Loading...
2018 SIA/Kalispell Nat'l Investment Co/Bloomstone Ph 2o Return to: Aimee Brunckhorst Kalispell City Clerk 201 1" Avenue East Kalispell, MT 59901 1111111111111111111 IN2 0.18 Page?. g01874 IDof913 Debbie Pierson, Flathead County MT by DD 8/23/2018 12 04 PM APPENDIX E SUBDIVISION Ill OROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this Ce "!- day of 20_ff, by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, P of the First Part and hereinafter referred to as the CITY, and Kalispell National Investment Company, LLC (Name of Developer) a Montana limited liability company (Individual, Company or Corporation) located at 124 Swan Ridge Court, Kalispell, MT 69901 (Street Address/P. O. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. t� c-s WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as 1n Bloomstone, Phase 2 (Name of l Subdivision) located at Assessors Tract 5C ( Assessor's No. 0011734). SW 114 of Section 36, T29N, R22W. P.M.M., Flathead County, Montana (Location of Subdivision) and, WHEREAS, the City has conditioned it's approval of the final plat of Bloomstone, Phase 2 , upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A'; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B'; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $ 343,9W.70 NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $429.945.88 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $. 429.945.88 the estimated cost of completing the required improvements in ebm. Phase 2 (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by September 1 , 2018 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete, b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of two (2) years from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. Bloomstone, Phase 2, Kalispell National Investment Company, LLC (Name of Subdivision/Deve /Fir ) q by tjet Manager (Name) (Title) STATE OF MONTANA COUNTY OF Flathead On this 2g day of 'SuyNe- , 20 1$ ,before me, a Notary Public for the State of Montana, personally appeared Jim Davis known to me to be the Manager of Kalispell National Investment Company, LLc , whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year first above written. Notary Public r the to f Montana Printed Name -.gfiak Residing at My Commission Expires il- i- 7-02-C' MAYOR, CITY OF KALISPELL MAYOR HAILEY MAGSTADT tasGsl ��(ARIq{4p� NOTARY PUBLIC for the State of Montana * SEA.'- * Residing at Kalispell, Montana rFOF 1' My Commission Expires November 01, 2020 ATTEST: f CLERK i►-d�'`�s SEAL 1892 s e EXHIBIT A Conditions of approval as fixed to the preliminary plat by the City Council, Kalispell, Montana. EXHIBIT B This agreement specifically includes the following improvements, their projected construction completion date and estimated construction costs. CHECK CONSTRUCTION ESTIMATED PERCENTAGE APPROPRIATE COMPLETION CONSTRUCTION COMPLETE IMPROVEMENTS DATE COSTS Street Grading/Paving Street Base Sidewalks Curbs and Gutters Sanitary Sewers Mains Other ( ) On -Site Sewage Facilities Water Systems Mains Other ( ) On -Site Water Supply Water Storage Tanks Fire Hydrants Storm Sewer or Drainage Facilities Street Signs Street Lighting Street Monuments Survey Monument Boxes Landscaping/Boulevard trees Other ( ) SUBTOTAL FEES TOTALS COSTS TOTAL COLLATERAL (TOTALS COSTS X 125%) RESOLUTION NO.5840 A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF BLOOMSTONE SUBDIVISION PHASES 2-6, DESCRIBED AS A PORTION OF TRACT 5C IN THE SOUTHWEST QUARTER OF SECTION 36, TOWNSHIP 29 NORTH, RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA AND AS MORE PARTICULARLY DESCRIBED ON EXHIBIT "A". WHEREAS, Kalispell National Investment Company, LLC, the owners of the certain real property described above, have petitioned for approval of the Subdivision Plat of said property; and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on September 12, 2017, on the proposal and reviewed Subdivision Report #KPP-17-03 issued by the Kalispell Planning Department; and WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval of the Preliminary Plat of Bloomstone Subdivision, Phases 2-6, subject to certain conditions and recommendations; and WHEREAS, the City Council of the City of Kalispell at its regular Council Meeting of October 2, 2017, reviewed the Kalispell Planning Department Report #KPP-17-03, reviewed the recommendations of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-17-03 are hereby adopted as the Findings of Fact of the City Council. SECTION 2. That the application of Kalispell National Investment Company, LLC for approval of the Preliminary Plat of Bloomstone Subdivision, Phases 2-6, Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: Conditions: 1. