E7. Bid Award Recomendation City Shops2011' Avenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax. 406-758-7831 www.kalispelfcom /public works MEMORANDUM March 12, 2019 TO: Doug Russell, City Manager CC: Keith Haskins, PE — City Engineer Susie Turner, PE — Public Works Director FROM: Patrick Jentz, PE — Engineer 2 SUBJECT: City Shops Complex Asphalt Rehabilitation MEETING: March 18, 2019 BACKGROUND: The City Shops Complex Asphalt Rehabilitation is a planned Capital Improvement Project which will improve the degraded asphalt, stormwater system and stormwater treatment unit to meet current stormwater standards. A total of 658 feet of 6-inch and 8-inch pipe will be installed along with various catch basins and manholes. City crews will pave the parking lot upon completion of the stormwater improvements. The work was broken into a Base Bid and one Additive Alternate. Bids were received and opened on March 7, 2019 at 1:40 pm. Five responsive bids were received from local contractors. The bid results follow: Contractor Base Bid Additive Alternate Total Bid Price Cutting Edge Excavation, LLC $100,378.00 $47,096.00 $147,474.00 LHC, Inc $95,445.73 $58,807.76 $154,253.49 Sandry Construction $116,745.00 $50,029.00 $166,774.00 AGC, Inc. $117,226.00 $60,381.00 $177,607.00 Sapphire Construction Services LLC $136,872.00 $72,833.5 $209,705.50 Engineer's Estimate $108,840.00 90,605.00 $199,445.00 References for Cutting Edge Excavation, LLC were reviewed. Cutting Edge Excavation, LLC was determined to be a responsible contractor successfully completing projects of larger size and scope in Northwest Montana. ACTION REQUESTED: Award the Base Bid and Additive Alternate 1 for the City Shops Complex Asphalt Rehabilitation to Cutting Edge Excavation, LLC in the amount of $147,474.00. FISCAL EFFECTS: The project construction cost for installation of the stormwater infrastructure will be paid for from the Stormwater Fund Line Item 5349-453-430246-953 Shops Complex Project. There is $188,000 budgeted for the Shops Complex Project. ALTERNATIVES: As suggested and approved by the City Council.