00
0.00%
3. Foundations
$960
$0.08
0.14%
4. Substructure
$24,466
$2.09
3.69%
5. Superstructure
$54,951
$4.69
8.28%
6. Exterior Closure
$26,104
$2.23
3.94%
7. Roofing
$0
$0.00
0.00%
8. Interior Construction
$167,279
$14.29
25.22%
9. Conveying
$55,000
$4.70
- 8.29%
IO.Mechanical
$110,626
$9.45
16.68%
1 LElectrical
$57,779
$4.94
8.71%
12.SpecialConstruction
$10,000
$0.85
1.51%
Sub -Total $514,165 $43.92 77.52%
General Conditions
5.0%
$25,708
$2.20
3.88%
Overhead & Profit
7.0%
$35,992
$3.07
5.43%
Bond
1.0%
$5,142
$0.44
0.78%
Montana State Contractor's Tax
1.0%
$5,142
$0.44
0.78%
Pre -Design Costing Allowance
15.0%
$77,125
$6.59
11.63%
Construction Inflation 12-Months
0.0%
$0
$0.00
0.00% N.I.
Sub -Total
$149,108
$12.74
22.48%
TOTAL
TOTAL DOLLARS PER SQUARE FOOT
$663,272
$56.66 $56.66 100.0%
Pre -Design Construction Cost F-C.1
DESCRIPTION REF QUANTITY QUANTITY UNITS COST SUB -TOTAL SYSTEM
CONVERTED IN TOTAL
1: General Requirements
Temporary Office, Communications, Utilities
M
Permits
M
Contractor Testing Program
M
Scheduling
M
Selective Demolition & Cutting -Patching
Selective Demolition
M
Lead Paint Encapsulation
M
Asbestos Abatement
M
2: Sitework
Building Excavation & Structural Pad
P
Utilities
ADG
Parking
M
Site Landscaping
P
Site Lighting
M
3: Foundations
Backfill for Foundations M
Footings and Foundations M
4: Substructure
Concrete Slab -on -Grade M
1 1 Inc
$1,500
$1,500
1 1 Inc
$1,500
$1,500
1 1 Inc
$1,000
$1,000
1 1 Inc
$500
$500
1 1000
Sf
$2.50
$2,500
0 0
Sf
$0.00
$0
0 0
Sf
$0.00
$0
$7,000
0 0
Cy
$0.00
$0
0 0
Unit
$0.00
$0
0 0
Ea
$0.00
$0
0 0
Sf
$0.00
$0
0 0
Ea
$0.00
$0
$0
0 0 Sf-G $0.00
1 8 Ea $120.00
$0
$960
$960
1 5853 Sf-G $4.18 $24,466
$24,466
Pre -Design Construction Cost F-C.2
DESCRIPTION
REF
QUANTITY
QUANTITY
CONVERTED
UNITS
IN
COST
SUB -TOTAL SYSTEM
TOTAL
5: Superstructure
Elevated Floors
M
1
5853
Sf-F
$8.53
$49,926
Roof
M
0
0
Sf-R
$0.00
$0
Steel Stairs
M
1
1
Ea
$5,025
$5,025
6: Exterior Closure
Walls: CMU M
Doors M
Windows M
7: Roofing
Roof Covering: CSPE A
Insulation A
Openings & Specialties A
8: Interior Construction
Partitions
Interior Doors
Wall Finishes
Floor Finishes
Ceiling Finishes
Interior Surface of Exterior Wall
M
M
M
P
M
M
$54$54=951
0 0 Sf-F $0.00 $0
0 0 Sf-F $0.00 $0
0 11706 Sf-F $2.23 $26,104
$26,104
0 0 Sf-F $0.00 $0
0 0 Inc
0 0 U-P $0.00 $0
$0
1 11706
Sf-F
$5.12
$59,935
1 11706
Sf-F
$1.75
$20,486
1 11706
Sf-F
$2.31
$27,041
1 11706
Sf-F
$2.06
$24,114
1 11706
Sf-F
$2.69
$31,489
1 11706
Sf-F
$0.36
$4,214
$167,279
Pre -Design Construction Cost F—C.3
DESCRIPTION REF QUANTITY QUANTITY UNITS COST SUBTOTAL SYSTEM
CONVERTED IN TOTAL
9: Coveying
Elevator M 1 1 Ea $55,000 $55,000
Conveyors M 0 0 $0.00 $0
$55,000
10: Mechanical
Plumbing
M
I
6
Ea
$2,459
$14,754
Fire Protection
M
1
11706
Sf-F
$0.94
$11,004
Heating
Heating & Cooling
M
1
11706
Sf-F
$7.25
$84,869
Special Systems
M
0
0
$0.00
$0.00
$110,626
11: Electrical
Service & Distribution
1
13252
Sf-F
$0.75
$9,939
Lighting & Power
1
13252
Sf-F
$3.00
$39,756
Special Electrical
1
13252
Sf-F
$0.61
$8,084
$57,779
12: Special Construction
Miscellaneous Specialties
1
1
Unit
$10,000
$10,000
$10,000
NOTES
Pre -Design Construction Cost F—r.4
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3C
OFFICES
KALISPELL • MONTANA
ARCHITECTS DESIGN GROUP
ADG: 01-111-3
May-01
PRE -DESIGN PHASE PROJECT COST
Project Area Summary
Actual Adjusted Percent
Total
Basement
0
0
0%
Main Floor
8,100
8,100
32.45%
Second Floor
5,152
5,152
20.64%
Remodeling Area
11,706
11,706
46.90%
Total Area G.S.F.
24,958
24,958
100%
Summary of Funding Funding Funding Percent
Sub -Total Per S.F. Total
Funding Total
Differential Funding to Projected Cost
Ratio Construction Costs / Project Cost
80%
Summary of Cost Cost Cost Percent
Sub -Total Per S.F. Total
1. Site Acquisition
$0
$0.00
0.00%
2. Special Site Costs
$150,000
$6.01
5.23%
3. Construction Contingency
$115,126
$4.61
4.02%
4. Probable Cost of Construction
$2,302,522
$92.26
80.30%
5. Construction Alternates
$0
$0.00
0.00%
6. Furniture -Fixtures -Equipment
$128,530
$5.15
4.48%
7. A/E Design Services
$131,140
$5.25
4.57%
8. A/E Designated Services
$23,000
$0.92
0.80%
9. A/E Reimbursable Services
$5.000
$0.20
0.17%
10.Building Activation
$0
$0.00
0.00%
II.Miscellaneous
$12,000
$0.48
0.42%
TOTAL
$2,867,318
TOTAL DOLLARS PER SQUARE FOOT
$114.89
$114.89
100.0%
F-D
New Fire Station
& Full Remodeling of Existing
Fire Department
Pre -Design Project Cost F-D.,
DESCRIPTION
1. Site Acquisition
Site Acquisition
2. Special Site Costs
Off -Site Costs
Existing Building Demolition
3. Construction Contingency
Construction Contingency
4. Probable Cost of Construction
New Fire Station
City Hall Complex Fire Dept Remodeling
5. Construction Altemates
Alternate No. 1:
Alternate No. 2:
Alternate No. 3
6. Fumiture-Fixtures-Equipment
Furnishings
Equipment I: Telephone & Data System
Equipment II
REF ITEM ITEM
UTll.I D MULTIPLE
ITEM SUB -TOTAL SYSTEM
AMOUNT TOTAL
No
0
0
$0
$0
No 0 0 $0
Yes 1 150,000 $150,000
$150,000
Yes 1 5% $115,126
$115,126
Yes
1
$1,639,250
$1,639,250
Yes
1
$663,272
$663,272
$2,302,522
None
1
$0.00
$0
None
1
$0.00
$0
None
1
$0.00
$0
Yes 1 $70,000.00 $70,000
Yes 11,706 $5.00 $58,530
No 0 $0.00 $0
$128,530
Pre -Design Project Cost F-D.z
DESCRIPTION
REF ITEM
UTn,IZED
ITEM
MULTIPLE
ITEM
AMOUNT
SUB -TOTAL
SYSTEM
TOTAL
7. A/E Design Services
A/E Design Services
Yes
8.00%
$131,140
$131,140
$131,140
8. A/E Designated Services
Pre -Design
No
0
$0
$0
Interior Architecture
No
0
$0
$0
Civil Engineering
Yes
1
$10,000
$10,000
Landscape Architecture
Yes
1
$5,000
$5,000
Landscape Irrigation Engineering
Yes
1
$1,000
$1,000
Food Service
No
0
$0
$0
Laundry Service
No
0
$0
$0
Security Equipment
No
0
$0
$0
Security Electronics
No
0
$0
$0
Detailed Probable Cost of Construction
Yes
1
$7,000
$7,000
Value Engineering
No
0
$0
$0
Life Cycle Costing Analysis
No
0
$0
$0
Extended Site Representation
No
0
$0
$0
$23,000
9. A/E Reimbursable Services
Travel & Communications Reimbursable
No
0
$0
$0
Reproductions
Yes
1
$5,000
$5,000
$5,000
10. Building Activation
Building Activation
No
0
$0
$0
Pre -Design Project Cost F-D.3
DESCRIPTION REF ITEM ITEM ITEM SUB -TOTAL SYSTEM
UTILIZED MULTIPLE AMOUNT TOTAL
11. Miscellaneous
Environmental Analysis
No
0
$0
$0
Abatement Design & Reporting
No
0
$0
$0
Abatement Air Monitoring
No
0
$0
$0
Land Appraisal
No
0
$0
$0
Financial Advisor Services
No
0
$0
$0
Geodetic Survey
Yes
1
$3,000
$3,000
Geotechnical Survey
Yes
1
$4,000
$4,000
Special Quality Control Service
Yes
1
$5,000
$5,000
Special Inspection Quality Control Service
No
0
$0
$0
NOTES
$12,000
Pre -Design Project Cost F-DA
KAUSPELL MONfANA
5F1/01
SUMMARY
Gross Space
New Fire Station
New Fire Station on City of
Kalispell Property
DEPARTMENT
CURRENT
REQUIRED
ALLOCATED
ALLOCATED
ALLOCATED
ALLOCATED
EXISTING
2010
TO
TO
TO
TO
SPACE
SPACE NEED
CITY HALL
PE & CD
NEW PROJECT
OTHER
G.S.F.