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. 2. All applicable conditions within Ordinance 1635 (Bloomstone PUD) shall apply. EXHIBIT 3. The preliminary plat approval shall be valid for a period of three years from the date of approval. 4. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. 5. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. 6. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction. 7. The developer shall submit the street design to the Kalispell Public Works Department for review and approval prior to construction. 8. A letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. 9. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 10. Treeline Road shall be extended to Four Mile Drive with an all weather surface prior to final plat of Phase 2. 11, Treeline Road shall be fully improved to city standards prior to final plat of Phase 3. 12. The path along Four Mile Drive shall be extended to the eastern property boundary prior to final plat of Phase 4. 13. Four Mile Drive improvements that meet the requirements of the City of Kalispell Construction and Design Standards shall be completed prior to final plat of Phase 4. This includes a left turn lane at Treeline Road and Foxglove Drive. 14. Treeline Road and Foxglove Drive shall have 3 lanes at the intersection with Four Mile Drive. 15. No additional public or private accesses are permitted onto Four Mile Drive other than Treeline Road and Foxglove Drive. 16. The water line shall be looped through the remainder parcel between Treeline Road and Foxglove Drive prior to final plat of Phase 4. The water line shall be located within a city street. 17. A 12" water line shall be extended to the northwest corner of Lot 55 prior to final plat of Phase 3. The City of Kalispell is responsible for the upsizing of the water line from an 8" line to a 12" line. 18. The following requirements shall be met per the Kalispell Fire Department and so certified in writing by the Fire Department: a. Water mains designed to provide required fire flows shall be installed per city specifications at approved locations. Fire flows shall be in accordance with International Fire Code. b. Fire hydrants shall be provided per city specifications at locations approved by this department, prior to combustible construction. C. Fire Department access shall be provided in accordance with International Fire Code. d. Street naming shall be approved by the Fire Department. e. Addressing shall comply with the International Fire Code and Kalispell Fire Department Standard Operating Guidelines. f. Required fire flows shall be verified and approved by the Kalispell Fire Department prior to combustible construction. 19. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature 20. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 21. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. 22. A parks plan for the areas designated as "park and walking trail" shall be approved by the Parks and Recreation Director. 23. A park maintenance district shall be formed incorporating all the lots within the subdivision. The park maintenance district shall not be effective until such time as any open space or parks are accepted by the city. In this case an assessment would be levied within the maintenance district to be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 24. A homeowner's association (HOA) shall be formed and established for the common areas prior to final plat. 25. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal. 26. All utilities shall be installed underground. 27. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. SECTION 3. Upon proper review and filing of the Final Plat of said subdivision in the office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, THIS 2ND DAY OF OCTOBER, 2017. Mark Johnson Mayor ATTEST: iQF�t..z Ai ee Brunckhorst, CMC z ° City Clerk = SEAL EXHIBIT "A" Bloomstone Phases 2, 3, 4, 5, 6 & Remainder Legal Description: That portion of the SW 1/4 of Section 36, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana, described as follows: Commencing at the Center 1/4 Corner of Section 36; Thence along the North line of the SW 1/4 of Section 36, N 89°58'06" W 426.50 feet to a point lying on a 420.00 foot radius curve, concave Southeasterly, having a radial bearing of S 06° 13'22" E; Thence Southwesterly along said curve through a central angle of 83°50'46" along an arc length of 614.62 feet; Thence S 00004'08" E 152.23 feet to the POINT OF BEGINNING, said point being the beginning of a 280.00 foot radius curve to the right; Thence Southwesterly along the curve through a central angle of 58000'30" along an arc length of 283.48 feet; Thence S 57°56'22" W 128.37 feet to the beginning of a 220.00 foot radius curve to the left; Thence Southwesterly along the curve through a central angle of 57°56'22" along an arc length of 222.47 feet; Thence South 204.22 feet; Thence West 516.15 feet to the Easterly right of way of the Kalispell Bypass North as described in Document No. 20100009740; Thence S 03035'40" E 812.31 feet; Thence S 15° 13' 16" E 524.16 feet; Thence S 89°44'07" E 634.71 feet to the beginning of a 8,264.44 foot radius curve to the right; Thence Southeasterly along the curve through a central angle of 02°02'38" along an arc length of 292.62 feet to the beginning of a 8,264.44 foot radius curve to the left; Thence Northeasterly along the curve through a central angle of 03°31'56" along an arc length of 506.56 feet; Thence N 88046'00" E 16.33 feet; Thence N 00°04'05" W 1,656.65 feet; Thence S 89°48'52" E 24.85 feet; Thence N 00°04'05" W 277.14 feet; Thence N 89°54'46" W 801.47 feet; Thence N 00°04'08" W 91.72 feet to the POINT OF BEGINNING, containing 62.25 acres of land, all as shown hereon. Subject to and together with easements as shown. Subject to and together with easements of record. June 20, 2018 City of Kalispell Public Works PO Box 1997 Kalispell, MT 59903 406.758.7720 Re: Bloomstone Phase II Engineer's Estimate of Remaining Infrastructure Attached to this letter is an engineer's estimate of the costs to construct the remaining improvements for the Bloomstone Phase 2 Subdivision. The grand total is $343,956.70. Robert Smith, PE Project Engineer •.• --------- s •..•• 00 N rq A'•, t ROBERr sMIrH � (Pic o.�2592PEO �NSEp �. .• ONgL E��r EXHIBIT BLOOMSTONE PHASE 2 - REMAINING IMPROVEMENTS # IDESCRIPTION Q!.'ANTITY JUNIT I UNIT COST TOTAL COST STREET & SIDEWALKS I V ASPHALT 64,000 SF $ 1.73 $ 110,720.00 2 CURB & GUTTER 1,500 LF $ 13.81 $ 20,715.00 3 4" SIDEWALK 15,000 SF $ 3.53 $ 52,950.00 4 ADA RAMP 14 EA $ 474.47 $ 6,642,58 5 MH COLLARS 22 EA $ 476.53 $ 10,483.66 6 CB APRONS 6 EA $ 476.53 $ 2,859.18 7 VALVE COLLAR 9 EA $ 326.63 $ 2,939.67 8 MAILBOX CONCRETE 48 SF $ 4.88 $ 234.24 ELECTRICAL/COMM/GAS 9 ISINGLE PRASE VAULTS 5 EA $ 750.00 $ 3,750.00 10 LIGHT BASES VAULTS 8 EA $ 650.00 $ 5,200.00 11 3" CONDUIT 5,500 LF $ 1.90 $ 10,450M 12 2" CONDUIT 2,800 LF $ 1.12 $ 3,136.00 13 CONDUIT 2 X 1.25 REDUCER 11 EA $ 2.98 $ 32.78 14 ICONDUIT ROPE 10,000 LF $ 0.06 $ 6CO.00 15 CONDUIT 3" SWEEPS 70 EA $ 15.50 $ 1,085.00 16 CONDUIT 2" SWEEPS 40 EA $ 11.75 $ 470.00 17 CONDUIT WARNING TAPE 3 EA 1 $ 24.50 $ 73.50 PARK/GREEN SPACE 18 IRRIGATION CITY FEES 2.00 EA $ 10,000.00 $ 20,000,00 19 IRRIGATION SYSTEM 1.00 EA $ 11,250.00 $ 11,250.00 20 PARK AREA - SIDEWALK 5FT 3,373.00 SF $ 3.53 $ 11,906.69 21 PARK AREA - SIDEWALK BASE 6' 65.00 CY $ 59.36 $ 3,858.40 22 PARK AREA - TREES 56.00 EA $ 425.00 $ 23,800.00 23 PARK AREA - BBALL CT CONCRETE 2,500.00 SF $ 4.88 1 $ 12,200.00 24 PARK AREA - BBALL CT BASKETS 1.00 EA $ 2,000.00 $ 2,000.00 25 PARK AREA - SOD 70,000.00 SF $ 0.38 1 $ 26,600.00 GRAND TOTAL COSTS TO COMPLETE = $ 343,956.70 ASSIGNMENT This Assignment is made by and between Kalispell National Investment Company, LLC currently of 124 Swan Ridge Court, Kalispell, MT 59901 ("Assignor") and The City of Kalispell, Montana, P.O. Box 1997, Kalispell, Montana 59903, ("Assignee"). THE PARTIES AGREE AS FOLLOWS: RECITALS WHEREAS, Assignor is the owner of certain securities set forth in the attached and incorporated Exhibit "A" ("Securities"); and