Background and IntroductionI. Introduction and Background This application is submitted concurrently for Planned Unit Development (PUD) modification and Preliminary Plat approval within the City of Kalispell for Phase 2A through Phase 2D development The Silverbrook Estates project has been submitted for your review consists of approximately 325 acres. The property is generally located on the west side of Highway 93, north of the city limits of Kalispell, Montana. Phase 1 and 1 A have previously been submitted and approved. The PUD, annexation and first preliminary plat were approved in 2006. The property was previously used for production of agricultural crops. There are currently several buildings on the southeast corner of the site. These will be removed during demolition and improvement installation. The property is bordered to the north by Church Drive, to the south by agricultural land and residences, to the east by US Highway 93, and to the west by the Stillwater River. The application for Subdivision Preliminary Plat included here, contain all required information, with the "Adjoining Property Owner's List". This application includes an "Environmental Assessment" (EA) regarding existing conditions and anticipated effects of the proposed development on existing infrastructure and services. This EA was previously submitted and approved in 2006. The subjects covered include geology, surface water, vegetation, wildlife, agriculture and timber production, historical, and archaeological or cultural features. In addition, the application addresses such items as sewage, water, solid waste, drainage, roads, emergency services, schools, economic benefits, land use, parks and recreation facilities, and utilities. History of Project Planninq The Silverbrook Estates has been carefully planned with guidance and feedback from Planning Board members, City Council members, jurisdictional agencies, and the City of Kalispell Planning Staff. The planning and design process began in March of 2006. The Applicant has been carefully monitoring the City of Kalispell Growth Policy plan and its update as it applies to the project area. Throughout the process, the recommendations of the policy have been diligently adhered to. The Applicant then made a Pre -application presentation for Silverbrook Estates to the Planning Board work -session on June 13, 2006. On August 7t", the Applicant met with the Planning Staff to discuss the project in further detail, and then presented to the City Council work -session on August 14, 2006 once the Growth Policy was adopted. With the comments the Applicant then revised the design to incorporate any additional comments and concerns. Since 2006, the applicant has developed the first phase (Phase 1 and Phase 1A) according to the preliminary plat approved in January 2007. The project also included extending water and sewer north along Highway 93 from Grandview Station to Silverbrook Estates. It is also important to note that one significant item recommended in the Soils Report has been completed as a part of the initial grading construction. This was adjusting the slopes along the river bank located in Phase 2D. Silverbrook Estates