G.S.F.
G.S.F.
G.S.F
G.S.F.
G.S.F.
A
R
C
D
E
F
-
2,024
-
-
BUILDING
1,024
2,024
COMMUNITY DEVELOPMENT
919
1,090
1,090
-
-
-
COMMON SPACES BD & CD
1,825
2,472
2,472
-
-
-
SUB -TOTAL
3,768
5,586
PUBLIC WORKS
1,707
3,691
3,691
-
-
-
PARKS & RECREATION
426
2,345
-
-
-
2,345
FINANCE & WATER
5,121
7,849
7,849
-
-
-
CITY ADMINISTRATION
4,892
6,322
6,322
-
-
-
COURTS
855
4,150
4,150
-
-
-
POLICE
9,385
13,272
13,272
-
-
-
FIRE
11,833
13,252
-
-
13,252
-
APPARATUS ROOM -FLOOR 1
5,853
APPARATUS ROOM -FLOOR 2
-
SUB -TOTAL
40,072
50,881
40,970
-
13,252
2,345
[1]
[21
[31
[41
151
[53
TOTAL
43,840
56,467
56,467
A
B
C+D+E+F
NOTES
[1]
Current Existing City Hall Complex Space Available
[21
Departments Scheduled to Move to City Hall
[31
New Fire Station
[41
Parks & Recreation Remains at Present Site
[51
Existing Area Less then City Hall Need Allocation
New Fire Station
F-E.1
Cy1wall WMR11M96111t1,
REVIEW OF PROPERTY -PART 3
NEW FIRE STATION -RELATED COSTS
KAUSPEU- MONTANA
ARCHITECTS DESIGN GROUP
ADG: 01-111-3
May • 01
PRE -DESIGN
COSTING
Summary of Project Area Area Adjusted
Site Area 0 0
Basement 0 0
Main Floor 5,853 5,853 New Office
Second Floor 0 0
Cost Attributable Area G.S.F. . 5,853 5,853
Summary of Cost Cost Cost Percent
Sub -Total Per S.F. Total
1. General Requirements
$7,000
$1.20
2.40%
2. Sitework
$0
$0.00
0.00%
3. Foundations
$0
$0.00
0.00%
4. Substructure
$24,466
$4.18
8.38%
5. Superstructure
$0
$0.00
0.00%
6. Exterior Closure
$13,052
$2.23
4,47%,
7. Rooting
$0
$0.00
0.00%
8. Interior Construction
$88,380
$15.10
30.29%
9. Conveying
$0
$0.00
0.00%
10.Mechanical
$57,772
$9.87
19.80%
11.Electrical
$25,519
$4.36
8.75%
12.Special Construction
$10,000
$1.71
3.43%
Sub -Total $226,189 $38.64 77.52%
F-F
Remodeling City Hall
Vacated Fire Department
Space for Office Use
General Conditions
5.0%
$11,309
$1.93
3.88%
Overhead & Profit
7.0%
$15,833
$2.71
5.43°%
Bond
1.0%
$2,262
$0.39
0.78%
Montana State Contractor's Tax
1.0%
$2,262
$0.39
0.78%
Pre -Design Costing Allowance
15.0%
$33,928
$5.80
11.63%
Construction Inflation 12-Months
0.0%
$0
$0.00
0.00% N.I.
Sub -Total $65,595 $11.21 22.48%
TOTAL
TOTAL DOLLARS PER SQUARE FOOT
$291,784
$49.85 $49.85 100.0%
Pre -Design Construction Cost F-F.1
DESCRIPTION REF QUANTITY QUANTITY UNITS COST SUB -TOTAL SYSTEM
CONVERTED IN TOTAL
1: General Requirements
Temporary Office, Communications, Utilities M
Permits M
Contractor Testing Program M
Scheduling M
Selective Demolition & Cutting -Patching
Selective Demolition M
Lead Paint Encapsulation M
Asbestos Abatement M
2: Sitework
Building Excavation & Structural Pad
P
Utilities
ADG
Parking
M
Site Landscaping
P
Site Lighting
M
3: Foundations
Backfill for Foundations M
Footings and Foundations M
4: Substructure
Concrete Slab -on -Grade M
1
1
1
1
1
0
0
1 Inc
$1,500
$1,500
1 Inc
$1,500
$1,500
1 Inc
$1,000
$1,000
1 Inc
$500
$500
1000 Sf $2.50 $2,500
0 Sf $0.00 $0
0 Sf $0.00 $0
$7,000
0 0
Cy
$0.00
$0
0 0
Unit
$0.00
$0
0 0
Ea
$0.00
$0
0 0
Sf
$0.00
$0
0 0
Ea
$0.00
$0
1
$0
0 Sf-G $0.00 $0
0 Ea $0.00 $0
$0
5853 Sf-G $4.18 $24,466
$24,466
Pre -Design Construction Cost F-F.2
DESCRIPTION
REF QUANTITY QUANTITY UNITS COST SUB -TOTAL SYSTEM
CONVERTED IN. TOTAL
5: Superstructure
Elevated Floors M
Roof M
Steel Stairs M
6: Exterior Closure
Walls: CMU M
Doors M
Windows M
7: Roofing
Roof Covering: CSPE A
Insulation A
Openings & Specialties A
8: Interior Construction
Partitions
Interior Doors
Wall Finishes
Floor Finishes
Ceiling Finishes
Interior Surface of Exterior Wall
0 0 Sf-F $0.00 $0
0 0 Sf-R $0.00 $0
0 0 Ea $0.00 $0
0 0 Sf-F $0.00 $0
0 0 Sf-F $0.00 $0
0 5853 Sf-F $2.23 $13,052
$13,052
0 0 Sf-F $0.00 $0
0 0 Inc
0 0 Lf-P $0.00 $0
$0
1 5853
Sf-F
$5.12
$29,967
1 5853
Sf-F
$1.75
$10,243
1 5853
Sf-F
$2.31
$13,520
1 5853
Sf-F
$2.06
$12,057
1 5853
Sf-F
$3.50
$20,486
1 5853
Sf-F
$0.36
$2,107
$88,380
Pre -Design Construction Cost F—F.3
DESCRIPTION
REF
QUANTITY
QUANTITY
UNITS
COST
SUB -TOTAL
SYSTEM
CONVERTED
IN
TOTAL
9: Coveying
Elevator
M
0
0
Ea
$0.00
$0
Conveyors
M
0
0
$0.00
$0
$0
10: Mechanical
Plumbing
M
1
4
Ea
$2,459
$9,836
Fire Protection
M
1
5853
Sf-F
$0.94
$5,502
Heating
Heating & Cooling
M
1
5853
Sf-F
$7.25
$42,434
Special Systems
M
0
0
$0.00
$0.00
$57,772
11: Electrical
Service & Distribution
1
5853
Sf-F
$0.75
$4,390
Lighting & Power
1
5853
Sf-F
$3.00
$17,559
Special Electrical
1
5853
Sf-F
$0.61
$3,570
$25,519
12: Special Construction
Miscellaneous Specialties
I
1
Unit
$10.000
$10,000
$10,000
NOTES
Pre -Design Construction Cost F-F.4
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3C
OFFICES
KAL[SPELL• MONTANA
ARCHITECTS DESIGN GROUP
F-G
ADG: 01-111-3
May-01
New Fire Station
& Partial Remodeling of Existing
PRE -DESIGN PHASE PROJECT COST
Fire Department
Project Area Summary
Actual
Adjusted
Percent
Total
Basement
0
0
0%
Main Floor
8,100
8,100
42.40%
Second Floor
5,152
5,152
26.97%
Remodeling Area
5,853
5,853
30.64%
Total Area G.S.F.