WHEREAS, Assignor and Assignee have entered into a Subdivision Improvement Agreement dated A-1., , 2018 ("SIA") regarding the development of a subdivision known as Bloomstone, ftase 2, located at Assessor's Tract 5C (Assessor's No. 001734), SW '/4 of Section 36, T29N, R22 W, P.M.M., Flathead County, Montana; and WHEREAS, one of the obligations of Assignor in the SIA is to provide a financial security of One Hundred Twenty Five percent (125%) of the estimated total cost of constructing certain improvements set forth in Exhibit A to the SIA ("Improvements"). In addition, the SIA further requires Assignor to deposit as collateral with the Assignee a Letter of Credit, or other acceptable collateral as determined by the Assignee, in the amount of Four Hundred Twenty Nine Thousand Nine Hundred Fourty Five Dollars and Eighty Eight Cents ($429,945.88), and that such Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: i. That the Creditor guarantees funds in the sum of $429,945.88, the estimated cost of completing the required improvements in Bloomstone, Phase 2. ii. That if Assignor fails to complete the specified improvements within the required period, the creditor will pay to the Assignee immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limit of credit stated in the letter; and WHEREAS, the date set for completion of the Improvements is September 1, 2018; and WHEREAS, in lieu of a Letter of Credit, Assignor and the Assignee agreed that Assignor, shall, on behalf of KNIC, execute an assignment document related to the Securities, which shall be held in escrow with Insured Titles, 1724 Fairview Avenue Suite C, Missoula, Montana, 59801 ("Escrow Agent"), pending completion of the Improvements or the expiration date set for completion of the Improvements; and EXHIBIT Is __2, t WHEREAS, Assignor and Assignee have agreed that upon Assignor's timely completion of the Improvements, and upon Assignor submitting to Escrow Agent an affidavit of completion executed by the Assignee, the Escrow Agent shall release the assignment document to Assignor. Assignor and Assignee have also agreed that if Assignor fails to timely complete the Improvements as required by the SIA, and upon the Assignee submitting to Escrow Agent an affidavit of non -completion, the Escrow Agent shall release the assignment document to the Assignee, and the Assignee shall be able to liquidate the Securities to the extent necessary to finance the completion of the Improvements up to the amount of $429,945.88, provided that the unused portion of any of the Securities, and any unused portion of funds obtained from liquidating any of the Securities, shall be transferred and assigned back to Assignee; and WHEREAS, Assignee, in the event that Assignor does not complete the Improvements by the expiration date set for completion of the Improvements, desires to assign the Securities to Assignee so that Assignee may liquidate the Securities to the extent necessary to finance the completion of the Improvements up to the amount of $429,945.88. NOW THEREFORE, in consideration of the mutual covenants contained in this agreement to assign, it is further agreed as follows: 1. Assignor, upon Assignee submitting to Escrow Agent an affidavit of non - completion after the date set for the completion of the Improvements has expired, and by these presents, assigns all of Assignor's right, title and interest in the Securities to Assignee. Assignee shall also be entitled to liquidate the Securities to the extent necessary to finance the completion of the Improvements up to the amount of $429,945.88, and any unused portion of any of the Securities, and any unused portion of funds obtained from liquidating any of the Securities, shall be transferred and assigned back to Assignor. 2. Assignor further agrees that this Assignment shall apply not only to the Securities as currently held, but also to any securities or cash for which they are traded as part of the management by Charles Schwab, and with the exception of trades and exchanges made as part of the management of the Securities, Assignor shall not liquidate any of the Securities. Assignor: Kalispell National Inves ent Company, LLC By: Dated: 92018 Its: AA dA d Assignee: Cit of Kalispell Dated: 7 2018 oug R , City Manager