19,105
19,105
100%
Summary of Funding
Funding Total
Differential Funding to Projected Cost
Ratio Construction Costs / Project Cost
Summary of Cost
Funding Funding Percent
Sub -Total Per S.F. Total
78%
Cost Cost Percent
Sub -Total Per S.F. Total
1. Site Acquisition
$0
$0.00
0.00%
2. Special Site Costs
$150,000
$7.85
6.06%
3. Construction Contingency
$96,552
$5.05
3.90%
4. Probable Cost of Construction
$1,931,034
$101.07
77.95%
5. Construction Alternates
$0
$0.00
0.00%
6. Fumiture-Fixtures-Equipment
$128,530
$6.73
5.19%
7. A/E Design Services
$131,140
$6.86
5.29%
8. A/E Designated Services
$23,000
$1.20
0.93%
9. A/E Reimbursable Services
$5,000
$0.26
0.20%
10.Building Activation
$0
$0.00
0.00%
11.Miscellaneous
$12,000
$0.63
0.48%
TOTAL
$2,477,256
TOTAL DOLLARS PER SQUARE FOOT
$129.67
$129.67
100.0%
Pre -Design Project Cost F-G.1
DESCRIPTION REF ITEM ITEM rrEM SUB -TOTAL SYSTEM
UTILIZED MULTIPLE AMOUNT TOTAL
1. Site Acquisition
Site Acquisition No 0 0 $0
$0
2. Special Site Costs
Off -Site Costs No 0 0 $0
Existing Building Demolition Yes 1 150,000 $150,000
$150,000
3. Construction Contingency
Construction Contingency Yes 1 5% $96,552
$96,552
4. Probable Cost of Construction
New Fire Station Yes 1 $1,639,250 $1,639,250
City Hall Complex Fire Dept Remodeling Yes 1 $291,784 $291,784
$1,931,034
5. Construction Alternates
Alternate No. 1: None 1 $0.00 $0
Alternate No. 2: None 1 $0.00 $0
Alternate No. 3 None 1 $0.00 $0
6. Fumiture-Fixtures-Equipment
Furnishings Yes 1 $70,000.00 $70,000
Equipment I: Telephone & Data System Yes 11,706 $5.00 $58,530
Equipment II No 0 $0.00 $0
$128,530
Pre -Design Project Cost F-G.2
DESCRIPTION
REF ITEM
UTILIZED
ITEM
MULTIPLE
ITEM SUB -TOTAL SYSTEM
AMOUNT TOTAL
7. A/E Design Services
A/E Design Services
Yes
8.00%
$131,140 $131,140
$13
8. A/E Designated Services
Pre -Design
No
0
$0
$0
Interior Architecture
No
0
$0
$0
Civil Engineering
Yes
1
$10,000
$10,000
Landscape Architecture
Yes
1
$5,000
$5,000
Landscape Irrigation Engineering
Yes
1
$1,000
$1,000
Food Service
No
0
$0
$0
Laundry Service
No
0
$0
$0
Security Equipment
No
0
$0
$0
Security Electronics
No
0
$0
$0
Detailed Probable Cost of Construction
Yes
1
$7,000
$7,000
Value Engineering
No
0
$0
$0
Life Cycle Costing Analysis
No
0
$0
$0
Extended Site Representation
No
0
$0
$0
$23,000
9. A/E Reimbursable Services
Travel & Communications Reimbursable No 0 $0 $0
Reproductions Yes 1 $5,000 $5,000
$5,000
10. Building Activation
Building Activation No 0 $0 $0
$0
Pre -Design Project Cost F-G.3
A ,
DESCRIPTION
REF
ITEM
ITEM
ITEM
SUB -TOTAL
SYSTEM
UTILIZED
MULTIPLE
AMOUNT
TOTAL
11. Miscellaneous
Environmental Analysis
No
0
$0
$0
Abatement Design & Reporting
No
0
$0
$0
Abatement Air Monitoring
No
0
$0
$0
Land Appraisal
No
0
$0
$0
Financial Advisor Services
No
0
$0
$0
Geodetic Survey
Yes
1
$3,000
$3,000
Geotechnical Survey
Yes
1
$4,000
$4,000
Special Quality Control Service
Yes
1
$5,000
$5,000
Special Inspection Quality Control Service
No
0
$0
$0
NOTES
$12,000
Pre -Design Project Cost F'^.4
ARCHITECTS DESIGN GROUP
KAUSPELL MONTANA
5J2/01
SUMMARY
GROSS SPACE
New Police Station on City of
Kalispell Property
DEPARTMENT
CURRENT
REQUIRED
ALLOCATED
ALLOCATED
ALLOCATED
ALLOCATED
EXISTING
2010
TO
TO
TO
TO
SPACE
SPACE
CITY HALL
PE&CD
NEW PROJECT
OTHER
G.S.F.
G.S.F.
G.S.F.
G.S.F
G.S.F.
G.S.F.
A
B
C
D
E
F
BUILDING
1,024
2,024
2,024
-
-
-
COMMUNITY DEVELOPMENT
919
1,090
1,090
-
-
-
COMMON SPACES BD & CD
1,825
2,472
2,472
-
-
-
SUB -TOTAL
3,768
5,586
PUBLIC WORKS
1,707
3,691
3,691
-
-
-
PARKS &RECREATION
426
2,345
-
-
-
2,345
FINANCE & WATER
5,121
7,849
7,849
-
-
CITY ADMINISTRATION
4,892
6,322
6,322
-
-
-
COURTS
855
4,150
-
-
4,150
-
POLICE
9,385
13,272
-
-
13,272
-
FIRE
11,833
13,252
13,252
-
-
_
SUB -TOTAL
34,219
50,881
36,700
-
17,422
2,345
[1]
[21
[31
[4]
[51
151
TOTAL
37,987
56,467
56,467
A
B
C+D+E+F
NOTES
[1]
Current Existing City Hall Complex Space Available
[2]
Departments Scheduled to Move to City Hall
[31
New Police Department & Court Space
PECD Moves to the City Hall Complex
[41
Parks & Recreation Remains at Present Site
[51
Existing Area Less then City Need Allocation
New Police Station
P-A.1
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
NEW POLICE STATION
KALISPELL• MONTANA
ARCHITECTS DESIGN GROUP
ADO: 01-111 B
May •01
PRE -DESIGN CONSTRUCTION COSTING
Summary of Project Area Area Adjusted
Site Area 23,100 23,100
Basement 0 0
Main Floor -Police & Office 8,711 8,711
Second Floor -Police & Office 8,711 8,711
Cost Attributable Area G.S.F. 17,422 17,422
Summary of Cost
Cost Cost Percent
Sub -Total Per S.F. Total
1. General Requirements
$15,000
$0.86
0.62%
2. Sitework
$83,020
$4.77
3.42%
3. Foundations
$80,611
$4.63
3.32%
4. Substructure
$43,594
$2.50
1.80%
5. Superstructure
$114,130
$6.55
4.70%
6. Exterior Closure
$451,495
$25.92
18.59%
7. Roofing
$63,213
$3.63
2.60%
8. Interior Construction
$278,122
$15.96
11.45%
9. Conveying
$55,000
$3.16
2.26%
IO.Mechanical
$349,523
$20.06
14.39%
11.Electrical
$207,249
$11.90
8.53%
12.Special Construction
$141,575
$8.13
5.83%
Sub -Total $1,882,533 $108.05 77.52%
P-B
New
Police Station & Court on
City of Kalispell Property
General Conditions
5.0%
$94,127
$5.40
3.88%
Overhead & Profit
7.0%
$131,777
$7.56
5.43%
Bond
1.0%
$18,825
$1.08
0.78%
Montana State Contractor's Tax
1.0%
$18,825
$1.08
0.78%
Pre -Design Costing Allowance
15.0%
$282,380
$16.21
11.63%
Construction Inflation 12-Months
0.0%
$0
$0.00
0.00% N.I.
Sub -Total
$545,935
$31.34
22.48%
TOTAL
$2,428,468
TOTAL DOLLARS PER SQUARE FOOT
$13939
$13939
100.0%
Pre -Design Construction Cost r-D.1
DESCRIPTION
REF
QUANTrrY
QUANTITY
CONVERTED
UNITS
IN
COST
SUB -TOTAL SYSTEM
TOTAL
1: General Requirements
Temporary Office, Communications, Utilities
M
1
1
1
$4,000
$4,000
Permits
M
1
1
1
$5,000
$5,000
Contractor Testing Program
M
1
1
1
$5,000
$5,000
Scheduling
M
I
1
1
$1,000
$1,000
Selective Demolition & Cutting -Patching
Demolition
M
0
0
Sf
$0.00
$0
Lead Paint Encapsulation
M
0
0
Sf
$0.00
$0
Asbestos Abatement
M
0
0
Sf
$0.00
$0
$15,000
2: Sitework
Building Excavation & Structural Pad
P
8,711
1613
Cy
$17.41
$28,082
Utilities
ADG
1
1
Unit
$10,000
$10,000
Parking
M
14,389
48
Ea
$615.00
$29,520
Site Landscaping
P
1
1748
Sf
$3.50
$6,118
Site Lighting
M
1
6
Ea
$1,550
$9,300
$83,020
3: Foundations
Backfill for Foundations
1
8711
Sf-G
$1.17
$10,192
Footings and Foundations
1
8711
Sf-G
$5.54
$48,259
Footings and Foundations Shoot Range
1
2000
Sf-G
$11.08
$22,160
$80,611
4: Substructure
Concrete Slab -on -Grade
M
1
8711
Sf-G
$4.07
$35,454
Concrete Slab -on -Grade
M
1
2000
Sf-G
$4.07
$8,140
$43,594
Pre -Design Construction Cost P-B .2
DESCRIPTION REF QUANTITY QUANTITY UNITS COST SUB -TOTAL SYSTEM
CONVERTED IN TOTAL
5: Superstructure
Elevated Floors M
Roof M
Steel Stairs
6: Exterior Closure
Walls: Steel Studs - Brick
HM Doors
Windows
7: Roofing
Roof Covering: CSPE A
Insulation A
Openings & Specialties A
8: Interior Construction
Gypsum Board Walls -Steel Studs-Int
Gypsum Board Walls -Steel Studs-Ext
Single Leaf Wood Door
Reception Counters & Misc
Painting & Wall Covering-Int
Painting & Wall Covering-Ext
Floor Finishes -Carpet & Vinyl & Ceramic
Ceilings
1 8711
Sf-F
$7.02
$61,151
1 8711
Sf-F
$4.71
$41,029
1 2
Ea
$5,975
$11.950
$114,130
1 15120
Sf
$21.00
$317,520
1 17422
Sf-F
$1.08
$18,816
1 17422
S&F
$6.61
$115,159
$451,495
1 8711
Sf-F
$6.86
$59,757
0 0
Inc
1 540
Lf-P
$6.40
$3,456
$63,213
M
20Sf-F/LfP
11315
Sf
$3.11
M
15120
Sf
$1.73
M
200 Sf / D
94
Ea
$534
P
1
40
Lf
$262.50
M
40-60
11315
Sf
$1.08
M
68,000
15120
Sf
$1.08
M
60-30-10
17422
Sf
$3.69
M
1
17422
Sf
$3.63
$35,190
$26,158
$50,196
$10,500
$12,220
$16,330
$64,287
$63,242
$278,122
Pre -Design Construction Cost r -B .3
DESCRIPTION
REF QUANrft-Y QUANTITY UNITS
COST
SUB -TOTAL SYSTEM
CONVERTED IN
TOTAL
9: Coveying
Elevator
M 1 1 Ea
$55,000
$55,000
Conveyors
M 0 0
$0.00
$0
$55,000
10: Mechanical
Plumbing
M
1
24
Ea
$1,300
$31,200
Fire Protection
M
1
18858
Sf-F
$1.88
$35,453
Heating
Heating & Cooling
M
1
18858
Sf-F
$15.00
$282,870
Special Systems
M
0
0
$0.00
$0.00
$349,523
11: Electrical
Service & Distribution
1
18858
Sf-F
$2.82
$53,180
Lighting & Power
1
18858
Sf-F
$7.50
$141,435
Alarm & Emergency Lighting
1
18858
Sf-F
$0.67
$12,635
$207,249
12: Special Construction
Dispatch Old and New Requirements
EST
1
1
Unit
$100,000
$100,000
Holding Rooms [No Detention]
0
0
Sf-F
$0.00
$0
Lockers
M
1
50
Ea
$220.00
$11,000
Shooting Range
M
1
1
Ea
$23,800
$23,800
Safe
M
1
1
Ea
$6,775
$6,775
Flagpoles
M
1
1
Ea
$2,675
$2,675
Emergency Lighting
M
1
10
Ea
$655
$6,550
$141,575
NOTES
Pre -Design Construction Cost r -B .4
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
NEW POLICE STATION
KALISPELL• MONTANA
ARCHITECTS DESIGN GROUP
P-C
ADG: 01-111 B
Remodeling City Hall
May • 01
Vacated Police Department
PRE -DESIGN CONSTRUCTION COSTING
Space for Office Use
Summary of Project Area Area Adjusted
Site Area 0 0
Basement 0 0
Main Floor 3,623 3,623 Work Area
Second Floor 0 0
Cost Attributable Area G.S.F.
3,623 3,623
Summary of Cost Cost Cost Percent
Sub -Total Per S.F. Total
1. General Requirements
$19,188
$5.30
6.42%
2. Sitework
$0
$0.00
0.00%
3. Foundations
$0
$0.00
0.00%
4. Substructure
$0
$0.00
0.00%
5. Superstructure
$0
$0.00
0.00%
6. Exterior Closure
$0
$0.00
0.00%
7. Roofing
$0
$0.00
0.00%
8. Interior Construction
- $53,857
$14.87
18.01%
9. Conveying
$0
$0.00
0.00%
10.Mechanical
$42,914
$11.84
14.35%
11.Electrical
$15,796
$4.36
5.28%
12.Special Construction
$100,000
$27.60
33.45%
Sub -Total $231,755 $63.97 77.52%
General Conditions
5.0%
$11,588
$3.20
3.88%
Overhead & Profit
7.0%
$16,223
$4.48
5.43%
Bond
1.0%
$2,318
$0.64
0.78%
Montana State Contractor's Tax
1.0%
$2,318
$0.64
0.78%
Pre -Design Costing Allowance
15.0%
$34,763
$9.60
11.63%
Construction Inflation 12-Months
0.0%
$0
$0.00
0.00% N.I.
Sub -Total
$67,209
$18.55
22.48%
TOTAL
TOTAL DOLLARS PER SQUARE FOOT
$298,963
$82.52 $8252 100.0%
Pre -Design Construction Cost P -C.1
DESCRIPTION REF QUANTITY QUANTITY UNITS COST SUB -TOTAL SYSTEM
CONVERTED IN TOTAL
1: General Requirements
Temporary Office, Communications, Utilities
M
Permits
M
Contractor Testing Program
M
Scheduling
M
Selective Demolition & Cutting -Patching
Light Selective Demolition
M
Heavy Selective Demolition
A
Lead Paint Encapsulation
M
Asbestos Abatement
M
2: Sitework
Building Excavation & Structural Pad
P
Utilities
ADG
Parking
M
Site Landscaping
P
Site Lighting
M
3: Foundations
Backfrll for Foundations
Footings and Foundations
Footings and Foundations Shoot Range
4: Substructure
Concrete Slab -on -Grade
1 1
J
$1,500
$1,500
1 1
J
$1,500
$1,500
1 1
J
$1,000
$1,000
1 1
J
$500
$500
1 3623
Sf
$2.50
$9,058
1 1126
Sf
$5.00
$5,630
0 0
Sf
$0.00
$0
0 0
Sf
$0.00
$0
$19,188
0 0
Cy
$0.00
$0
0 0
unit
$0.00
$0
0 0
Ea
$0.00
$0
0 0
Sf
$0.00
$0
0 0
Ea
$0.00
$0
$0
0 0 Sf-G $0.00 $0
0 0 Sf-G $0.00 $0
0 0 Sf-G $0.00 $0
$0
M 0 0 Sf-G $0.00 $0
$0
Pre -Design Construction Cost r -C.2
DESCRIPTION
REF
QUANTITY
QUANTITY
UNITS
COST
SUB -TOTAL
SYSTEM
CONVERTED
IN
TOTAL
5: Superstructure
Elevated Floors M
Roof M
Steel Stairs
6: Exterior Closure
Walls: Steel Studs - Brick
HM Doors
Windows
7: Roofing
Roof Covering: CSPE A
Insulation A
Openings & Specialties A
8: Interior Construction
Gypsum Board Walls -Steel Studs-Int
Gypsum Board Walls -Steel Studs-Ext
Single Leaf Wood Door
Reception Counters & Misc
Painting & Wall Covering-Int
Painting & Wall Covering-Ext
Floor Finishes -Carpet & Vinyl & Ceramic
Ceilings
0 0 Sf-F $0.00
0 0 Sf-F $0.00
0 0 Ea $0.00
0 0 Sf $0.00
0 0 Sf-F $0.00
0 0 Sf-F $0.00
0 0 Sf-F $0.00
0 0 Inc
0 0 Lf-P $0.00
M
20 Sf-F / Lf P
2173
Sf
$3.11
M
0
Sf
$1.73
M
200 Sf / D
18
Ea
$534
P
1
20
Lf
$262.50
M
40-60
2173
Sf
$1.08
M
68,000
3120
Sf
$1.08
M
60-30-10
3623
Sf
$3.69
M
1
3623
Sf
$3.63
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$6,758
$0
$9,612
$5,250
$2,347
$3,370
$13,369
$13,151
$53,857
Pre -Design Construction Cost P-C.3
DESCRIPTION
REF QUANTITY
QUANTITY UNrrS
CONVERTED IN
COST
SUB -TOTAL SYSTEM
TOTAL
9: Coveying
Elevator
M 0
0 Ea
$0.00
$0
Conveyors
M 0
0
$0.00
$0
$0
10: Mechanical
Plumbing
M
1 4 Ea
$2,459
$9,836
Fire Protection
M
1 3623 Sf-F
$1.88
$6,811
Heating
Heating & Cooling
M
1 3623 Sf-F
$7.25
$26,267
Special Systems
M
0 0
$0.00
$0.00
$42,914
11: Electrical
Service & Distribution 1 3623 Sf-F $0.75 $2,717
Lighting & Power 1 3623 Sf-F $3.00 $10,869
Alarm & Emergency Lighting 1 3623 Sf-F $0.61 $2,210
$15,796
12: Special Construction
Dispatch Old and New Requirements EST 1 1 Unit $100,000 $100,000
$100,000
NOTES
Pre -Design Construction Cost r —C.4
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
POLICE DEPARTMENT MOVE
KALISPEIL• MONTANA
ARCHITECTS DESIGN GROUP
ADG: 01-111 B
May-01
PRE -DESIGN PHASE PROJECT COST
Project Area Summary
Actual Adjusted Percent
Total
Basement
0
0
0%
Main Floor -Police & Court
8,711
8,711
41.39%
Second Floor -Police & Court
8,711
8,711
41.39%
Remodeling Area
3,623
3,623
17.22%
Total Area G.S.F.
21,045
21,045
100%
Summary of Funding
Funding Total
Differential Funding to Projected Cost
Ratio Construction Costs / Project Cost
Funding Funding Percent
Sub -Total Per S.F. Total
79%
Summary of Cost Cost Cost Percent
Sub -Total Per S.F. Total
1. Site Acquisition
$0
$0.00
0.00%
2. Special Site Costs
$150,000
$7.13
4.36%
3. Construction Contingency
$136,372
$6.48
3.96%
4. Probable Cost of Construction
$2,727,431
$129.60
79.23%
5. Construction Alternates
$0
$0.00
0.00%
6. Fumiture-Fixtures-Equipment
$164,290
$7.81
4.77%
7. A/E Design Services
$194,277
$9.23
5.64% .
8. A/E Designated Services
$33,000
$1.57
0.96%
9. A/E Reimbursable Services
$10,000
$0.48
0.29%
10.Building Activation
$10,000
$0.48
0.29%
11.Miscellaneous
$17,000
$0.81
0.49%
TOTAL
$3,442,370
TOTAL DOLLARS PER SQUARE FOOT
$163.57
$16357
100.0%
P-D
New Police Station -Court
& Remodeling of Portion of
Vacated Police Space
Pre -Design Project Cost PD.1
DESCRIPTION REF ITEM rrEM ITEM SUB -TOTAL SYSTEM
UTIL= MULTIPLE AMOUNT TOTAL
1. Site Acquisition
Site Acquisition No 0 0 $0
$0
2. Special Site Costs
Off -Site Costs No 0 0 $0
Existing Building Demolition Y 1 150,000 $150,000
$150,000
3. Construction Contingency
Constmction Contingency Yes 1 5% $136,372
$136,372
4. Probable Cost of Construction
New Police Station -Court
Yes
1
$2,428,469
$2,428,468
City Hall Complex Police Dept Remodeling
Yes
1
$298,963
$298,963
$2,727,431
5. ConstructionAlternates
Alternate No. 1:
None
1
$0.00
$0
Alternate No. 2:
None
1
$0.00
$0
Alternate No. 3
None
1
$0.00
$0
$0
6. Furniture -Fixtures -Equipment
Furnishings
Equipment I: Telephone & Data System
Equipment II
Yes 1 $70,000.00 $70,000
Yes 18,858 $5.00 $94,290
No 0 $0.00 $0
$164,290
Pre -Design Project Cost PD.2
DESCRIPTION REF ITEM ITEM ITEM SUB -TOTAL SYSTEM
U H..IZED MULTIPLE AMOUNT TOTAL
7. A/E Design Services
A/E Design Services Yes 8.00% $194,277 $194,277
$194,277
8. A/E Designated Services
Pre -Design
No
0
$0
$0
Interior Architecture
No
0
$0
$0
Civil Engineering
Yes
1
$10,000
$10,000
Landscape Architecture
Yes
1
$5,000
$5,000
Landscape Irrigation Engineering
Yes
1
$1,000
$1,000
Food Service
No
0
$0
$0
Laundry Service
No
0
$0
$0
Security Equipment
No
0
$0
$0
Security Electronics
Yes
1
$10,000
$10,000
Detailed Probable Cost of Construction
Yes
1
$7,000
$7,000
Value Engineering
No
0
$0
$0
Life Cycle Costing Analysis
No
0
$0
$0
Extended Site Representation
No
0
$0
$0
$33,000
9. A/E Reimbursable Services
Travel & Communications Reimbursable
Yes
1
$5,000
$5,000
Reproductions
Yes
1
$5,000
$5,000
$10,000
10. Building Activation
Building Activation Yes 1 $10,000 $10,000
$10,000
Pre -Design Project Cost PD.3
DESCRIPTION REF ITEM ITEM rrEM SUB -TOTAL SYSTEM
UTHJ D MULTIPLE AMOUNT TOTAL
11. Miscellaneous
Environmental Analysis
No
0
$0
$0
Abatement Design & Reporting
No
0
$0
$0
Abatement Air Monitoring
No
0
$0
$0
Land Appraisal
No
0
$0
$0
Financial Advisor Services
No
0
$0
$0
Geodetic Survey
Yes
1
$5,000
$5,000
Geotechnical Survey
Yes
1
$7,000
$7,000
Special Quality Control Service
Yes
1
$5,000
$5,000
Special Inspection Quality Control Service
No
0
$0
$0
NOTES
$17,000
Pre -Design Project Cost PD.4
ARCHITECTS DESIGN GROUP
KALISPE-L MONTANA
51V01
SUMMARY
GROSS SPACE
City Offices on City of
Kalispell Property
DEPARTMENT
CURRENT
REQUIRED
ALLOCATED
ALLOCATED
ALLOCATED
ALLOCATED
EXISTING
2010
TO
TO
TO
TO
SPACE
SPACE
CITY HALL
PE & CD
NEW PROJECT
OTHER
G.S.F.
G.S.F.
G.S.F.
G.S.F
G.S.F.
G.S.F.
A
B
C
D
E
F
-
-
2,024
-
1,024
2,024
BUILDING
COMMUNITY DEVELOPMENT
919
1,090
-
-
1,090
-
COMMON SPACES BD & CD
1,825
2,472
-
-
2,472
-
SUB -TOTAL
3,768
5,586
PUBLIC WORKS
1,707
3,691
-
-
3,691
-
PARKS & RECREATION
426
2,345
-
-
-
2,345
FINANCE & WATER
5,121
7,949
5,445
-
-
-
CITY ADMINISTRATION
4,892
6,322
5,200
-
-
-
COURTS
855
4,150
910
-
-
-
POLICE
9,385
13,272
9,980
-
-
-
FIRE
11,833
13,252
12,580
-
-
-
SUB -TOTAL
34,115
9,277
2,345
34,219
50,881
[f]
[21
[31
[4]
[51
151
TOTAL
37,987
56,467
45,737
A
B
C+D+E+F
NOTES
[1] Current Existing City Hall Complex Space Available
[21 Departments Scheduled to Move to City Hall
[31 New City Office Space
[41 Parks & Recreation Remains at Present Site
151 Existing Area Accommodates City at Current
Space Levels with Minor Expansion Capability
City Offices O-A.1
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
OFFICES
KALISPELL • MONTANA
ARCHITECTS DESIGN GROUP
ADG: 01-111-3
May •01
PRE -DESIGN CONSTRUCTION COSTING
Summary of Project Area Area Adjusted
Site Area
23,100
23,100
Basement
0
0
Main Floor
4,638
4,638
Second Floor
4,638
4,638
Cost Attributable Area G.S.F.
9,276
9,276
Summary of Cost Cost Cost Percent
Sub -Total Per S.F. Total
1.
General Requirements
$11,000
$1.19
0.89%
2.
Sitework
$71,754
$7.74
5.79%
3.
Foundations
$42,994
$4.64
3.47%
4.
Substructure
$18,877
$2.04
1.52%
5.
Superstructure
$71,782
$7.74
5.79%
6.
Exterior Closure
$240,676
$25.95
19.41%
7.
Roofing
$33,660
$3.63
2.71%
8.
Interior Construction
$152,929
$16.49
12.33%
9.
Conveying
$55,000
$5.93
4.44%
10.Mechanical
$155,940
$16.81
12.58%
11.Electrical
$103,984
$11.21
8.39%
12.Special
Construction
$2,675
$0.29
0.22%
Sub -Total $961.271 $103.63 77.52%
O-B
New
Offices on
City of Kalispell Property
General Conditions
5.0%
$48,064
$5.18
3.88%
Overhead & Profit
7.0%
$67,289
$7.25
5.43%
Bond
1.0%
$9,613
$1.04
0.78%
Montana State Contractor's Tax
1.0%
$9,613
$1.04
0.78%
Pre -Design Costing Allowance
15.0%
$144,191
$15.54
11.63%
Construction Inflation 12-Months
0.0%
$0
$0.00
0.000/0 N.I.
Sub -Total
$278,769
$30.05
22.48%
TOTAL
$1,240,040
TOTAL DOLLARS PER SQUARE FOOT
$133.68
$133.68
100.0%
Pre -Design Construction Cost O-B .1
I
DESCRIPTION REF QUANTITY QUANTITY UNITS COST SUB -TOTAL SYSTEM
CONVERTED IN TOTAL
1: General Requirements
Temporary Office, Communications, Utilities
M
1
1
J
$3,000
$3,000
Permits
M
1
1
J
$3,000
$3,000
Contractor Testing Program
M
1
1
J
$4,000
$4,000
Scheduling
M
1
1
J
$1,000
$1,000
Selective Demolition & Cutting -Patching
Demolition
M
0
0
Sf
$0.00
$0
Lead Paint Encapsulation
M
0
0
Sf
$0.00
$0
Asbestos Abatement
M
0
0
Sf
$0.00
$0
2: Sitework
Building Excavation & Structural Pad
P
4,638 858
Cy
$17.41
$14,938
Utilities
ADG
1 1
Unit
$10,000
$10,000
Parking
M
18,462 61
Ea
$615.00
$37,515
Site Landscaping
P
1 1748
Sf
$1.25
$1
Site Lighting
M
1 6
Ea
$1,550
$9,300
3: Foundations
Backfill for Foundations M 1 4638 Sf-G $1.08
Footings and Foundations M 1 4638 Sf-G $8.19
4: Substructure
Concrete Slab -on -Grade M 1 4638 Sf-G $4.07
$5,009
$37,985
$18,877
$11,000
$71,754
$42,994
$18,877
Pre -Design Construction Cost O-D .2
DESCRIPTION
REF
QUANTITY
QUANTITY
UNITS
COST
SUB -TOTAL
SYSTEM
CONVERTED
IN
TOTAL
5: Superstructure
Elevated Floors
M
1
4638
Sf-F
$8.41
$39,006
Roof
M
1
4638
Sf-R
$4.90
$22,726
Steel Stairs
1
2
Ea
$5,025
$10,050
$71,782
6: Exterior Closure
Walls: Steel Studs - Brick
1
8064
Sf-W
$21.00
$169,344
HM Doors
1
9276
Sf-F
$1.08
$10,018
Windows
1
9276
Sf-F
$6.61
$61,314
$240,676
7: Roofing
Roof Covering: CSPE
A
1
4638
Sf-F
$6.86
$31,817
Insulation
A
0
0
Inc
Openings & Specialties
A
1
288
Lf-P
$6.40
$1,843
$33,660
8: Interior Construction
Gypsum Board Walls -Steel Studs-Int
Gypsum Board Walls -Steel Studs-Ext
Single Leaf Wood Door
Reception Counters & Misc
Painting & Wall Covering-Int
Painting & Wall Covering-Ext
Floor Finishes -Carpet & Vinyl & Ceramic
Ceilings
M 20 Sf-F / Lf P
6007
Sf
$3.11
$18,682
M
8064
Sf
$1.73
$13,951
M 200 Sf / D
50
Ea
$534
$26,700
P 1
40
Lf
$262.50
$10,500
M 40-60
6007
Sf
$1.08
$6,488
M
8064
Sf
$1.08
$8,709
M 60-30-10
9276
Sf
$3.69
$34,228
M 1
9276
Sf
$3.63
$33,672
$152,929
Pre -Design Construction Cost O—D.3
DESCRIPTION
REF
QUANTITY
QUANTITY UNITS
COST
SUB -TOTAL
SYSTEM
CONVERTED IN
TOTAL
9: Coveying
Elevator
M
1
1 Ea
$55,000
$55,000
Conveyors
M
0
0
$0.00
$0
$55,000
10: Mechanical
Plumbing
Fire Protection
Heating
Heating & Cooling
Special Systems
11: Electrical
Service & Distribution
Lighting & Power
Special Electrical
12: Special Construction
Flagpoles
NOTES
M 1 / 1,320 Sf 12 Ea $2,459 $29,608
M 1 9276 Sf-F $1.88 $17,439
M 1 9276 St-F $11.76 $108,993
M 0 0 $0.00 $0.00
$155,940
1 9276 Sf-F $2.82 $26,158
1 9276 Sf-F $7.78 $72,167
1 9276 Sf-F $0.61 $5,658
$103,984
M 1 1 Ea $2,675
$2,675
$2,675
Pre -Design Construction Cost O-D .4
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
OFFICES
KALISPELL • MONTANA
ARCHITECTS DESIGN GROUP
ADG: 01-111-3
May-01
PRE -DESIGN PHASE PROJECT COST
O-C
New
Offices on
City of Kalispell Property
Project Area Summary
Actual
Adjusted
Percent
Total
Basement
0
0
0%
Main Floor
4,638
4,638
50.00%
Second Floor
4,638
4,638
50.00%
Remodeling Area
0
0
0.00%
Total Area G.S.F.
9,276
9,276
100%
Summary of Funding
Funding
Funding
Percent
Sub -Total
Per S.F.
Total
Funding Total
Differential Funding to Projected Cost
Ratio Construction Costs / Project Cost
73%
Summary of Cost
Cost
Cost
Percent
Sub -Total
Per S.F.
Total
1. Site Acquisition
$0
$0.00
0.00%
2. Special Site Costs
$150,000
$16.17
8.78%
3. Construction Contingency
$62,002
$6.68
3.63%
4. Probable Cost of Construction
$1,240,040
$133.68
72.62%
5. Construction Alternates
$0
$0.00
0.00%
6. Furniture -Fixtures -Equipment
$116,380
$12.55
6.82%
7. A/E Design Services
$99,203
$10.69
5.81%
8. A/E Designated Services
$23,000
$2.48
1.35%
9. A/E Reimbursable Services
$5,000
$0.54
0.29%
10.Building Activation
$0
$0.00
0.00%
11.Miscellaneous
$12,000
$1.29
0.70%
TOTAL
$1,707,625
TOTAL DOLLARS PER SQUARE FOOT
$184.09
$184.09
100.0%
Pre -Design Project Cost O-C.1
DESCRIPTION
1. Site Acquisition
Site Acquisition
2. Special Site Costs
Off -Site Costs
Existing Building Demolition
3. Construction Contingency
Construction Contingency
4. Probable Cost of Construction
New Office Building
5. Construction Alternates
Alternate No. 1:
Alternate No. 2:
Alternate No. 3
6. Furniture -Fixtures -Equipment
Furnishings
Equipment 1: Telephone & Data System
Equipment II _
REF ITEM ITEM ITEM SUBTOTAL SYSTEM
UTILIZED MULTE'LE AMOUNT TOTAL
No 0 0 $0
$0
No 0 0 $0
Y 1 150,000 $150,000
$150,000
Yes 1 5% $62,002
$62,002
Yes
1
$1,240,040
$1,240,040
$1,240,040
None
1
$0.00
$0
None
1
$0.00
- $0
None
1
$0.00
$0
$0
Yes 1 $70,000.00 $70,000
Yes 9,276 $5.00 $46,380
No 0 $0.00 $0
$116,380
Pre -Design Project Cost O-C.2
DESCRIPTION REF ITEM ITEM ITEM SUB -TOTAL SYSTEM
UTILIZED MULTIPLE AMOUNT TOTAL
7. A/E Design Services
A/E Design Services Yes 8.00% $99,203 $99,203
$99,203
8. A/E Desianated Services
Pm -Design
No
0
$0
$0
Interior Architecture
No
0
$0
$0
Civil Engineering
Yes
1
$10,000
$10,000
Landscape Architecture
Yes
1
$5,000
$5,000
Landscape Irrigation Engineering
Yes
1
$1,000
$1,000
Food Service
No
0
$0
$0
Laundry Service
No
0
$0
$0
Security Equipment
No
0
$0
$0
Security Electronics
No
0
$0
$0
Detailed Probable Cost of Construction
Yes
1
$7,000
$7,000
Value Engineering
No
0
$0
$0
Life Cycle Costing Analysis
No
0
$0
$0
Extended Site Representation
No
0
$0
$0
$23,000
9. A/E Reimbursable Services
Travel & Communications Reimbursable No 0 $0 $0
Reproductions Yes 1 $5,000 $5,000
$5,000
10. Building Activation
Building Activation No 0 $0 $0
$0
Pre -Design Project Cost 0-C.3
-r _
DESCRIPTION
11. Miscellaneous
REF ITEM ITEM ITEM SUB -TOTAL
UTILIZED MULTIPLE AMOUNT
Environmental Analysis
No
0
$0
$0
Abatement Design & Reporting
No
0
$0
$0
Abatement Air Monitoring
No
0
$0
$0
Land Appraisal
No
0
$0
$0
Financial Advisor Services
No
0
$0
$0
Geodetic Survey
Yes
1
$3,000
$3,000
Geotechnical Survey
Yes
1
$4,000
$4,000
Special Quality Control Service
Yes
1
$5,000
$5,000
Special Inspection Quality Control Service
No
0
$0
$0
NOTES
SYSTEM
TOTAL
$12,000
Pre -Design Project Cost O-C.4
ARCHITECTS DESIGN GROUP
KALISPELL MONTANA
511101
SUMMARY
GROSSSPACE
Purchase of Wyckman
Property
DEPARTMENT
CURRENT
REQUIRED
ALLOCATED
ALLOCATED
ALLOCATED
ALLOCATED
EXISTING
2010
TO
TO
TO
TO
SPACE
SPACE
CITY HALL
PE&CD
WYCKMAN
OTHER
G.S.F.
G.S.F.
G.S.F.
G.S.F
G.S.F.
G.S.F.
A
B
C
D
E
F
20,088
BUILDING
1,024
2,024
-
-
2,024
COMMUNITY DEVELOPMENT
919
1,090
-
-
1,090
-
COMMON SPACES BD & CD
1,825
2,472
-
-
2,472
-
SUB -TOTAL
3,768
5,586
PUBLIC WORKS
1,707
3,691
3,691
-
-
-
PARKS & RECREATION
426
2,345
-
-
-
2,345
FINANCE & WATER
5,121
7,849
-
-
7,849
-
CITY ADMINISTRATION
4,892
6,322
-
-
6,322
-
COURTS
855
4,150
4,150
-
-
-
POLICE
9,385
13,272
13,272
-
FIRE
11,833
13,252
13,252
-
-
-
SUB -TOTAL
34,219
50,881
34,365
-
19,757
2,345
[1]
[21
[31
[41
[51
[51
TOTAL
37,987
56,467
56,467
A
B
C+D+E+F
NOTES
[1]
Current Existing City Hall Complex Space Available
[21
Departments Scheduled to Move to City Hall
[31
Utilization of the Wyckman Building by Department
[41
Parks & Recreation Remains at Present Site
151
Existing Area Less then City Need Allocation
The Wyckman Property YY -A.1
CITY OF KALISPELL
REVIEW OF PROPERTY -PART 3
POLICE DEPARTMENT MOVE
KALISPELL • MONTANA
ARCHITECTS DESIGN GROUP
ADG: 01-111 B
May-01
PRE -DESIGN PHASE PROJECT COST
Project Area Summary Actual Adjusted Percent
Total
Basement
6,696
6,696
33%
Main Floor -Police & Court
6,696
6,696
33.33%
Second Floor -Police & Court
6,696
6,696
33.33%
Remodeling Area
0
0
0.00%
Total Area G.S.F.
20,088
20,088
100%
Summary of Funding Funding Funding Percent
Sub -Total Per S.F. Total
Funding Total
Differential Funding to Projected Cost
Ratio Construction Costs / Project Cost
0%
Summary of Cost Cost Cost Percent
Sub -Total Per S.F. Total
1. Site Acquisition & Improvements
$1,809,148
$90.06
82.00%
2. Special Site Costs -Classical Gas
$226,663
$11.28
10.27%
3. Construction Contingency
$0
$0.00
0.00%
4. Probable Cost of Construction
$0
$0.00
0.00%
5. Construction Alternates
$0
$0.00
0.00%
6. Furniture -Fixtures -Equipment
$170,440
$8.48
7.73%
7. A/E Design Services
$0
$0.00
0.00%
8. A/E Designated Services
$0
$0.00
0.00%
9. A/E Reimbursable Services
$0
$0.00
0.00%
10.Building Activation
$0
$0.00
0.00%
11.Miscellaneous
$0
$0.00
0.00%
TOTAL
$2,206,251
TOTAL DOLLARS PER SQUARE FOOT
$109.83
$109.83
100.0%
W-B
Purchase
Wyckman Property
Pre -Design Project Cost YY —D.1
DESCRIPTION
REF ITEM
UTn.IZED
ITEM
MULTIPLE
HEM
AMOUNT
SUB -TOTAL SYSTEM
TOTAL
1. Site Acquisition
Purchase Wyckman per Letter of 5/15/Ol
Yes
1
550,000
$550,000
Wyckman Improvements
Yes
1
1,259,148
$1,259,148
$1,809,148
2. Special Site Costs
Purchase Classical Gas Yes 1 161,663 $161,663
Improvements to Classical Gas Yes 1 65,000 $65,000
$226,663
3. Construction Contingency
Construction Contingency
No
0
0%
$0
$0
4. Probable Cost of Construction
Building
No
0
$0
$0
$0
5. Construction Alternates
Alternate No. 1:
None
0
$0.00
$0
Alternate No. 2:
None
0
$0.00
$0
Alternate No. 3
None
0
$0.00
$0
6. Furniture -Fixtures -Equipment
Furnishings Yes 1 $70,000.00 $70,000
Equipment I: Telephone & Data System Yes 20,088 $5.00 $100,440
Equipment II No 0 $0.00 $0
$170,440
Pre -Design Project CostW—B .2
DESCRIPTION
7. A/E Design Services
A/E Design Services
S. A/E Designated Services
Pre -Design
Interior Architecture
Civil Engineering
Landscape Architecture
Landscape Irrigation Engineering
Food Service
Laundry Service
Security Equipment
Security Electronics
Detailed Probable Cost of Construction
Value Engineering
Life Cycle Costing Analysis
Extended Site Representation
9. A/E Reimbursable Services
Travel & Communications Reimbursable
Reproductions
10. Building Activation
Building Activation
REF ITEM ITEM
UTILIZED MULTIPLE
No 0.00%
ITEM SUB -TOTAL SYSTEM
AMOUNT TOTAL
$0 $0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
No
0
$0
$0
$0
No
0
$0
$0
No
0
$0
$0
$0
No
0
$0
$0
$0
Pre -Design Project CostW—D.3
DESCRIPTION REF ITEM ITEM ITEM SUB -TOTAL SYSTEM
UTILIZED MULTIPLE AMOUNT TOTAL
11. Miscellaneous
Environmental Analysis
No
0
$0
$0
Abatement Design & Reporting
No
0
$0
$0
Abatement Air Monitoring
No
0
$0
$0
Land Appraisal
No
0
$0
$0
Financial Advisor Services
No
0
$0
$0
Geodetic Survey
No
0
$0
$0
Geotechnical Survey
No
0
$0
$0
Special Quality Control Service
No
0
$0
$0
Special Inspection Quality Control Service
No
0
$0
$0
NOTES
$0
Pre -Design Project Cost YV —D .4
1
CITY ADMINISTRATION
COUNCIL
EH
1
UILDING COMM PUBLIC
FINANCE CITY
DEPT DEVELOP WORKS
WATER TTp�
2
PARKS t
REC
POLICE FIRE
3
;COURT
2
BUII.DING DEPARTMENT
BUILDING DEPf CITY ADMIN COUNCIL
PUBLIC FIRE
b7-
woRrs
2
COMM CD
FINANCE CITY
DEVELOP
WATER TTORN
3
�PACOURT POLICE
3
COMMUNITY DEVELOPMENT
COMMUNITY DEVEL CITY ADMIN COUNCIL
1
2
BUILDING PUBLIC
FINANCE CIN
DEFT WORr.S
WATER TTORN
3
PARYS E COURT POLICE FIRE
REC
CITY OF KALISPELL
SPACE NEEDS STUDY
DIAGRAM OF DEPARTMENTAL RELATIONSHPS
ADO 99-930H-6/20n000
4 PUBLIC WORKS
PUBUC WORK5
1
BUILDING
DEPT
COMM
CITY ADMIN I COUNCIL
FINANCE
WATER
P R�EC $1 I 1 I COURT POLICE
5 PARKS & RECREATION
PARKS E REC CITY ADMINT COUNCIL
FINANCE
WATER
MIRE
BUILDING COMM 1 PUBLIC i ( FIRE
DEPT DEVELOP WORKS I` COURT ` POLICE J
6 FINANCE & WATER DEPARTMENT
FINANCE E WATER CITY ADMIN COUNCIL
DEPT
PUBLIC
WORK5
PARK5 #
REC
COURT
POLICE I I FIRE
CITY OF KALISPELL
SPACE NEEDS STUDY
DIAGRAM OF DEPARTMENTAL RELATIONSHPS
CITY
COURT
COURT
CITY ADMIN I COUNCIL
POLICE
BUDEPT G DEVE OP WORKS [ RECEC €
8 POLICE DEPARTMENT
POLICE DEPAKTTMENT
1
PUBLIC
WORK5
BUILDING f COMM ( 1
DEFT DEVEOP U
9 FIRE DEPARTMENT
FIRE DEPARTMENT
DEPT
CITY ADMIN I COUNCIL
PARKS #
REC
CITY ADMIN I COUNCIL
POLICE
EVEL PUBUC
DEVELOPj WORjcS
FINANCE
WATER
P RC CAURT
CITY OF KALISPELL
PIKE
FIRE
SPACE NEEDS STUDY
DIAGRAM OF DEPARTMENTAL RELATIONSHPS
CITY
1
O CITY ATTORNEY
COUNCIL CITY ADMINCOUR
M
BUILDING
COMM
FWAN1:R
DEFT DEVELOP yyppB�
3
P #
FIRE
RE
COMM
DEVELOP
FWANCE
ATTER
z
O
1= J
COURT
U� D
OV
CITY
MBUC
RFC ATTNY
WORKS
0
Q
OLIC
FIRE
BUILDING
CITY
ATTNY
1
1 PRIMARY RELATIONSHIPS:
OPTION 1
CITY OF KALISPELL
SPACE NEEDS STUDY
DIAGRAM OF DEPARTMENTAL RELATIONSHPS
ADa 99-9MB-&20n000
COMM
DEVELOP
FINANCE
WATER
z0
F J
U
COURT
p�
u�N
PARKS CITY
PUBUC
4 REC ATTNY
WORKS
p
a
ouc
FIRE
BUILDING
CITY
TTNY
12
PRIMARY RELATIONSHIPS:
OPTION 2
CITY OF KALISPELL
SPACE NEEDS STUDY
DIAGRAM OF DEPARTMENTAL RELATIONSHPS
Ana 99-93413-s20a000